The project of construction of Shibsha bridge over Shibsha river and Kaira bridge over Kaira river on 33rd k.m of Bethgram Tala-Paikghacha-kaira road has been approved by Honorable planning Adviser on 10 January 2008.
The DPP (Second Revised) has a total cost of 46.23 crore taka and the completion period of the project is from 200-2001 to 2009-2010.
|