List of ongoing works on the road ( N3 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Development  BTJR/RDD/2005-2006 (Lot No- 13)..  8-Mar-2006  20 Days  Carpeting  LRPS  0 0     LRPS  1000 1     Dhaka, (Division Office) 
 Development  BTJR(165)/RDD/2005-2006 (Lot No- 05)  10-Oct-2005  7 Days  Road Rehablitation  LRPS  0 0     LRPS  50 0.05     Dhaka, (Division Office) 
 Development  BTJR(56)/RDD/2007-2008 (Lot No.32)  6-Jul-2008  30 Days  Carpeting  LRPS  0 0     LRP010  0 9.993     Dhaka, (Division Office) 
 Development  BTJR (45)/RDD/2005-2006 (Lot No- 11)  28-Jul-2006  30 Days  Pavement  LRPS  265 0.265     LRPS  530 0.53     Dhaka, (Division Office) 
 Development  dsd  6-Jan-2012  7 Days  Carpeting  LRPS  455 0.455     LRPS  700 0.7     Dhaka, (Division Office) 
 Development  BTJ (56)/RDD/2007-2008. (Lot No-32)-1  3-Feb-2008  365 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Development  BTJ(56)/RDD/2007-2008. (Lot No-32)    0 Days  Road Embankment  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 3)  28-Mar-2006  30 Days  Carpeting  LRPS  2000 2     LRPS  2100 2.1     Dhaka, (Division Office) 
 Development  BTJR(97)/RDD/2006-2007 (Lot No- 27)  10-Jan-2007  30 Days  Road Rehablitation  LRPS  2200 2.2     LRPS  2250 2.25     Dhaka, (Division Office) 
 Development  TAEPZR (199)/EE/RDD/2005-2006. (Lot No-59)  14-Feb-2006  20 Days  Carpeting  LRPS  5500 5.5     LRPS  5900 5.9     Dhaka, (Division Office) 
 Development  98/Gazipur/2007-2008. (03/22)  4-Jul-2007  10 Days  Road Embankment  LRP010  250 10.243     LRP010  452 10.445     Gazipur, (Division Office) 
 Development  28/Gazipur/2006-2007. (22/02)  28-Dec-2006  10 Days  Road Embankment  LRP010  550 10.543     LRP010  825 10.818     Gazipur, (Division Office) 
 Development  148/Gazipur/2005-06.  25-May-2006  10 Days  Pavement  LRP010  550 10.543     LRP010  800 10.793     Gazipur, (Division Office) 
 Development  90/Gazipur/2006-2007. (JMMR/RDG/2006-2007/08)  1-Mar-2007  120 Days  Pavement  LRP010  640 10.633     LRP010  1000 10.993     Gazipur, (Division Office) 
 Development  77/Joydebpur/2003-2007 (NPAR/RDG/2002/04)  3-Apr-2004  90 Days  New Road  LRP011  0 10.998     LRP012  320 12.315     Gazipur, (Division Office) 
 Development  52/Tongi/2008-2009. (BTJR/01/RDG/2008-2009/02).  1-Jan-2009  120 Days  Pavement  LRP011  0 10.998     LRP018  0 17.973     Gazipur, (Division Office) 
 Development  112/Gazipur/2006-2007. (04/43)  27-May-2007  390 Days  Pavement  LRP011  250 11.248     LRP011  550 11.548     Gazipur, (Division Office) 
 Development  150/Gazipur/2005-2006. (20/08)  17-May-2006  10 Days  Pavement  LRP010  1610 11.603     LRP010  1865 11.858     Gazipur, (Division Office) 
 Development  BTJR(122)/RDD/2008-2009 (Lot No-02)  2-Apr-2009  30 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Development  117/Joydebpur/2004-2005 (KMMR/RDG/2004-05/05)  14-May-2005  90 Days  Pavement  LRP013  0 12.991     LRP033  0 32.915     Gazipur, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 24)  25-May-2006  20 Days  Carpeting  LRPS  14000 14     LRPS  14100 14.1     Dhaka, (Division Office) 
 Development  31/Gazipur/2006-2007. (16/01)  11-Oct-2006  60 Days  Pavement  LRP010  4748 14.741     LRP010  5243 15.236     Gazipur, (Division Office) 
 Development  85/Gazipur/2005-2006. (12/46)  27-Mar-2006  10 Days  Pavement  LRP010  4770 14.763     LRP010  5000 14.993     Gazipur, (Division Office) 
 Development  75/Gazipur/2005-06.  22-Mar-2006  10 Days  Pavement  LRP010  5000 14.993     LRP010  5150 15.143     Gazipur, (Division Office) 
 Development  113/Gazipur/2004-2005. JMMR/RDG/2004-05/01  14-May-2005  90 Days  Overlay  LRP010  5700 15.693     LRP010  7750 17.743     Gazipur, (Division Office) 
 Development  BTJR(14)/RDD/2006-2007 (Lot No- 10)  11-Oct-2007  10 Days  Pavement  LRPS  17400 17.4     LRPS  17600 17.6     Dhaka, (Division Office) 
 Development  BTJR(32)/RDD/2008-2009 (Lot No-02)-1  17-Nov-2008  15 Days  Carpeting  LRPS  17500 17.5     LRPS  17800 17.8     Dhaka, (Division Office) 
 Development  171/Joydebpur/2005-2006. (12/24)  23-Mar-2006  10 Days  Pavement  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Development  93/Joydebpur/2005-2006.(NPAR/RDG/2002/01).  24-Jan-2006  950 Days  New Road  LRP010  8000 17.993     LRP010  9000 18.993     Gazipur, (Division Office) 
 Development  BTJR(139)/RDD/2005-2006 (Lot No- 09)  14-Jan-2007  30 Days  Pavement  LRPS  18000 18     LRPS  18500 18.5     Dhaka, (Division Office) 
 Development  BTJR (265)/RDD/2005-2006 (Lot No- 10)  12-Mar-2006  20 Days  Pavement  LRPS  18120 18.12     LRPS  18745 18.745     Dhaka, (Division Office) 
 Development  BTJR (198)/RDD/2005-2006. (Lot No-9)  13-Feb-2006  15 Days  Carpeting  LRPS  18500 18.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 14)  14-Mar-2006  30 Days  Carpeting  LRPS  18745 18.745     LRPS  19195 19.195     Dhaka, (Division Office) 
 Development  27/Joydebpur/2006-2007. (22/27)  5-Jul-2006  10 Days  Pavement  LRP010  9000 18.993     LRP021  20000 41.008     Gazipur, (Division Office) 
 Development  115/Joydebpur/2004-2005. (JMMR/RDG/2004-05/03)    90 Days  Overlay  LRP010  9000 18.993     LRP012  12000 23.995     Gazipur, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 14)  25-May-2006  20 Days  Carpeting  LRPS  19000 19     LRPS  19100 19.1     Dhaka, (Division Office) 
 Development  BTJR (386)/RDD/2005-2006 (Lot No- 38)  15-Jun-2006  20 Days  Road Rehablitation  LRPS  19464 19.464     LRPS  19750 19.75     Dhaka, (Division Office) 
 Development  BTJR/RDD/2006-2007. (Lot No- 55)  19-Feb-2007  30 Days  Carpeting  LRPS  19500 19.5     LRPS  19900 19.9     Dhaka, (Division Office) 
 Development  173/Joydebpur/2005-2006. (12/45)  27-Mar-2006  10 Days  Pavement  LRP018  1800 19.773     LRP018  18200 36.173     Gazipur, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 13)  20-Jun-2006  20 Days  Pavement  LRPS  20060 20.06     LRPS  20232 20.232     Dhaka, (Division Office) 
 Development  01/Joydebpur/2007-2008. (08/03)  4-Oct-2007  20 Days  Pavement  LRP020  100 20.108     LRP020  200 20.208     Gazipur, (Division Office) 
 Development  BTJR(400)/RDD/2005-2006. (Lot No-13)  20-Jun-2006  20 Days  Carpeting  LRPS  20500 20.5     LRPS  20900 20.9     Dhaka, (Division Office) 
 Development  BTJR(104)/RDD/2006-2007. (Lot No-3)  22-Feb-2007  30 Days  Carpeting  LRPS  20500 20.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Development  BTJRR/412/RDD/2005-2006. Lot No-15  21-Jun-2006  30 Days  Carpeting  LRPS  20500 20.5     LRPS  20900 20.9     Dhaka, (Division Office) 
 Development  01/Joydebpur/2007-2008. (08/03)  4-Oct-2007  20 Days  Pavement  LRP020  525 20.533     LRP020  900 20.908     Gazipur, (Division Office) 
 Development  BTJR(01)/RDD/2006-2007 (Lot No-21)..  22-Jul-2007  60 Days  Pavement  LRPS  20550 20.55     LRPS  20650 20.65     Dhaka, (Division Office) 
 Development  BTJR(01)/RDD/2006-2007 (Lot No- 21)  22-Jul-2007  60 Days  Carpeting  LRPS  20756 20.756     LRPS  21000 21     Dhaka, (Division Office) 
 Development  62/Joydebpur/2006-2007. (NPAR/RDG/2002-2003/03)  11-Mar-2007  90 Days  New Road  LRP011  10000 20.998     LRP011  11000 21.998     Gazipur, (Division Office) 
 Development  BTJR (344)/RDD/2005-2006 (Lot No- 57)  12-Jun-2006  20 Days  Pavement  LRPS  21000 21     LRPS  21100 21.1     Dhaka, (Division Office) 
 Development  BTJR/RDD/2006-2007 (Lot No- 45)  19-Mar-2007  30 Days  Pavement  LRPS  21060 21.06     LRPS  21265 21.265     Dhaka, (Division Office) 
 Development  200/Joydebur/2004-2005. (19/13)  25-May-2005  7 Days  Pavement  LRP011  10250 21.248     LRP011  10442 21.44     Gazipur, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 13)................  1-Jun-2006  20 Days  Carpeting  LRPS  21412 21.412     LRPS  21578 21.578     Dhaka, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 13)  1-Jun-2006  20 Days  Carpeting  LRPS  21412 21.412     LRPS  21578 21.578     Dhaka, (Division Office) 
 Development  96/Tongi/2006-2007. (25/16)  26-Jun-2007  20 Days  Pavement  LRP021  600 21.608     LRP022  0 21.96     Gazipur, (Division Office) 
 Development  JUDBNMR/RDD/2005-2006 (Group No- 46)  7-Feb-2006  20 Days  Carpeting  LRPS  21720 21.72     LRPS  21820 21.82     Dhaka, (Division Office) 
 Development  93/Tongi/2006-2007. (Quo. 02/01)  18-Jan-2007  3 Days  Pavement  LRP022  0 21.96     LRP023  0 22.983     Gazipur, (Division Office) 
 Development  119/Tongi/2005-06.  10-May-2006  10 Days  Road Embankment  LRP022  0 21.96     LRP030  0 29.981     Gazipur, (Division Office) 
 Development  BTJR/RDD/2005-2006 (Lot No- 16)  19-Mar-2006  30 Days  Carpeting  LRPS  22000 22     LRPS  22100 22.1     Dhaka, (Division Office) 
 Development  40/Tongi/2007-2008. (03/27)  20-May-2008  10 Days  Pavement  LRP022  800 22.76     LRP022  950 22.91     Gazipur, (Division Office) 
 Development  27/Tongi/2006-2007. (22/67)  8-Oct-2006  10 Days  Road Embankment  LRP013  12000 24.991     LRP013  13000 25.991     Gazipur, (Division Office) 
 Development  161/Joydebpur/2005-2006. (14/30)  28-Mar-2006  10 Days  Pavement  LRP013  12330 25.321     LRP013  12630 25.621     Gazipur, (Division Office) 
 Development  116/Joydebpur. (JMMR/RDG/2004-2005.)    90 Days  Overlay  LRP023  2800 25.783     LRP030  31500 61.481     Gazipur, (Division Office) 
 Development  25/Joydebpur/2006-2007. (20/69)  19-Jul-2006  10 Days  Pavement  LRP013  12885 25.876     LRP014  13255 27.253     Gazipur, (Division Office) 
 Development  191/Joydebpur/2005-2006. (14/14)  28-Mar-2006  10 Days  Pavement  LRP014  13255 27.253     LRP014  13550 27.548     Gazipur, (Division Office) 
 Development  67/Joydebpur/2005-2006. (18/11)  28-Dec-2005  5 Days  Pavement  LRP014  13355 27.353     LRP014  13675 27.673     Gazipur, (Division Office) 
 Development  02/Joydebpur/2007-2008. (02/02).  28-Oct-2007  20 Days  Pavement  LRP014  13450 27.448     LRP014  13550 27.548     Gazipur, (Division Office) 
 Development  188/Joydebpur/2005-06.  6-Apr-2006  10 Days  Pavement  LRP014  13550 27.548     LRP014  13860 27.858     Gazipur, (Division Office) 
 Development  02/Joydebpur/2007-2008. (02/02).  28-Oct-2007  20 Days  Pavement  LRP014  13750 27.748     LRP015  14100 29.079     Gazipur, (Division Office) 
 Development  03/Joydebpur/2007-2008. (02/03)  28-Oct-2007  20 Days  Carpeting  LRP015  14100 29.079     LRP015  14525 29.504     Gazipur, (Division Office) 
 Development  192/Joydebpur/2005-2006. (14/24)  4-Apr-2006  10 Days  Pavement  LRP015  14350 29.329     LRP015  14500 29.479     Gazipur, (Division Office) 
 Development  90/Joydebpur/2005-2006. (08/12)  29-Jan-2006  10 Days  Pavement  LRP015  14540 29.519     LRP015  14770 29.749     Gazipur, (Division Office) 
 Development  53/Tongi/2005-2006. (BTJR/RDG/2004-05/03)  8-Jan-2006  90 Days  Road Embankment  LRP030  0 29.981     LRP031  500 31.416     Gazipur, (Division Office) 
 Development  102/Joydebpur/2007-2008. (05/41)  4-Jul-2007  352 Days  Pavement  LRP030  0 29.981     LRP030  195 30.176     Gazipur, (Division Office) 
 Development  105/Joydebpur/2006-2007. (05/38)  4-Jul-2007  20 Days  Pavement  LRP030  195 30.176     LRP030  385 30.366     Gazipur, (Division Office) 
 Development  01/Tongi/2007-2008. (21/15)  9-Dec-2007  20 Days  Pavement  LRP030  400 30.381     LRP030  900 30.881     Gazipur, (Division Office) 
 Development  54/Tongi/05-06. BTJR/RDG/04-05/04.  8-Apr-2006  932 Days  Pavement  LRP030  500 30.481     LRP032  0 31.916     Gazipur, (Division Office) 
 Development  65/Joydebpur/2005-2006. (19/20)  22-Dec-2005  5 Days  Pavement  LRP015  15760 30.739     LRP016  16000 31.983     Gazipur, (Division Office) 
 Development  93/Tongi/2005-06.  22-Mar-2006  10 Days  DBST  LRP031  0 30.916     LRP031  0 30.916     Gazipur, (Division Office) 
 Development  20/Gazipur/2007-2008. (BJJR/05/RDG/2007-2008/02.  14-May-2008  90 Days  Pavement  LRP016  15500 31.483     LRP016  15760 31.743     Gazipur, (Division Office) 
 Development  236/Joydebpur/2005-2006. (Lot No. 08/10)  20-Mar-2006  7 Days  Pavement  LRP016  15840 31.823     LRP016  16050 32.033     Gazipur, (Division Office) 
 Development  48/Tongi/2005-06.  15-Dec-2005  90 Days  Pavement  LRP032  0 31.916     LRP032  0 31.916     Gazipur, (Division Office) 
 Development  24/Gazipur/2007-2008. (Quo. 09/02)  8-Jun-2008  3 Days  Road Embankment  LRP033  0 32.915     LRP034  0 33.916     Gazipur, (Division Office) 
 Development  38/Gazipur/2006-2007. (25/11)  29-Nov-2006  25 Days  Pavement  LRP033  0 32.915     LRP033  500 33.415     Gazipur, (Division Office) 
 Development  70/Gazipur/2006-2007. (01/31)  18-Jan-2007  251 Days  Pavement  LRP033  50 32.965     LRP033  450 33.365     Gazipur, (Division Office) 
 Development  39/Gazipur/2006-2007. (25/13)  29-Nov-2006  286 Days  Pavement  LRP033  500 33.415     LRP034   33.916     Gazipur, (Division Office) 
 Development  112/Joydebpur/2005-2006. (08/55)  23-Feb-2006  10 Days  Pavement  LRP034  0 33.916     LRP035  0 34.601     Gazipur, (Division Office) 
 Development  66/Joydebpur/2005-2006. (19/15)  26-Dec-2005  7 Days  Pavement  LRP018  16500 34.473     LRP018  16575 34.548     Gazipur, (Division Office) 
 Development  09/Joydebpur/2007-2008 (02/01)  18-Nov-2007  10 Days  Pavement  LRP018  17000 34.973     LRP018  17200 35.173     Gazipur, (Division Office) 
 Development  137/Joydebpur/2005-06.  22-Mar-2006  10 Days  Pavement  LRP018  17200 35.173     LRP018  17400 35.373     Gazipur, (Division Office) 
 Development  14/Joydebpur/2006-2007. (22/44)  15-Aug-2006  10 Days  Pavement  LRP018  17400 35.373     LRP018  17600 35.573     Gazipur, (Division Office) 
 Development  32/Joydebpur/2006-2007. (20/23)  2-Jul-2006  10 Days  Pavement  LRP018  17600 35.573     LRP018  17733 35.706     Gazipur, (Division Office) 
 Development  190/Joydebpur/2005-2006. (14/37)  27-Mar-2006  10 Days  Pavement  LRP018  18200 36.173     LRP018  18400 36.373     Gazipur, (Division Office) 
 Development  48/Joydebpur/2006-2007. (04/46)  21-Jan-2007  10 Days  Pavement  LRP020  18130 38.138     LRP020  18430 38.438     Gazipur, (Division Office) 
 Development  251/Joydebpur/2005-2006. (20/19)  31-May-2006  10 Days  Pavement  LRP020  20150 40.158     LRP020  20300 40.308     Gazipur, (Division Office) 
 Development  49/Joydebpur/2006-2007. (04/45)  21-Jan-2007  10 Days  Pavement  LRP021  20000 41.008     LRP021  20150 41.158     Gazipur, (Division Office) 
 Development  96/Joydebpur/2006-2007 (08/04)  21-Jun-2007  20 Days  Pavement  LRP021  20150 41.158     LRP021  20275 41.283     Gazipur, (Division Office) 
 Development  221/Joydebpur/2005-2006. (19/24)  8-Jun-2006  10 Days  Pavement  LRP021  20300 41.308     LRP021  20450 41.458     Gazipur, (Division Office) 
 Development  96/Joydebpur/2006-2007 (08/04)  21-Jun-2007  20 Days  Pavement  LRP021  20400 41.408     LRP021  20600 41.608     Gazipur, (Division Office) 
 Development  229/Joydebpur/2005-2006. (20/81)  15-Jun-2006  10 Days  Pavement  LRP021  20450 41.458     LRP021  20600 41.608     Gazipur, (Division Office) 
 Development  207/Joydebpur/2003-2004. (10/06)  15-Mar-2005  45 Days  Pavement  LRP021  20630 41.638     LRP021  20800 41.808     Gazipur, (Division Office) 
 Development  13/Tongi/2006-2007. (23/16)  4-Sep-2006  15 Days  Pavement  LRP022  22000 43.96     LRP030  26000 55.981     Gazipur, (Division Office) 
 Development  57/Tongi/2006-2007. (05/22)  14-Feb-2007  20 Days  Carpeting  LRP023  22500 45.483     LRP023  22800 45.783     Gazipur, (Division Office) 
 Development  52/Tongi/2005-2006. (BTJR/RDG/2004-2005/02.)  5-Jan-2006  90 Days  Pavement  LRP023  25500 48.483     LRP030  26800 56.781     Gazipur, (Division Office) 
 Development  54/Tongi/05-06. BTJR/RDG/04-05/04.  8-Apr-2006  932 Days  Pavement  LRP023  27000 49.983     LRP023  28518 51.501     Gazipur, (Division Office) 
 Development  54/Tongi/2005-2006. (BTJR/RDG/2005-2006/04)  8-Jan-2006  90 Days  Pavement  LRP023  27000 49.983     LRP030  28518 58.499     Gazipur, (Division Office) 
 Development  113/Tongi/2005-06.  20-Apr-2006  30 Days  Pavement  LRP023  28500 51.483     LRP023  28900 51.883     Gazipur, (Division Office) 
 Development  31/Tongi/2006-2007. (23/06)  12-Sep-2006  489 Days  Carpeting  LRP030  23650 53.631     LRP030  24200 54.181     Gazipur, (Division Office) 
 Development  28/Tongi/2006-2007. (21/26)  12-Sep-2006  494 Days  Pavement  LRP030  24800 54.781     LRP030  25500 55.481     Gazipur, (Division Office) 
 Development  07/Tongi/2006-2007. (23/04)  21-Aug-2006  607 Days  Pavement  LRP030  24800 54.781     LRP030  25500 55.481     Gazipur, (Division Office) 
 Development  159/Joydebpur/2005-2006. (12/47)  27-Mar-2006  10 Days  Pavement  LRP030  25000 54.981     LRP030  25250 55.231     Gazipur, (Division Office) 
 Development  53/Tongi/2005-2006. (BTJR/RDG/2004-05/03)  8-Jan-2006  90 Days  Pavement  LRP030  26770 56.751     LRP030  28418 58.399     Gazipur, (Division Office) 
 Development  69/Joydebpur/2006-2007. (JMMR/RDG/2006-2007/06).  16-Apr-2007  90 Days  Pavement  LRP030  27000 56.981     LRP030  27581 57.562     Gazipur, (Division Office) 
 Development  04/Joydebpur/2007-2008. (05/33)  4-Nov-2007  20 Days  Pavement  LRP030  27385 57.366     LRP030  27580 57.561     Gazipur, (Division Office) 
 Development  Test-01  22-Feb-2008  60 Days  Pavement  LRP059  0 57.899     LRP060  0 58.932     Mymensingh, (Division Office) 
 Development  107/Tongi/2007-2008. (04/21)  4-Jul-2007  10 Days  Pavement  LRP030  28440 58.421     LRP030  28500 58.481     Gazipur, (Division Office) 
 Development  02/Joydebpur/2006-2007. (08/02)  26-Jul-2006  10 Days  Pavement  LRP030  28500 58.481     LRP030  28750 58.731     Gazipur, (Division Office) 
 Development  138/Tongi/2005-2006. (20/47)  12-Jun-2006  10 Days  Pavement  LRP030  29150 59.131     LRP030  29300 59.281     Gazipur, (Division Office) 
 Development  149/Joydebpur/2004-2005.  2-Jun-2005  45 Days  Pavement  LRP030  29195 59.176     LRP030  29390 59.371     Gazipur, (Division Office) 
 Development  37/Joydebpur/2006-2007. (14/26)  9-Aug-2006  10 Days  Pavement  LRP030  29200 59.181     LRP030  29400 59.381     Gazipur, (Division Office) 
 Development  194/Joydebpur/2005-2006. (14/36)  3-Apr-2006  10 Days  Pavement  LRP030  29400 59.381     LRP030  29600 59.581     Gazipur, (Division Office) 
 Development  238/Joydebpur/2005-2006. (12/21)  13-Jun-2006  10 Days  Pavement  LRP030  29500 59.481     LRP030  29750 59.731     Gazipur, (Division Office) 
 Development  131/Tongi/2005-2006. (BTJR/RDG/2005-2006)  16-Apr-2006  60 Days  Pavement  LRP031  30335 61.251     LRP031  30885 61.801     Gazipur, (Division Office) 
 Development  177/Gazipur/2005-06.  21-Jun-2006  15 Days  Pavement  LRP033  32000 64.915     LRP033  32500 65.415     Gazipur, (Division Office) 
 Development  86/Gazipur/2005-06.  20-Mar-2006  10 Days  Pavement  LRP033  32250 65.165     LRP033  32500 65.415     Gazipur, (Division Office) 
 Development  19/Gazipur/2008-2009. BTJR/08/RDG/2008-2009/08.  8-Jun-2009  25 Days  Pavement  LRP033  32310 65.225     LRP033  32640 65.555     Gazipur, (Division Office) 
 Development  15/Gazipur/2008-2009. (BTJR/01/RDG/2008-2009/01).  15-Feb-2009  90 Days  Pavement  LRP033  32650 65.565     LRP034  33900 67.816     Gazipur, (Division Office) 
 Development  68/Gazipur/2005-06.  1-Mar-2006  45 Days  Pavement  LRP033  32759 65.674     LRP034  33169 67.085     Gazipur, (Division Office) 
 Development  85/Gazipur/2005-06.  20-Mar-2006  10 Days  Pavement  LRP034  33575 67.491     LRP034  33875 67.791     Gazipur, (Division Office) 
 Development  161/Gazipur/2005-06.  26-Jun-2006  10 Days  Carpeting  LRP034  33579 67.495     LRP034  33999 67.915     Gazipur, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division