LeftNavigation
  General Job Description  
  Specific Job Descriptions  
  Strategy  
  Operational Plan  
  Rules and Regulations  
  Operational Procedures  
  Databases  
  Active Tenders  
  Online Documents  
  RHD News  
  Search  
 
Construction of 2nd Meghna and 2nd Meghna-Gumti Bridge on Dhaka- Chittagong highway (Length: 930+1410=2340m).

 
 
Background of the Project: Dhaka - Chittagong highway directly connects Dhaka with the port city, Chittagong. After construction of Jamuna bridge the importance of this highway has become vital. Traffic volume is increasing rapidly day by day. The strategic road section between Dhaka and Dautkandi on Dhaka-chittagong highway is being widened in to 4-lane highway to cope up the increased traffic volume. At present the existing 2-lane Meghna and Meghna-Gumti bridge are not in a position to face the increased traffic volume.

Brief Description of the Project : a) The lengths of 2nd Meghna and 2nd Meghna-Gumti will be 930m and 1410m long respectively.Both the bridges will be 2-lane Prestressed Concrete bridges and will be constructed adjacent to the existing bridges.

Estimated Amount:

Total Estimated Amount is US $ 150.00 Million
 
 
 
 

Footer