List of ongoing works on the road ( N2 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Revenue  DPM 08(Eight)/EE, RHD/HRD/2008-2009  14-May-2009  7 Days  Road Rehablitation  LRP002  0 1.142     LRP002  5 1.147     Habiganj, (Division Office) 
 Revenue  WD 22(Twenty two)/2016-2017/EE, RHD/Sylhet  7-Jun-2017  15 Days  Pavement  LRP002  0 1.142     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  RFQ No. 03/2015-2016/EE, RHD/Sylhet, Lot No. 01  24-Aug-2015  7 Days  Pavement  LRP002  0 1.142     LRP192  0 191.174     Sylhet, (Division Office) 
 Revenue  10l/EE, RHD/Sylhet/2012-2013  8-Nov-2012  30 Days  Pavement  LRP002  0 1.142     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  36d/EE, RHD/Sylhet/2012-2013  23-Sep-2012  7 Days  Pavement  LRP002  0 1.142     LRP002  858 2     Sylhet, (Division Office) 
 Revenue  MZ(e-GP)-07/PMP(Road)/2014-2015  11-Dec-2014  180 Days  Carpeting  LRP002  1000 2.142     LRP073   73     Kishoreganj, (Division Office) 
 Revenue  36/2004-2005/EE.RHD/HRD (D to R)  17-May-2009  90 Days  Pavement  LRP002  9400 10.542     LRP111   110.556     Habiganj, (Division Office) 
 Revenue  DPM 13(Thirteen)/EE, RHD/HRD/2008-2009  17-May-2009  7 Days  Pavement  LRP002  10400 11.542     LRP002  10600 11.742     Habiganj, (Division Office) 
 Revenue  43/NRD/2014-2015  26-Oct-2014  7 Days  Pavement  LRPS  13600 13.6     LRPS  14000 14     Narayanganj, (Division Office) 
 Revenue  42/NRD/2014-2015  27-Oct-2014  7 Days  Pavement  LRPS  14000 14     LRPS  14400 14.4     Narayanganj, (Division Office) 
 Revenue  5/NRD/2015-2016  13-Jul-2015  30 Days  Pavement  LRPS  14500 14.5     LRPS  15600 15.6     Narayanganj, (Division Office) 
 Revenue  97/NRD/2012-2013  4-Dec-2012  25 Days  Pavement  LRPS  15500 15.5     LRPS  16000 16     Narayanganj, (Division Office) 
 Deposit Works  135/NRD/2006-2007  7-Jan-2007  25 Days  Road Embankment  LRPS  16350 16.35     LRPS  16500 16.5     Narayanganj, (Division Office) 
 Revenue  100/NRD/2013-2014  28-Oct-2013  7 Days  Pavement  LRPS  16600 16.6     LRPS  16850 16.85     Narayanganj, (Division Office) 
 Revenue  122/NRD/2013-2014  3-Feb-2014  20 Days  Pavement  LRPS  18100 18.1     LRPS  18850 18.85     Narayanganj, (Division Office) 
 Revenue  PMP 2009-10/06/Overlay  5-Apr-2010  726 Days  Overlay  LRP019   18.22     LRP019  800 19.02     Narayanganj, (Division Office) 
 Deposit Works  132/NRD/2006-2007  1-Feb-2007  25 Days  Pavement  LRPS  20000 20     LRPS  22000 22     Narayanganj, (Division Office) 
 Revenue  11/NRD/2011-2012  21-Nov-2011  15 Days  Pavement  LRPS  23000 23     LRPS  30000 30     Narayanganj, (Division Office) 
 Revenue  83/NRD/2015-2016  7-Oct-2015  7 Days  Pavement  LRPS  23250 23.25     LRPS  23350 23.35     Narayanganj, (Division Office) 
 Revenue  92/NRD/2013-2014  9-Oct-2013  7 Days  Pavement  LRPS  23500 23.5     LRPS  24500 24.5     Narayanganj, (Division Office) 
 Deposit Works  106/NRD/2006-2007  16-Jan-2007  30 Days  Pavement  LRPS  24000 24     LRPS  25000 25     Narayanganj, (Division Office) 
 Revenue  73/NRD/2015-2016  24-Sep-2015  7 Days  Pavement  LRPS  24085 24.085     LRPS  24130 24.13     Narayanganj, (Division Office) 
 Revenue  67/NRD/2015-2016  24-Sep-2015  7 Days  Pavement  LRPS  24130 24.13     LRPS  24185 24.185     Narayanganj, (Division Office) 
 Revenue  70/NRD/2015-2016  24-Sep-2015  7 Days  Pavement  LRPS  24185 24.185     LRPS  24250 24.25     Narayanganj, (Division Office) 
 Revenue  100/NRD/2015-2016  26-Oct-2015  7 Days  Pavement  LRPS  24350 24.35     LRPS  24420 24.42     Narayanganj, (Division Office) 
 Revenue  PMP 2009-10/06/Overlay  5-Apr-2010  726 Days  Overlay  LRP027   26.254     LRP030  595 29.854     Narayanganj, (Division Office) 
 Deposit Works  122/NRD/2006-2007  18-Jan-2007  30 Days  Pavement  LRPS  28000 28     LRPS  31000 31     Narayanganj, (Division Office) 
 Deposit Works  151/NRD/2006-2007  15-Feb-2007  30 Days  Pavement  LRPS  31000 31     LRPS  32500 32.5     Narayanganj, (Division Office) 
 Deposit Works  56/NRD/2006-2007  10-Jan-2007  30 Days  Road Embankment  LRPS  32000 32     LRPS  33000 33     Narayanganj, (Division Office) 
 Revenue  PMP 2009-10/06/Overlay  5-Apr-2010  726 Days  Overlay  LRP034  4512 37.83     LRP039   38.33     Narayanganj, (Division Office) 
 Revenue  PMP 2009-10/06/Overlay  5-Apr-2010  726 Days  Overlay  LRP034  4512 37.83     LRP039   38.33     Narayanganj, (Division Office) 
 Revenue  13/e-GP/EE/HRD/2016-2017/ 91317  3-May-2017  30 Days  Carpeting  LRP002  56000 57.142     LRP002  56800 57.942     Habiganj, (Division Office) 
 Revenue  172/EE/KRD/2007-08  26-Jun-2008  3 Days  Carpeting  LRP068  0 67.407     LRP073  0 73     Kishoreganj, (Division Office) 
 Revenue  110/EE/KRD/2007-08  9-Mar-2008  3 Days  Carpeting  LRP068  0 67.407     LRP073  0 73     Kishoreganj, (Division Office) 
 Revenue  91/EE/KRD/2009-2010  7-Jun-2010  5 Days  Carpeting  LRP073  0 73     LRP073  11000 84     Kishoreganj, (Division Office) 
 Revenue  108/EE/KRD/2008-09  22-Jun-2009  30 Days  Carpeting  LRP073  0 73     LRP073  1000 74     Kishoreganj, (Division Office) 
 Revenue  13/EE/KRD/2009-10  14-Jan-2010  3 Days  Carpeting  LRP073  0 73     LRP073  1000 74     Kishoreganj, (Division Office) 
 Revenue  23/EE/KRD/2010-11  13-Feb-2011  5 Days  Carpeting  LRP073  0 73     LRP073  500 73.5     Kishoreganj, (Division Office) 
 Revenue  53/EE/KRD/2011-12.  13-Sep-2011  15 Days  Carpeting  LRP073  0 73     LRP073  1000 74     Kishoreganj, (Division Office) 
 Revenue  112/EE/KRD/2008-09  22-Jun-2009  30 Days  Carpeting  LRP073  0 73     LRP073  87 73.087     Kishoreganj, (Division Office) 
 Revenue  14/EE/KRD/2013-14  30-Oct-2013  3 Days  Carpeting  LRP073  0 73     LRP073  1000 74     Kishoreganj, (Division Office) 
 Revenue  101/EE/KRD/2009- 2010.  14-Jun-2010  5 Days  Carpeting  LRP073  0 73     LRP073  100 73.1     Kishoreganj, (Division Office) 
 Revenue  24/EE/KRD/2010-11.  13-Feb-2011  5 Days  Carpeting  LRP073  0 73     LRP073  500 73.5     Kishoreganj, (Division Office) 
 Revenue  04/(OTM) EE. RHD. B-Baria /2008-2009 Lot No.-02.  4-Jan-2009  30 Days  Carpeting  LRP078  -4000 74     LRP109   108.549     Brahmanbaria, (Division Office) 
 Revenue  07/(OTM) EE. RHD. B-Baria. 2009-2010. Lot 07 (Seven).  14-Jan-2010  60 Days  Carpeting  LRP078  -3820 74.18     LRP109  201 108.75     Brahmanbaria, (Division Office) 
 Revenue  20/EE/KRD/2010-11  7-Feb-2011  3 Days  Carpeting  LRP073  9000 82     LRP073  10000 83     Kishoreganj, (Division Office) 
 Revenue  02/SE/MRC/2011-2012, Lot No. - 01 (one).  14-Mar-2012  180 Days  Carpeting  LRP073  10000 83     LRP073  12000 85     Kishoreganj, (Division Office) 
 Revenue  185/EE/KRD/2011-12  13-Jun-2012  365 Days  Carpeting  LRP073  12000 85     LRP073  13000 86     Kishoreganj, (Division Office) 
 Revenue  23.../EE/KRD/2010-11  13-Feb-2011  5 Days  Carpeting  LRP073  12000 85     LRP073  13000 86     Kishoreganj, (Division Office) 
 Revenue  80/EE/KRD/2008-09  27-Apr-2009  30 Days  Carpeting  LRP073  12001 85.001     LRP073  13000 86     Kishoreganj, (Division Office) 
 Revenue  80.../EE/KRD/2008-09  27-Apr-2009  30 Days  Carpeting  LRP073  12001 85.001     LRP073  13000 86     Kishoreganj, (Division Office) 
 Revenue  70/EE/KRD/2009-10.  28-Apr-2010  60 Days  Carpeting  LRP073  13000 86     LRP073  14000 87     Kishoreganj, (Division Office) 
 Revenue  86/EE/KRD-2007 - 08.  2-Mar-2008  3 Days  Carpeting  LRP068  19000 86.407     LRP073  15000 88     Kishoreganj, (Division Office) 
 Revenue  166/EE/KRD/2009-2010.  24-Jun-2010  5 Days  Carpeting  LRP073  14000 87     LRP073  14500 87.5     Kishoreganj, (Division Office) 
 Revenue  18/e-GP/PMP (Road)/ACE/RHD/Sylhet/2017-2018/151613  15-Mar-2018  274 Days  DBST  LRP002  99999 101.165     LRP146  984 146.025     Habiganj, (Division Office) 
 Revenue  e-GP19/RHD/HRD/2017-2018 (149734)  8-Mar-2018  30 Days  Carpeting  LRP110  0 108.906     LRP111  0 109.906     Habiganj, (Division Office) 
 Revenue  e-GP19/RHD/HRD/2017-2018 (149734)  8-Mar-2018  30 Days  Pavement  LRP110  0 108.906     LRP111  0 109.906     Habiganj, (Division Office) 
 Revenue  e-GP45/RHD/HRD/2017-2018 (194040)  3-Jun-2018  21 Days  Carpeting  LRP110  0 108.906     LRP112  819 111.73     Habiganj, (Division Office) 
 Revenue  e-GP20/RHD/HRD/2017-2018 (149735)  8-Mar-2018  30 Days  Carpeting  LRP110  0 108.906     LRP127  0 125.951     Habiganj, (Division Office) 
 Revenue  e-GP20/RHD/HRD/2017-2018 (149735)  8-Mar-2018  30 Days  Pavement  LRP110  0 108.906     LRP127  0 125.951     Habiganj, (Division Office) 
 Revenue  37/EE, RHD/HRD/2004-2005 (D to R)  17-May-2009  90 Days  Carpeting  LRP110  14 109.563     LRP126  2128 127.128     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP110  89 109.638     LRP111  582 111.138     Moulavi Bazar, (Division Office) 
 Revenue  02(Two)/SE/MRC/2011-2012  5-Jul-2011  210 Days  Overlay  LRP110  489 110.038     LRP110  589 110.138     Habiganj, (Division Office) 
 Revenue  02(Two)/SE/MRC/2011-2012  5-Jul-2011  210 Days  Overlay  LRP110  589 110.138     LRP110  989 110.538     Habiganj, (Division Office) 
 Revenue  41(Forty One)/2008-2009/EE, RHD/HRD  25-Jun-2009  30 Days  Carpeting  LRP111  47 110.603     LRP111  649 111.205     Habiganj, (Division Office) 
 Revenue  DPM 15(Fifteen)/ EE, HRD/HRD/2008-2009  17-May-2009  7 Days  Carpeting  LRP111  111 110.667     LRP111  114 110.67     Habiganj, (Division Office) 
 Revenue  DPM 14(Forteen)/EE, RHD/HRD/2008-2009  17-May-2009  7 Days  Carpeting  LRP111  115 110.671     LRP111  120 110.676     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP111  1182 111.738     LRP111  2182 112.738     Moulavi Bazar, (Division Office) 
 Revenue  e-GP46/RHD/HRD/2017-2018 (194041)  7-Jun-2018  21 Days  Carpeting  LRP113  339 112.25     LRP116  0 114.916     Habiganj, (Division Office) 
 Revenue  e-GP30/RHD/HRD/2017-2018 (177164)  10-May-2018  30 Days  Carpeting  LRP115  0 113.916     LRP116  0 114.916     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP111  3382 113.938     LRP111  3882 114.438     Moulavi Bazar, (Division Office) 
 Revenue  e-GP-10(ten)/ACE/SZ/2015-2016/28109  19-Nov-2015  408 Days  DBST  LRP116  126 115.126     LRP181  5570 185.57     Habiganj, (Division Office) 
 Revenue  02(Two)/SE/MRC/2011-2012  5-Jul-2011  210 Days  Overlay  LRP116  1962 116.962     LRP116  3738 118.738     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP116  3738 118.738     LRP116  4738 119.738     Moulavi Bazar, (Division Office) 
 Revenue  DPM- 83(Eighty Three)/HRD/2016-2017  15-Jun-2017  5 Days  Road Rehablitation  LRP120  0 118.921     LRP121  0 119.921     Habiganj, (Division Office) 
 Revenue  02(Two)/SE/MRC/2011-2012  5-Jul-2011  210 Days  Overlay  LRP116  4738 119.738     LRP116  5100 120.1     Habiganj, (Division Office) 
 Revenue  20(Twenty)/2011-2012/ E.E. RHD/ HRD  1-Mar-2012  30 Days  Carpeting  LRP121  0 120     LRP131  0 130     Habiganj, (Division Office) 
 Revenue  18(Eighteen)/2013-2014/ E.E. RHD/ HRD  29-Jan-2014  90 Days  Road Rehablitation  LRP121  0 120     LRP191  5000 195     Habiganj, (Division Office) 
 Revenue  e-GP/13/ACE/SZ/2013-2014/6747  5-May-2014  240 Days  DBST  LRP121  280 120.28     LRP146  900 145.9     Habiganj, (Division Office) 
 Revenue  DPM- 19(Nineteen)-2017-2018.  6-Aug-2017  3 Days  Carpeting  LRP122  0 120.921     LRP123  0 121.911     Habiganj, (Division Office) 
 Revenue  DPM- 19(Nineteen)-2017-18.  6-Aug-2017  3 Days  Pavement  LRP122  0 120.921     LRP123  0 121.911     Habiganj, (Division Office) 
 Revenue  02(Two)/SE/MRC/2011-2012  5-Jul-2011  210 Days  Overlay  LRP116  6200 121.2     LRP116  8560 123.56     Habiganj, (Division Office) 
 Revenue  30(Thirty)/2012-2013/ E.E. RHD/ HRD  21-Apr-2013  30 Days  Road Rehablitation  LRP121  1350 121.35     LRP131  1850 131.85     Habiganj, (Division Office) 
 Revenue  20/E(Twenty / E)/2011-2012/ E.E. RHD/ HRD  22-Mar-2012  30 Days  Road Rehablitation  LRP121  2000 122     LRP121  2600 122.6     Habiganj, (Division Office) 
 Revenue  35-G(Thirty Five-G)/2012-2013/ E.E. RHD/ HRD  18-Jun-2013  30 Days  Road Rehablitation  LRP121  2000 122     LRP151  3000 153     Habiganj, (Division Office) 
 Revenue  DPM- 09(Nine)/HRD/2016-17  17-Aug-2016  3 Days  Road Rehablitation  LRP121  4250 124.25     LRP121  4440 124.44     Habiganj, (Division Office) 
 Revenue  12(Twelve)/2012-2013/ E.E. RHD/ HRD  21-Oct-2012  30 Days  Carpeting  LRP121  4450 124.45     LRP161  1650 161.65     Habiganj, (Division Office) 
 Revenue  12(Twelve)/2008-2009/EE, RHD/HRD  11-Mar-2009  45 Days  Pavement  LRP126   125     LRP126  18 125.018     Habiganj, (Division Office) 
 Revenue  35-E(Thirty Five-E)/2012-2013/ E.E. RHD/ HRD  18-Jun-2013  30 Days  Road Rehablitation  LRP121  5000 125     LRP146  5000 150     Habiganj, (Division Office) 
 Revenue  DPM- 90(Ninety)/HRD/2016-17  18-Jun-2017  3 Days  Pavement  LRP127  0 125.951     LRP128  0 126.951     Habiganj, (Division Office) 
 Revenue  DPM- 52(Fifty-Two)/HRD/2016-17  8-Jan-2017  3 Days  Road Rehablitation  LRP126  1450 126.45     LRP126  2585 127.585     Habiganj, (Division Office) 
 Revenue  35-D(Thirty Five-D)/2012-2013/ E.E. RHD/ HRD  18-Jun-2013  90 Days  Pavement  LRP126  2800 127.8     LRP126  3150 128.15     Habiganj, (Division Office) 
 Revenue  e-GP21/RHD/HRD/2017-2018 (149738)  8-Mar-2018  30 Days  Carpeting  LRP129  44 128     LRP129  444 128.4     Habiganj, (Division Office) 
 Revenue  e-GP21/RHD/HRD/2017-2018 (149738)  8-Mar-2018  30 Days  Carpeting  LRP128  1049 128     LRP128  1449 128.4     Habiganj, (Division Office) 
 Revenue  e-GP21/RHD/HRD/2017-2018 (149738)  8-Mar-2018  30 Days  Carpeting  LRP130  24 129     LRP130  409 129.385     Habiganj, (Division Office) 
 Revenue  e-GP21/RHD/HRD/2017-2018 (149738)  8-Mar-2018  30 Days  Carpeting  LRP130  74 129.05     LRP130  414 129.39     Habiganj, (Division Office) 
 Revenue  e-GP21/RHD/HRD/2017-2018 (149738)  8-Mar-2018  30 Days  Carpeting  LRP130  124 129.1     LRP130  174 129.15     Habiganj, (Division Office) 
 Revenue  19(Nineteen)/2008-2009/EE, RHD/HRD (Final)  29-May-2009  30 Days  Surfacing  LRP131  0 130     LRP131  22 130.022     Habiganj, (Division Office) 
 Revenue  19(Nineteen) 2008-2009/EE, RHD/HRD (Final approved)  29-Apr-2009  30 Days  Carpeting  LRP131  0 130     LRP131  22 130.022     Habiganj, (Division Office) 
 Revenue  14-A(Fourteen-A)/2013-2014/ E.E. RHD/ HRD  6-Oct-2013  60 Days  Pavement  LRP126  5000 130     LRP126  5100 130.1     Habiganj, (Division Office) 
 Revenue  17/e-GP/EE/HRD/2014-2015  8-Mar-2015  30 Days  Carpeting  LRP131  1000 131     LRP136  1000 136     Habiganj, (Division Office) 
 Revenue  02(Two)/2011-2012/ E.E. RHD/ HRD  7-Jul-2011  150 Days  Pavement  LRP131  1779 131.779     LRP131  1879 131.879     Habiganj, (Division Office) 
 Revenue  09-A(Nine-A)/2012-2013/ E.E. RHD/ HRD  10-Sep-2012  30 Days  Road Rehablitation  LRP131  2250 132.25     LRP131  4200 134.2     Habiganj, (Division Office) 
 Revenue  13(Thirteen)/2013-2014/ E.E. RHD/ HRD  31-Jul-2013  60 Days  Carpeting  LRP131  3800 133.8     LRP146  4375 149.375     Habiganj, (Division Office) 
 Revenue  16-B(Sixteen-B)/2013-2014/ E.E. RHD/ HRD  15-Oct-2013  30 Days  Carpeting  LRP136  0 135     LRP146  3000 148     Habiganj, (Division Office) 
 Revenue  DPM. 02(Two)/EE, HRD/HRD/2009-2010  24-Dec-2009  7 Days  Road Rehablitation  LRP136  1 135.001     LRP136  750 135.75     Habiganj, (Division Office) 
 Revenue  DPM- 49(Forty-Nine)/HRD/2016-17  24-Nov-2016  3 Days  Road Rehablitation  LRP137  0 136.016     LRP139  979 139     Habiganj, (Division Office) 
 Revenue  DPM- 46(Forty-Six)/HRD/2016-17  23-Nov-2016  3 Days  Road Rehablitation  LRP140  0 139.031     LRP142  0 141.031     Habiganj, (Division Office) 
 Revenue  36(Thirty Six)/2008-2009/EE, RHD/HRD  17-Jun-2009  30 Days  Road Embankment  LRP141  71 140.071     LRP141  72 140.072     Habiganj, (Division Office) 
 Revenue  30/e-GP/EE/HRD/2016-2017/99628  24-May-2017  30 Days  Overlay  LRP141  200 140.2     LRP141  1069 141.069     Habiganj, (Division Office) 
 Revenue  RFQ-03(Three) EE.RHD.HRD-2017-2018.  26-Oct-2017  10 Days  Pavement  LRP141  964 141     LRP141  1894 141.93     Habiganj, (Division Office) 
 Revenue  RFQ No-03(Three) EE.RHD,HRD -2017-2018.  26-Oct-2017  10 Days  Pavement  LRP142  0 141.031     LRP142  899 141.93     Habiganj, (Division Office) 
 Revenue  03(Three)/2012-2013/ E.E. RHD/ HRD  10-Jul-2012  30 Days  Pavement  LRP141  1069 141.069     LRP141  1099 141.099     Habiganj, (Division Office) 
 Revenue  RFQ No-02(Two) EE.RHD,HRD -2017-2018.  26-Oct-2017  10 Days  Pavement  LRP142  899 141.93     LRP146  759 145.8     Habiganj, (Division Office) 
 Revenue  RFQ-02(Two) EE.RHD.HRD-2017-2018.  26-Oct-2017  10 Days  Pavement  LRP141  1894 141.93     LRP145  1769 145.8     Habiganj, (Division Office) 
 Revenue  26(Twenty Six)/2012-2013/ E.E. RHD/ HRD  13-Feb-2013  30 Days  Road Rehablitation  LRP141  2045 142.045     LRP141  2110 142.11     Habiganj, (Division Office) 
 Revenue  39(Thirty Nine)/2012-2013/ E.E. RHD/ HRD  23-Jun-2013  30 Days  Pavement  LRP141  2200 142.2     LRP141  2420 142.42     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP141  2230 142.23     LRP146  230 145.23     Moulavi Bazar, (Division Office) 
 Revenue  DPM- 93(Ninety Three)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP144  0 143.031     LRP145  0 144.031     Habiganj, (Division Office) 
 Revenue  39(Thirty Nine)/2012-2013/ E.E. RHD/ HRD  23-Jun-2013  30 Days  Pavement  LRP141  3300 143.3     LRP141  3600 143.6     Habiganj, (Division Office) 
 Revenue  27(Twenty Seven)/2012-2013/ E.E. RHD/ HRD  18-Feb-2013  60 Days  Carpeting  LRP141  4115 144.115     LRP141  4165 144.165     Habiganj, (Division Office) 
 Revenue  01(One)/2012-2013/ E.E. RHD/ HRD  2-Jul-2012  30 Days  Overlay  LRP141  4150 144.15     LRP141  4350 144.35     Habiganj, (Division Office) 
 Revenue  21(Twenty One)/2012-2013/ E.E. RHD/ HRD  20-Jan-2013  30 Days  Road Rehablitation  LRP131  14200 144.2     LRP131  14500 144.5     Habiganj, (Division Office) 
 Revenue  RFQ No-35(Thirty Five) EE.RHD,HRD -2010-2011.  7-Mar-2011  7 Days  Carpeting  LRP146  0 145     LRP146  145 145.145     Habiganj, (Division Office) 
 Revenue  RFQ No-44(Forty Four) EE.RHD,HRD -2010-2011.  15-Mar-2011  7 Days  Road Rehablitation  LRP141  5000 145     LRP141  50030 190.03     Habiganj, (Division Office) 
 Revenue  DPM- 94(Ninety Four)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP146  0 145.041     LRP147  0 146.046     Habiganj, (Division Office) 
 Revenue  10(Ten)/2010-2011/ E.E. RHD/ HRD  26-Dec-2010  644 Days  Carpeting  LRP146  77 145.077     LRP146  730 145.73     Habiganj, (Division Office) 
 Revenue  09(Nine)/2010-2011/ E.E. RHD/ HRD  21-Dec-2010  30 Days  Pavement  LRP146  360 145.36     LRP146  610 145.61     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP146  830 145.83     LRP146  2830 147.83     Moulavi Bazar, (Division Office) 
 Revenue  09-B(Nine-B)/2012-2013/ E.E. RHD/ HRD  10-Sep-2012  30 Days  Pavement  LRP146  1650 146.65     LRP156  1230 156.23     Habiganj, (Division Office) 
 Revenue  DPM- 05(Five)/HRD/2016-17  10-Aug-2016  3 Days  Road Rehablitation  LRP146  2000 147     LRP146  3000 148     Habiganj, (Division Office) 
 Revenue  14-B(Fourteen-B)/2013-2014/ E.E. RHD/ HRD  6-Oct-2013  30 Days  Road Rehablitation  LRP146  2000 147     LRP146  2100 147.1     Habiganj, (Division Office) 
 Revenue  DPM- 92(Ninety Two)/HRD/2016-17  18-Jun-2017  3 Days  Carpeting  LRP149  0 147.991     LRP150  0 149.001     Habiganj, (Division Office) 
 Revenue  DPM- 23(Twenty-Three)/HRD/2016-17  28-Aug-2016  3 Days  Road Rehablitation  LRP151  1000 151     LRP151  2000 152     Habiganj, (Division Office) 
 Revenue  DPM- 18(Eighteen)-2017-18.  6-Aug-2017  3 Days  Pavement  LRP153  0 152.031     LRP154  0 153.041     Habiganj, (Division Office) 
 Revenue  DPM- 18(Eighteen)-2017-2018.  6-Aug-2017  3 Days  Carpeting  LRP153  0 152.031     LRP154  0 153.041     Habiganj, (Division Office) 
 Revenue  RFQ No-04(Four) EE.RHD,HRD -2012-2013  10-Jun-2013  7 Days  Carpeting  LRP151  4150 154.15     LRP151  4230 154.23     Habiganj, (Division Office) 
 Revenue  37(Thirty Seven)/2012-2013/ E.E. RHD/ HRD  20-Jun-2013  30 Days  Road Rehablitation  LRP151  4225 154.225     LRP171  4120 174.12     Habiganj, (Division Office) 
 Revenue  38(Thirty Eight)/2012-2013/ E.E. RHD/ HRD  23-Jun-2013  60 Days  Carpeting  LRP156  50 155.05     LRP156  620 155.62     Habiganj, (Division Office) 
 Revenue  52/EE/KRD/2011-2012  14-Sep-2011  5 Days  Carpeting  LRP073  82500 155.5     LRP073  83000 156     Kishoreganj, (Division Office) 
 Revenue  DPM- 09(Nine)-2017-2018.  19-Jul-2017  3 Days  Carpeting  LRP157  0 156.061     LRP158  0 157.061     Habiganj, (Division Office) 
 Revenue  DPM- 09(Nine)-2017-18.  19-Jul-2017  3 Days  Road Rehablitation  LRP157  0 156.061     LRP158  0 157.061     Habiganj, (Division Office) 
 Revenue  41(Forty One)/2012-2013/ E.E. RHD/ HRD  23-Jun-2013  60 Days  Carpeting  LRP156  1370 156.37     LRP156  3690 158.69     Habiganj, (Division Office) 
 Revenue  54/EE/KRD/2011-2012  14-Sep-2011  5 Days  Carpeting  LRP073  83500 156.5     LRP073  84000 157     Kishoreganj, (Division Office) 
 Development  e-GP/11(eleven)/ACE/SZ/2014-2015(Re-tender)/28664  21-Oct-2015  548 Days  Carpeting  LRP156  3000 158     LRP171   170     Habiganj, (Division Office) 
 Revenue  DPM- 04(Four)-2017-18.  9-Jul-2017  3 Days  Road Rehablitation  LRP160  0 159.086     LRP161  0 160.091     Habiganj, (Division Office) 
 Revenue  DPM- 04(Four)-2017-2018.  9-Jul-2017  3 Days  Carpeting  LRP160  0 159.086     LRP161  0 160.091     Habiganj, (Division Office) 
 Revenue  13-D(Thirteen-D)/2013-2014/ E.E. RHD/ HRD  5-Aug-2013  30 Days  Pavement  LRP156  5000 160     LRP156  5080 160.08     Habiganj, (Division Office) 
 Revenue  DPM-05/HRD/2015-2016  21-Dec-2015  3 Days  Road Rehablitation  LRP156  5000 160     LRP161  1000 161     Habiganj, (Division Office) 
 Revenue  DPM-06/HRD/2015-2016  21-Dec-2015  3 Days  Pavement  LRP161  1000 161     LRP161  2000 162     Habiganj, (Division Office) 
 Revenue  07/B(Seven/B)/2011-2012/ E.E. RHD/ HRD  2-Nov-2011  60 Days  Pavement  LRP161  1000 161     LRP161  1178 161.178     Habiganj, (Division Office) 
 Revenue  15-A(Fifteen-A)/2013-2014/ E.E. RHD/ HRD  7-Oct-2013  30 Days  Carpeting  LRP161  2000 162     LRP176  0 175     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP161  3529 163.529     LRP161  5529 165.529     Moulavi Bazar, (Division Office) 
 Revenue  E-gp-01(One)EE/RHD/HRD/2013-2014  7-May-2014  30 Days  Road Rehablitation  LRP161  4450 164.45     LRP166  3950 168.95     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP166  4929 169.929     LRP171  1129 171.129     Moulavi Bazar, (Division Office) 
 Revenue  21/e-GP/EE/HRD/2014-2015  29-Mar-2015  30 Days  Carpeting  LRP166  5000 170     LRP176  1000 176     Habiganj, (Division Office) 
 Revenue  e-GP09/RHD/HRD/2017-2018 (131435)  7-Mar-2018  30 Days  Carpeting  LRP172  450 171.623     LRP176  350 175.618     Habiganj, (Division Office) 
 Revenue  02(Two)/2012-2013/ E.E. RHD/ HRD  2-Jul-2012  30 Days  Road Rehablitation  LRP176  0 175     LRP191  0 190     Habiganj, (Division Office) 
 Revenue  DPM- 99(Ninety Nine)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP176  0 175.268     LRP189  0 188.21     Habiganj, (Division Office) 
 Revenue  29/A(Twenty Nine/A)/2011-2012/ E.E. RHD/ HRD  21-Jun-2012  30 Days  Road Rehablitation  LRP176  1000 176     LRP176  2000 177     Habiganj, (Division Office) 
 Revenue  e-GP42/RHD/HRD/2017-2018 (194036)  11-Jun-2018  17 Days  Carpeting  LRP176  987 176.255     LRP176  1392 176.66     Habiganj, (Division Office) 
 Revenue  15(Fifteen)/2011-2012/ E.E. RHD/ HRD  23-Jan-2012  90 Days  Road Rehablitation  LRP171  7000 177     LRP181  5000 185     Habiganj, (Division Office) 
 Revenue  14-D(Fourteen-D)/2013-2014/ E.E. RHD/ HRD  6-Oct-2013  30 Days  Road Rehablitation  LRP176  2000 177     LRP191  500 190.5     Habiganj, (Division Office) 
 Revenue  19/A(Nineteen/A)/2011-2012/ E.E. RHD/ HRD  7-Feb-2012  30 Days  Road Rehablitation  LRP171  7000 177     LRP191  50000 240     Habiganj, (Division Office) 
 Revenue  05(Five)/2012-2013/ E.E. RHD/ HRD  26-Jul-2012  30 Days  Road Rehablitation  LRP176  2000 177     LRP191  14000 204     Habiganj, (Division Office) 
 Revenue  22/e-GP/EE/HRD/2016-2017/93229  11-May-2017  30 Days  Carpeting  LRP176  3000 178     LRP181  0 180     Habiganj, (Division Office) 
 Revenue  e-GP42/RHD/HRD/2017-2018 (194036)  11-Jun-2018  17 Days  Carpeting  LRP178  1115 178.19     LRP180  315 179.41     Habiganj, (Division Office) 
 Revenue  16/e-GP/EE/HRD/2014-2015  9-Mar-2015  30 Days  Road Rehablitation  LRP176  4000 179     LRP186  3000 188     Habiganj, (Division Office) 
 Revenue  DPM- 73(Seventy Three)/HRD/2016-17  14-Jun-2017  3 Days  Road Rehablitation  LRP180  0 179.095     LRP181  0 180.08     Habiganj, (Division Office) 
 Revenue  35-C(Thirty Five-C)/2012-2013/ E.E. RHD/ HRD  18-Jun-2013  60 Days  Pavement  LRP176  4200 179.2     LRP176  5000 180     Habiganj, (Division Office) 
 Revenue  e-GP-07(Seven)/ACE/SZ/2016-2017/83421.  24-Apr-2017  274 Days  Overlay  LRP178  2425 179.5     LRP185  385 184.57     Habiganj, (Division Office) 
 Revenue  e-GP42/RHD/HRD/2017-2018 (194036)  11-Jun-2018  17 Days  Carpeting  LRP180  575 179.67     LRP181  620 180.7     Habiganj, (Division Office) 
 Revenue  DPM- 96(Ninety Six)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP181  0 180.08     LRP182  0 181.13     Habiganj, (Division Office) 
 Revenue  DPM- 95(Ninety Five)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP181  0 180.08     LRP182  0 181.13     Habiganj, (Division Office) 
 Revenue  36(Thirty-Six)/ 2007-2008/EE, RHD/HRD  22-Jun-2008  7 Days  Carpeting  LRP181  500 180.5     LRP181  1000 181     Habiganj, (Division Office) 
 Revenue  19-B(Nineteen-B)/2012-2013/ E.E. RHD/ HRD  18-Dec-2012  90 Days  Road Rehablitation  LRP181  522 180.522     LRP181  612 180.612     Habiganj, (Division Office) 
 Revenue  RFQ No-81(Eighty One) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP181  1000 181     LRP181  1035 181.035     Habiganj, (Division Office) 
 Revenue  DPM- 74(Seventy Four)/HRD/2016-17  14-Jun-2017  3 Days  Road Rehablitation  LRP182  0 181.13     LRP183  0 182.18     Habiganj, (Division Office) 
 Revenue  42(Forty Two)/2008-2009/EE, RHD/HRD  25-Jun-2009  30 Days  Pavement  LRP181  1600 181.6     LRP181  1900 181.9     Habiganj, (Division Office) 
 Revenue  42(Forty Two)/2008-2009/EE, RHD/HRD  25-Jun-2009  30 Days  Pavement  LRP181  2100 182.1     LRP181  2800 182.8     Habiganj, (Division Office) 
 Revenue  DPM- 25(Twenty Five)-2017-18.  8-Aug-2017  3 Days  Pavement  LRP183  0 182.18     LRP184  0 183.18     Habiganj, (Division Office) 
 Revenue  42(Forty Two)/2008-2009/EE, RHD/HRD  25-Jun-2009  30 Days  Pavement  LRP181  3000 183     LRP181  3760 183.76     Habiganj, (Division Office) 
 Revenue  19/e-GP/EE/HRD/2016-2017/ 93228  11-May-2017  30 Days  Carpeting  LRP181  3000 183     LRP186  4000 189     Habiganj, (Division Office) 
 Revenue  RFQ No-81(Eighty One) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP181  3000 183     LRP181  3028 183.028     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP181  3129 183.129     LRP181  4570 184.57     Moulavi Bazar, (Division Office) 
 Revenue  DPM- 75(Seventy Five)/HRD/2016-17  14-Jun-2017  3 Days  Road Rehablitation  LRP184  0 183.18     LRP185  0 184.185     Habiganj, (Division Office) 
 Revenue  42(Forty Two)/2008-2009/EE, RHD/HRD  25-Jun-2009  30 Days  Pavement  LRP181  3450 183.45     LRP181  4700 184.7     Habiganj, (Division Office) 
 Revenue  2012-13/03/Overlay  19-Feb-2013  365 Days  Overlay  LRP181  4000 184     LRP191  14000 204     Habiganj, (Division Office) 
 Revenue  42(Forty Two)/2008-2009/EE, RHD/HRD  25-Jun-2009  30 Days  Pavement  LRP181  4200 184.2     LRP181  4700 184.7     Habiganj, (Division Office) 
 Revenue  29/A(Twenty Nine/A)/2011-2012/ E.E. RHD/ HRD  21-Jun-2012  30 Days  Road Rehablitation  LRP181  5000 185     LRP186  2800 187.8     Habiganj, (Division Office) 
 Revenue  DPM. 01(One)/EE, HRD/HRD/2009-2010  5-Nov-2009  7 Days  Road Embankment  LRP186  1 185.001     LRP186  750 185.75     Habiganj, (Division Office) 
 Revenue  e-GP-07(Seven)/ACE/SZ/2016-2017/83421.  24-Apr-2017  274 Days  Overlay  LRP186  400 185.57     LRP190  0 189.21     Habiganj, (Division Office) 
 Revenue  DPM-25/HRD/2015-2016  15-Jun-2016  3 Days  Road Rehablitation  LRP186  1085 186.085     LRP186  1091 186.091     Habiganj, (Division Office) 
 Revenue  DPM-26/HRD/2015-2016  15-Jun-2016  3 Days  Road Rehablitation  LRP186  1091 186.091     LRP186  1097 186.097     Habiganj, (Division Office) 
 Revenue  e-GP39/RHD/HRD/2017-2018 (184948)  28-May-2018  30 Days  Carpeting  LRP186  930 186.1     LRP188  30 187.24     Habiganj, (Division Office) 
 Revenue  e-GP39/RHD/HRD/2017-2018 (184948)  28-May-2018  30 Days  Carpeting  LRP187  20 186.25     LRP187  55 186.285     Habiganj, (Division Office) 
 Revenue  e-GP39/RHD/HRD/2017-2018 (184948)  28-May-2018  30 Days  Carpeting  LRP187  200 186.43     LRP187  250 186.48     Habiganj, (Division Office) 
 Revenue  RFQ No-80(Eighty) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP186  2000 187     LRP186  2020 187.02     Habiganj, (Division Office) 
 Revenue  PMP : 2009-10/23/DBST & Overlay  19-Aug-2010  360 Days  DBST  LRP186  2005 187.005     LRP186  3329 188.329     Moulavi Bazar, (Division Office) 
 Revenue  DPM- 99(Ninety Nine)/HRD/2016-2017  18-Jun-2017  3 Days  Road Rehablitation  LRP188  0 187.21     LRP189  0 188.21     Habiganj, (Division Office) 
 Revenue  RFQ No-80(Eighty) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP186  3000 188     LRP186  3028 188.028     Habiganj, (Division Office) 
 Revenue  DPM- 100(One Hundred)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP189  0 188.21     LRP190  1197 190.407     Habiganj, (Division Office) 
 Revenue  DPM- 76(Seventy Six)/HRD/2016-17  14-Jun-2017  3 Days  Road Rehablitation  LRP189  0 188.21     LRP190  0 189.21     Habiganj, (Division Office) 
 Revenue  5/e-GP/EE/HRD/2015-2016  6-Jan-2016  30 Days  Carpeting  LRP186  4000 189     LRP186  5000 190     Habiganj, (Division Office) 
 Revenue  DPM- 100(One Hundred)/HRD/2016-2017  18-Jun-2017  3 Days  Road Rehablitation  LRP190  0 189.21     LRP190  1790 191     Habiganj, (Division Office) 
 Revenue  79/EE/SRD/2007-2008  11-Sep-2007  5 Days  Pavement  LRP191  0 190     LRP192  0 191.174     Sylhet, (Division Office) 
 Revenue  147/EE/SRD/2007-2008  21-Nov-2007  3 Days  Road Embankment  LRP191  0 190     LRP192  0 191.174     Sylhet, (Division Office) 
 Revenue  96/EE/SRD/2007-2008  31-Oct-2007  45 Days  Carpeting  LRP191  0 190     LRP192  0 191.174     Sylhet, (Division Office) 
 Revenue  26/e-GP/EE/HRD/2014-2015  25-Mar-2015  30 Days  Carpeting  LRP191  0 190     LRP191  5000 195     Habiganj, (Division Office) 
 Revenue  234/EE/SRD/2007-2008  6-Nov-2007  5 Days  Carpeting  LRP191   190     LRP192   191.174     Sylhet, (Division Office) 
 Revenue  145/EE/SRD/2007-2008  27-Nov-2007  3 Days  Surfacing  LRP191  0 190     LRP192  0 191.174     Sylhet, (Division Office) 
 Revenue  143/EE/SRD/2007-2008  20-Nov-2007  3 Days  Pavement  LRP191  0 190     LRP192  0 191.174     Sylhet, (Division Office) 
 Revenue  DPM- 97(Ninety Seven)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP190  1825 191.035     LRP190  2590 191.8     Habiganj, (Division Office) 
 Revenue  RFQ No. 07/2015-2016/EE, RHD/Sylhet, Lot No. 02  30-Sep-2015  7 Days  Surfacing  LRP192  0 191.174     LRP204  0 203     Sylhet, (Division Office) 
 Development  15/EE/SRD/2008-2009  12-Aug-2008  5 Days  Pavement  LRP192  0 191.174     LRP197  0 196.174     Sylhet, (Division Office) 
 Development  SYL/DW-P1/2010-2011/Sylhet Zone  13-Jun-2011  365 Days  Overlay  LRP192  0 191.174     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  36t/EE, RHD/Sylhet/2013-2014  6-Feb-2014  60 Days  Surfacing  LRP192  0 191.174     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  e-GP/14/ACE/SZ/2013-2014/6730  12-May-2014  414 Days  DBST  LRP192  0 191.174     LRP215  3109 217.109     Sylhet, (Division Office) 
 Revenue  01/2017-2018  4-Jan-2018  10 Days  Carpeting  LRP192  0 191.21     LRP193  0 192.22     Sylhet, (Division Office) 
 Revenue  20/e-GP/PMP(Road)/ACE/RHD/Sylhet/2017-2018/153835  26-Apr-2018  272 Days  Overlay  LRP192  390 191.564     LRP215  1564 215.564     Sylhet, (Division Office) 
 Revenue  e-GP/04(Four)/ACE/SZ/2016-2017/83096  9-May-2017  275 Days  Overlay  LRP192  756 191.93     LRP220  2968 221.968     Sylhet, (Division Office) 
 Revenue  12(Twelve)/SE, RHD/Sylhet/2015-2016  25-Jan-2016  45 Days  Pavement  LRP192  826 192     LRP192  1826 193     Sylhet, (Division Office) 
 Revenue  WD 23(Twenty three))/2015-2016/EE, RHD/Sylhet  31-Mar-2016  60 Days  Pavement  LRP192  826 192     LRP192  1826 193     Sylhet, (Division Office) 
 Revenue  RFQ No-80(Eighty) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP191  2000 192     LRP191  2029 192.029     Habiganj, (Division Office) 
 Revenue  RFQ No. 04/2015-2016/EE, RHD/Sylhet, Lot No. 02  27-Aug-2015  7 Days  Carpeting  LRP192  838 192.012     LRP192  898 192.072     Sylhet, (Division Office) 
 Revenue  e-GP/08(Eight)/ACE/SZ/2015-2016/28105  12-Jan-2016  354 Days  Surfacing  LRP192  1326 192.5     LRP209  3890 211.89     Sylhet, (Division Office) 
 Revenue  30/e-GP/EE/HRD/2014-2015  5-May-2015  30 Days  Road Rehablitation  LRP191  2950 192.95     LRP191  3000 193     Habiganj, (Division Office) 
 Revenue  RFQ No-54(Fifty Four) EE.RHD,HRD -2010-2011.  1-Jun-2011  7 Days  Carpeting  LRP191  3000 193     LRP191  3380 193.38     Habiganj, (Division Office) 
 Revenue  RFQ No-57(Fifty Seven) EE.RHD,HRD -2010-2011.  1-Jun-2011  7 Days  Carpeting  LRP191  3000 193     LRP191  3071 193.071     Habiganj, (Division Office) 
 Revenue  19/e-GP/EE/HRD/2015-2016  28-Feb-2016  30 Days  Road Rehablitation  LRP191  3000 193     LRP191  3500 193.5     Habiganj, (Division Office) 
 Revenue  RFQ No-03(Three) SDE.RHD,HRD -2011-2012  27-May-2012  7 Days  Carpeting  LRP191  3000 193     LRP191  3057 193.057     Habiganj, (Division Office) 
 Revenue  RFQ No-56(Fifty Six) EE.RHD,HRD -2010-2011.  1-Jun-2011  7 Days  Carpeting  LRP191  3000 193     LRP191  3267 193.267     Habiganj, (Division Office) 
 Revenue  RFQ No-55(Fifty Five) EE.RHD,HRD -2010-2011.  1-Jun-2011  7 Days  Carpeting  LRP191  3000 193     LRP191  3072 193.072     Habiganj, (Division Office) 
 Revenue  04(Four)/2011-2012/ E.E. RHD/ HRD  21-Jul-2011  30 Days  Carpeting  LRP191  3000 193     LRP191  12000 202     Habiganj, (Division Office) 
 Revenue  RFQ No-01(One) SDE.RHD,HRD -2011-2012  11-Jan-2012  7 Days  Carpeting  LRP191  3000 193     LRP191  3057 193.057     Habiganj, (Division Office) 
 Revenue  RFQ No-02(Two) SDE.RHD,HRD -2011-2012  18-Mar-2012  7 Days  Carpeting  LRP191  3000 193     LRP191  3057 193.057     Habiganj, (Division Office) 
 Revenue  DPM- 98(Ninety Eight)/HRD/2016-17  18-Jun-2017  3 Days  Road Rehablitation  LRP190  3945 193.155     LRP190  4674 193.884     Habiganj, (Division Office) 
 Revenue  RFQ No-79(Seventy Nine) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP191  4000 194     LRP191  4035 194.035     Habiganj, (Division Office) 
 Revenue  RFQ No-79(Seventy Nine) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP191  4000 194     LRP191  4028 194.028     Habiganj, (Division Office) 
 Revenue  13/e-GP/EE/HRD/2015-2016  11-Jan-2016  30 Days  Carpeting  LRP191  4000 194     LRP191  8000 198     Habiganj, (Division Office) 
 Revenue  11/e-GP/EE/HRD/2014-2015  28-Feb-2015  30 Days  Carpeting  LRP191  5000 195     LRP191  5780 195.78     Habiganj, (Division Office) 
 Revenue  6/e-GP/EE/HRD/2015-2016  6-Jan-2016  30 Days  Carpeting  LRP191  6000 196     LRP191  7000 197     Habiganj, (Division Office) 
 Revenue  RFQ No-77(Seventy Seven) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP191  6100 196.1     LRP191  6782 196.782     Habiganj, (Division Office) 
 Revenue  WD 03(Three)/2017-2018/EE, RHD/Sylhet  29-Oct-2017  30 Days  Pavement  LRP197  0 196.174     LRP197  1316 197.49     Sylhet, (Division Office) 
 Revenue  44(Forty Four)/2012-2013/ E.E. RHD/ HRD  28-Jun-2013  60 Days  Pavement  LRP191  8000 198     LRP191  9000 199     Habiganj, (Division Office) 
 Revenue  DPM-15/HRD/2015-2016  15-May-2016  3 Days  Pavement  LRP110  89451 199     LRP191  10000 200     Habiganj, (Division Office) 
 Revenue  30/e-GP/EE/HRD/2015-2016  26-Jun-2016  4 Days  Carpeting  LRP191  10000 200     LRP191  11000 201     Habiganj, (Division Office) 
 Revenue  RFQ No-78(Seventy Eight) EE.RHD,HRD -2010-2011.  12-Jun-2011  7 Days  Road Rehablitation  LRP191  10700 200.7     LRP191  11380 201.38     Habiganj, (Division Office) 
 Revenue  e-GP/09/EE/MRD/2017-2018/125162  17-Jan-2018  30 Days  Carpeting  LRP192  11090 202.3     LRP192  11540 202.75     Moulavi Bazar, (Division Office) 
 Revenue  e-GP/04/EE/MRD/2015-2016/33459  7-Jan-2016  60 Days  Surfacing  LRP192  11190 202.4     LRP192  13160 204.37     Moulavi Bazar, (Division Office) 
 Revenue  75d/EE, RHD/Sylhet/2013-2014  12-Nov-2013  3 Days  Pavement  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  99/EE, RHD/Sylhet/2010-2011  2-Sep-2010  5 Days  Surfacing  LRP204  0 203     LRP209  0 208     Sylhet, (Division Office) 
 Revenue  249d/EE, RHD/Sylhet/2013-2014  22-Jun-2014  3 Days  Pavement  LRP204  0 203     LRP204  500 203.5     Sylhet, (Division Office) 
 Revenue  231/EE/SRD/2007-2008  25-Nov-2007  5 Days  Carpeting  LRP204  0 203     LRP209  0 208     Sylhet, (Division Office) 
 Revenue  80/EE, RHD/Sylhet/2009-2010  24-Nov-2009  5 Days  Surfacing  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  99/EE/SRD/2007-2008  31-Oct-2007  45 Days  Pavement  LRP204  0 203     LRP226  0 225     Sylhet, (Division Office) 
 Revenue  28t/EE, RHD/Sylhet/2013-2014  16-Jan-2014  65 Days  Pavement  LRP204   203     LRP226  3000 228     Sylhet, (Division Office) 
 Revenue  13d/EE, RHD/Sylhet/2012-2013  12-Jul-2012  3 Days  Pavement  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  187/EE, RHD/Sylhet/2009-2010  17-Jan-2010  5 Days  Surfacing  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  175d/EE, RHD/Sylhet/2013-2014  30-Mar-2014  3 Days  Carpeting  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  282d/EE, RHD/Sylhet/2013-2014  25-Jun-2014  3 Days  Surfacing  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  e-GP/09/EE/MRD/2017-2018/125162  17-Jan-2018  30 Days  Carpeting  LRP192  11790 203     LRP192  12360 203.57     Moulavi Bazar, (Division Office) 
 Revenue  72/EE,RHD/Sylhet/2011-2012  21-Sep-2011  3 Days  Surfacing  LRP204   203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  37/EE, RHD/Sylhet/2009-2010  20-Aug-2009  5 Days  Surfacing  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  193/EE/SRD/2007-2008  1-Jan-2008  21 Days  Surfacing  LRP204  0 203     LRP204  1000 204     Sylhet, (Division Office) 
 Revenue  264d/EE, RHD/Sylhet/2013-2014  19-Jun-2014  3 Days  Pavement  LRP204  0 203     LRP204  500 203.5     Sylhet, (Division Office) 
 Revenue  RFQ No-22(Twenty Two) EE.RHD,HRD -2009-2010.  24-Jun-2010  7 Days  Road Rehablitation  LRP186  18700 203.7     LRP186  18800 203.8     Habiganj, (Division Office) 
 Revenue  44t/EE, RHD/Sylhet/2013-2014  25-Feb-2014  60 Days  Surfacing  LRP204  1000 204     LRP239  1098 239     Sylhet, (Division Office) 
 Revenue  02r/EE, RHD/Sylhet/2014-2015  3-Feb-2015  7 Days  Pavement  LRP204  1000 204     LRP204  2000 205     Sylhet, (Division Office) 
 Revenue  01r/EE, RHD/Sylhet/2014-2015  3-Feb-2015  7 Days  Pavement  LRP204  1000 204     LRP204  2000 205     Sylhet, (Division Office) 
 Revenue  15l/EE, RHD/Sylhet/2012-2013  20-Dec-2012  30 Days  Pavement  LRP204  1000 204     LRP204  2000 205     Sylhet, (Division Office) 
 Revenue  264d/EE, RHD/Sylhet/2014-2015  24-Sep-2014  7 Days  Pavement  LRP204  1800 204.8     LRP204  1950 204.95     Sylhet, (Division Office) 
 Revenue  146/EE/SRD/2008-2009  7-May-2009  5 Days  Surfacing  LRP204  2000 205     LRP204  3000 206     Sylhet, (Division Office) 
 Revenue  10l/EE, RHD/Sylhet/2013-2014  30-Jul-2013  30 Days  Pavement  LRP204  2000 205     LRP239  1098 239     Sylhet, (Division Office) 
 Revenue  284d/EE, RHD/Sylhet/2013-2014  25-Jun-2014  3 Days  Surfacing  LRP204  2000 205     LRP204  3000 206     Sylhet, (Division Office) 
 Revenue  101d/EE, RHD/Sylhet/2013-2014  2-Dec-2013  3 Days  Surfacing  LRP204  2000 205     LRP204  4000 207     Sylhet, (Division Office) 
 Revenue  06t/EE, RHD/Sylhet/2013-2014  12-Nov-2013  30 Days  Pavement  LRP204  2000 205     LRP237  1098 237     Sylhet, (Division Office) 
 Revenue  PMP 2008-2009/09/Overlay  2-Apr-2009  727 Days  Overlay  LRP204  2070 205.07     LRP234  108 233     Sylhet, (Division Office) 
 Revenue  04t/EE, RHD/Sylhet/2013-2014  3-Jul-2013  7 Days  Pavement  LRP204  3000 206     LRP209  5000 213     Sylhet, (Division Office) 
 Revenue  13l/EE, RHD/Sylhet/2013-2014  11-Aug-2013  30 Days  Pavement  LRP204  3000 206     LRP209  6000 214     Sylhet, (Division Office) 
 Revenue  210d/EE, RHD/Sylhet/2012-2013  11-Jun-2013  7 Days  Surfacing  LRP204  3000 206     LRP204  4000 207     Sylhet, (Division Office) 
 Revenue  WD 04(Four)/2017-2018/EE, RHD/Sylhet  29-Oct-2017  30 Days  Pavement  LRP209  0 208     LRP209  2597 210.597     Sylhet, (Division Office) 
 Revenue  283d/EE, RHD/Sylhet/2013-2014  25-Jun-2014  3 Days  Surfacing  LRP209  0 208     LRP209  1000 209     Sylhet, (Division Office) 
 Revenue  268/EE/SRD/2007-2008  8-Jan-2008  7 Days  Surfacing  LRP209  0 208     LRP215  0 214     Sylhet, (Division Office) 
 Revenue  109d/EE, RHD/Sylhet/2013-2014  4-Dec-2013  3 Days  Surfacing  LRP204  5400 208.4     LRP220  1500 220.5     Sylhet, (Division Office) 
 Revenue  220d/EE, RHD/Sylhet/2014-2015  14-Oct-2014  3 Days  Surfacing  LRP209  1000 209     LRP209  3000 211     Sylhet, (Division Office) 
 Revenue  115d/EE, RHD/Sylhet/2013-2014  2-Dec-2013  3 Days  Surfacing  LRP209  1000 209     LRP209  4000 212     Sylhet, (Division Office) 
 Revenue  188/EE, RHD/Sylhet/2011-2012  2-Apr-2012  3 Days  Surfacing  LRP209  1000 209     LRP209  2000 210     Sylhet, (Division Office) 
 Revenue  261d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Surfacing  LRP209  1000 209     LRP209  3000 211     Sylhet, (Division Office) 
 Revenue  71l/EE, RHD/Sylhet/2012-2013  18-Jun-2013  15 Days  Pavement  LRP209  1000 209     LRP226  3000 228     Sylhet, (Division Office) 
 Revenue  WD 06(Six)/2017-2018/EE, RHD/Sylhet/118192  9-Nov-2017  45 Days  Pavement  LRP209  3376 211.376     LRP215  1418 215.418     Sylhet, (Division Office) 
 Revenue  e-GP/09(Nine)/ACE/SZ/2015-2016/28107  7-Jan-2016  180 Days  DBST  LRP209  4700 212.7     LRP220  6050 225.05     Sylhet, (Division Office) 
 Revenue  05t/EE, RHD/Sylhet/2013-2014  4-Jul-2013  7 Days  Pavement  LRP209  5000 213     LRP215  4000 218     Sylhet, (Division Office) 
 Revenue  27l/EE, RHD/Sylhet/2012-2013  12-Feb-2013  30 Days  Pavement  LRP215  0 214     LRP226  0 225     Sylhet, (Division Office) 
 Revenue  19/EE, RHD/Sylhet/2010-2011  8-Sep-2010  7 Days  Surfacing  LRP215  0 214     LRP220  0 219     Sylhet, (Division Office) 
 Revenue  14l/EE, RHD/Sylhet/2013-2014  11-Aug-2013  30 Days  Pavement  LRP215  1000 215     LRP226  2000 227     Sylhet, (Division Office) 
 Revenue  79/EE, RHD/Sylhet/2010-2011  30-Sep-2010  7 Days  Surfacing  LRP204  12000 215     LRP215  2000 216     Sylhet, (Division Office) 
 Revenue  169/EE, RHD/Sylhet/2011-2012  14-Mar-2012  3 Days  Surfacing  LRP215  2000 216     LRP215  3000 217     Sylhet, (Division Office) 
 Revenue  45t/EE, RHD/Sylhet/2012-2013  2-Jun-2013  7 Days  Pavement  LRP215  6000 220     LRP220  6000 225     Sylhet, (Division Office) 
 Revenue  108d/EE, RHD/Sylhet/2013-2014  5-Dec-2013  3 Days  Surfacing  LRP197  26226 222.4     LRP238  2899 239.8     Sylhet, (Division Office) 
 Revenue  RFQ No. 04/2015-2016/EE, RHD/Sylhet, Lot No. 01  27-Aug-2015  7 Days  Surfacing  LRP220  4000 223     LRP220  5000 224     Sylhet, (Division Office) 
 Revenue  363/EE/SRD/2007-2008  22-Apr-2008  45 Days  Surfacing  LRP226  0 225     LRP226  1000 226     Sylhet, (Division Office) 
 Revenue  e-GP/08/ACE/SZ/2014-2015/11863  28-Dec-2014  180 Days  DBST  LRP226  51 225.051     LRP233  1106 233.001     Sylhet, (Division Office) 
 Revenue  46t/EE, RHD/Sylhet/2012-2013  30-May-2013  7 Days  Pavement  LRP226  1000 226     LRP237  1098 237     Sylhet, (Division Office) 
 Revenue  159d/EE, RHD/Sylhet/2013-2014  9-Mar-2014  7 Days  Surfacing  LRP226  2000 227     LRP226  4000 229     Sylhet, (Division Office) 
 Revenue  54t/EE, RHD/Sylhet/2013-2014  30-Jan-2014  90 Days  Pavement  LRP226  2000 227     LRP226  3000 228     Sylhet, (Division Office) 
 Revenue  100/EE/SRD/2007-2008  6-Nov-2007  30 Days  Pavement  LRP226  3000 228     LRP226  4000 229     Sylhet, (Division Office) 
 Revenue  268d/EE, RHD/Sylhet/2012-2013  17-Jun-2013  7 Days  Surfacing  LRP226  3000 228     LRP237  1098 237     Sylhet, (Division Office) 
 Revenue  PMP 2006-07/15/ DBST & Overlay  7-Jun-2007  150 Days  Overlay  LRP226  3000 228     LRP231  1000 231     Sylhet, (Division Office) 
 Revenue  WD 06(Six)/2016-2017/EE, RHD/Sylhet  8-Dec-2016  50 Days  Pavement  LRP226  3000 228     LRP231  0 230     Sylhet, (Division Office) 
 Revenue  35t/EE, RHD/Sylhet/2013-2014  6-Feb-2014  60 Days  Pavement  LRP226  4000 229     LRP231  0 230     Sylhet, (Division Office) 
 Revenue  WD 18(Eighteen)/2017-2018/EE, RHD/Sylhet/139869  22-Feb-2018  30 Days  Pavement  LRP226  4599 229.599     LRP226  4893 229.893     Sylhet, (Division Office) 
 Revenue  PMP 2012-2013/01/Overlay  19-Feb-2013  360 Days  Overlay  LRP226  4880 229.88     LRP283  2222 284.09     Sylhet, (Division Office) 
 Revenue  WD 16(Sixteen)/2017-2018/EE, RHD/Sylhet/139867  22-Feb-2018  30 Days  Pavement  LRP226  4893 229.893     LRP226  4990 229.99     Sylhet, (Division Office) 
 Revenue  126/EE, RHD/Sylhet/2009-2010  15-Dec-2009  7 Days  Surfacing  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  281/EE/SRD/2008-2009  21-Jun-2009  7 Days  Surfacing  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  505/EE/SRD/2007-2008  8-Jun-2008  5 Days  Pavement  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  278/EE/SRD/2008-2009  7-Jun-2009  7 Days  Pavement  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  12l/EE, RHD/Sylhet/2013-2014  7-Aug-2013  30 Days  Pavement  LRP231  0 230     LRP238  1099 238     Sylhet, (Division Office) 
 Revenue  WD 12(Twelve)/2017-2018/EE, RHD/Sylhet/144697  20-Feb-2018  30 Days  Pavement  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  312/EE/SRD/2008-2009  24-Jun-2009  3 Days  Surfacing  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  309/EE/SRD/2008-2009  24-Jun-2009  5 Days  Surfacing  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  WD 10(Ten)/2016-2017/EE, RHD/Sylhet  28-Feb-2017  60 Days  Carpeting  LRP231  0 230     LRP260  0 258.985     Sylhet, (Division Office) 
 Development  EDDRP/ADB/SLZ/SYL/N-01  3-Jun-2008  576 Days  Road Rehablitation  LRP231  0 230     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  351/EE/SRD/2007-2008  19-Mar-2008  3 Days  Road Embankment  LRP231  0 230     LRP234  0 232.892     Sylhet, (Division Office) 
 Development  14/EE/SRD/2008-2009  7-Aug-2008  5 Days  Pavement  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  45/EE, RHD/Sylhet/2010-2011  12-Sep-2010  7 Days  Pavement  LRP231  0 230     LRP233  0 231.895     Sylhet, (Division Office) 
 Revenue  15/EE,RHD/Sylhet/2011-2012  21-Aug-2011  7 Days  Surfacing  LRP231  95 230.095     LRP231  120 230.12     Sylhet, (Division Office) 
 Revenue  16/EE,RHD/Sylhet/2011-2012  21-Aug-2011  7 Days  Surfacing  LRP231  120 230.12     LRP231  146 230.146     Sylhet, (Division Office) 
 Revenue  07t/EE, RHD/Sylhet/2012-2013  24-Dec-2012  60 Days  Pavement  LRP231  1000 231     LRP233  1105 233     Sylhet, (Division Office) 
 Revenue  235/EE/SRD/2008-2009  16-Jun-2009  5 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  479/EE/SRD/2007-2008  22-Apr-2008  5 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  279/EE/SRD/2008-2009  23-Jun-2009  5 Days  Surfacing  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  72/EE/SRD/2008-2009  24-Nov-2008  5 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  352/EE/SRD/2007-2008  9-Apr-2008  3 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  94/EE/SRD/2008-2009  17-Dec-2008  5 Days  Surfacing  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  431/EE/SRD/2007-2008  26-May-2008  3 Days  Surfacing  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  293/EE/SRD/2008-2009  26-May-2009  7 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  RFQ No. 09/2015-2016/EE, RHD/Sylhet, Lot No. 02  3-Nov-2015  7 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  489/EE/SRD/2007-2008  1-Jun-2008  3 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  319d/EE, RHD/Sylhet/2012-2013  27-Jun-2013  5 Days  Pavement  LRP233   231.895     LRP234   232.892     Sylhet, (Division Office) 
 Revenue  376/EE/SRD/2007-2008  28-Apr-2008  5 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  19/e-GP/PMP(Road)/ACE/RHD/Sylhet/2017-2018/151580  18-Mar-2018  274 Days  Overlay  LRP233   231.895     LRP269   267.985     Sylhet, (Division Office) 
 Revenue  117/EE/SRD/2008-2009  22-Jan-2009  5 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  508/EE/SRD/2007-2008  9-Jun-2008  5 Days  Pavement  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  58/EE/SRD/2007-2008  5-Sep-2007  5 Days  Surfacing  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  209/EE/SRD/2008-2009  26-Apr-2009  5 Days  Surfacing  LRP233  0 231.895     LRP234  0 232.892     Sylhet, (Division Office) 
 Revenue  65/EE/SRD/2008-2009  2-Dec-2008  150 Days  Surfacing  LRP233  15 231.91     LRP233  480 232.375     Sylhet, (Division Office) 
 Revenue  100/EE/SRD/2007-2008  6-Nov-2007  30 Days  Pavement  LRP231  2000 232     LRP231  3000 233     Sylhet, (Division Office) 
 Development  13/EE/SRD/2008-2009  10-Aug-2008  5 Days  Pavement  LRP234  0 232.892     LRP235  0 233.905     Sylhet, (Division Office) 
 Revenue  331/EE/SRD/2008-2009  24-Jun-2009  5 Days  Surfacing  LRP234  0 232.892     LRP235  0 233.905     Sylhet, (Division Office) 
 Revenue  RFQ No. 09/2015-2016/EE, RHD/Sylhet, Lot No. 01  3-Nov-2015  7 Days  Carpeting  LRP234  0 232.892     LRP235  0 233.905     Sylhet, (Division Office) 
 Revenue  374/EE/SRD/2007-2008  10-Apr-2008  3 Days  Pavement  LRP234  0 232.892     LRP235  0 233.905     Sylhet, (Division Office) 
 Revenue  PMP 2007-08/13/ DBST  27-Mar-2008  734 Days  DBST  LRP234  108 233     LRP269  615 268.6     Sylhet, (Division Office) 
 Revenue  115d/EE, RHD/Sylhet/2012-2013  25-Jan-2013  3 Days  Road Embankment  LRP234  108 233     LRP235  95 234     Sylhet, (Division Office) 
 Revenue  22t/EE, RHD/Sylhet/2013-2014  9-Jan-2014  25 Days  Pavement  LRP233  1105 233     LRP238  1099 238     Sylhet, (Division Office) 
 Revenue  PMP 2009-2010/25/DBST & Overlay  18-Aug-2010  591 Days  Overlay  LRP234  108 233     LRP244  84 243     Sylhet, (Division Office) 
 Revenue  356/EE/SRD/2007-2008  6-Apr-2008  3 Days  Pavement  LRP235  0 233.905     LRP236  0 234.895     Sylhet, (Division Office) 
 Revenue  WD 13(Thirteen)/2017-2018/EE, RHD/Sylhet/144698  6-Mar-2018  30 Days  Pavement  LRP235  0 233.905     LRP251  0 249.953     Sylhet, (Division Office) 
 Revenue  350/EE/SRD/2008-2009  18-Jun-2009  3 Days  Surfacing  LRP235  0 233.905     LRP236  0 234.895     Sylhet, (Division Office) 
 Revenue  PMP 2008-2009/09/Overlay  2-Apr-2009  727 Days  Overlay  LRP235  0 233.905     LRP251  0 249.953     Sylhet, (Division Office) 
 Revenue  321/EE/SRD/2007-2008  19-Feb-2008  3 Days  Surfacing  LRP235  0 233.905     LRP236  0 234.895     Sylhet, (Division Office) 
 Revenue  200d/EE, RHD/Sylhet/2012-2013  17-Jun-2013  7 Days  Pavement  LRP234  1108 234     LRP235  1095 235     Sylhet, (Division Office) 
 Revenue  262d/EE, RHD/Sylhet/2012-2013  19-Jun-2013  7 Days  Surfacing  LRP235  95 234     LRP236  105 235     Sylhet, (Division Office) 
 Revenue  332d/EE, RHD/Sylhet/2012-2013  27-Jun-2013  5 Days  Pavement  LRP234  1108 234     LRP235  1095 235     Sylhet, (Division Office) 
 Revenue  162/EE/SRD/2008-2009  10-May-2009  7 Days  Surfacing  LRP236  0 234.895     LRP237  0 235.902     Sylhet, (Division Office) 
 Revenue  271/EE/SRD/2008-2009  23-Jun-2009  5 Days  Pavement  LRP236  0 234.895     LRP237  0 235.902     Sylhet, (Division Office) 
 Revenue  09l/EE, RHD/Sylhet/2012-2013  8-Nov-2012  30 Days  Pavement  LRP236   234.895     LRP280   278.874     Sylhet, (Division Office) 
 Revenue  176/EE, RHD/Sylhet/2009-2010  30-Dec-2009  7 Days  Surfacing  LRP236  0 234.895     LRP237  0 235.902     Sylhet, (Division Office) 
 Revenue  277/EE/SRD/2008-2009  25-Jun-2009  5 Days  Surfacing  LRP236  0 234.895     LRP237  0 235.902     Sylhet, (Division Office) 
 Revenue  353d/EE, RHD/Sylhet/2014-2015  14-Oct-2014  3 Days  Carpeting  LRP236  0 234.895     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  47l/EE, RHD/Sylhet/2012-2013  20-Jun-2013  15 Days  Pavement  LRP235  1095 235     LRP237  1098 237     Sylhet, (Division Office) 
 Revenue  79d/EE, RHD/Sylhet/2013-2014  19-Nov-2013  7 Days  Pavement  LRP235  1095 235     LRP236  1105 236     Sylhet, (Division Office) 
 Revenue  292d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Surfacing  LRP235  1095 235     LRP236  1105 236     Sylhet, (Division Office) 
 Revenue  187/EE, RHD/Sylhet/2011-2012  2-Apr-2012  3 Days  Surfacing  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  236/EE, RHD/Sylhet/2009-2010  24-Feb-2010  7 Days  Surfacing  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  310/EE/SRD/2008-2009  24-Jun-2009  5 Days  Surfacing  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  27d/EE, RHD/Sylhet/2014-2015  14-Jul-2014  7 Days  Pavement  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  267/EE/SRD/2008-2009  25-May-2009  5 Days  Surfacing  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  252d/EE, RHD/Sylhet/2014-2015  14-Oct-2014  3 Days  Pavement  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  75d/EE, RHD/Sylhet/2012-2013  1-Jan-2013  5 Days  Surfacing  LRP237  0 235.902     LRP238  0 236.901     Sylhet, (Division Office) 
 Revenue  290d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Pavement  LRP235  2095 236     LRP237  1098 237     Sylhet, (Division Office) 
 Revenue  100/EE/SRD/2007-2008  6-Nov-2007  30 Days  Pavement  LRP237  98 236     LRP238  99 237     Sylhet, (Division Office) 
 Revenue  229/EE/SRD/2008-2009  2-Jun-2009  5 Days  Pavement  LRP238  0 236.901     LRP241  0 239.908     Sylhet, (Division Office) 
 Revenue  345/EE/SRD/2008-2009  23-Jun-2009  3 Days  Pavement  LRP238  0 236.901     LRP239  0 237.902     Sylhet, (Division Office) 
 Revenue  327d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Surfacing  LRP237  1098 237     LRP238  1099 238     Sylhet, (Division Office) 
 Revenue  326d/EE, RHD/Sylhet/2012-2013  17-Jun-2013  7 Days  Surfacing  LRP237  1098 237     LRP238  1099 238     Sylhet, (Division Office) 
 Revenue  69d/EE, RHD/Sylhet/2013-2014  18-Nov-2013  7 Days  Surfacing  LRP237  1098 237     LRP238  1099 238     Sylhet, (Division Office) 
 Revenue  319/EE, RHD/Sylhet/2008-2009  7-Jul-2009  542 Days  Pavement  LRP238  767 237.668     LRP239  14 237.916     Sylhet, (Division Office) 
 Revenue  321/EE/SRD/2008-2009  21-Jun-2009  3 Days  Surfacing  LRP239  0 237.902     LRP240  0 238.907     Sylhet, (Division Office) 
 Revenue  08/e-GP/PMP(Road)/ACE/RHD/Sylhet/2017-2018/126270  4-Feb-2018  272 Days  Overlay  LRP238  1099 238     LRP244  1384 244.3     Sylhet, (Division Office) 
 Revenue  238/EE, RHD/Sylhet/2011-2012  10-Apr-2012  3 Days  Surfacing  LRP240  0 238.907     LRP241  0 239.908     Sylhet, (Division Office) 
 Revenue  239/EE, RHD/Sylhet/2011-2012  10-Apr-2012  3 Days  Surfacing  LRP240  0 238.907     LRP241  0 239.908     Sylhet, (Division Office) 
 Revenue  23/EE, RHD/Sylhet/2009-2010  18-Aug-2009  5 Days  Pavement  LRP240   238.907     LRP241   239.908     Sylhet, (Division Office) 
 Revenue  37l/EE, RHD/Sylhet/2012-2013  22-May-2013  10 Days  Pavement  LRP240  0 238.907     LRP241  0 239.908     Sylhet, (Division Office) 
 Revenue  83/EE, RHD/Sylhet/2010-2011  3-Oct-2010  7 Days  Pavement  LRP240  0 238.907     LRP241  0 239.908     Sylhet, (Division Office) 
 Revenue  100/EE/SRD/2007-2008  6-Nov-2007  30 Days  Pavement  LRP240  93 239     LRP241  92 240     Sylhet, (Division Office) 
 Revenue  17l/EE, RHD/Sylhet/2013-2014  19-Sep-2013  30 Days  Pavement  LRP239  1098 239     LRP240  1093 240     Sylhet, (Division Office) 
 Revenue  92d/EE, RHD/Sylhet/2013-2014  27-Nov-2013  3 Days  Surfacing  LRP240  1093 240     LRP241  1092 241     Sylhet, (Division Office) 
 Revenue  49/EE, RHD/Sylhet/2010-2011  28-Sep-2010  7 Days  Pavement  LRP243  0 241.915     LRP245  0 243.916     Sylhet, (Division Office) 
 Revenue  61t/EE, RHD/Sylhet/2013-2014  7-Jan-2014  60 Days  Pavement  LRP243  0 241.915     LRP267  0 265.986     Sylhet, (Division Office) 
 Revenue  50/EE, RHD/Sylhet/2010-2011  28-Sep-2010  7 Days  Pavement  LRP243   241.915     LRP245   243.916     Sylhet, (Division Office) 
 Revenue  252/EE/SRD/2008-2009  20-May-2009  30 Days  Pavement  LRP243  0 241.915     LRP244  0 242.916     Sylhet, (Division Office) 
 Revenue  10t/EE, RHD/Sylhet/2012-2013  31-Jan-2013  60 Days  Pavement  LRP242  1088 242     LRP243  1085 243     Sylhet, (Division Office) 
 Revenue  105d/EE, RHD/Sylhet/2013-2014  28-Nov-2013  7 Days  Pavement  LRP242  1088 242     LRP243  1085 243     Sylhet, (Division Office) 
 Revenue  251/EE/SRD/2007-2008  22-Jan-2008  30 Days  Pavement  LRP244  0 242.916     LRP245  0 243.916     Sylhet, (Division Office) 
 Revenue  467/EE/SRD/2007-2008  3-Mar-2008  5 Days  Carpeting  LRP244  0 242.916     LRP246  0 244.943     Sylhet, (Division Office) 
 Revenue  51/EE, RHD/Sylhet/2010-2011  28-Sep-2010  7 Days  Pavement  LRP244  0 242.916     LRP245  0 243.916     Sylhet, (Division Office) 
 Revenue  e-GP 08/EE, RHD/Sylhet/2014-2015  19-Jan-2015  30 Days  Pavement  LRP244  1380 244.296     LRP245  400 244.316     Sylhet, (Division Office) 
 Revenue  22l/EE, RHD/Sylhet/2012-2013  29-Jan-2013  30 Days  Pavement  LRP246  0 244.943     LRP263  0 261.987     Sylhet, (Division Office) 
 Revenue  354/EE/SRD/2007-2008  13-Mar-2008  3 Days  Pavement  LRP246  0 244.943     LRP247  0 245.944     Sylhet, (Division Office) 
 Development  74/EE/SRD/2006-2007  13-Dec-2006  10 Days  Road Rehablitation  LRP247  0 245.944     LRP249  0 247.95     Sylhet, (Division Office) 
 Revenue  106d/EE, RHD/Sylhet/2013-2014  2-Dec-2013  7 Days  Pavement  LRP246  1057 246     LRP237  11098 247     Sylhet, (Division Office) 
 Revenue  136/EE,RHD/Sylhet/2011-2012  3-Oct-2011  7 Days  Pavement  LRP248  0 246.949     LRP249  0 247.95     Sylhet, (Division Office) 
 Revenue  251/EE/SRD/2007-2008  22-Jan-2008  30 Days  Pavement  LRP248  0 246.949     LRP249  0 247.95     Sylhet, (Division Office) 
 Revenue  251/EE/SRD/2007-2008  22-Jan-2008  30 Days  Pavement  LRP249  0 247.95     LRP250  0 248.952     Sylhet, (Division Office) 
 Revenue  129/EE, RHD/Sylhet/2010-2011  9-Feb-2011  30 Days  Pavement  LRP249  0 247.95     LRP250  0 248.952     Sylhet, (Division Office) 
 Revenue  e-GP/15/ACE/SZ/2013-2014/6746  6-May-2014  240 Days  Pavement  LRP248  1051 248     LRP260  1051 260.036     Sylhet, (Division Office) 
 Revenue  51l/EE, RHD/Sylhet/2012-2013  20-Jun-2013  10 Days  Pavement  LRP250  0 248.952     LRP251  0 249.953     Sylhet, (Division Office) 
 Revenue  46/EE, RHD/Sylhet/2010-2011  19-Sep-2010  7 Days  Pavement  LRP251  0 249.953     LRP258  0 256.983     Sylhet, (Division Office) 
 Revenue  137/EE,RHD/Sylhet/2011-2012  3-Oct-2011  7 Days  Pavement  LRP251  0 249.953     LRP253  0 251.973     Sylhet, (Division Office) 
 Revenue  251/EE/SRD/2007-2008  22-Jan-2008  30 Days  Pavement  LRP251  0 249.953     LRP253  0 251.973     Sylhet, (Division Office) 
 Revenue  101d/EE, RHD/Sylhet/2012-2013  30-Dec-2012  5 Days  Surfacing  LRP250  1048 250     LRP261  1008 261     Sylhet, (Division Office) 
 Revenue  23/EE,RHD/Sylhet/2011-2012  27-Jul-2011  5 Days  Pavement  LRP253  0 251.973     LRP253  27 252     Sylhet, (Division Office) 
 Revenue  131d/EE, RHD/Sylhet/2012-2013  2-May-2013  7 Days  Pavement  LRP253  27 252     LRP253  1027 253     Sylhet, (Division Office) 
 Revenue  125d/EE, RHD/Sylhet/2012-2013  23-Apr-2013  7 Days  Pavement  LRP253  27 252     LRP253  1027 253     Sylhet, (Division Office) 
 Revenue  99d/EE, RHD/Sylhet/2013-2014  2-Dec-2013  7 Days  Pavement  LRP251  2047 252     LRP253  1027 253     Sylhet, (Division Office) 
 Revenue  171/EE, RHD/Sylhet/2011-2012  3-Oct-2011  7 Days  Surfacing  LRP253  27 252     LRP253  1027 253     Sylhet, (Division Office) 
 Revenue  60t/EE, RHD/Sylhet/2013-2014  6-Jan-2014  90 Days  Pavement  LRP254  0 252.976     LRP257  0 255.981     Sylhet, (Division Office) 
 Revenue  110/EE, RHD/Sylhet/2011-2012  28-Dec-2011  30 Days  Carpeting  LRP251  3023 252.976     LRP255  1521 255.5     Sylhet, (Division Office) 
 Revenue  133/EE, RHD/Sylhet/2011-2012  28-Dec-2011  30 Days  Pavement  LRP255  1521 255.5     LRP258  1017 258     Sylhet, (Division Office) 
 Revenue  116d/EE, RHD/Sylhet/2013-2014  2-Dec-2013  7 Days  Pavement  LRP256  1020 256     LRP257  1019 257     Sylhet, (Division Office) 
 Revenue  122d/EE, RHD/Sylhet/2012-2013  23-Apr-2013  7 Days  Pavement  LRP257  1019 257     LRP258  1017 258     Sylhet, (Division Office) 
 Revenue  48l/EE, RHD/Sylhet/2012-2013  20-Jun-2013  15 Days  Road Embankment  LRP257  1019 257     LRP258  1017 258     Sylhet, (Division Office) 
 Revenue  175/EE, RHD/Sylhet/2011-2012  14-Feb-2012  30 Days  Carpeting  LRP258  1017 258     LRP261  1988 261.98     Sylhet, (Division Office) 
 Revenue  291d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Pavement  LRP248  11051 258     LRP259  977 259     Sylhet, (Division Office) 
 Revenue  251/EE/SRD/2007-2008  22-Jan-2008  30 Days  Pavement  LRP260  0 258.985     LRP261  0 259.992     Sylhet, (Division Office) 
 Revenue  e-GP/05(Five)/ACE/SZ/2015-2016/28101  5-Jan-2016  180 Days  DBST  LRP261  0 259.992     LRP267  0 265.986     Sylhet, (Division Office) 
 Revenue  251/EE/SRD/2007-2008  22-Jan-2008  30 Days  Pavement  LRP262  0 260.99     LRP263  0 261.987     Sylhet, (Division Office) 
 Revenue  272/EE, RHD/Sylhet/2011-2012  22-Mar-2012  30 Days  Pavement  LRP262  0 260.99     LRP266  0 264.977     Sylhet, (Division Office) 
 Revenue  289d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Pavement  LRP261  1008 261     LRP262  1010 262     Sylhet, (Division Office) 
 Revenue  85/EE, RHD/Sylhet/2010-2011  3-Oct-2010  7 Days  Pavement  LRP263  0 261.987     LRP264  0 262.985     Sylhet, (Division Office) 
 Revenue  23l/EE, RHD/Sylhet/2012-2013  31-Jan-2013  30 Days  Pavement  LRP263  1013 263     LRP266  1023 266     Sylhet, (Division Office) 
 Revenue  135/EE,RHD/Sylhet/2011-2012  3-Oct-2011  7 Days  Pavement  LRP263  1913 263.9     LRP264  1515 264.5     Sylhet, (Division Office) 
 Revenue  30l/EE, RHD/Sylhet/2012-2013  22-Jan-2013  20 Days  Pavement  LRP265  0 263.984     LRP277  0 275.878     Sylhet, (Division Office) 
 Revenue  87/EE, RHD/Sylhet/2010-2011  3-Oct-2010  7 Days  Pavement  LRP265   263.984     LRPE   286.409     Sylhet, (Division Office) 
 Revenue  e-GP 09/EE, RHD/Sylhet/2014-2015  8-Feb-2015  30 Days  Pavement  LRP265  0 263.984     LRP277  0 275.878     Sylhet, (Division Office) 
 Revenue  162d/EE, RHD/Sylhet/2014-2015  12-Oct-2014  3 Days  Carpeting  LRP266  0 264.977     LRP267  0 265.986     Sylhet, (Division Office) 
 Revenue  29l/EE, RHD/Sylhet/2012-2013  22-Jan-2013  10 Days  Pavement  LRP266  0 264.977     LRP268  0 266.985     Sylhet, (Division Office) 
 Revenue  100/EE,RHD/Sylhet/2011-2012  18-Aug-2011  7 Days  Pavement  LRP265  1566 265.55     LRP266  1023 266     Sylhet, (Division Office) 
 Revenue  163d/EE, RHD/Sylhet/2014-2015  8-Oct-2014  3 Days  Surfacing  LRP267  0 265.986     LRP268  0 266.985     Sylhet, (Division Office) 
 Revenue  213/EE/SRD/2007-2008  22-Jan-2008  21 Days  Carpeting  LRP267  0 265.986     LRP268  0 266.985     Sylhet, (Division Office) 
 Revenue  113d/EE, RHD/Sylhet/2012-2013  4-Apr-2013  3 Days  Pavement  LRP268  15 267     LRP269  15 268     Sylhet, (Division Office) 
 Revenue  142d/EE, RHD/Sylhet/2013-2014  5-Feb-2014  3 Days  Pavement  LRP269  0 267.985     LRP270  0 269.047     Sylhet, (Division Office) 
 Revenue  24l/EE, RHD/Sylhet/2012-2013  31-Jan-2013  30 Days  Pavement  LRP270  0 269.047     LRP278  0 276.876     Sylhet, (Division Office) 
 Revenue  58/EE,RHD/Sylhet/2011-2012  18-Sep-2011  7 Days  Pavement  LRP269  1465 269.45     LRP270  953 270     Sylhet, (Division Office) 
 Revenue  WD 30(Thirty)/2017-2018/EE, RHD/Sylhet/162155  15-May-2018  40 Days  Pavement  LRP271  0 269.925     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  202/EE, RHD/Sylhet/2011-2012  14-Feb-2012  30 Days  Pavement  LRP271  0 269.925     LRP273  0 271.881     Sylhet, (Division Office) 
 Revenue  09(Nine)/SE, RHD/Sylhet/2015-2016  7-Jan-2016  60 Days  Pavement  LRP271  0 269.925     LRP280  0 278.874     Sylhet, (Division Office) 
 Revenue  131/EE, RHD/Sylhet/2010-2011  7-Feb-2011  30 Days  Pavement  LRP270  998 270.045     LRP270  1498 270.545     Sylhet, (Division Office) 
 Revenue  12(Twelve)/SE, RHD/Sylhet/2014-2015  21-Apr-2015  45 Days  Pavement  LRP270  1155 270.202     LRP270  1555 270.602     Sylhet, (Division Office) 
 Revenue  DPM 14(Fourteen)/2016-2017/EE, RHD/Sylhet  4-Jun-2017  5 Days  Pavement  LRP272  0 270.882     LRP273  0 271.881     Sylhet, (Division Office) 
 Revenue  WD 20(Twenty)/2015-2016/EE, RHD/Sylhet  31-Mar-2016  60 Days  Pavement  LRP272  0 270.882     LRP281  0 279.869     Sylhet, (Division Office) 
 Revenue  PMP 2007-08/13/ DBST  27-Mar-2008  734 Days  DBST  LRP272  318 271.2     LRP281  131 280     Sylhet, (Division Office) 
 Revenue  213/EE/SRD/2007-2008  22-Jan-2008  21 Days  Carpeting  LRP273  0 271.881     LRP274  0 272.877     Sylhet, (Division Office) 
 Revenue  S 01(One)/2017-2018/EE, RHD/Sylhet  6-Feb-2018  7 Days  Pavement  LRP273  0 271.881     LRP274  0 272.877     Sylhet, (Division Office) 
 Revenue  42l/EE, RHD/Sylhet/2012-2013  26-May-2013  10 Days  Pavement  LRP272  1118 272     LRP274  1123 274     Sylhet, (Division Office) 
 Revenue  301d/EE, RHD/Sylhet/2014-2015  14-Oct-2014  3 Days  Pavement  LRP274  0 272.877     LRP275  0 273.879     Sylhet, (Division Office) 
 Revenue  143d/EE, RHD/Sylhet/2013-2014  5-Feb-2014  3 Days  Pavement  LRP274  0 272.877     LRP275  0 273.879     Sylhet, (Division Office) 
 Revenue  300d/EE, RHD/Sylhet/2014-2015  14-Oct-2014  3 Days  Pavement  LRP275  0 273.879     LRP276  0 274.859     Sylhet, (Division Office) 
 Revenue  18/EE, RHD/Sylhet/2010-2011  3-Oct-2010  7 Days  Pavement  LRP275  0 273.879     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  138/EE, RHD/Sylhet/2011-2012  18-Aug-2011  7 Days  Pavement  LRP274  1333 274.21     LRP274  1378 274.255     Sylhet, (Division Office) 
 Revenue  347/EE/SRD/2007-2008  12-Sep-2007  5 Days  Surfacing  LRP276  0 274.859     LRP277  0 275.878     Sylhet, (Division Office) 
 Revenue  06/EE, RHD/Sylhet/2011-2012  14-Jul-2011  7 Days  Pavement  LRP276  719 275.578     LRP276  1021 275.88     Sylhet, (Division Office) 
 Revenue  321d/EE, RHD/Sylhet/2013-2014  26-Jun-2014  3 Days  Pavement  LRP277  0 275.878     LRP278  0 276.876     Sylhet, (Division Office) 
 Revenue  213/EE/SRD/2007-2008  22-Jan-2008  21 Days  Carpeting  LRP277  0 275.878     LRP281  0 279.869     Sylhet, (Division Office) 
 Revenue  32l/EE, RHD/Sylhet/2012-2013  20-Feb-2013  30 Days  Pavement  LRP277  0 275.878     LRP282  0 280.87     Sylhet, (Division Office) 
 Revenue  273/EE, RHD/Sylhet/2010-2011  26-May-2011  7 Days  Pavement  LRP275  2089 275.968     LRP276  1291 276.15     Sylhet, (Division Office) 
 Revenue  WD 01(One)/2016-2017/EE, RHD/Sylhet  20-Dec-2016  60 Days  Pavement  LRP278  0 276.876     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  RFQ No. 05/2015-2016/EE, RHD/Sylhet, Lot No. 03  13-Sep-2015  7 Days  Pavement  LRP279  0 277.874     LRP281  0 279.869     Sylhet, (Division Office) 
 Revenue  e-GP 11/EE, RHD/Sylhet/2014-2015  8-Feb-2015  45 Days  Pavement  LRP279  0 277.874     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  WD 02(Two)/2017-2018/EE, RHD/Sylhet  10-Oct-2017  60 Days  Pavement  LRP279  0 277.874     LRP281  0 279.869     Sylhet, (Division Office) 
 Revenue  RFQ No. 09A/2015-2016/EE, RHD/Sylhet  11-Nov-2015  7 Days  Pavement  LRP279  0 277.874     LRP282  0 280.87     Sylhet, (Division Office) 
 Development  214/EE/SRD/2007-2008  3-Dec-2007  5 Days  Pavement  LRP279   277.874     LRP280   278.874     Sylhet, (Division Office) 
 Revenue  DPM 15(Fifteen)/2016-2017/EE, RHD/Sylhet  15-Jun-2017  5 Days  Pavement  LRP279  0 277.874     LRP280  0 278.874     Sylhet, (Division Office) 
 Revenue  WD 21(Twenty one))/2015-2016/EE, RHD/Sylhet  18-Apr-2016  60 Days  Pavement  LRP281  0 279.869     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  08(Eight)/SE, RHD/Sylhet/2015-2016  4-Jan-2016  45 Days  Pavement  LRP281  0 279.869     LRP282  0 280.87     Sylhet, (Division Office) 
 Revenue  WD 01(One)/2017-2018/EE, RHD/Sylhet  8-Oct-2017  60 Days  Pavement  LRP281  0 279.869     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  RFQ No. S 02/2016-2017/EE, RHD/Sylhet  21-Jul-2016  7 Days  Pavement  LRP281  0 279.869     LRP282  0 280.87     Sylhet, (Division Office) 
 Revenue  106/EE/SRD/2007-2008  6-Nov-2007  30 Days  Pavement  LRP281  0 279.869     LRP282  0 280.87     Sylhet, (Division Office) 
 Revenue  213/EE/SRD/2007-2008  22-Jan-2008  21 Days  Carpeting  LRP281  0 279.869     LRP282  0 280.87     Sylhet, (Division Office) 
 Revenue  190/EE/SRD/2007-2008  13-Dec-2007  5 Days  Pavement  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  13(Thirteen)/SE, RHD/Sylhet/2015-2016  31-Jan-2016  60 Days  Pavement  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  PMP 2006-07/15/ DBST & Overlay  7-Jun-2007  150 Days  Overlay  LRP282   280.87     LRP283  2000 283.868     Sylhet, (Division Office) 
 Revenue  213/EE/SRD/2007-2008  22-Jan-2008  21 Days  Carpeting  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  26/EE, RHD/Sylhet/2009-2010  5-Oct-2009  5 Days  Surfacing  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  54/EE, RHD/Sylhet/2009-2010  22-Nov-2009  5 Days  Pavement  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  264/EE, RHD/Sylhet/2009-2010  2-Feb-2010  3 Days  Surfacing  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  260/EE, RHD/Sylhet/2009-2010  13-Jun-2010  3 Days  Surfacing  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  214/EE/SRD/2008-2009  9-Jun-2009  3 Days  Pavement  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  RFQ No. 08/2015-2016/EE, RHD/Sylhet, Lot No. 02  6-Oct-2015  7 Days  Pavement  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  105/EE/SRD/2007-2008  6-Nov-2007  45 Days  Pavement  LRP282  0 280.87     LRP283  0 281.868     Sylhet, (Division Office) 
 Revenue  287/EE/SRD/2008-2009  4-Jun-2009  3 Days  Pavement  LRP283  0 281.868     LRP285c  0 284.64     Sylhet, (Division Office) 
 Revenue  48/EE, RHD/Sylhet/2010-2011  3-Oct-2010  7 Days  Pavement  LRP283  0 281.868     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  33l/EE, RHD/Sylhet/2012-2013  17-Feb-2013  30 Days  Pavement  LRP283  0 281.868     LRP283  1000 282.868     Sylhet, (Division Office) 
 Revenue  RFQ No. 06/2015-2016/EE, RHD/Sylhet, Lot No. 02  30-Sep-2015  10 Days  Pavement  LRP283  0 281.868     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  WD 02(Two)/2016-2017/EE, RHD/Sylhet  20-Dec-2016  60 Days  Pavement  LRP283  1132 283     LRP283  2132 284     Sylhet, (Division Office) 
 Revenue  236d/EE, RHD/Sylhet/2012-2013  19-Jun-2013  7 Days  Pavement  LRP283  2132 284     LRP283  3132 285     Sylhet, (Division Office) 
 Revenue  DPM 16(Sixteen)/2016-2017/EE, RHD/Sylhet  13-Jun-2017  5 Days  Pavement  LRP283  2132 284     LRP283  3132 285     Sylhet, (Division Office) 
 Revenue  WD 03(Three)/2016-2017/EE, RHD/Sylhet  20-Dec-2016  60 Days  Pavement  LRP283  2132 284     LRP283  3132 285     Sylhet, (Division Office) 
 Revenue  07(Seven)/SE, RHD/Sylhet/2012-2013  11-Mar-2013  270 Days  Pavement  LRP283  2222 284.09     LRP283  2652 284.52     Sylhet, (Division Office) 
 Revenue  334/EE, RHD/Sylhet/2010-2011  31-May-2011  7 Days  Pavement  LRP283  2532 284.4     LRP283  2802 284.67     Sylhet, (Division Office) 
 Revenue  270/EE, RHD/Sylhet/2011-2012  18-Jun-2012  7 Days  Pavement  LRP283  2652 284.52     LRP283  2808 284.676     Sylhet, (Division Office) 
 Revenue  47/EE, RHD/Sylhet/2009-2010  14-Oct-2009  5 Days  Pavement  LRP285c   284.64     LRPE   286.409     Sylhet, (Division Office) 
 Revenue  112/EE, RHD/Sylhet/2009-2010  15-Dec-2009  5 Days  Pavement  LRP285c  0 284.64     LRPE  0 286.409     Sylhet, (Division Office) 
 Revenue  PMP 2007-08/13/ DBST  27-Mar-2008  734 Days  DBST  LRP285c  228 284.868     LRP285c  1360 286     Sylhet, (Division Office) 
 Revenue  253/EE, RHD/Sylhet/2010-2011  23-May-2011  7 Days  Pavement  LRP282  4030 284.9     LRP283  3520 285.388     Sylhet, (Division Office) 
 Revenue  259d/EE, RHD/Sylhet/2012-2013  24-Jun-2013  7 Days  Pavement  LRP283  3132 285     LRP283  4132 286     Sylhet, (Division Office) 
 Revenue  18(Eighteen)/SE, RHD/Sylhet/2015-2016  1-Mar-2016  60 Days  Pavement  LRP283  4000 285.868     LRPE  0 286.409     Sylhet, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division