List of ongoing works on the road ( N3 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Revenue  13 (thirteen) / RDG / 2013-2014. RFQ-06/01.  26-Jan-2014  5 Days  Road Embankment  LRPS  0 0     LRP011  0 10.998     Gazipur, (Division Office) 
 Revenue  80/Tongi/2011-2012. RFQ. T-07/L-01 (11-12)  28-Jun-2012  5 Days  Pavement  LRPS  0 0     LRP011  0 10.998     Gazipur, (Division Office) 
 Revenue  BTJR (356)/RDD/2005-2006 (Lot No- 58)  4-Jun-2006  20 Days  Road Rehablitation  LRPS  0 0     LRPS  910 0.91     Dhaka, (Division Office) 
 Revenue  PMP 2007-08/07/Overlay  27-Mar-2008  248 Days  Overlay  LRPS  0 0     LRP005  800 5.8     Dhaka, (Division Office) 
 Revenue  BTJR(129)/RDD/2007-2008  14-Feb-2008  5 Days  Road Rehablitation  LRPS  0 0     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  e-Gp/19/RDG/Works/2016-2017. Invitation Ref. : e-Gp/43/RDG/2015-2016. & Tender ID # 55614.  24-Aug-2016  10 Days  Pavement  LRPS  0 0     LRP015  0 14.979     Gazipur, (Division Office) 
 Revenue  45/Gazipur/11-12. LTM Package No. JMMR/05/RDG/11-12/07.  27-Oct-2011  30 Days  Pavement  LRPS  0 0     LRPS  650 0.65     Gazipur, (Division Office) 
 Revenue  44/Gazipur/2010-2011. JMMR/07/RDG/2010-2011/35.  7-Apr-2011  15 Days  Pavement  LRPS  0 0     LRPS  600 0.6     Gazipur, (Division Office) 
 Revenue  BTJR  20-Dec-2016  7 Days  Carpeting  LRPS  0 0     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  DAR(04)/RDD/2005-2006 (Lot No-03) (DTM)  4-Jul-2008  7 Days  Carpeting  LRPS  0 0     LRPS  900 0.9     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006. (Lot No- 17) 2  20-Jun-2006  15 Days  Carpeting  LRPS  0 0     LRPS  500 0.5     Dhaka, (Division Office) 
 Revenue  58/Gazipur/2009-2010. (RFQ-15/03).  3-May-2010  7 Days  Pavement  LRPS  0 0     LRP011  9000 19.998     Gazipur, (Division Office) 
 Revenue  64/Gazipur/2010-2011. JMMR/10/RDG/2010-2011/18.  18-May-2011  10 Days  Pavement  LRPS  0 0     LRPS  500 0.5     Gazipur, (Division Office) 
 Revenue  BTJR(116)/EE/RDD/2011-2012. (Lot No-24)  13-Dec-2011  20 Days  Carpeting  LRPS  0 0     LRPS  1 0.001     Dhaka, (Division Office) 
 Revenue  BTJR(104)/RDD/2008-2009 (Lot No-03)  17-Mar-2009  7 Days  Carpeting  LRPS  0 0     LRP005  0 5     Dhaka, (Division Office) 
 Revenue  e-GP/40/RDG/Works/2015-2016. Invitation Ref. : e-Gp/19/RDG/2015-2016 & Tender ID # 41841.  3-Feb-2016  15 Days  Pavement  LRPS  0 0     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  20/Tongi/2008-2009. (RFQ-05/04)  21-Sep-2008  3 Days  Pavement  LRPS  0 0     LRP023  0 22.983     Gazipur, (Division Office) 
 Revenue  DZ(e-GP)-02/PMP(Overlay)/2013-2014  20-May-2014  346 Days  Carpeting  LRPS  0 0     LRPS  5900 5.9     Dhaka, (Division Office) 
 Revenue  BTJR/TAEPZR(13)/RDD/2009-2010 (RSD-1)  16-Nov-2009  3 Days  Carpeting  LRPS  0 0     LRPS  500 0.5     Dhaka, (Division Office) 
 Revenue  51/Gazipur/2011-2012. LTM Package No. JMMR/05/RDG/2011-2012/08.  27-Oct-2011  30 Days  Pavement  LRPS  0 0     LRPS  650 0.65     Gazipur, (Division Office) 
 Revenue  73/Gazipur/2010-2011. JMMR/07/RDG/2010-2011/24.  1-Jun-2011  15 Days  Pavement  LRPS  0 0     LRPS  600 0.6     Gazipur, (Division Office) 
 Revenue  85/Tongi/2008-2009. BJJR/14/RDG/2008-09/01.  21-Jun-2009  7 Days  Pavement  LRPS   0     LRP011   10.998     Gazipur, (Division Office) 
 Revenue  38/Gazipur/2010-2011. JMMR/06/RDG/2010-2011/12.  6-Mar-2011  10 Days  Pavement  LRPS  0 0     LRPS  600 0.6     Gazipur, (Division Office) 
 Revenue  17/Joydebpur/2011-2012. LTM Package No. JMMR /01/RDG/2011-2012/24.  4-Oct-2011  10 Days  Pavement  LRPS  0 0     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  BTJR(138)/EE/SDE-1/2009-2010 (Lot No-18)  25-May-2010  7 Days  Carpeting  LRPS  0 0     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  e-Gp/39/RDG/Works/2015-2016. Invitation Ref. No. e-Gp/18/RDG/2015-2016. Tender # 41096.  1-Feb-2016  20 Days  Road Embankment  LRPS  0 0     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  01/Kallayanpur/2007-2008-1 (Deposit)  1-Jul-2008  15 Days  Carpeting  LRPS  2 0.002     LRPS  4 0.004     Dhaka, (Division Office) 
 Revenue  28/Gazipur/2011-2012. LTM Package No. JMMR /01/RDG/2011-2012/12.  12-Oct-2011  10 Days  Pavement  LRPS  100 0.1     LRPS  365 0.365     Gazipur, (Division Office) 
 Revenue  Mtc/(90)/e-gp/SR/DRC/2016-2017 (77149)  9-Jan-2017  30 Days  Carpeting  LRPS  100 0.1     LRPS  900 0.9     Dhaka, (Division Office) 
 Revenue  Mtc/09/e-GP/SR/DRC/2016-17 Tender ID no-77149  9-Jan-2017  30 Days  Carpeting  LRPS  100 0.1     LRPS  900 0.9     Dhaka, (Division Office) 
 Revenue  test-4  21-Oct-2013  7 Days  Carpeting  LRPS  100 0.1     LRPS  150 0.15     Dhaka, (Division Office) 
 Revenue  DMLR(11)/RDD/2006-2007 (Emergency Work) (DTM)  1-Jul-2008  15 Days  Carpeting  LRPS  100 0.1     LRPS  200 0.2     Dhaka, (Division Office) 
 Revenue  27/Gazipur/2011-2012. LTM Package No. JMMR /01/RDG/2011-2012/14.  12-Oct-2011  10 Days  Pavement  LRPS  200 0.2     LRPS  400 0.4     Gazipur, (Division Office) 
 Revenue  102/Gazipur/2010-2011. OTM Package No. JMMR/10/RDG/2010-2011/56.  15-Jun-2011  10 Days  Pavement  LRPS  225 0.225     LRPS  305 0.305     Gazipur, (Division Office) 
 Revenue  05/Gazipur/2011-2012. JMMR/07/RDG/2010-2011/10.  8-Aug-2011  10 Days  Pavement  LRPS  294 0.294     LRPS  433 0.433     Gazipur, (Division Office) 
 Revenue  BRJR/DPM/EE/RDD/2012-2013.  30-Jul-2012  3 Days  Carpeting  LRPS  500 0.5     LRPS  900 0.9     Dhaka, (Division Office) 
 Revenue  e-GP/90/EE/DRD/2017-2018 (ID 191577)  5-Jun-2018  24 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  e-GP/82/EE/DRD/2017-2018 No-178543  6-May-2018  15 Days  Carpeting  LRPS  500 0.5     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  Baily Bridge(52)/09/EE/RDD/2013-2014 (Lot No-20)  22-Apr-2014  7 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  BTJR(57)/EE/RDD/2013-2014. (Lot No-05)  28-Apr-2014  10 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  e-GP/49/EE/DRD/2016-2017 (76903)  12-Dec-2016  3 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  egp/10/DRD/2014-2015  25-Nov-2014  11 Days  Carpeting  LRPS  500 0.5     LRPS  700 0.7     Dhaka, (Division Office) 
 Revenue  BTJR(59)/EE/RDD/2013-2014. (Lot No-09)  29-Apr-2014  15 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(187)/EE/RDD/2011-2012. (Lot No-09)  4-Jun-2012  15 Days  Carpeting  LRPS  500 0.5     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  Old Airport(147)/11/EE/RDD/2011-2012 (Lot No 08)  10-Jan-2012  5 Days  Carpeting  LRPS  500 0.5     LRPS  800 0.8     Dhaka, (Division Office) 
 Revenue  BTJR(133)/RDD/2008-2009 (Lot No-03)  21-Apr-2009  5 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  BTJR(61)/EE/RDD/2013-2014. (Lot No-07)  23-Apr-2014  10 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(21)/EE/DRD/2015-2016.  28-Jan-2016  7 Days  Carpeting  LRPS  500 0.5     LRPS  800 0.8     Dhaka, (Division Office) 
 Revenue  BTJR(02)/EE/RDD/2014-2015. (Lot No-04)  5-Nov-2014  10 Days  Carpeting  LRPS  500 0.5     LRPS  900 0.9     Dhaka, (Division Office) 
 Revenue  BTJR(12)/03/EE/DRD/2015-2016  10-Nov-2015  30 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  egp/01/DRD/2012-2013. (Lot No-01)  26-May-2013  21 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(02)/EE/RDD/2012-2013. (Lot No-02)  2-Jul-2012  3 Days  Carpeting  LRPS  500 0.5     LRPS  800 0.8     Dhaka, (Division Office) 
 Revenue  BTJR(40)/EE/RDD/2013-2014. (Lot No-02)  6-Nov-2013  10 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(40)/RDD/2014-2015  14-Dec-2014  3 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(58)/EE/RDD/2013-2014. (Lot No-08  28-Apr-2014  10 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(39)/EE/RDD/2014-2015  11-Dec-2014  3 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(81)/EE/RDD/2012-2013 (Lot No-06)  21-May-2013  20 Days  Carpeting  LRPS  500 0.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  15/Gazipur/2010-2011. JMMR/03/RDG/2010-2011/14.  13-Dec-2010  10 Days  Pavement  LRPS  600 0.6     LRPS  1000 1     Gazipur, (Division Office) 
 Revenue  98/Gazipur/2006-2007. (05/26)  11-Mar-2007  15 Days  Pavement  LRPS  650 0.65     LRPS  1300 1.3     Gazipur, (Division Office) 
 Revenue  72/Gazipur/2011-2012. LTM Package No. JMMR /07/RDG/2011-2012/03.  23-Feb-2012  10 Days  Pavement  LRPS  700 0.7     LRPS  1500 1.5     Gazipur, (Division Office) 
 Revenue  BTJR(188)/10/EE/RDD/2011-2012 (Lot No 03)  13-Jun-2012  15 Days  Carpeting  LRPS  800 0.8     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  ZKDR(121)/RDD/2008-2009 (Lot No-17)  23-Jun-2010  3 Days  Carpeting  LRPS  800 0.8     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006. (Lot No- 24) 2  25-May-2006  15 Days  Carpeting  LRPS  900 0.9     LRPS  1200 1.2     Dhaka, (Division Office) 
 Revenue  Equipment Control(101)/11/EE/RDD/2011-2012 (Lot No 03)  12-Jan-2012  30 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  BTJ(01)/EE/DRD/2016-2017(Lot No 01)  9-Oct-2016  3 Days  Carpeting  LRPS  1000 1     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  BTJ-29/03/EE/RDD/2013-2014-(Lot No 05  10-Oct-2013  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  Test-123    5 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  BTJR(41)/RDD/2014-2015  14-Dec-2014  3 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(38)/RDD/2014-2015  11-Dec-2014  3 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  ID/138408/e-GP/32/EE/DRD/2017-2018  28-Dec-2017  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(70)/EE/RDD/2012-2013. (Lot No-03)  27-Feb-2013  7 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  BTJR(08)/10/EE/RDD/2012-2013 (Lot no 02)  7-Jul-2013  45 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006. (Lot No- 14) 2  25-May-2006  15 Days  Carpeting  LRPS  1000 1     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  BTJR(37)/05/EE/RDD/2013-2014 (Lot No 03)  5-Nov-2013  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(05)/EE/DRD/2014-2015 (Lot No 03)  5-Nov-2014  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(67)/09/EE/RDD/2013-2014 (Lot No. 03)  27-Apr-2014  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  1247    3 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  BTJR(DPM)/EE/RDD/2012-2013.  30-Jul-2012  3 Days  Carpeting  LRPS  1000 1     LRPS  1200 1.2     Dhaka, (Division Office) 
 Revenue  e-GP/81/EE/DRD/2016-2017, ID No 85913)  6-Aug-2017  5 Days  Carpeting  LRPS  1000 1     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  12    3 Days  Carpeting  LRPS  1000 1     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  BTJR(45)/05/EE/RDD/2010-2011 (Lot No 17)  28-Dec-2010  20 Days  Carpeting  LRPS  1000 1     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  e-GP/40/EE/DRD/2016-2017 ( 75179)  8-Dec-2016  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(38)/05/EE/RDD/2013-2014 (Lot No. 04)  5-Nov-2013  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(01)/EE/DRD/2016-2017 (Lot No 01)  9-Oct-2016  3 Days  Carpeting  LRPS  1000 1     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  BTJR(56)/09/EE/RDD-2013-2014 (Lot No-06)  27-Apr-2014  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  e-GP/32/EE/DRD/2017-2018 (ID 138408)  28-Dec-2017  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(05)/EE/DRD/2014-2015 (Lot No 05)  5-Nov-2014  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  987  30-Jun-2010  10 Days  Carpeting  LRPS  1000 1     LRPS  1200 1.2     Dhaka, (Division Office) 
 Revenue  BTJR(141)/RDD/2008-2009 (Lot No-01)  17-May-2009  30 Days  Carpeting  LRPS  1100 1.1     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(92)/03/EE/RDD/2011-2012 (Lot No 02)  24-Oct-2011  10 Days  Carpeting  LRPS  1150 1.15     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006. (Lot No- 17) 1  20-Jun-2006  30 Days  Carpeting  LRPS  1200 1.2     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  1212    15 Days  Carpeting  LRPS  1200 1.2     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  99/Gazipur/2006-2007. (05/14)  11-Mar-2007  15 Days  Pavement  LRPS  1300 1.3     LRPS  1950 1.95     Gazipur, (Division Office) 
 Revenue  BTJR(134)/EE/SDE-1/2009-2010 (Lot No-13)  30-May-2010  7 Days  Carpeting  LRPS  1400 1.4     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(134)/EE/SDE-1/2009-2010 (Lot No-13)  30-May-2010  7 Days  Carpeting  LRPS  1400 1.4     LRPS  14800 14.8     Dhaka, (Division Office) 
 Revenue  BTJR(24)/RDD/2008-2009 (Lot No-02)  13-Jun-2009  5 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  TAEPZR(94)/RDD/2008-2009 (Lot No-15)  12-Mar-2009  15 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  BTJR(23)/RDD/2008-2009 (Lot No-03)  13-Jun-2009  5 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  Office Articles (30)/RDD/2008-2009  22-Jun-2009  5 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  BTJR(31)/RDD/2009-2010 (RSD-1) (Lot No-01)  4-Aug-2009  30 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  17  22-Oct-2016  3 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  BTJR(42)/RDD/2008-2009 (Lot No-01)  27-Nov-2008  7 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  Office(28)/RDD/2008-2009  15-Jun-2009  5 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  BTJR(91)/EE/RDD/2010-2011 (Lot No-10)  22-Mar-2011  30 Days  Carpeting  LRPS  1500 1.5     LRPS  15800 15.8     Dhaka, (Division Office) 
 Revenue  BTJR(20)/RDD/2008-2009 (Lot No-01)  15-Jul-2008  7 Days  Carpeting  LRPS  1500 1.5     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  BTJR(133)/RDD/2008-2009 (Lot No-03)-1  26-Jul-2009  6 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  BTJR(68)/RDD/2008-2009 (Lot No-02)  28-Jan-2009  7 Days  Carpeting  LRPS  1750 1.75     LRPS  1850 1.85     Dhaka, (Division Office) 
 Revenue  BTJR(85)/EE/SDE-1/2009-2010 (Lot No-01)  1-Apr-2010  7 Days  Carpeting  LRPS  1800 1.8     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(142)/RDD/2008-2009.  1-Jun-2009  30 Days  Carpeting  LRPS  1800 1.8     LRPS  2100 2.1     Dhaka, (Division Office) 
 Revenue  BTJR(20)/26/EE/RDD/2011-2012 (Lot No 21)  27-Aug-2011  20 Days  Carpeting  LRPS  1800 1.8     LRPS  18155 18.155     Dhaka, (Division Office) 
 Revenue  50/Gazipur/2009-2010. (RFQ-13/21)  15-Apr-2010  7 Days  Pavement  LRPS  1850 1.85     LRPS  1955 1.955     Gazipur, (Division Office) 
 Revenue  BTJR(55)/EE/RDD/2013-2014 (Lot No-04)  30-Apr-2014  15 Days  Carpeting  LRPS  2000 2     LRPS  2900 2.9     Dhaka, (Division Office) 
 Revenue  49/Gazipur/2009-2010. (RFQ-13/20).  15-Apr-2010  7 Days  Pavement  LRPS  2000 2     LRPS  2115 2.115     Gazipur, (Division Office) 
 Revenue  BTJ(03)/EE/RDD/2013-2014 (Lot No-03)  18-Jul-2013  10 Days  Carpeting  LRPS  2000 2     LRPS  2900 2.9     Dhaka, (Division Office) 
 Revenue  BTJR(186)/10/EE/RDD/2011-2012 (Lot No 12)  12-Jun-2012  15 Days  Carpeting  LRPS  2050 2.05     LRPS  20750 20.75     Dhaka, (Division Office) 
 Revenue  BTJR(10)/RDD/2006-2007 (Lot No- 02)  10-Sep-2007  5 Days  Road Rehablitation  LRPS  2100 2.1     LRPS  2150 2.15     Dhaka, (Division Office) 
 Revenue  BTJR(295/1)/RDD/2005-2006 (Lot No- 11)  9-Apr-2006  20 Days  Carpeting  LRPS  2100 2.1     LRPS  2200 2.2     Dhaka, (Division Office) 
 Revenue  BTJR(193)/10/EE/RDD/2011-2012 (Lot No 08)  13-Jun-2012  15 Days  Carpeting  LRPS  2100 2.1     LRPS  2800 2.8     Dhaka, (Division Office) 
 Revenue  JUDVNMR/RDD/2007-2008 (Lot No- 03)  30-Sep-2007  7 Days  Road Rehablitation  LRPS  2200 2.2     LRPS  2250 2.25     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006 (Lot No- 30)  12-Dec-2005  20 Days  Carpeting  LRPS  2200 2.2     LRPS  2210 2.21     Dhaka, (Division Office) 
 Revenue  BTJR/17/(20)/EE/RDD/2009-2010 (Lot No-05)  15-Sep-2010  30 Days  Carpeting  LRPS  2250 2.25     LRPS  23000 23     Dhaka, (Division Office) 
 Revenue  PMP 2008-2009/11/DBST & OVERLAY.  29-Jul-2009  245 Days  Pavement  LRPS  2469 2.469     LRP021  947 21.955     Gazipur, (Division Office) 
 Revenue  BTJR(183)/EE/RDD/2011-2012. (Lot No-10)  6-Jun-2012  15 Days  Carpeting  LRPS  2500 2.5     LRPS  3500 3.5     Dhaka, (Division Office) 
 Revenue  KKHIHR(123)/14/EE/RDD/2011-2012 (Lot No 01)  2-May-2012  15 Days  Carpeting  LRPS  2500 2.5     LRPS  6500 6.5     Dhaka, (Division Office) 
 Revenue  26/Gazipur/2010-2011. JMMR/04/RDG/2010-2011/13.  24-Jan-2011  10 Days  Pavement  LRPS  3000 3     LRPS  4000 4     Gazipur, (Division Office) 
 Revenue  29/Gazipur/2011-2012. LTM Package No. JMMR/03/RDG/2011-2012/21.  15-Oct-2011  10 Days  Pavement  LRPS  3000 3     LRPS  3500 3.5     Gazipur, (Division Office) 
 Revenue  e-GP/45/EE/DRD/2015-2016,  25-Apr-2016  15 Days  Carpeting  LRPS  3100 3.1     LRPS  3900 3.9     Dhaka, (Division Office) 
 Revenue  TAEPZR(09)/RDD/2008-2009 (Lot No 03)  16-Oct-2010  30 Days  Carpeting  LRPS  3500 3.5     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  BTJR(04)/EE/RDD/2013-2014 (Lot No-05)  8-Jul-2013  10 Days  Carpeting  LRPS  3500 3.5     LRPS  4500 4.5     Dhaka, (Division Office) 
 Revenue  TAER(90)/RDD/KSD/2008-2009 (Lot No-19)  26-Jul-2009  6 Days  Carpeting  LRPS  3500 3.5     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  BTJR(55)/EE/RDD/2012-2013 (Lot No-01)  8-Nov-2012  10 Days  Carpeting  LRPS  3500 3.5     LRPS  3800 3.8     Dhaka, (Division Office) 
 Revenue  DMR/RDD/2004-2005. (Lot No- 44)  7-Feb-2006  15 Days  Carpeting  LRPS  3500 3.5     LRPS  3800 3.8     Dhaka, (Division Office) 
 Revenue  BTJR(01)/13/EE/RDD/2012-2013 (Lot No 12)  4-Jul-2013  10 Days  Carpeting  LRPS  3500 3.5     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  BTJR(06)/EE/RDD/2013-2014 (Lot No-04)  7-Jul-2013  10 Days  Carpeting  LRPS  3500 3.5     LRPS  4500 4.5     Dhaka, (Division Office) 
 Revenue  DJDSR(224)/EE/SDE-11/2009-2010 (Lot no 11)  17-Oct-2010  30 Days  Carpeting  LRPS  3500 3.5     LRPS  4000 4     Dhaka, (Division Office) 
 Revenue  62/Gazipur/2010-2011. JMMR/07/RDG/2010-2011/27.  10-May-2011  10 Days  Pavement  LRPS  3700 3.7     LRPS  4000 4     Gazipur, (Division Office) 
 Revenue  16/Gazipur/2010-2011. JMMR/04/RDG/2010-2011/12.  3-Jan-2011  10 Days  Pavement  LRPS  4000 4     LRPS  4300 4.3     Gazipur, (Division Office) 
 Revenue  BTJR(01)/EE/DRD/2016-2017, Lot No 02  9-Oct-2016  3 Days  Carpeting  LRPS  4000 4     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  BTJ (45)/06/EE/RDD/2013-2014 (Lot No. 07)  4-Mar-2014  10 Days  Carpeting  LRPS  4000 4     LRPS  4200 4.2     Dhaka, (Division Office) 
 Revenue  BTJ(01)/EE/DRD/2016-2017 (Lot No 02)  9-Oct-2016  3 Days  Carpeting  LRPS  4000 4     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  BTJR(45)/06/EE/RDD/2013-2014 (Lot No. 07)  4-Apr-2014  10 Days  Carpeting  LRPS  4000 4     LRPS  4100 4.1     Dhaka, (Division Office) 
 Revenue  70/Gazipur/2010-2011. JMMR/10/RDG/2010-2011/09.  19-May-2011  10 Days  Pavement  LRPS  4000 4     LRPS  4300 4.3     Gazipur, (Division Office) 
 Revenue  51/Gazipur/2011-2012. LTM Package No. JMMR/05/RDG/2011-2012/08.  27-Oct-2011  30 Days  Pavement  LRPS  4300 4.3     LRPS  4600 4.6     Gazipur, (Division Office) 
 Revenue  BATJR(189)/10/EE/RDD/2011-2012 (Lot No 11)  13-Jun-2012  15 Days  Carpeting  LRPS  4300 4.3     LRPS  4700 4.7     Dhaka, (Division Office) 
 Revenue  45/Gazipur/11-12. LTM Package No. JMMR/05/RDG/11-12/07.  27-Oct-2011  30 Days  Pavement  LRPS  4300 4.3     LRPS  4600 4.6     Gazipur, (Division Office) 
 Revenue  76/Gazipur/2010-2011. JMMR/10/RDG/2010-2011/38.  1-Jun-2011  10 Days  Pavement  LRPS  4400 4.4     LRPS  4500 4.5     Gazipur, (Division Office) 
 Revenue  BTJR(43)/RDD/2008-2009 (Lot No-03)  27-Nov-2008  7 Days  Carpeting  LRPS  4500 4.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  e-GP/84/EE/DRD/2017-2018 No-178778  7-May-2018  18 Days  Carpeting  LRPS  4500 4.5     LRPS  5900 5.9     Dhaka, (Division Office) 
 Revenue  DJDSR(216)/EE/SDE-11/2009-2010 (Lot No 03)  18-Oct-2010  30 Days  Carpeting  LRPS  4500 4.5     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  BTJR(54)/EE/RDD/2014-2015.  11-Jan-2015  3 Days  Carpeting  LRPS  4500 4.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR (48)/RDD/2008-2009 (Lot No-02)  27-Nov-2008  7 Days  Carpeting  LRPS  4500 4.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR(184)/EE/RDD/2011-2012. (Lot No-07)  3-Jun-2012  15 Days  Carpeting  LRPS  4500 4.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  TAEPZR(52)/RDD/2008-2009 (Lot No 01)  15-Oct-2010  30 Days  Carpeting  LRPS  4500 4.5     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  BTJR(72)/EE/RDD/2012-2013. (Lot No-02)  28-Feb-2013  7 Days  Carpeting  LRPS  4500 4.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006. (Lot No- 24) 1  25-May-2006  15 Days  Carpeting  LRPS  4500 4.5     LRPS  4900 4.9     Dhaka, (Division Office) 
 Revenue  90/Gazipur/2006-2007. JMMR/02/RDG/2006-2007/08.  1-Mar-2007  483 Days  Pavement  LRPS  4640 4.64     LRPS  5000 5     Gazipur, (Division Office) 
 Revenue  62/Gazipur/2010-2011. JMMR/07/RDG/2010-2011/27.  10-May-2011  10 Days  Pavement  LRPS  4850 4.85     LRPS  5000 5     Gazipur, (Division Office) 
 Revenue  e-GP/30/EE/DRD/2016-2017 (75059)  20-Dec-2016  7 Days  Carpeting  LRPS  5000 5     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(08)/EE/RDD/2015-2016. (Lot No-06)  19-Oct-2015  7 Days  Carpeting  LRPS  5000 5     LRPS  5900 5.9     Dhaka, (Division Office) 
 Revenue  113/Gazipur/2006-2007. (05/09)  15-Feb-2007  20 Days  Road Embankment  LRPS  5050 5.05     LRPS  5300 5.3     Gazipur, (Division Office) 
 Revenue  e-GP/70/EE/DRD/2017-2018 ID NO-159675  6-Mar-2018  7 Days  Carpeting  LRPS  5100 5.1     LRPS  5900 5.9     Dhaka, (Division Office) 
 Revenue  e-GP/61/EE/DRD/2017-2018 ID No-154047  5-Mar-2018  20 Days  Carpeting  LRPS  5100 5.1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  TAEPZR(180)/RDD/2008-2009. (Lot No-16)  23-Jul-2009  7 Days  Carpeting  LRPS  5100 5.1     LRPS  5800 5.8     Dhaka, (Division Office) 
 Revenue  BTJR(05)/EE/RDD/2014-2015. (Lot No-08)  3-Nov-2014  10 Days  Carpeting  LRPS  5100 5.1     LRPS  5800 5.8     Dhaka, (Division Office) 
 Revenue  e-GP/55/EE/DRD/2015-2016  25-Jul-2016  15 Days  Carpeting  LRPS  5100 5.1     LRPS  5900 5.9     Dhaka, (Division Office) 
 Revenue  BTJR(06)/EE/RDD/2014-2015. (Lot no-05)  2-Nov-2014  10 Days  Carpeting  LRPS  5200 5.2     LRPS  5800 5.8     Dhaka, (Division Office) 
 Revenue  TAEPZR/RDD/2008-2009  23-Jul-2009  7 Days  Carpeting  LRPS  5400 5.4     LRPS  5800 5.8     Dhaka, (Division Office) 
 Revenue  BTJR(05)/EE/RDD/2015-2016. (Lot No-02)  30-Sep-2015  7 Days  Carpeting  LRPS  5500 5.5     LRPS  7500 7.5     Dhaka, (Division Office) 
 Revenue  BTJR(49)/EE/RDD/2012-2013. (Lot No-27)  1-Nov-2012  10 Days  Carpeting  LRPS  5500 5.5     LRPS  5800 5.8     Dhaka, (Division Office) 
 Revenue  DZ(e-GP)-10/GoB/2016-2017  19-Jan-2017  30 Days  Carpeting  LRPS  5500 5.5     LRPS  5700 5.7     Dhaka, (Division Office) 
 Revenue  e-GP/33/EE/DRD/2017-2018 (141834)  1-Jan-2018  7 Days  Carpeting  LRPS  5500 5.5     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2005-2006. (Lot No- 14) 1  25-May-2006  15 Days  Carpeting  LRPS  5500 5.5     LRPS  8500 8.5     Dhaka, (Division Office) 
 Revenue  BTJR(191)/EE/RDD/2011-2012. (Lot No-05)  13-Jun-2012  15 Days  Carpeting  LRPS  5500 5.5     LRPS  7500 7.5     Dhaka, (Division Office) 
 Revenue  BTJR(20)/12/EE/DRD/2014-2015 (Lot No 02)  4-May-2015  15 Days  Carpeting  LRPS  5500 5.5     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  BTJR(192)/EE/RDD/2011-2012. (Lot No-06)  13-Jun-2012  15 Days  Carpeting  LRPS  5500 5.5     LRPS  7500 7.5     Dhaka, (Division Office) 
 Revenue  7648    5 Days  Carpeting  LRPS  5500 5.5     LRPS  6500 6.5     Dhaka, (Division Office) 
 Revenue  BTJR(46)/07/EE/RDD/2013-2014 (Lot No 01)  5-Mar-2014  10 Days  Carpeting  LRPS  5500 5.5     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  DZ(e-GP)-08/GoB/2016-2017  19-Jan-2017  30 Days  Carpeting  LRPS  5500 5.5     LRPS  5700 5.7     Dhaka, (Division Office) 
 Revenue  29/Gazipur/2009-2010. (RFQ-09/14)  1-Jul-2010  7 Days  Pavement  LRPS  5600 5.6     LRPS  5825 5.825     Gazipur, (Division Office) 
 Revenue  PMP 2007-08/08/Overlay  31-Mar-2008  150 Days  Overlay  LRP005  800 5.8     LRP007  2469 9.5     Dhaka, (Division Office) 
 Revenue  BTJR/09/EE/RDD/2013-2014 (Lot no 01)  28-May-2014  10 Days  Carpeting  LRPS  6000 6     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  BTJR(06)/03/EE/DRD/2015-2016 (Lot No 03)  1-Oct-2015  7 Days  Carpeting  LRPS  6000 6     LRPS  8000 8     Dhaka, (Division Office) 
 Revenue  BTJR(09)/EE/DRD/Sub Division-1/2013-2014  16-Sep-2013  7 Days  Carpeting  LRPS  6000 6     LRPS  9500 9.5     Dhaka, (Division Office) 
 Revenue  BTJR(07)03/EE/DRD/2015-2016 (Lot No 06)  4-Oct-2015  7 Days  Carpeting  LRPS  6000 6     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  BTJR(07)/03/EE/DRD/2015-2015  4-Oct-2015  7 Days  Carpeting  LRPS  6000 6     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  BTJR(10)/DRD/Sub Division-1/2013-2014  16-Sep-2013  7 Days  Carpeting  LRPS  6000 6     LRPS  9500 9.5     Dhaka, (Division Office) 
 Revenue  BTJR(87)/EE/RDD/2012-2013 (Lot No-07)  23-Jun-2013  15 Days  Carpeting  LRPS  6500 6.5     LRPS  6900 6.9     Dhaka, (Division Office) 
 Revenue  26/Gazipur/2009-2010. (RFQ-07/20).  21-Dec-2009  3 Days  Pavement  LRPS  6510 6.51     LRP011  6800 17.798     Gazipur, (Division Office) 
 Revenue  113/Gazipur/2006-2007. (05/09)  15-Feb-2007  20 Days  Road Embankment  LRPS  6710 6.71     LRPS  6960 6.96     Gazipur, (Division Office) 
 Revenue  27/Gazipur/2010-2011. JMMR/04/RDG/2010-2011/09.  26-Jan-2011  10 Days  Pavement  LRPS  7000 7     LRPS  8000 8     Gazipur, (Division Office) 
 Revenue  e-GP/17/EE/DRD/2015-2016 (36145)  8-Dec-2015  30 Days  Carpeting  LRPS  7000 7     LRPS  8000 8     Dhaka, (Division Office) 
 Revenue  45/Gazipur/11-12. LTM Package No. JMMR/05/RDG/11-12/07.  27-Oct-2011  30 Days  Pavement  LRPS  7200 7.2     LRPS  7700 7.7     Gazipur, (Division Office) 
 Revenue  51/Gazipur/2011-2012. LTM Package No. JMMR/05/RDG/2011-2012/08.  27-Oct-2011  30 Days  Pavement  LRPS  7200 7.2     LRPS  7700 7.7     Gazipur, (Division Office) 
 Revenue  BTJR(185)/EE/RDD/2011-2012. (Lot No-04)  5-Jun-2012  15 Days  Carpeting  LRPS  7500 7.5     LRPS  9500 9.5     Dhaka, (Division Office) 
 Revenue  BTJR/EE/190/RDD/2011-2012. ( Lot No-01)  4-Jun-2012  15 Days  Carpeting  LRPS  7500 7.5     LRPS  9500 9.5     Dhaka, (Division Office) 
 Revenue  BTJR(190)/EE/RDD/2011-2012 (Lot No-02)  18-Jun-2012  15 Days  Carpeting  LRPS  7500 7.5     LRPS  9500 9.5     Dhaka, (Division Office) 
 Revenue  89/Tongi/08-09. (RFQ-16/11)    519 Days  Pavement  LRPS  7700 7.7     LRPS  8000 8     Gazipur, (Division Office) 
 Revenue  89/Gazipur/2006-2007.  1-Mar-2007  60 Days  Pavement  LRPS  7700 7.7     LRPS  8000 8     Gazipur, (Division Office) 
 Revenue  51/Gazipur/2011-2012. LTM Package No. JMMR/05/RDG/2011-2012/08.  27-Oct-2011  30 Days  Pavement  LRPS  8500 8.5     LRPS  8700 8.7     Gazipur, (Division Office) 
 Revenue  45/Gazipur/11-12. LTM Package No. JMMR/05/RDG/11-12/07.  27-Oct-2011  30 Days  Pavement  LRPS  8500 8.5     LRPS  8700 8.7     Gazipur, (Division Office) 
 Revenue  67/Gazipur/2010-2011. JMMR/10/RDG/2010-2011/14.  15-May-2011  10 Days  Pavement  LRPS  8600 8.6     LRPS  9000 9     Gazipur, (Division Office) 
 Revenue  46/Gazipur/2010-2011. JMMR/08/RDG/2010-2011/36.  11-Apr-2011  10 Days  Pavement  LRPS  8600 8.6     LRPS  8950 8.95     Gazipur, (Division Office) 
 Revenue  BTJR(51)/EE/RDD/2012-2013. (Lot No-04)  20-Nov-2012  7 Days  Carpeting  LRPS  9000 9     LRPS  9900 9.9     Dhaka, (Division Office) 
 Revenue  BTJR(82)17/EE/RDD/2010-2011 (Lot No 29)  9-Mar-2011  20 Days  Carpeting  LRPS  9200 9.2     LRPS  9800 9.8     Dhaka, (Division Office) 
 Revenue  BTJR(52)/02/EE/RDD/2012-2013 (Lot No 03)  20-Nov-2012  10 Days  Carpeting  LRPS  9200 9.2     LRPS  10000 10     Dhaka, (Division Office) 
 Revenue  BTJR(94)/13/EE/RDD/2012-2013 (Lot No 03)  2-Jul-2013  10 Days  Carpeting  LRPS  9500 9.5     LRPS  10000 10     Dhaka, (Division Office) 
 Revenue  e-GP/15/RDG/work/ 2014-2015. (Invitation Ref. e-Gp/13/RDG/2014-2015 & Tender ID : 17239)  26-Feb-2015  30 Days  Road Embankment  LRPS  9600 9.6     LRPS  9760 9.76     Gazipur, (Division Office) 
 Revenue  99/Joydebpur/2006-2007. (Quo. 01/14)  8-Oct-2006  3 Days  Pavement  LRP010  0 9.993     LRP011  0 10.998     Gazipur, (Division Office) 
 Revenue  10/Gazipur/2007-2008. (01/01)  3-Jan-2008  182 Days  Road Embankment  LRP010  0 9.993     LRP010  235 10.228     Gazipur, (Division Office) 
 Revenue  19/Gazipur/2007-2008. (01/02)  21-Jan-2008  20 Days  Pavement  LRP010   9.993     LRP010  235 10.228     Gazipur, (Division Office) 
 Revenue  124/Gazipur/2006-2007. (Quo. 01/11)  8-Oct-2006  3 Days  Pavement  LRP010  50 10.043     LRP010  600 10.593     Gazipur, (Division Office) 
 Revenue  62/Gazipur/2006-2007. (03/14)  16-Jan-2007  10 Days  Pavement  LRP010  150 10.143     LRP010  445 10.438     Gazipur, (Division Office) 
 Revenue  148/Gazipur/2005-06.    10 Days  Pavement  LRP010  550 10.543     LRP010  800 10.793     Gazipur, (Division Office) 
 Revenue  89/Gazipur/2006-2007. JMMR/06/RDG/2006-2007/04.  1-Mar-2007  60 Days  Pavement  LRP010  700 10.693     LRP010  1000 10.993     Gazipur, (Division Office) 
 Revenue  14/Gazipur/2007-2008. (Quo. 05/08)  16-Jan-2008  3 Days  Pavement  LRP010  945 10.938     LRP010  960 10.953     Gazipur, (Division Office) 
 Revenue  09/Tongi/2012-2013. RFQ. T-02 (12-13).  15-Oct-2012  10 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  15 (fifteen) / RDG / 2013-2014. RFQ-06/02.  23-Jan-2014  5 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  102 (one hundred two) / RDG / 2013-2014. LTM Tender Package No. BTJR/02/RDG/2013-2014.  17-Jun-2014  10 Days  Carpeting  LRP011  0 10.998     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  37/Tongi/2008-2009. (RFQ-08/02).  23-Oct-2008  3 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  16 (Sixteen) /RDG/2013-2014. RFQ-07.  3-Apr-2014  5 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  27 (twenty seven) / RDG / 2013-2014. OTM Tender Package No. BTJR/07/RDG/2012-2013/13.  14-Aug-2013  45 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  10 (ten) / RDG / 2013-2014. RFQ- 05/02.  20-Jan-2014  5 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  18/Joydebpur/2007-2008. DPM - 20.  26-Sep-2007  3 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  e-Gp/34/RDG/Works/2017-2018. Invitation Ref. e-Gp/34/RDG/2017-2018. Tender ID # 147138.  16-Jan-2018  20 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  55/Tongi/2008-2009. (04/04)  13-Jan-2009  7 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  45/Tongi/2011-2012. LTM Package No. BTJR/05/RDG/2011-2012/01.  27-Oct-2011  30 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  28 (twenty eight) / RDG / 2013-2014. OTM Tender Package No. BTJR/06/RDG/2012-2013/13.  14-Aug-2013  45 Days  Pavement  LRP011  0 10.998     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  11 (eleven) / RDG / 2014-2015. (RFQ - 04/01).  10-Sep-2014  5 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  06/Tongi/2012-2013. LTM Package No. BTJR /01/RDG/2012-2013/01.  28-Aug-2012  15 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  81/Tongi/2011-2012. RFQ. T-07/L-02 (11-12).  28-Jun-2012  5 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  e-Gp/26/RDG/Works/2015-2016. Invitation Ref. e-Gp/03/RDG/2015-2016 & Tender ID # 31470.  15-Nov-2015  15 Days  Road Embankment  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  40 (forty) / RDG / 2013-2014. OTM Tender Package No. BTJR/06/RDG/2012-2013/11.  19-Aug-2013  45 Days  Pavement  LRP011  0 10.998     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  DPM Notice No. 11/Road Sub-Division Tongi/2013-2014.  26-May-2014  3 Days  Pavement  LRP011  0 10.998     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  143/Tongi/2009-2010. (RFQ-17/04)  23-May-2010  7 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  26/Joydebpur/2010-2011. JMMR/06/RDG/2010-2011/03.  13-Feb-2011  10 Days  Pavement  LRP011  0 10.998     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  e-Gp/08/RDG/Works/2015-2016. Invitation Ref. e-Gp/57/RDG/2014-2015 & ID - 22132.  21-Jul-2015  30 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  DZ(e-GP)-04/PMP(Road)/2014-2015. Tender ID : 12055.  1-Jan-2015  243 Days  Pavement  LRP011  0 10.998     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  17/Tongi/2008-2009. (RFQ-05/03).  21-Sep-2008  3 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  55/Tongi22009-2010 (BTJR/04/RDG/2009-2010/02).  29-Dec-2009  10 Days  Pavement  LRP011  0 10.998     LRP013  0 12.991     Gazipur, (Division Office) 
 Revenue  24 (twenty four)/RDG/2013-2014. Tender Package No. BTJR/06/RDG/2012-2013/10.  13-Aug-2013  30 Days  Pavement  LRP011  0 10.998     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  17 (seventeen) / RDG / 2013-2014. RFQ - 08.  28-Apr-2014  3 Days  Pavement  LRP011  0 10.998     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  22 (twenty two)/ RDG / 2014-2015. (RFQ-08)  7-Jan-2015  5 Days  Road Embankment  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  31/Tongi/2008-2009. (RFQ-06/01).  5-Oct-2008  3 Days  Pavement  LRP011  0 10.998     LRP013  0 12.991     Gazipur, (Division Office) 
 Revenue  135/Tongi/2009-2010. (RFQ-15/13).  9-May-2010  7 Days  Pavement  LRP011  0 10.998     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  13/Tongi/2009-2010. (RFQ-03/02)  5-Oct-2009  3 Days  Pavement  LRP011  0 10.998     LRP013  0 12.991     Gazipur, (Division Office) 
 Revenue  10(ten)/RDG/2014-2015. LTM Package No. BTJR/01/RDG/2014-2015/08.  15-Dec-2014  30 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  129/Tongi/2009-2010. (RFQ-15/11).  4-May-2010  7 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  14 (fourteen) / RDG / 2013-2014. RFQ-06/03.  23-Jan-2014  5 Days  Road Embankment  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  104/Tongi/2009-2010. (RFQ-13/01).  1-Apr-2010  7 Days  Pavement  LRP011  0 10.998     LRP012  0 11.995     Gazipur, (Division Office) 
 Revenue  BTJR(59)/RDD/2008-2009  4-Jan-2009  30 Days  Carpeting  LRPS  11000 11     LRPS  11500 11.5     Dhaka, (Division Office) 
 Revenue  82/Tongi/2009-2010. (RFQ-11/20).  10-Feb-2010  7 Days  Pavement  LRP011  200 11.198     LRP011  300 11.298     Gazipur, (Division Office) 
 Revenue  BTJR(127)/RDD/2008-2009 (Lot No-02)  11-May-2009  30 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(131)/08/EE/RDD/2010-2011 (Lot No 20)  5-May-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  BTJR(132)/07/EE/RDD/2011-2012 (Lot No 07)  29-Dec-2011  10 Days  Carpeting  LRPS  11500 11.5     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  BTR(129)/EE/SDE-1/2009-2010. (Lot No-10)  25-May-2010  7 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR (162)/RDD/2008-2009 (Lot No-13)  21-Jun-2009  5 Days  Carpeting  LRPS  11500 11.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(93)/EE/RDD/2011-2012. (Lot No-07)  2-Nov-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(57)/RDD/2009-2010 (RSD-1) (Lot No-01)  7-Jan-2010  7 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(40)/21/EE/RDD/2010-2011 (Lot No 30)  11-Aug-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  12000 12     Dhaka, (Division Office) 
 Revenue  BTJR(120)/19/EE/RDD/2010-2011 (Lot No 07)  18-Apr-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(168)/EE/RDD/2009-2010 (Lot No 09)  30-Jun-2010  15 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(58)/RDD/2009-2010 (RSD) (Lot No-03)  7-Jan-2010  7 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(87)/EE/RDD/2011-2012. (Lot No-01)  31-Oct-2011  10 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(117)/EE/RDD/2010-2011 (Lot No-17)  21-Apr-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(37)/RDD/2008-2009 (Lot No-05)  27-Nov-2008  7 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(92)/EE/RDD/2010-2011 (Lot No-14)  24-Mar-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(168)/LTM/EE/RDD/2009-2010 (Lot No-09)  20-Jun-2010  15 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(114)/07/EE/RDD/2011-2012 (Lot No 03)  7-Dec-2011  10 Days  Carpeting  LRPS  11500 11.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(126)/RDD/2008-2009-1  6-May-2009  20 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(39)/RDD/2008-2009 (Lot No-03)  27-Nov-2008  7 Days  Carpeting  LRPS  11500 11.5     LRPS  12500 12.5     Dhaka, (Division Office) 
 Revenue  BTJR(63)/24/EE/RDD/2011-2012 (Lot No 02)  12-Sep-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(129)/EE/SDE-1/2009-2010. (Lot No-10)  25-May-2010  7 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(16)/27/EE/RDD/2011-2012 (Lot no 01)  27-Aug-2011  30 Days  Carpeting  LRPS  11500 11.5     LRPS  11900 11.9     Dhaka, (Division Office) 
 Revenue  BTJR(62)/RDD/2008-2009 (Lot No-02)  21-Jan-2009  5 Days  Carpeting  LRPS  11500 11.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(50)/RDD/2009-2010 (RSD-1) Lot No-03)  10-Dec-2009  7 Days  Carpeting  LRPS  11500 11.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(64)/EE/RDD/2010-2011 (Lot No-21)  26-Jan-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(76)/EE/SDE-1/2009-2010 (Lot No-04)  24-Feb-2010  7 Days  Carpeting  LRPS  11500 11.5     LRPS  11700 11.7     Dhaka, (Division Office) 
 Revenue  BTJR(06)/EE/RDD/2010-2011 (Lot No-04)  1-Feb-2011  30 Days  Carpeting  LRPS  11500 11.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR (126)/RDD/2008-2009  6-May-2009  20 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(144)/RDD/2008-2009 (Lot No-09)  1-Jun-2009  5 Days  Carpeting  LRPS  11500 11.5     LRPS  12500 12.5     Dhaka, (Division Office) 
 Revenue  BTJR(169)/RDD/2007-2008. (Lot No-8)  22-Jun-2009  15 Days  Carpeting  LRPS  11500 11.5     LRPS  12500 12.5     Dhaka, (Division Office) 
 Revenue  BTJ(18)/EE/RDD/2009-2010 (Lot No-17)  21-Sep-2010  20 Days  Carpeting  LRPS  11500 11.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(68)/06/EE/RDD/2010-2011 (Lot No-07)  26-Jan-2011  30 Days  Carpeting  LRPS  11500 11.5     LRPS  11800 11.8     Dhaka, (Division Office) 
 Revenue  187/Joydebpur/2005-06. (08/56)  6-Apr-2006  10 Days  Pavement  LRP011  570 11.568     LRP011  1000 11.998     Gazipur, (Division Office) 
 Revenue  BTJR(127)/RDD/2006-2007 (Lot No- 01)  1-Feb-2007  5 Days  Road Embankment  LRPS  11850 11.85     LRPS  21900 21.9     Dhaka, (Division Office) 
 Revenue  BTJR(69)/RDD/2007-2008    0 Days  Carpeting  LRPS  11900 11.9     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  100/Joydebpur/2006-2007. (Quo. No. 01/15)  8-Oct-2006  3 Days  Pavement  LRP012  0 11.995     LRP013  0 12.991     Gazipur, (Division Office) 
 Revenue  30/Tongi/2012-2013. LTM Package No. BTJR/02/RDG/2012-2013/24.  27-Dec-2012  15 Days  Pavement  LRP012  0 11.995     LRP013  0 12.991     Gazipur, (Division Office) 
 Revenue  34/Tongi/2008-2009. (RFQ-07/01)  21-Oct-2008  3 Days  Pavement  LRP012  0 11.995     LRP013  0 12.991     Gazipur, (Division Office) 
 Revenue  116/Tongi/2009-2010. (RFQ-13/15).  20-Apr-2010  7 Days  Pavement  LRP012  0 11.995     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  BTJR(178)/13/EE/RDD/2011-2012 (Lot No 31)  26-Apr-2012  365 Days  Carpeting  LRPS  12000 12     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(12/EE/RDD/2011-2012. (Lot No-02)  22-Mar-2012  15 Days  Carpeting  LRPS  12000 12     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR(54)/RDD/2007-2008 (Emergency Work) (BTJR(006)  1-Oct-2007  5 Days  Road Rehablitation  LRPS  12100 12.1     LRPS  12250 12.25     Dhaka, (Division Office) 
 Revenue  BTJR(11)/EE/RDD/2011-2012 (Lot No-01)  14-Aug-2011  30 Days  Carpeting  LRPS  12100 12.1     LRPS  12850 12.85     Dhaka, (Division Office) 
 Revenue  28/Joydebpur/2007-2008. DPM - 35.  22-Nov-2007  3 Days  Pavement  LRP012  110 12.105     LRP014  975 14.973     Gazipur, (Division Office) 
 Revenue  BTJR(28)/EE/RDD/2011-2012 (Lot No-03)  28-Aug-2011  30 Days  Carpeting  LRPS  12250 12.25     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  BTJR(157)/12/EE/RDD/2011-2012 (Lot No 03)  19-Jan-2012  7 Days  Carpeting  LRPS  12500 12.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(65)/08/EE/RDD/2010-2011 (Lot No-19)  26-Jan-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(140)/07/EE/RDD/2011-2012 (Lot No 09)  12-Dec-2011  10 Days  Carpeting  LRPS  12500 12.5     LRPS  17700 17.7     Dhaka, (Division Office) 
 Revenue  BTJR(13)/RDD/2008-2009.  24-Dec-2008  3 Days  Carpeting  LRPS  12500 12.5     LRPS  12900 12.9     Dhaka, (Division Office) 
 Revenue  BTJR(71)/RDD/2009-2010(RSD-1) (Lot No-04)  21-Jan-2010  6 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(15)/23/EE/RDD/2011-2012 (Lot No 10)  27-Aug-2011  30 Days  Carpeting  LRPS  12500 12.5     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  BTJR(117)/EE/SDE-1/2009-2010 9(Lot No-01)  5-May-2010  6 Days  Carpeting  LRPS  12500 12.5     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  BTJR(64)/08/EE/RDD/2010-2011 (Lot No-20)  26-Jan-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(113)/RDD/2009-2010 (RSD-1)(Lot No-05)  22-Mar-2010  6 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJ(21)/EE/RDD/2009-2010 (Lot No-01)  23-Sep-2010  14 Days  Carpeting  LRPS  12500 12.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(159)/13/EE/RDD/2011-2012 (Lot No 13)  19-Jan-2012  15 Days  Carpeting  LRPS  12500 12.5     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR(136)/19/EE/RDD/2010-2011 (Lot No 29)  11-Apr-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  BTJR(65)/RDD/2009-2010 (RSD-1) (Lot No-01  17-Dec-2009  7 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(90)/03/EE/RDD/2011-2012 (Lot No 09)  31-Oct-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  BTJ(131)/08/EE/RDD/2010-2011 (Lot No 20)  18-Apr-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  BTJR(129)/04/EE/RDD/2011-2012 (Lot No 13)  27-Dec-2011  10 Days  Carpeting  LRPS  12500 12.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(72)RDD/2009-2010(RSD-1)(Lot No-03)  28-Jan-2010  5 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(60)/RDD/2008-2009 (Lot No-02)  7-Jan-2009  7 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  BTJR(67)/08/EE/RDD/2010-2010 (Lot No-07)  20-Jan-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(21)/EE/RDD/2009-2010 (Lot No -23)  23-Sep-2010  20 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(55)/RDD/2009-2010 (RSD-1)(Lot No-05)  14-Dec-2009  7 Days  Carpeting  LRPS  12500 12.5     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  BTJR(126)/EE/SDE-1/2009-2010 (Lot No-01)  23-May-2010  6 Days  Carpeting  LRPS  12500 12.5     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  BTJR(142)/EE/SDE-1/2009-2010 (Lot No-10)  15-Jul-2010  15 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJ(92)03/EE/RDD/2011-2012 (Lot No 02)  24-Oct-2011  10 Days  Carpeting  LRPS  12500 12.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(143)/RDD/2008-2009 (RSD-1)  17-Nov-2009  30 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(45)/21/EE/RDD/2011-2012 (Lot No 18)  3-Aug-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(20)/18/EE/RDD-2009-2010 (Lot No-01)  23-Sep-2010  75 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(43)/RDD/2009-2010(RSD-1) (Lot No-01)  9-Dec-2009  5 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(63)/RDD/2009-2010 (RSD-1)(Lot No-02)  14-Jan-2010  7 Days  Carpeting  LRPS  12500 12.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(127)/RDD/2008-2009 (Lot No-02)-1  23-Jul-2009  25 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(83)/RDD/2009-2010(RSD) (Lot No-02)  9-Mar-2010  7 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(102)/13/EE/RD/2010-2011(Lot No 15)  11-Apr-2011  30 Days  Carpeting  LRPS  12500 12.5     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  BTJR(34)/18/EE/RDD/2009-2010 (Lot No 02)  25-Oct-2010  365 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR (47)/RDD/2008-209 (Lot No-05)  27-Nov-2008  7 Days  Carpeting  LRPS  12500 12.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(127)/RDD/2008-2009 (Lot No-02)-2  13-Sep-2009  20 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(117)/EE/SDE-1/2009-2010 (Lot No-01)  6-May-2010  10 Days  Carpeting  LRPS  12500 12.5     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  BTJR(61)/RDD/2009-2010 (RSD-1) (Lot No-06)  19-Jan-2010  5 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(77)/08/EE/RDD/2010-2011 (Lot No-15)  20-Feb-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  DAR(51)/EE/RDD/2009-2010 (Lot No-01)  8-Dec-2009  5 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  BTJR(44)/04/EE/RDD/2010-2011 (Lot No-07)  27-Dec-2010  30 Days  Carpeting  LRPS  12500 12.5     LRPS  12800 12.8     Dhaka, (Division Office) 
 Revenue  41/Tongi/2008-2009. (RFQ-08/01)  23-Oct-2008  3 Days  Pavement  LRP012  640 12.635     LRP012  740 12.735     Gazipur, (Division Office) 
 Revenue  BTJR(126)/RDD/2007-2008 (Lot No- 05)  24-Jun-2008  7 Days  Road Rehablitation  LRPS  12725 12.725     LRPS  12975 12.975     Dhaka, (Division Office) 
 Revenue  BTJR(19)/DMP/RDD/2007-2008 (Lot No- 10)  15-Nov-2007  7 Days  Carpeting  LRPS  12750 12.75     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(118)/RDD/2008-2009 (Lot No-04)  12-Apr-2009  7 Days  Carpeting  LRPS  12800 12.8     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  BTJR(118)/RDD/2008-2009 (Lot No-04)-1  12-Apr-2009  7 Days  Carpeting  LRPS  12800 12.8     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  BTJR(127)/RDD/2007-2008 (Lot No- 07)  24-Jun-2008  7 Days  Road Rehablitation  LRPS  12975 12.975     LRPS  13225 13.225     Dhaka, (Division Office) 
 Revenue  168/Tongi/2009-2010. (LTM-01/02).  16-Jun-2010  7 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  27/Tongi/2009-2010. (RFQ-04/09).  12-Oct-2009  3 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  03 (three) / RDG / 2014-2015. (RFQ - 01/03)  28-Aug-2014  5 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  35/Joydebpur/2007-2008. DPM - 43.  7-Feb-2008  3 Days  Pavement  LRP013   12.991     LRP016   15.983     Gazipur, (Division Office) 
 Revenue  07/Joydebpur/2008-2009. (RFQ-06/05)  5-Oct-2008  3 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  75/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/13.  16-May-2011  10 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  127/Joydebpur/2009-2010. (LTM-04/44)  17-Jun-2010  7 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  19/Tongi/2008-2009. (RFQ-04/03).  18-Sep-2008  3 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  30/Tongi/2008-2009. (RFQ-06/02)  23-Oct-2008  3 Days  Pavement  LRP013  0 12.991     LRP015  0 14.979     Gazipur, (Division Office) 
 Revenue  15/Tongi/2009-2010. (RFQ-03/18).  10-May-2009  3 Days  Pavement  LRP013  0 12.991     LRP014  0 13.998     Gazipur, (Division Office) 
 Revenue  127/Gazipur/2006-2007. (Quo. 01/12)  8-Oct-2006  3 Days  Pavement  LRP010  3000 12.993     LRP010  3500 13.493     Gazipur, (Division Office) 
 Revenue  BTJR(122)/RDD/2007-2008  18-Feb-2008  5 Days  Road Rehablitation  LRPS  13000 13     LRPS  13200 13.2     Dhaka, (Division Office) 
 Revenue  BTJR(58)/RDD/2008-2009 (Lot No-01)  4-Jan-2009  30 Days  Carpeting  LRPS  13000 13     LRPS  13900 13.9     Dhaka, (Division Office) 
 Revenue  BTJR(74)/EE/RDD/2010-2011 (Lot No-30)  8-Feb-2011  20 Days  Carpeting  LRPS  13000 13     LRPS  14560 14.56     Dhaka, (Division Office) 
 Revenue  110/Joydebpur/2006-2007. (05/37)  5-Aug-2007  20 Days  Carpeting  LRP013  355 13.346     LRP014  450 14.448     Gazipur, (Division Office) 
 Revenue  126/Gazipur/2006-2007. (Quo. 01/13)  8-Oct-2006  3 Days  Pavement  LRP010  3500 13.493     LRP010  4000 13.993     Gazipur, (Division Office) 
 Revenue  BTJR(05)/RDD/2008-2009 (Lot No-02)  20-Oct-2008  5 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(107)/15/EE/RDD/2010-2011 (Lot No 02)  11-Apr-2011  45 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(50)/RDD/2008-2009 (Lot No-06)  27-Nov-2008  7 Days  Carpeting  LRPS  13500 13.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(56)/RDD/2009-2010 (RSD-1) (Lot No-08)  18-Jan-2010  5 Days  Carpeting  LRPS  13500 13.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(152)/EE/SDE-1/2009-2010 (Lot No-04)  27-Apr-2010  6 Days  Carpeting  LRPS  13500 13.5     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  BTJR(100)/EE/RDD/2010-2011. (Lot No-16)  2-Mar-2011  20 Days  Carpeting  LRPS  13500 13.5     LRPS  13900 13.9     Dhaka, (Division Office) 
 Revenue  BTJR(67)/RDD/2009-2010 (RSD-1) Lot No-01)-1  21-Jan-2010  3 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(71)/EE/RDD/2010-2011 (Lot No-18)  19-Jan-2011  20 Days  Carpeting  LRPS  13500 13.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(43)/21/EE/RDD/2011-2012 (Lot No 06)  20-Aug-2011  30 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJ(89)/RDD/2008-2009 (Lot No-09)  23-Feb-2009  20 Days  Carpeting  LRPS  13500 13.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(02)/RDD/2009-2010 (Lot No-02)  22-Jul-2009  5 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR (67)/RDD/2009-2010 (RSD-1) Lot No-01)  21-Jan-2010  3 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  BTJR(30)/21/EE/RDD/2011-2012 (Lot No 03)  2-Aug-2011  20 Days  Carpeting  LRPS  13640 13.64     LRPS  15480 15.48     Dhaka, (Division Office) 
 Revenue  BTJR( 49)/RDD/2009-2010 (RSD-1) (Lot No-03)  14-Dec-2009  6 Days  Carpeting  LRPS  13820 13.82     LRPS  15654 15.654     Dhaka, (Division Office) 
 Revenue  102/Tongi/2009-2010. (RFQ-14/04).  1-Apr-2010  7 Days  Pavement  LRP014  0 13.998     LRP015  0 14.979     Gazipur, (Division Office) 
 Revenue  21/Tongi/2012-2013. LTM Package No. BTJR/02/RDG/2012-2013/22.  18-Nov-2012  15 Days  Pavement  LRP014  0 13.998     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  101/Joydebpur/2006-2007. (Quo. 01/16)  8-Oct-2006  3 Days  Pavement  LRP014  0 13.998     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  14/Tongi/2009-2010. (RFQ-03/23).  5-Oct-2009  3 Days  Pavement  LRP014  0 13.998     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  BTJR(49)/04/EE/RDD/2010-2011 (Lot No 10)  1-Dec-2010  20 Days  Carpeting  LRPS  14010 14.01     LRPS  14110 14.11     Dhaka, (Division Office) 
 Revenue  BTJR (121)/RDD/2007-2008 (Lot No-02) (DTM)  4-Jul-2008  15 Days  Carpeting  LRPS  14100 14.1     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  BTJR(36)/RDD/2008-2009 (Lot No-07)  27-Nov-2008  7 Days  Carpeting  LRPS  14100 14.1     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  154/Joydebpur/2005-2006. (06/06)  16-Mar-2006  705 Days  Pavement  LRP014  180 14.178     LRP014  365 14.363     Gazipur, (Division Office) 
 Revenue  BTJR(27)/EE/RDD/2009-2010 (Lot No-22)  14-Oct-2010  20 Days  Carpeting  LRPS  14200 14.2     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  BTJR(36)/RDD/2008-2009 (Lot No-07)-1  27-Nov-2008  10 Days  Carpeting  LRPS  14200 14.2     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  BTJR(136)09/EE/RDD/2011-2012 (Lot No 07)  12-Jan-2012  5 Days  Carpeting  LRPS  14500 14.5     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  BTJR(20)/EE/RDD/2009-2010 (Lot No-10)  1-Jul-2010  10 Days  Carpeting  LRPS  14500 14.5     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  BTJR(35)/16/EE/RDD/2012-2013 (Lot No 03)  23-Jul-2012  10 Days  Carpeting  LRPS  14500 14.5     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  BTJR(163)/RDD/2008-2009 (Lot No--14)  21-Jun-2009  5 Days  Carpeting  LRPS  14500 14.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(94)/EE/RDD/2011-2012. (Lot No-06)  2-Nov-2011  20 Days  Carpeting  LRPS  14500 14.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(141)/EE/SDE-1/2009-2010 (Lot No-11)  3-Jun-2010  6 Days  Carpeting  LRPS  14500 14.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(155)/EE/SDE-1/2009-2010 (Lot No-1)  10-Jun-2010  9 Days  Carpeting  LRPS  14500 14.5     LRPS  14700 14.7     Dhaka, (Division Office) 
 Revenue  BTJR(121)/RDD/2008-2009 (Lot No-20)  4-Jul-2008  15 Days  Carpeting  LRPS  14500 14.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(31)/EE/RDD/2011-2012 (Lot No-19)  26-Aug-2011  30 Days  Carpeting  LRPS  14500 14.5     LRPS  16200 16.2     Dhaka, (Division Office) 
 Revenue  Residence(10)/RDD/2008-2009 (Lot No-02)  5-Apr-2009  7 Days  Carpeting  LRPS  14500 14.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(40)/RDD/2008-2009 (Lot No-06)  27-Nov-2008  7 Days  Carpeting  LRPS  14500 14.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(117)/RDD/2008-2009 (Lot No-03)  10-Apr-2009  7 Days  Carpeting  LRPS  14500 14.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(119)/EE/RDD/2010-2011 (Lot No-10)  5-Apr-2011  20 Days  Carpeting  LRPS  14500 14.5     LRPS  14600 14.6     Dhaka, (Division Office) 
 Revenue  BTJR(175)/20/EE/RDD/2009-2010 (Lot No 10)  1-Jul-2010  10 Days  Carpeting  LRPS  14500 14.5     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  DAR(68)/Kallyanpur/2009-2010 (Lot No-04)  16-Dec-2009  3 Days  Carpeting  LRPS  14500 14.5     LRPS  14700 14.7     Dhaka, (Division Office) 
 Revenue  BTJR(141)/EE/RDD/2011-2012 (Lot No-13)  12-Jan-2012  5 Days  Carpeting  LRPS  14500 14.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(138)/EE/SDE-1/2007-2008 (Lot No-15)  25-May-2010  8 Days  Carpeting  LRPS  14500 14.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(106)/EE/RDD/2011-2012. (Lot No-37)  11-Oct-2011  20 Days  Carpeting  LRPS  14700 14.7     LRPS  14950 14.95     Dhaka, (Division Office) 
 Revenue  BTJR(74)/RDD/2008-2009 (Lot No-05)  5-Feb-2009  7 Days  Carpeting  LRPS  14700 14.7     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(134)/EE/SDE-1/2009-2010 (Lot No-13)-1  30-May-2010  5 Days  Carpeting  LRPS  14735 14.735     LRPS  14900 14.9     Dhaka, (Division Office) 
 Revenue  84/Gazipur/2005-2006. (12/46)  27-Mar-2006  10 Days  Pavement  LRP010  4770 14.763     LRP010  5000 14.993     Gazipur, (Division Office) 
 Revenue  BTJR(60)/RDD/2009-2010 (RSD-1) (Lot No-05)  14-Jan-2010  5 Days  Carpeting  LRPS  14900 14.9     LRPS  15100 15.1     Dhaka, (Division Office) 
 Revenue  BTJR(82)/21/EE/RDD/2011-2012 (Lot No 20)  20-Oct-2011  30 Days  Carpeting  LRPS  14950 14.95     LRPS  15200 15.2     Dhaka, (Division Office) 
 Revenue  41 (forty one) / RDG / 2013-2014. OTM Package Tender No. BTJR/07/RDG/2012-2013/12.  19-Aug-2013  45 Days  Pavement  LRP015  0 14.979     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  119/Tongi/2009-2010. (RFQ-13/14).  20-Apr-2010  7 Days  Pavement  LRP015  0 14.979     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  16/Tongi/2008-2009. (RFQ-04/05).  18-Sep-2008  3 Days  Pavement  LRP015  0 14.979     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  25 twenty five)/RHD/2013-2014. Tender Package No. BTJR/07/RDG/2012-2013/11.  13-Aug-2013  30 Days  Carpeting  LRP015  0 14.979     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  e-Gp/36/RDG/Works/2017-2018. Invitation Ref. e-Gp/36/RDG/2017-2018, Tender ID # 147985.  25-Jan-2018  30 Days  Pavement  LRP015  0 14.979     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  59/Tongi/2010-2011. OTM Package No. BTJR/07/RDG/2010-2011/29.  26-Apr-2011  155 Days  Pavement  LRP015  0 14.979     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  88 (eighty eight) / RDG / 2013-2014. Tender Package No. BTJR/03/RDG/2013-2014/07.  22-Jan-2014  30 Days  Pavement  LRP015  0 14.979     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  13(thirteen)/RDG/2014-2015. LTM Package No. BTJR/01/RDG/2014-2015/06.  17-Dec-2014  30 Days  Pavement  LRP015  0 14.979     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  18 (eighteen) / RDG / 2013-2014. RFQ-09/01.  28-Apr-2014  3 Days  Pavement  LRP015  0 14.979     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  e-Gp/26/RDG/Works/2015-2016. Invitation Ref. e-Gp/03/RDG/2015-2016 & Tender ID # 31470.  15-Nov-2015  15 Days  Road Embankment  LRP015  0 14.979     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  167/Tongi/2009-2010. (LTM-01/01).  16-Jun-2010  7 Days  Pavement  LRP015  0 14.979     LRP016  0 15.983     Gazipur, (Division Office) 
 Revenue  e-Gp/21/RDG/Works/2016-2017. Invitation Ref. e-Gp/44/RDG/2015-2016 & Tender ID # 55615.  21-Aug-2016  25 Days  Pavement  LRP015  0 14.979     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  137/Gazipur/2005-06.  8-Jun-2006  10 Days  Pavement  LRP010  5000 14.993     LRP010  5265 15.258     Gazipur, (Division Office) 
 Revenue  135/Gazipur/2005-2006. (19/04)  5-Jun-2006  10 Days  Pavement  LRP010  5000 14.993     LRP010  5340 15.333     Gazipur, (Division Office) 
 Revenue  BTJR(174)/20/EE/RDD/2009-2010 (Lot No 01)  23-Jun-2011  15 Days  Carpeting  LRPS  15000 15     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(137)/EE/SDE-1/2009-2010 (Lot No-07)  4-May-2010  6 Days  Carpeting  LRPS  15000 15     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  BTJR(59)/RDD/2009-2010 (RSD-1) (Lot No-01)  11-Jan-2010  7 Days  Carpeting  LRPS  15100 15.1     LRPS  15320 15.32     Dhaka, (Division Office) 
 Revenue  BTJR(194)/EE/RDD/2011-2012. (Lot No-03)  18-Jun-2012  7 Days  Carpeting  LRPS  15100 15.1     LRPS  15800 15.8     Dhaka, (Division Office) 
 Revenue  BTJR(21)/21/EE/RDD/2011-2012 (Lot No 25)  14-Aug-2011  30 Days  Carpeting  LRPS  15200 15.2     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  45/Gazipur/2010-2011. JMMR/08/RDG/2010-2011/32.  28-Apr-2011  10 Days  Pavement  LRP011  4300 15.298     LRP011  4500 15.498     Gazipur, (Division Office) 
 Revenue  BTJR(14)/EE/RDD/2011-2012 (Lot No-02)  26-Aug-2011  30 Days  Carpeting  LRPS  15300 15.3     LRPS  15546 15.546     Dhaka, (Division Office) 
 Revenue  BTJR(14)/EE/RDD/2010-2011 (Lot No-02)  26-Aug-2011  30 Days  Carpeting  LRPS  15300 15.3     LRPS  15546 15.546     Dhaka, (Division Office) 
 Revenue  BTJR(32)/21/EE/RDD/2010-2011 (Lot No 24)  14-Aug-2011  20 Days  Carpeting  LRPS  15400 15.4     LRPS  18200 18.2     Dhaka, (Division Office) 
 Revenue  BTJR(33)/23/EE/RDD/2010-2011 (Lot no 18)  16-Aug-2011  20 Days  Carpeting  LRPS  15400 15.4     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(107)/EE/SDE-1/2009-2010 (Lot No-03)  28-Mar-2010  5 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(78)/EE/RDD/2010-2011 (Lot No-15)  22-Feb-2011  20 Days  Carpeting  LRPS  15500 15.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(128)/04/EE/RDD/2011-2012 (Lot No 12)  29-Dec-2011  10 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(79)/RDD/EE/SDE-1/2009-2010 (Lot No 03)  10-Mar-2010  6 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(37)/17/EE/RDD/2009-2010 (Lot No 10)  9-Dec-2010  20 Days  Carpeting  LRPS  15500 15.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(163)/RDD/2008-2009 (Lot No-14)-1  27-Oct-2009  5 Days  Carpeting  LRPS  15500 15.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(146)/EE/SDE-1/2009-2010 (Lot No-05)  6-Jun-2010  6 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(115)/RDD/2008-2009 (Lot No-02)  12-Apr-2009  7 Days  Carpeting  LRPS  15500 15.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(59)/EE?RDD/2009-2010 (Lot No-12)  11-Jan-2011  504 Days  Carpeting  LRPS  15500 15.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(128)/EE/SDE-1/2009-2010 (Lot No-06)  25-May-2010  6 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(153)/EE/SDE-1/2009-2010 (Lot No-03)  31-May-2010  16 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(187)/RDD/2007-2008  1-Jul-2008  3 Days  Carpeting  LRPS  15500 15.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(54)/RDD/2009-2010 (RSD-1)(Lot No-06)  14-Dec-2009  6 Days  Carpeting  LRPS  15500 15.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR/174/20/EE/RDD/2009-2010 (Lot No 1)  23-Jul-2010  15 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(115)/RDD/2008-2009 (Lot No-02)-1  12-Apr-2009  10 Days  Carpeting  LRPS  15500 15.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(13/)/EE/SDE-1/2007-2008 (Lot No-15)  25-May-2010  8 Days  Carpeting  LRPS  15500 15.5     LRPS  15700 15.7     Dhaka, (Division Office) 
 Revenue  BTJR(122)/19/EE/RDD/2010-2011 (Lot No 05)  20-Apr-2011  30 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  BTJR(43)/06/EE/RDD/2010-2011 (Lot No-01)  29-Dec-2010  30 Days  Carpeting  LRPS  15500 15.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJ(180)/EE/RDD/2009-2010 (Lot No-17)  24-Jun-2010  30 Days  Carpeting  LRPS  15500 15.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(169)/LTM/EE/RDD/2009-2010 (Lot No-04)  17-Jun-2010  20 Days  Carpeting  LRPS  15595 15.595     LRPS  15960 15.96     Dhaka, (Division Office) 
 Revenue  BTJR(153)/19/EE/RDD/2010-2011 (Lot No 12)  20-Apr-2011  30 Days  Carpeting  LRPS  15600 15.6     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(21)/RDD/2007-2008 (Emergency Work)  22-Aug-2007  5 Days  Road Rehablitation  LRPS  15800 15.8     LRPS  15850 15.85     Dhaka, (Division Office) 
 Revenue  83/Tongi/2008-2009. BTJR/07/RDG/2008-2009/03.  21-Jun-2009  30 Days  Pavement  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  103/Tongi/2009-2010. (RFQ-14/05).  1-Apr-2010  7 Days  Pavement  LRP016  0 15.983     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  117/Tongi/2009-2010. (RFQ-13/16).  20-Apr-2010  7 Days  Road Embankment  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  e-Gp/28/RDG/Works/2016-2017. Invitation Ref. : e-Gp/05/RDG/2016-2017 & Tender ID # 79852.  25-Jan-2017  15 Days  Pavement  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  34/Tongi/2009-2010. (RFQ-05/07)  9-Nov-2009  3 Days  Pavement  LRP016  0 15.983     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  e-Gp/24/RDG/Works/2015-2016. Invitation Ref. : e-Gp/01/RDG/2015-2016 & Tender ID 29904.  4-Nov-2015  20 Days  Road Embankment  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  128/Tongi/2009-2010. (RFQ-15/10).  4-May-2010  7 Days  Pavement  LRP016  0 15.983     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  29/Tongi/2012-2013. LTM Package No. BTJR /02/RDG/2012-2013/19.  2-Dec-2012  15 Days  Pavement  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  e-Gp/37/RDG/2017-2018. Invitation Ref.: e-Gp/37/RDG/2017-2018, Tender ID # 169156.  25-Mar-2018  15 Days  Pavement  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  18/Tongi/2008-2009. (RFQ-04/06)  18-Sep-2008  3 Days  Pavement  LRP016  0 15.983     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  15/Tongi/2012-2013. LTM Package No. BTJR /02/RDG/2012-2013/21.  8-Nov-2012  15 Days  Pavement  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  04/Tongi/2008-2009. (RFQ-03/01)  14-Sep-2008  3 Days  Pavement  LRP016  0 15.983     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  BTJR/RDD/2005-2006 (Lot No- 16)  1-Jun-2006  20 Days  Road Rehablitation  LRPS  16000 16     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(175)/EE/RDD/2011-2012. (Lot No-10)  25-Sep-2011  30 Days  Carpeting  LRPS  16000 16     LRPS  16750 16.75     Dhaka, (Division Office) 
 Revenue  BTJR(135)/RDD/2007-2008  11-Feb-2008  5 Days  Road Rehablitation  LRPS  16000 16     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  50/Tongi/2010-2011. BTJR/06/RDG/2010-2011/08.  19-Apr-2011  15 Days  Pavement  LRPS  16000 16     LRPS  16850 16.85     Gazipur, (Division Office) 
 Revenue  BTJR(23)/23/EE/RDD/2011-2012 (Lot No 05)  26-Aug-2011  30 Days  Carpeting  LRPS  16200 16.2     LRPS  17650 17.65     Dhaka, (Division Office) 
 Revenue  BTJR(48)/04/EE/RDD/2010-2011 (Lot No 14)  3-Jan-2011  20 Days  Carpeting  LRPS  16250 16.25     LRPS  16450 16.45     Dhaka, (Division Office) 
 Revenue  BTJR(53.)/RDD/2007-2008 (Emergency Work)  31-Oct-2007  5 Days  Road Rehablitation  LRPS  16425 16.425     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  BTJR(76)/11/EE/RDD/2010-2011 (Lot No 03)  28-Feb-2011  30 Days  Carpeting  LRPS  16500 16.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJ(116)/EE/RDD/2010-2011 (Lot No-06)  20-Apr-2011  30 Days  Carpeting  LRPS  16500 16.5     LRPS  16900 16.9     Dhaka, (Division Office) 
 Revenue  BTJR(82)/RDD/2009-2010(RSD-1)(Lot No-01)  10-Mar-2010  6 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR/RDD/2004-2005 (Lot No-4)  6-Jul-2008  30 Days  Carpeting  LRPS  16500 16.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(45)/RDD/2009-2010 (RSD-1) (Lot No-06)  14-Dec-2009  5 Days  Carpeting  LRPS  16500 16.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(135)/20/EE/RDD/2010-2011 (Lot No 05)  20-Apr-2011  30 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR(25)/14/EE/RDD/2012-2013 (Lot No 03)  3-Aug-2012  10 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR (11)/RDD/2008-2009  9-Nov-2008  2 Days  Carpeting  LRPS  16500 16.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  TAJR(33)/EE/SDE-1/2009-2010  15-Jun-2010  2 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  PQ(12)/RDD/2008-2009  3-Mar-2009  3 Days  Carpeting  LRPS  16500 16.5     LRPS  16900 16.9     Dhaka, (Division Office) 
 Revenue  BTJR(44)/RDD/2007-2008-1  22-Jul-2008  30 Days  Carpeting  LRPS  16500 16.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(71)/RDD/2008-2009 (Lot No-10)  28-Jan-2009  7 Days  Carpeting  LRPS  16500 16.5     LRPS  16900 16.9     Dhaka, (Division Office) 
 Revenue  BTJ(170)/EE/RDD/2009-2010 (Lot No-05)  20-Jun-2010  10 Days  Carpeting  LRPS  16500 16.5     LRPS  16900 16.9     Dhaka, (Division Office) 
 Revenue  BTJR(87)/RDD/2009-2010(RSD-1)(Lot No-01)  10-Mar-2010  15 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJ(25)/EE/RDD/2009-2010 (Lot No-21)  6-Oct-2010  20 Days  Carpeting  LRPS  16500 16.5     LRPS  16900 16.9     Dhaka, (Division Office) 
 Revenue  BTJR(79)/EE/SDE-1/2009-2010 (Lot No-03)  10-Mar-2010  6 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR(18)/RDD/2005-2006 (Lot No- 61)  4-Oct-2007  20 Days  Road Rehablitation  LRPS  16700 16.7     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR/SDE-1/2007-2008 (BTJ-02)  8-Jul-2007  5 Days  Road Rehablitation  LRPS  16800 16.8     LRPS  16850 16.85     Dhaka, (Division Office) 
 Revenue  12/Gazipur Sub-Division/SO-1/2007-08.    3 Days  Road Embankment  LRP010  6900 16.893     LRP010  7400 17.393     Gazipur, (Division Office) 
 Revenue  31/Joydebpur/2007-2008. DPM - 38.  22-Nov-2007  3 Days  Pavement  LRP016  966 16.949     LRP018  0 17.973     Gazipur, (Division Office) 
 Revenue  BTJR(53)/RDD/2007-2008 (Emergency Work)  31-Oct-2007  5 Days  Road Rehablitation  LRPS  16950 16.95     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  BTJR(82)/RDD/2006-2007 (Lot No-31) (DTM)  5-Jul-2008  30 Days  Carpeting  LRPS  17000 17     LRPS  17350 17.35     Dhaka, (Division Office) 
 Revenue  BTJR(27)/01/EE/RDD/2012-2013 (Lot No 01)  16-Sep-2012  7 Days  Carpeting  LRPS  17000 17     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(160)/13/EE/RDD/2011-2012 (Lot No 09)  18-Jan-2012  15 Days  Carpeting  LRPS  17000 17     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(145)/EE/RDD/2009-2010 (Lot No-04)  7-Jun-2010  7 Days  Carpeting  LRPS  17000 17     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  BTJR(69)/RDD/2008-2009 (Lot No-06)  28-Jan-2009  7 Days  Carpeting  LRPS  17100 17.1     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  BTJR(75)/24/EE/RDD/2011-2012 (Lot No 31)  5-Oct-2011  30 Days  Carpeting  LRPS  17200 17.2     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  BTJR(29)/21/EE/RDD/2011-2012 (Lot No 04)  2-Aug-2011  20 Days  Carpeting  LRPS  17200 17.2     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(161)/EE/SDE-1/2009-2010 (Lot No-15)  16-Jun-2010  5 Days  Carpeting  LRPS  17300 17.3     LRPS  17600 17.6     Dhaka, (Division Office) 
 Revenue  BTJ(179)/EE/RDD/2009-2010 (Lot No-08)  22-Jun-2010  15 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(42)/25/EE/RDD/2011-2012 (Lot No 10)  27-Aug-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR(151)/EE/SDE-1/2009-2010 (Lot No-03)  27-Apr-2010  6 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(109)/11/EE/RDD/2010-2011 (Lot No 13)  27-Mar-2011  30 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(99)/EE/RDD/2011-2012 (Lot No-28)  16-Nov-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(121)/19/EE/RDD/2010-2011 (Lot No 04)  19-Apr-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(67)/RDD/2008-2009 (Lot No-04)  28-Jan-2009  7 Days  Carpeting  LRPS  17500 17.5     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR (10)/RDD/2008-2009 (Lot No-04)  20-Oct-2008  7 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(02)/RDD/2009-2010  11-Nov-2009  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(12)/RDD/2008-2009 (Lot No-01)  19-Oct-2008  7 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(199)/EE/RDD/2011-2012. (Lot No06)  13-Feb-2012  7 Days  Carpeting  LRPS  17500 17.5     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR(35)/RDD/2006-2007) Lot of 57)-1  28-Oct-2008  25 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(01)/RDD/2009-2010  11-Nov-2009  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(84)/04/EE/RDD/2011-2012 (Lot No 14)  20-Oct-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  BTJR(32)RDD/2011-2012  10-Jan-2012  3 Days  Carpeting  LRPS  17500 17.5     LRPS  17950 17.95     Dhaka, (Division Office) 
 Revenue  BTJR(02)/RDD/2009-2010-1  11-Nov-2009  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(170)/09/EE/RDD/2011-2012 (Lot No 09)  14-Dec-2011  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(140)/RDD/2008-2009 (Lot No 05, Start IPC-3)  17-Jul-2011  30 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJ(86)/03/EE/RDD/2011-2012 (Lot No 13)  31-Oct-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  BTJR(63)/05/EE/RDD/2010-2011 (Lot no-05)  26-Jan-2011  30 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(50)/29/EE/RDD/2011-2012 (Lot no 18)  1-Nov-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  22300 22.3     Dhaka, (Division Office) 
 Revenue  BTJR(29)/21/EE/RDD/2011-2012 (Lot No 4)  2-Aug-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR(171)/EE/RDD/2011-2012. (Lot No-07)  5-Jan-2012  7 Days  Carpeting  LRPS  17500 17.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  RFQ(03)/EE/RDD/2009-2010 (Lot No-07)  22-Nov-2009  7 Days  Carpeting  LRPS  17500 17.5     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR(163)/EE/SDE-1/2009-2010 (Lot No-01)  10-Jun-2010  14 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(13)//RDD/2008-2009 (Lot No-07)  21-Oct-2008  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(49)/RDD/2008-2009 (Lot No-07)  27-Nov-2008  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  BTJR(70)/RDD/2008-2009 (Lot No-03)  28-Jan-2009  7 Days  Carpeting  LRPS  17700 17.7     LRPS  17742 17.742     Dhaka, (Division Office) 
 Revenue  BTJR(91)/EE/RDD/2011-2012. (Lot No-10)  25-Oct-2011  20 Days  Carpeting  LRPS  17700 17.7     LRPS  17900 17.9     Dhaka, (Division Office) 
 Revenue  BTJR(64)/RDD/2008-2009 (Lot No-01)  28-Jan-2009  7 Days  Carpeting  LRPS  17742 17.742     LRPS  17775 17.775     Dhaka, (Division Office) 
 Revenue  08(eight) / RDG / 2014-2015. (RFQ-02/04)  2-Sep-2014  5 Days  Pavement  LRP018  0 17.842     LRP019  0 18.864     Gazipur, (Division Office) 
 Revenue  BTJR(34)/RDD/2007-2008 (Lot No- 05)  12-Dec-2007  20 Days  Road Rehablitation  LRPS  17860 17.86     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  BTJR(66)/RDD/2008-2009 (Lot No-05)  21-Jan-2009  7 Days  Carpeting  LRPS  17873 17.873     LRPS  17936 17.936     Dhaka, (Division Office) 
 Revenue  23/Joydebpur/2011-2012. LTM Package No. JMMR /04/RDG/2011-2012/12.  11-Oct-2011  10 Days  Pavement  LRP018  0 17.973     LRP035  0 34.601     Gazipur, (Division Office) 
 Revenue  03/Tongi/2008-2009. (RFQ-03/08).  14-Sep-2008  3 Days  Pavement  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  e-Gp/26/RDG/Works/2015-2016. Invitation Ref. e-Gp/03/RDG/2015-2016 & Tender ID # 31470.  15-Nov-2015  15 Days  Road Embankment  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  47/Tongi/2009-2010. (RFQ-07/17)  23-Nov-2009  3 Days  Pavement  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  21/Tongi/2008-2009. (RFQ-04/07).  18-Sep-2008  3 Days  Road Embankment  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  18/Tongi2009-2010. (RFQ-03/03)  7-Oct-2009  3 Days  Pavement  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  12/Joydebpur/2007-2008. DPM-16  25-Sep-2007  3 Days  Road Embankment  LRP018  0 17.973     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  31/Joydebpur/2007-2008. DPM - 38.  22-Nov-2007  3 Days  Pavement  LRP018  0 17.973     LRP018  80 18.053     Gazipur, (Division Office) 
 Revenue  28/Tongi/2011-2012. LTM Package No. BTJR/03/RDG/2011-2012/09.  10-Oct-2011  10 Days  Pavement  LRP018  0 17.973     LRP020  0 20.008     Gazipur, (Division Office) 
 Revenue  68/Gazipur/2010-2011. JMMR/10/RDG/2010-2011/06.  18-May-2011  10 Days  Pavement  LRP011  7000 17.998     LRP011  7100 18.098     Gazipur, (Division Office) 
 Revenue  BTJR/RDD/2005-2006 (Lot No- 03)  28-Mar-2006  20 Days  Overlay  LRPS  18000 18     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  BTJR(31)8RDD/2009-2010(RSD-1)(Lot No-01)  4-Aug-2009  30 Days  Carpeting  LRPS  18000 18     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  05/01/2007/SE/DRC/DHAKA (Lot No-2) (Payment Start 4th IPC)  19-Jul-2009  270 Days  Carpeting  LRPS  18000 18     LRPS  28000 28     Dhaka, (Division Office) 
 Revenue  BTJ(01)/RDD/2006-2007 (Lot No-4)  6-Jul-2008  30 Days  Overlay  LRPS  18000 18     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  BTJR(164)/13/EE/RDD/2011-2012 (Lot No 40)  2-Feb-2012  10 Days  Carpeting  LRPS  18000 18     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  05/01/2007/SE/DRC/DHAKA (Lot No-2)  19-Jul-2009  270 Days  Carpeting  LRPS  18000 18     LRPS  28000 28     Dhaka, (Division Office) 
 Revenue  05/SE/DRC/RDD/2007-2008 (Lot No-2)  8-Jul-2008  30 Days  Carpeting  LRPS  18000 18     LRPS  28700 28.7     Dhaka, (Division Office) 
 Revenue  05/01/2007/SE/DRC/DHAKA (Lot No-2) (Final)  19-Jul-2009  270 Days  Carpeting  LRPS  18000 18     LRPS  28000 28     Dhaka, (Division Office) 
 Revenue  05/SE/DRC/RDD/2007-2008 (Lot No-02)  12-Jul-2008  30 Days  Carpeting  LRPS  18000 18     LRPS  28700 28.7     Dhaka, (Division Office) 
 Revenue  26/Joydebpur/2007-2008. DPM-33.  21-Nov-2007  3 Days  Pavement  LRP018  80 18.053     LRP018  190 18.163     Gazipur, (Division Office) 
 Revenue  JUDBNMR(88)/EE/RDD/2011-2012 (Lot No-01)  30-Oct-2011  20 Days  Carpeting  LRPS  18100 18.1     LRPS  19900 19.9     Dhaka, (Division Office) 
 Revenue  BTJR(49)/EE/RDD/2011-2012 (Lot No-20)  4-Sep-2011  30 Days  Carpeting  LRPS  18155 18.155     LRPS  18300 18.3     Dhaka, (Division Office) 
 Revenue  27/Joydebpur/2007-2008. DPM - 34.  22-Nov-2007  3 Days  Pavement  LRP018  200 18.173     LRP018  356 18.329     Gazipur, (Division Office) 
 Revenue  26/Joydebpur/2006-2007. (22/16)  12-Jul-2006  10 Days  Pavement  LRP018  200 18.173     LRP018  350 18.323     Gazipur, (Division Office) 
 Revenue  BTJR(54)/02/EE/RDD/2010-2011 (Lot No09)  2-Jan-2011  30 Days  Carpeting  LRPS  18200 18.2     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  143/Gazipur/2006-2007. (04/43)  12-Nov-2006  10 Days  Pavement  LRP011  7250 18.248     LRP011  7550 18.548     Gazipur, (Division Office) 
 Revenue  08/Tongi/20009-2010. (RFQ-01/08).  24-Sep-2009  3 Days  Pavement  LRP018  280 18.253     LRP018  1000 18.973     Gazipur, (Division Office) 
 Revenue  BTJR(96)/24/EE/RD/2011-2012 (Lot No 13)  31-Oct-2011  30 Days  Carpeting  LRPS  18300 18.3     LRPS  18550 18.55     Dhaka, (Division Office) 
 Revenue  BTJR(67)/29/EE/RDD/2011-2012 (Lot No 06)  3-Oct-2011  20 Days  Carpeting  LRPS  18300 18.3     LRPS  18445 18.445     Dhaka, (Division Office) 
 Revenue  25/Joydebpur/2007-2008. DPM-32.  21-Nov-2007  3 Days  Pavement  LRP018  356 18.329     LRP018  466 18.439     Gazipur, (Division Office) 
 Revenue  43/Joydebpur/2006-2007. (22/19).  10-Oct-2006  10 Days  Pavement  LRP018  400 18.373     LRP018  600 18.573     Gazipur, (Division Office) 
 Revenue  30/Joydebpur/2007-2008. DPM - 37  22-Nov-2007  3 Days  Pavement  LRP018  466 18.439     LRP021  815 21.823     Gazipur, (Division Office) 
 Revenue  BTJR(76)/RDD/2008-2009 (Lot No-10)  4-Feb-2009  20 Days  Carpeting  LRPS  18500 18.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  BTJR(81)/06/EE/RDD/2010-2011 (Lot No 03)  8-Feb-2011  30 Days  Carpeting  LRPS  18500 18.5     LRPS  19200 19.2     Dhaka, (Division Office) 
 Revenue  BTJR(140)/RDD/2008-2009 (Lot No-05)  10-May-2009  15 Days  Carpeting  LRPS  18500 18.5     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  BTJR(20)/RDD/2009-2010 (RSD-1)  12-Apr-2010  3 Days  Carpeting  LRPS  18500 18.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  BTJR(10)/RDD/2010-1011 (SDE-1)  7-Jun-2011  3 Days  Carpeting  LRPS  18500 18.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  BTJR(41)/RDD/2008-2009 (Lot No-04)  27-Nov-2008  7 Days  Carpeting  LRPS  18500 18.5     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  BTJR(38)/RDD/2008-2009 (Lot No-05)  27-Nov-2008  7 Days  Carpeting  LRPS  18500 18.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  JUDBNMR(139)/EE/SDE-1/2009-2010 (Lot No-07)  30-May-2010  5 Days  Carpeting  LRPS  18500 18.5     LRPS  27500 27.5     Dhaka, (Division Office) 
 Revenue  BTJR(134)/RDD/2007-2008 (Lot No-02)  2-Jul-2008  7 Days  Carpeting  LRPS  18500 18.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  BTJR(138)/10/EE/RDD/2011-2012 (Lot No 08)  18-Dec-2011  5 Days  Carpeting  LRPS  18500 18.5     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  BTJR(51)/02/EE/RDD/2010-2011 (Lot No-13)  3-Jan-2011  45 Days  Carpeting  LRPS  18500 18.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  BTJR(76)/RDD/2008-2009 (Lot No-10)-1  4-Feb-2009  7 Days  Carpeting  LRPS  18500 18.5     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  BTJR(78)/RDD/2009-2010(RSD-1)(Lot No-01)  11-Mar-2010  6 Days  Carpeting  LRPS  18500 18.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  BTJR/SDE-1/2007-2008 (BTJ-01)  4-Nov-2007  5 Days  Road Rehablitation  LRPS  18500 18.5     LRPS  18550 18.55     Dhaka, (Division Office) 
 Revenue  BTJR(86)/03/EE/RDD/2011-2012 (Lot No 13)  31-Oct-2011  20 Days  Carpeting  LRPS  18500 18.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  BTJR(31)/11/EE/RDD/ 2008-2009 (Lot No 01)    90 Days  Carpeting  LRPS  18500 18.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  BTJR(61)/24/EE/RDD/2011-2012 (Lot No 03)  28-Sep-2011  30 Days  Carpeting  LRPS  18570 18.57     LRPS  18800 18.8     Dhaka, (Division Office) 
 Revenue  52/Joydebpur/2006-2007. (04/75)  23-Nov-2006  77 Days  Pavement  LRP018  600 18.573     LRP018  725 18.698     Gazipur, (Division Office) 
 Revenue  46/Joydebpur/2006-2007. (19/26)  10-Oct-2006  10 Days  Pavement  LRP018  733 18.706     LRP018  866 18.839     Gazipur, (Division Office) 
 Revenue  BTJR/RDD/2007-2008 (Emergency Work)  10-Feb-2008  5 Days  Road Rehablitation  LRPS  18750 18.75     LRPS  18950 18.95     Dhaka, (Division Office) 
 Revenue  BTJR(80)/EE/RDD/2011-2012 (Lot No-25)  16-Oct-2011  30 Days  Carpeting  LRPS  18800 18.8     LRPS  19030 19.03     Dhaka, (Division Office) 
 Revenue  03 (three) / RDG / 2014-2015. Tender Package No. BTJR /08/RDG/2013-2014/06. Lot No. 06 (six).  24-Jul-2014  20 Days  Pavement  LRP019  0 18.864     LRP020  0 19.872     Gazipur, (Division Office) 
 Revenue  BTJR (327)/RDD/2005-2006 (Lot No- 36)  1-Mar-2006  20 Days  Carpeting  LRPS  19000 19     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  BTJR (111)/RDD/2008-2009 (Lot No-03)  2-Apr-2009  25 Days  Carpeting  LRPS  19200 19.2     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  BTJR(09)/RDD/2007-2008 (Lot No- 05)  30-Sep-2007  7 Days  Road Rehablitation  LRPS  19250 19.25     LRPS  20250 20.25     Dhaka, (Division Office) 
 Revenue  BTJR (349)/RDD/2005-2006 (Lot No- 23)  6-Jun-2006  20 Days  Road Rehablitation  LRPS  19265 19.265     LRPS  19345 19.345     Dhaka, (Division Office) 
 Revenue  BTJ/127/03/EE/RDD/2011-2012 (Lot No 12)  28-Nov-2011  30 Days  Carpeting  LRPS  19300 19.3     LRPS  19650 19.65     Dhaka, (Division Office) 
 Revenue  BTJR(162)/EE/RDD/2011-2012. (Lot No-39)  2-Feb-2012  5 Days  Carpeting  LRPS  19300 19.3     LRPS  19379 19.379     Dhaka, (Division Office) 
 Revenue  BTJR(127)/03/EE/RDD/2011-2012 (Lot No 12)  28-Nov-2011  30 Days  Carpeting  LRPS  19300 19.3     LRPS  19650 19.65     Dhaka, (Division Office) 
 Revenue  BTJR (372)/RDD/2005-2006 (Lot No- 17)  6-Jun-2006  20 Days  Road Rehablitation  LRPS  19315 19.315     LRPS  19511 19.511     Dhaka, (Division Office) 
 Revenue  25/Gazipur/2011-2012. LTM Package No. JMMR /01/RDG/2011-2012/15.  10-Oct-2011  10 Days  Pavement  LRP011  8500 19.498     LRP011  8625 19.623     Gazipur, (Division Office) 
 Revenue  BTJR(124)/RDD/2008-2009 (Lot No-02)  29-Apr-2009  15 Days  Carpeting  LRPS  19500 19.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  Sub-Division-1(95)/13/EE/RDD/2012-2013 (Lot No 07)-1  25-Jun-2014  15 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  BTJR(12/1)RDD/2007-2008  28-Jul-2009  3 Days  Carpeting  LRPS  19500 19.5     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  BTJR(147)/RDD/2008-2009 (Lot No-04)  17-Jul-2009  3 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  PQ(14)/RDD/2008-2009  3-Mar-2009  3 Days  Carpeting  LRPS  19500 19.5     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  BTJR(134)/RDD/2008-2009 (Lot No-06)  28-Jul-2009  5 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  BTJR (392)/RDD/2005-2006 (Lot No- 39)  21-Jun-2006  20 Days  Road Rehablitation  LRPS  19550 19.55     LRPS  19900 19.9     Dhaka, (Division Office) 
 Revenue  BTJR(125)/EE/RDD/2011-2012 (Lot No-29)  27-Dec-2011  20 Days  Carpeting  LRPS  19600 19.6     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  BTJR(37)/DPM/RDD/2007-2008 (Lot No- 10)  6-Dec-2007  7 Days  Pavement  LRPS  19650 19.65     LRPS  19850 19.85     Dhaka, (Division Office) 
 Revenue  117/Joydebpur/2005-2006. (08/39)  12-Mar-2006  10 Days  Pavement  LRP018  1800 19.773     LRP018  18200 36.173     Gazipur, (Division Office) 
 Revenue  BTJR(36)/DPM/RDD/2007-2008 (Lot No- 09)  6-Dec-2007  7 Days  Road Rehablitation  LRPS  19850 19.85     LRPS  19970 19.97     Dhaka, (Division Office) 
 Revenue  e-Gp/54/RDG/Works/2017-2018. Invitation Ref. : e-Gp/54/RDG/2017-2018. Tender ID # 167931.  8-Mar-2018  15 Days  Pavement  LRP020  0 19.872     LRP023  0 22.739     Gazipur, (Division Office) 
 Revenue  e-Gp/39/EDG/Works/2017-2018. Invitation Ref. e-Gp/39/RDG/2017-2018. TID # 147988.  24-Jan-2018  20 Days  Pavement  LRP020  0 19.872     LRP023  0 22.739     Gazipur, (Division Office) 
 Revenue  JUDBNMR/RDD/2005-2006 (Lot No-46)  6-Jul-2008  10 Days  Carpeting  LRPS  20000 20     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  DDSR(110)/EE/RDD/2011-2012. (Lot No-12)  28-Nov-2011  20 Days  Carpeting  LRPS  20000 20     LRPS  20900 20.9     Dhaka, (Division Office) 
 Revenue  BTJR(111)/RDD/2008-2009 (Lot No-03)-1  11-Jul-2009  15 Days  Carpeting  LRPS  20000 20     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  BTJR(110)/EE/RDD/2011-2012. (Lot No-14)  28-Nov-2011  20 Days  Carpeting  LRPS  20000 20     LRPS  20900 20.9     Dhaka, (Division Office) 
 Revenue  BTJR(104)/02/EE/RDD/2011-2012 (Lot No 32)  23-Nov-2011  20 Days  Carpeting  LRPS  20000 20     LRPS  20150 20.15     Dhaka, (Division Office) 
 Revenue  06 (six) / RDG / 2013-2014. OTM Tender Package No. BTJR/07/RDG/2012-2013/03. Lot No. 03.  4-Aug-2013  15 Days  Pavement  LRP020  0 20.008     LRP021  0 21.008     Gazipur, (Division Office) 
 Revenue  06 (six) / RDG / 2013-2014. OTM Tender Package No. BTJR/07/RDG/2012-2013/03.  24-Aug-2013  15 Days  Pavement  LRP020  0 20.008     LRP021  0 21.008     Gazipur, (Division Office) 
 Revenue  BTJR(50)/RDD/2007-2008 (Lot No-05)  1-Jul-2008  15 Days  Carpeting  LRPS  20050 20.05     LRPS  21050 21.05     Dhaka, (Division Office) 
 Revenue  29/Joydebpur/2007-2008. DPM - 36.  22-Nov-2007  3 Days  Pavement  LRP020  190 20.198     LRP020  370 20.378     Gazipur, (Division Office) 
 Revenue  BTJR(101)/02/EE/RDD/2011-2012 (Lot No 05)  20-Nov-2011  20 Days  Carpeting  LRPS  20200 20.2     LRPS  20700 20.7     Dhaka, (Division Office) 
 Revenue  82/Tongi/2008-2009. BTJR/08/RDG/2008-2009/05.  14-Jun-2009  20 Days  Pavement  LRP011  9500 20.498     LRP020  2008 22.016     Gazipur, (Division Office) 
 Revenue  78/Tongi/2008-2009. BTJR/08/RDG/2008-2009/04.  8-Jun-2009  20 Days  Pavement  LRP011  9500 20.498     LRP011  20008 31.006     Gazipur, (Division Office) 
 Revenue  BTJR(133)/RDD/2007-2008 (Lot No-01)  1-Jul-2008  7 Days  Carpeting  LRPS  20500 20.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  DAR/RDD/2007-2008/2-1    0 Days  Carpeting  LRPS  20500 20.5     LRPS  20900 20.9     Dhaka, (Division Office) 
 Revenue  BTJR(69)/EE/SDE-1/2009-2010 (Lot No-07)  21-Jan-2010  6 Days  Carpeting  LRPS  20500 20.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  BTJR(117)/04/EE/RDD/2011-2012 (Lot no 08)  13-Dec-2011  20 Days  Carpeting  LRPS  20500 20.5     LRPS  20800 20.8     Dhaka, (Division Office) 
 Revenue  BTJR(33)/RDD/2007-2008 (Lot No-01)  2-Jul-2008  7 Days  Carpeting  LRPS  20500 20.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  RFQ(02)/EE/RDD/2009-2010 (Lot No-07)  22-Nov-2009  3 Days  Carpeting  LRPS  20500 20.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  170/Tongi/2009-2010. (LTM-02/08)  17-Jun-2010  7 Days  Road Embankment  LRP011  9593 20.591     LRP011  10028 21.026     Gazipur, (Division Office) 
 Revenue  BTJR(143)/09/EE/RDD/2011-2012 (Lot No 10)  11-Dec-2011  5 Days  Carpeting  LRPS  20835 20.835     LRPS  21120 21.12     Dhaka, (Division Office) 
 Revenue  BTJR(85)/EE/SDE-1/2008-2009 (Lot No-15)  26-Jul-2009  7 Days  Carpeting  LRPS  21000 21     LRPS  21800 21.8     Dhaka, (Division Office) 
 Revenue  BTJR(133)/RDD/2007-2008  13-Feb-2008  5 Days  Pavement  LRPS  21000 21     LRPS  21200 21.2     Dhaka, (Division Office) 
 Revenue  BTJR(131)/RDD/2007-2008  17-Feb-2008  5 Days  Pavement  LRPS  21000 21     LRPS  21900 21.9     Dhaka, (Division Office) 
 Revenue  20 (twenty) / RDG / 2013-2014. OTM Tender Package No. BTJR/07/RDG/2012-2013/04.  11-Aug-2013  15 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  04(four) / RDG / 2014-2015. (RFQ-01/04)  28-Aug-2014  5 Days  Carpeting  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  38/Gazipur/2011-2012. LTM Package No. BTJR /04/RDG/2011-2012/16.  17-Oct-2011  10 Days  Road Embankment  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  02 (two) / RDG / 2014-2015. OTM Tender Package No. BTJR /08/RDG/2013-2014/02.  23-Jul-2014  30 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  e-Gp/16/RDG/Works/2016-2017. e-Gp/60/RDG/2015-2016. & Tender ID # 61073.  3-Aug-2016  15 Days  Pavement  LRP021  0 21.008     LRP023  0 22.983     Gazipur, (Division Office) 
 Revenue  79/Gazipur/2009-2010. (LTM-02/20)  15-Jun-2010  7 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  47/Gazipur/2009-2010. (RFQ-13/17)  11-Apr-2010  7 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  31 (thirty one) / RDG / 2013-2014. OTM Tender Package No. BTJR/06/RDG/2012-2013/01.  14-Aug-2013  45 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  21 (twenty one) / RDG / 2014-2015. (RFQ-07/03).  1-Jan-2015  5 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  15 (fifteen) / RDG / 2013-2014. RFQ Notice No. 05/RDG/2012-2013. Lot No. 02 (two).  12-Aug-2013  10 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  e-Gp/01/RDG/Works/2016-2017. e-Gp/30/RDG/2015-2016 & Tender ID # 54762.  19-Jul-2016  20 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  07/Gazipur/ 209-2010. (RFQ-03/12)  8-Oct-2009  3 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  05/Gazipur/2012-2013. LTM Package No. BTJR /02/RDG/2012-2013/02.  21-Oct-2012  25 Days  Road Embankment  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  e-Gp/09/RDG/2015-2016. Invitation Ref. e-Gp/59/RDG/2014-2015 & ID - 22330.  20-Jul-2015  30 Days  Pavement  LRP021  0 21.008     LRP022  0 21.96     Gazipur, (Division Office) 
 Revenue  181/Tongi/2009-2010. (LTM-04/14)  17-Jun-2010  7 Days  Road Embankment  LRP011  10028 21.026     LRP011  10463 21.461     Gazipur, (Division Office) 
 Revenue  BTJR(161)/12/EE/RDD/2011-2012 (Lot No 05)  22-Jan-2012  7 Days  Carpeting  LRPS  21120 21.12     LRPS  21400 21.4     Dhaka, (Division Office) 
 Revenue  BTJR(04)/RDD/2006-2007 (Lot No- 28)  17-Jul-2007  30 Days  Pavement  LRPS  21275 21.275     LRPS  21475 21.475     Dhaka, (Division Office) 
 Revenue  34/Tongi/2011-2012. LTM Package No. BTJR /01/RDG/2011-2012/08.  13-Oct-2011  10 Days  Pavement  LRP011  10500 21.498     LRP020  20500 40.508     Gazipur, (Division Office) 
 Revenue  JUDVNMR(125)/RDD/2007-2008  15-Jan-2008  5 Days  Road Rehablitation  LRPS  21500 21.5     LRPS  21600 21.6     Dhaka, (Division Office) 
 Revenue  BTJR(118)/04/EE/RDD/2011-2012 (Lot No 10)  16-Nov-2011  20 Days  Carpeting  LRPS  21500 21.5     LRPS  21800 21.8     Dhaka, (Division Office) 
 Revenue  BTJR(73)/RDD/2009-2010 (RSD-1)(Lot No-07)  20-Jan-2010  6 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  BTJR(139)/EE/RDD/2011-2012. (Lot No-07)  14-Dec-2011  5 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  BTJR(36)/EE/SDE-1/2010-2011 (Lot No 08)  26-Oct-2010  30 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  BTJR(109)/RDD/2008-2009 (Lot No-04)  24-Feb-2009  30 Days  Carpeting  LRPS  21500 21.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  BTJR(128)/19/EE/RDD/2010-2011 (Lot No 22)  11-Apr-2011  20 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  BTJR(110)/RDD/2008-2009 (Lot No-03)  2-Apr-2009  90 Days  Carpeting  LRPS  21500 21.5     LRPS  21800 21.8     Dhaka, (Division Office) 
 Revenue  BTJR(03)/RDD/2009-2010 (Lot No-02)  21-Jul-2009  5 Days  Carpeting  LRPS  21500 21.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  BTJR(38)/29/EE/RDD/2011-2012 (Lot No 14)  25-Aug-2011  30 Days  Carpeting  LRPS  21500 21.5     LRPS  21900 21.9     Dhaka, (Division Office) 
 Revenue  39/Joydebpur/2006-2007. (22/61)  3-Sep-2006  154 Days  Pavement  LRP021  600 21.608     LRP021  800 21.808     Gazipur, (Division Office) 
 Revenue  39/Tongi/2008-2009. (RFQ-08/04).  23-Oct-2008  3 Days  Pavement  LRP011  10670 21.668     LRP011  10740 21.738     Gazipur, (Division Office) 
 Revenue  40/Tongi/2008-2009. (RFQ-08/05).  23-Oct-2008  3 Days  Pavement  LRP011  10740 21.738     LRP011  10800 21.798     Gazipur, (Division Office) 
 Revenue  PMP 2007-08/10/ DBST  2-Apr-2008  453 Days  DBST  LRP021  947 21.955     LRP057  0 55.891     Gazipur, (Division Office) 
 Revenue  05/Gazipur/2009-2010. (RFQ-03/22)  6-Oct-2009  3 Days  Pavement  LRP022  0 21.96     LRP023  0 22.983     Gazipur, (Division Office) 
 Revenue  Quotation No. 05/RDG/2007-2008. (Lot No. 04)    0 Days  Road Embankment  LRP022  0 21.96     LRP023  0 22.983     Gazipur, (Division Office) 
 Revenue  07/Gazipur/2012-2013. LTM Package No. BTJR /02/RDG/2012-2013/20.  23-Oct-2012  15 Days  Pavement  LRP022  0 21.96     LRP023  0 22.983     Gazipur, (Division Office) 
 Revenue  71/Tongi/2006-2007. (05/15)  8-Mar-2007  20 Days  Pavement  LRP022  0 21.96     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  93 (ninety three) / RDG / 2013-2014. Tender Package No. BTJR/07/RDG/2013-2014/01.  9-Mar-2014  25 Days  Pavement  LRP022  0 21.96     LRP023  0 22.983     Gazipur, (Division Office) 
 Revenue  62/Joydebpur/2006-2007. NPAR/09/RDG/2002/03.  11-Mar-2007  385 Days  Pavement  LRP011  11000 21.998     LRP011  12000 22.998     Gazipur, (Division Office) 
 Revenue  BTJR(48)/RDD/2007-2008 (Lot No- 04)  10-Feb-2008  5 Days  Road Rehablitation  LRPS  22000 22     LRPS  22200 22.2     Dhaka, (Division Office) 
 Revenue  JUDVNMR(124)/RDD/2007-2008  15-Feb-2008  5 Days  Road Rehablitation  LRPS  22300 22.3     LRPS  22400 22.4     Dhaka, (Division Office) 
 Revenue  50/Tongi/2006-2007. (23/02)  30-Oct-2006  15 Days  Pavement  LRP022  400 22.36     LRP022  900 22.86     Gazipur, (Division Office) 
 Revenue  52/Joydebpur/2011-2012. LTM Package No. JMMR /07/RDG/2011-2012/04.  26-Feb-2012  20 Days  Pavement  LRP023  0 22.983     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  80/Joydebpur/2009-2010. (RFQ-13/04).  8-Apr-2010  7 Days  Pavement  LRP023  0 22.983     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  58/Tongi/2006-2007. (04/93)  8-Feb-2007  10 Days  Pavement  LRP023  0 22.983     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  150/Joydebpur/2009-2010. (T-04/G-06)    45 Days  Pavement  LRP023  0 22.983     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  35/Joydebpur/2009-2010. (RFQ-06/07).  23-Nov-2009  3 Days  Pavement  LRP023  0 22.983     LRP030  0 29.981     Gazipur, (Division Office) 
 Revenue  41/Tongi/2006-2007. (01/26)  24-Sep-2006  20 Days  Pavement  LRP023  0 22.983     LRP032  0 31.916     Gazipur, (Division Office) 
 Revenue  67/Tongi/2011-2012. LTM Package No. BTJR/08/RDG/2011-2012/04.  12-Dec-2011  20 Days  Pavement  LRP012  11000 22.995     LRP012  11420 23.415     Gazipur, (Division Office) 
 Revenue  97/Joydebpur/2009-2010. (RFQ-15/04).  6-May-2010  7 Days  Pavement  LRP012  11000 22.995     LRP012  12000 23.995     Gazipur, (Division Office) 
 Revenue  JUDVNMR(123)/RDD/2007-2008  18-Feb-2008  5 Days  Road Rehablitation  LRPS  23000 23     LRPS  23100 23.1     Dhaka, (Division Office) 
 Revenue  24/Gazipur/2011-2012. LTM Package No. BTJR/04/RDG/2011-2012/03.  9-Oct-2011  10 Days  Pavement  LRP021  2000 23.008     LRP021  20565 41.573     Gazipur, (Division Office) 
 Revenue  19/Gazipur/2011-2012. LTM Package No. BTJR/04/RDG/2011-2012/02.  10-Oct-2011  10 Days  Pavement  LRP021  2000 23.008     LRP021  20565 41.573     Gazipur, (Division Office) 
 Revenue  98/Tongi/2009-2010. (RFQ-12/02).  11-Mar-2010  7 Days  Pavement  LRP012  11015 23.01     LRP012  11115 23.11     Gazipur, (Division Office) 
 Revenue  97/Tongi/2009-2010. (RFQ-12/03).  11-Mar-2010  7 Days  Pavement  LRP012  11300 23.295     LRP012  11400 23.395     Gazipur, (Division Office) 
 Revenue  BTJR(49)/RDD/2007-2008  10-Feb-2008  5 Days  Road Rehablitation  LRPS  23300 23.3     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  95/Tongi/2009-2010. (RFQ-12/06)  11-Mar-2010  7 Days  Pavement  LRP012  11400 23.395     LRP012  11500 23.495     Gazipur, (Division Office) 
 Revenue  76/Tongi/2010-2011. BTJR/10/RDG/2010-2011/27.  15-May-2011  10 Days  Pavement  LRP012  11500 23.495     LRP012  12000 23.995     Gazipur, (Division Office) 
 Revenue  JUDBNM(146)/EE/RDD/2010-2011. (Lot No-04)  19-Apr-2011  30 Days  Carpeting  LRPS  23500 23.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  PQ(13)/RDD/2008-2009  3-Mar-2009  3 Days  Carpeting  LRPS  23500 23.5     LRPS  23900 23.9     Dhaka, (Division Office) 
 Revenue  egp/EE/DRD/11/2013-2014.    30 Days  Carpeting  LRPS  23500 23.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  JUDVNMR(126)/RDD/2007-2008  10-Jan-2008  5 Days  Road Rehablitation  LRPS  23600 23.6     LRPS  23700 23.7     Dhaka, (Division Office) 
 Revenue  52/Gazipur/2011-2012. LTM Package No. BTJR/05/RDG/2011-2012/11.  28-Oct-2011  30 Days  Pavement  LRP022  2000 23.96     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  JUDBNMR(41)/01/EE/RDD/2012-2013 (Lot No 05)  9-Oct-2012  10 Days  Carpeting  LRPS  24000 24     LRPS  28000 28     Dhaka, (Division Office) 
 Revenue  JUDVNMR/RDD/2007-2008 (Lot No- 04)  30-Sep-2007  7 Days  Road Rehablitation  LRPS  24200 24.2     LRPS  24250 24.25     Dhaka, (Division Office) 
 Revenue  16/Joydebpur/2010-2011. JMMR/04/RDG/2010-2011/04.  17-Jan-2011  10 Days  Pavement  LRP013  12000 24.991     LRP013  13000 25.991     Gazipur, (Division Office) 
 Revenue  03/Tongi/2011-2012. BTJR/07/RDG/2010-2011/11.  18-Aug-2011  15 Days  Pavement  LRP013  12350 25.341     LRP013  12450 25.441     Gazipur, (Division Office) 
 Revenue  23/Joydebpur/2006-2007. (24/07)  8-Aug-2006  10 Days  Pavement  LRP013  12350 25.341     LRP013  12630 25.621     Gazipur, (Division Office) 
 Revenue  DAR(59)/EE/RDD/2008-2009 (Lot No-06)  17-Mar-2009  7 Days  Carpeting  LRPS  25500 25.5     LRPS  28500 28.5     Dhaka, (Division Office) 
 Revenue  03/Tongi/2011-2012. BTJR/07/RDG/2010-2011/11.  18-Aug-2011  15 Days  Pavement  LRP013  12600 25.591     LRP014  13500 27.498     Gazipur, (Division Office) 
 Revenue  20/Joydebpur/2006-2007. (22/66)  28-Aug-2006  10 Days  Pavement  LRP013  12630 25.621     LRP013  12885 25.876     Gazipur, (Division Office) 
 Revenue  46/Tongi/2008-2009. (RFQ-07/09).  21-Oct-2008  3 Days  Pavement  LRP013  12820 25.811     LRP013  13940 26.931     Gazipur, (Division Office) 
 Revenue  78/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/07.  31-May-2011  10 Days  Pavement  LRP014  13000 26.998     LRP014  13600 27.598     Gazipur, (Division Office) 
 Revenue  76/Tongi/2010-2011. BTJR/10/RDG/2010-2011/27.  15-May-2011  10 Days  Pavement  LRP014  13500 27.498     LRP014  14000 27.998     Gazipur, (Division Office) 
 Revenue  JUDBNBR(60)/19/EE/RDD/2011-2012 (Lot No 14)  25-Sep-2011  20 Days  Carpeting  LRPS  27500 27.5     LRPS  27950 27.95     Dhaka, (Division Office) 
 Revenue  78/Joydebpur/2006-2007. (04/85)  23-Apr-2007  10 Days  Pavement  LRP014  13595 27.593     LRP014  13845 27.843     Gazipur, (Division Office) 
 Revenue  79/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/08.  31-May-2011  10 Days  Pavement  LRP014  13600 27.598     LRP014  14000 27.998     Gazipur, (Division Office) 
 Revenue  88/Tongi/2010-2011. BTJR/10/RDG/2010-2011/51.  7-Jun-2011  15 Days  Pavement  LRP013  14700 27.691     LRP014  15000 28.998     Gazipur, (Division Office) 
 Revenue  151/Joydebpur/2005-06.  16-Mar-2006  10 Days  Pavement  LRP014  13860 27.858     LRP015  14180 29.159     Gazipur, (Division Office) 
 Revenue  DA(01)/RDD/2005-2006 (Group No- 01)  31-Aug-2005  7 Days  Road Rehablitation  LRPS  28250 28.25     LRPS  28350 28.35     Dhaka, (Division Office) 
 Revenue  DAR(128)/RDD/2009-2010 (Lot No-06)  20-Sep-2010  4 Days  Carpeting  LRPS  28500 28.5     LRPS  29200 29.2     Dhaka, (Division Office) 
 Revenue  32/Tongi/2011-2012. LTM Package No. BTJR/03/RDG/2011-2012/13.  11-Oct-2011  10 Days  Pavement  LRP015  14300 29.279     LRP015  14600 29.579     Gazipur, (Division Office) 
 Revenue  72/Joydebpur/2009-2010. (RFQ-11/18).  10-Feb-2010  7 Days  Pavement  LRP030  0 29.981     LRP035  0 34.601     Gazipur, (Division Office) 
 Revenue  98/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/68.  15-Jun-2011  10 Days  Pavement  LRP030  0 29.981     LRP035  0 34.601     Gazipur, (Division Office) 
 Revenue  04/Joydebpur/2009-2010. (RFQ-01/03).  17-Sep-2009  3 Days  Road Embankment  LRP030  0 29.981     LRP031  0 30.916     Gazipur, (Division Office) 
 Revenue  26/Tongi/2007-2008. (Quo. 05/09)  16-Jan-2008  3 Days  Pavement  LRP030  0 29.981     LRP032  0 31.916     Gazipur, (Division Office) 
 Revenue  23/Joydebpur/2007-08. DPM - 30.  20-Nov-2007  3 Days  Pavement  LRP030  0 29.981     LRP030  250 30.231     Gazipur, (Division Office) 
 Revenue  Quotation Notice No. 05/RDG/2007-2008. (Lot No. 09)    3 Days  Road Embankment  LRP030  0 29.981     LRP032  0 31.916     Gazipur, (Division Office) 
 Revenue  100/Tongi/2006-2007. (05/47)  24-Jun-2007  20 Days  Carpeting  LRP030  0 29.981     LRP030  375 30.356     Gazipur, (Division Office) 
 Revenue  07/Joydebpur/2012-2013. LTM Package No. JMMR /02/RDG/2012-2013/17.  25-Oct-2012  15 Days  Pavement  LRP030  0 29.981     LRP031  0 30.916     Gazipur, (Division Office) 
 Revenue  100/Tongi/2006-2007. (05/47)  24-Jun-2007  20 Days  Carpeting  LRP030  150 30.131     LRP030  500 30.481     Gazipur, (Division Office) 
 Revenue  24/Joydebpur/2007-2008. DPM-31.  20-Nov-2007  3 Days  Pavement  LRP030  195 30.176     LRP030  300 30.281     Gazipur, (Division Office) 
 Revenue  15/Sub-Division Joydebpur/SO-2/2007-2008.    3 Days  Pavement  LRP030  195 30.176     LRP030  300 30.281     Gazipur, (Division Office) 
 Revenue  64/Tongi/2006-2007. (05/40)  12-Mar-2007  15 Days  Pavement  LRP030  400 30.381     LRP030  900 30.881     Gazipur, (Division Office) 
 Revenue  103/Tongi/2006-2007. (04/72)  4-Jul-2007  10 Days  Pavement  LRP030  450 30.431     LRP030  600 30.581     Gazipur, (Division Office) 
 Revenue  64/Tongi/2006-2007. (05/40)  12-Mar-2007  15 Days  Pavement  LRP030  500 30.481     LRP030  725 30.706     Gazipur, (Division Office) 
 Revenue  DAR(58)/EE/RDD/2008-2009 (Lot No-09)  17-Mar-2009  7 Days  Carpeting  LRPS  30500 30.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  128/Joydebpur/2009-2010. (LTM-04/11).  17-Jun-2010  7 Days  Pavement  LRP016  15200 31.183     LRP016  15500 31.483     Gazipur, (Division Office) 
 Revenue  109/Joydebpur/2010-2011. OTM Package No. JMMR/10/RDG/2010-2011/05.  15-Jun-2011  10 Days  Pavement  LRP016  15500 31.483     LRP016  16000 31.983     Gazipur, (Division Office) 
 Revenue  91/Tongi/2010-2011. BTJR/10/RDG/2010-2011/43.  8-Jun-2011  10 Days  Pavement  LRP016  15600 31.583     LRP018  16050 34.023     Gazipur, (Division Office) 
 Revenue  42/Tongi/2011-2012. LTM Package No. BTJR /04/RDG/2011-2012/15.  18-Oct-2011  10 Days  Pavement  LRP016  15680 31.663     LRP016  15735 31.718     Gazipur, (Division Office) 
 Revenue  55/Tongi/2010-2011. BTJR/07/RDG/2010-2011/13.  20-Apr-2011  15 Days  Pavement  LRP016  15800 31.783     LRP018  16800 34.773     Gazipur, (Division Office) 
 Revenue  22/Joydebpur/2011-2012. LTM Package No. DBJMR/03/RDG/2011-2012/04.  13-Oct-2011  10 Days  Pavement  LRP032  0 31.916     LRP033  0 32.915     Gazipur, (Division Office) 
 Revenue  58/Joydebpur/2008-2009. (RFQ-17/10)  24-Jun-2009  3 Days  Pavement  LRP032  0 31.916     LRP033  0 32.915     Gazipur, (Division Office) 
 Revenue  22/Joydebpur/2012-2013. LTM Package No. DBJMMR /02/RDG/2012-2013/15.  6-Nov-2012  15 Days  Pavement  LRP032  0 31.916     LRP048  0 47.566     Gazipur, (Division Office) 
 Revenue  01/Joydebpur/2012-2013. RFQ. T-08/L-01 (11-12).  3-Jul-2012  10 Days  Pavement  LRP032  0 31.916     LRP039  0 38.626     Gazipur, (Division Office) 
 Revenue  35/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/11.  1-Nov-2011  30 Days  Pavement  LRP032  0 31.916     LRP033  0 32.915     Gazipur, (Division Office) 
 Revenue  60/Gazipur/2006-2007. (05/06)  7-Dec-2006  20 Days  Pavement  LRP032  250 32.166     LRP032  650 32.566     Gazipur, (Division Office) 
 Revenue  16/Gazipur/2011-2012. LTM Package No. BTJR /01/RDG/2011-2012/11.  3-Oct-2011  10 Days  Pavement  LRP012  20300 32.295     LRP012  20780 32.775     Gazipur, (Division Office) 
 Revenue  17/Gazipur/2007-2008. DPM - 42.  27-Dec-2007  3 Days  Pavement  LRP030  2400 32.381     LRP030  25700 55.681     Gazipur, (Division Office) 
 Revenue  43/Tongi/2008-2009. (RFQ-07/06).  21-Oct-2008  3 Days  Pavement  LRP016  16925 32.908     LRP018  17075 35.048     Gazipur, (Division Office) 
 Revenue  03/Gazipur/2008-2009. (RFQ- 01/04)  1-Sep-2008  3 Days  Pavement  LRP033  0 32.915     LRP034  0 33.916     Gazipur, (Division Office) 
 Revenue  26/Gazipur/2008-2009. BTJR/09/RDG/2008-2009.  21-Jun-2009  25 Days  Pavement  LRP033  0 32.915     LRP034  0 33.916     Gazipur, (Division Office) 
 Revenue  38/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/16.  2-Nov-2011  30 Days  Pavement  LRP033  0 32.915     LRP035  0 34.601     Gazipur, (Division Office) 
 Revenue  42/Tongi/2008-2009. (RFQ-07/05).  21-Oct-2008  3 Days  Pavement  LRP016  16950 32.933     LRP018  17100 35.073     Gazipur, (Division Office) 
 Revenue  85/Tongi/2009-2010. (RFQ-11/15).  10-Feb-2010  7 Days  Pavement  LRP016  17310 33.293     LRP016  17400 33.383     Gazipur, (Division Office) 
 Revenue  80/Tongi/2009-2010. (RFQ-10/04).  2-Oct-2010  7 Days  Pavement  LRP016  17400 33.383     LRP016  17500 33.483     Gazipur, (Division Office) 
 Revenue  31/Joydebpur/2011-2012. LTM Package No. DBJMR/05/RDG/2011-2012/13.  28-Oct-2011  30 Days  Pavement  LRP034  0 33.916     LRP039  0 38.626     Gazipur, (Division Office) 
 Revenue  Pad Quotation No. 16/RDG/2007-2008.  29-Jan-2008  3 Days  Road Embankment  LRP034  0 33.916     LRP034  310 34.226     Gazipur, (Division Office) 
 Revenue  94/Joydebpur/2006-2007. (Quo. 01/17)  8-Oct-2006  3 Days  Pavement  LRP018  17000 34.973     LRP020  19000 39.008     Gazipur, (Division Office) 
 Revenue  162/Tongi/2009-2010. (LTM-01/13).  15-Jun-2010  7 Days  Pavement  LRP018  17360 35.333     LRP020  18830 38.838     Gazipur, (Division Office) 
 Revenue  96/Tongi/2009-2010. (RFQ-12/05).  11-Mar-2010  7 Days  Pavement  LRP018  17500 35.473     LRP018  17600 35.573     Gazipur, (Division Office) 
 Revenue  82/Joydebpur/2010-2011. OTM Package No. JMMR/10/RDG/2010-2011/04.  7-Jun-2011  10 Days  Pavement  LRP018  17500 35.473     LRP020  19000 39.008     Gazipur, (Division Office) 
 Revenue  26/Tongi/2011-2012. LTM Package No. BTJR/03/RDG/2011-2012/19.  10-Oct-2011  10 Days  Pavement  LRP018  17500 35.473     LRP020  19500 39.508     Gazipur, (Division Office) 
 Revenue  DPM Notice No. 04/Road Sub-Division Tongi/2013-2014.  23-Feb-2014  3 Days  Pavement  LRP018  17520 35.493     LRP018  17612 35.585     Gazipur, (Division Office) 
 Revenue  36/Tongi/2008-2009. (RFQ-08/07).  23-Oct-2008  3 Days  Pavement  LRP018  17560 35.533     LRP018  17700 35.673     Gazipur, (Division Office) 
 Revenue  14/Joydebpur/2011-2012. LTM Package No. DBTJR /01/RDG/2011-2012/29.  11-Oct-2011  10 Days  Pavement  LRP036  0 35.538     LRP039  0 38.626     Gazipur, (Division Office) 
 Revenue  09/Joydebpur/2012-2013. LTM Package No. BJMMR /02/RDG/2012-2013/09.  30-Oct-2012  15 Days  Pavement  LRP036  0 35.538     LRP039  0 38.626     Gazipur, (Division Office) 
 Revenue  41/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/18.  2-Nov-2011  30 Days  Pavement  LRP036  0 35.538     LRP039  0 38.626     Gazipur, (Division Office) 
 Revenue  166/Joydebpur/2005-2006. (14/22)  23-Mar-2006  10 Days  Pavement  LRP018  17866 35.839     LRP018  18000 35.973     Gazipur, (Division Office) 
 Revenue  35/Tongi/2008-2009. (RFQ-08/06).  23-Oct-2008  3 Days  Pavement  LRP018  17900 35.873     LRP020  18200 38.208     Gazipur, (Division Office) 
 Revenue  DPM Notice No. 08/Road Sub-Division Tongi/2013-2014.  16-Apr-2014  3 Days  Road Embankment  LRP018  18500 36.473     LRP020  18760 38.768     Gazipur, (Division Office) 
 Revenue  DPM Notice No. 06/Road Sub-Division Tongi/2013-2014.  23-Mar-2014  3 Days  Road Embankment  LRP018  18800 36.773     LRP020  19058 39.066     Gazipur, (Division Office) 
 Revenue  180/Tongi/2009-2010. (LTM-04/08).  17-Jun-2010  7 Days  Pavement  LRP018  19560 37.533     LRP020  20000 40.008     Gazipur, (Division Office) 
 Revenue  24/Sub-Division Joydebpur/SO-1/2007-2008.    10 Days  Pavement  LRP020  18080 38.088     LRP020  18900 38.908     Gazipur, (Division Office) 
 Revenue  48/Joydebpur/2006-2007. (T-04/G-46)  21-Jan-2007  10 Days  Carpeting  LRP020  18130 38.138     LRP020  18430 38.438     Gazipur, (Division Office) 
 Revenue  86/Tongi/2010-2011. BTJR/07/RDG/2010-2011/26.  8-Jun-2011  15 Days  Pavement  LRP020  18350 38.358     LRP020  18780 38.788     Gazipur, (Division Office) 
 Revenue  45/Joydebpur/2006-2007. (04/84)  26-Jan-2007  10 Days  Pavement  LRP020  18400 38.408     LRP020  18600 38.608     Gazipur, (Division Office) 
 Revenue  85/Joydebpur/2006-07. (Quo. 01/02)  9-Oct-2006  3 Days  Pavement  LRP020  19000 39.008     LRP021  21000 42.008     Gazipur, (Division Office) 
 Revenue  218/Joydebpur/2005-2006. (12/08)  21-May-2006  10 Days  Pavement  LRP020  19200 39.208     LRP020  19400 39.408     Gazipur, (Division Office) 
 Revenue  54/Tongi/2010-2011. OTM Package No. BTJR/04/RDG/2010-2011/01.  22-Mar-2011  10 Days  Pavement  LRP020  19200 39.208     LRP020  20000 40.008     Gazipur, (Division Office) 
 Revenue  108/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/57.  15-Jun-2011  15 Days  Pavement  LRP020  19300 39.308     LRP020  19400 39.408     Gazipur, (Division Office) 
 Revenue  45/Tongi/2008-2009. (RFQ-07/08).  21-Oct-2008  3 Days  Road Embankment  LRP020  19500 39.508     LRP020  19570 39.578     Gazipur, (Division Office) 
 Revenue  05/Joydebpur/2012-2013. RFQ. T-09/L-04 (11-12).  18-Jul-2012  10 Days  Pavement  LRP040  0 39.607     LRP053  0 52.577     Gazipur, (Division Office) 
 Revenue  40/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/14.  2-Nov-2011  30 Days  Pavement  LRP040  0 39.607     LRP041  0 40.5     Gazipur, (Division Office) 
 Revenue  47/Tongi/2008-2009. (RFQ-07/10).  21-Oct-2008  3 Days  Pavement  LRP020  19600 39.608     LRP020  20000 40.008     Gazipur, (Division Office) 
 Revenue  65/Tongi/2011-2012. LTM Package No. BTJR /08/RDG/2011-2012/07.  5-Dec-2011  20 Days  Pavement  LRP020  19680 39.688     LRP020  19800 39.808     Gazipur, (Division Office) 
 Revenue  76/Tongi/2011-2012. LTM Package No. BTJR /07/RDG/2011-2012/22.  28-Feb-2012  20 Days  Pavement  LRP020  19800 39.808     LRP020  20000 40.008     Gazipur, (Division Office) 
 Revenue  49/Joydebpur/2006-2007. (T-04/G-45)  21-Jan-2007  10 Days  Pavement  LRP020  20000 40.008     LRP020  20150 40.158     Gazipur, (Division Office) 
 Revenue  11/Joydebpur/2012-2013. LTM Package No. BJMMR /02/RDG/2012-2013/08.  1-Nov-2012  15 Days  Pavement  LRP041  0 40.5     LRP047  0 46.556     Gazipur, (Division Office) 
 Revenue  47/Gazipur/2011-2012. LTM Package No. BTJR/05/RDG/2011-2012/02.  27-Oct-2011  30 Days  Pavement  LRP021  20000 41.008     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  48/Gazipur/2011-2012. LTM Package No. BTJR/05/RDG/2011-2012/03.  27-Oct-2011  30 Days  Pavement  LRP021  20000 41.008     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  19 (nineteen) / RDG / 2013-2014. RFQ - 09/02.  29-Apr-2014  3 Days  Pavement  LRP021  20000 41.008     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  10/Gazipur/2010-2011. BTJR/03/RDG/2010-2011/07.  1-Dec-2010  10 Days  Pavement  LRP021  20000 41.008     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  09/Gazipur/2012-2013. LTM Package No. BTJR /02/RDG/2012-2013/04.  23-Oct-2012  15 Days  Pavement  LRP021  20050 41.058     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  58/Gazipur/2010-2011. JMMR/08/RDG/2010-2011/29.  12-May-2011  10 Days  Pavement  LRP021  20250 41.258     LRP021  20450 41.458     Gazipur, (Division Office) 
 Revenue  72/Gazipur/2010-2011. BTJR/10/RDG/2010-2011/64.  31-May-2011  10 Days  Pavement  LRP021  20550 41.558     LRP021  20950 41.958     Gazipur, (Division Office) 
 Revenue  77/Gazipur/2009-2010. (LTM-02/18).  15-Jun-2010  7 Days  Pavement  LRP021  20600 41.608     LRP021  20900 41.908     Gazipur, (Division Office) 
 Revenue  39/Gazipur/2011-2012. LTM Package No. BTJR /04/RDG/2011-2012/17.  17-Oct-2011  10 Days  Road Embankment  LRP021  20605 41.613     LRP021  20670 41.678     Gazipur, (Division Office) 
 Revenue  08/Gazipur/2010-2011. BTJR/03/RDG/2010-2011/06.  1-Dec-2010  10 Days  Pavement  LRP021  20670 41.678     LRP021  20730 41.738     Gazipur, (Division Office) 
 Revenue  40/Gazipur/2011-2012. LTM Package No. BTJR/04/RDG/2011-2012/04.  17-Oct-2011  10 Days  Pavement  LRP021  20710 41.718     LRP021  20750 41.758     Gazipur, (Division Office) 
 Revenue  87/Joydebpur/2006-2007. (08/06)  21-Jun-2007  6 Days  Pavement  LRP021  20800 41.808     LRP021  21000 42.008     Gazipur, (Division Office) 
 Revenue  33/Gazipur/2011-2012. LTM Package No. BTJR /03/RDG/2011-2012/18.  11-Oct-2011  10 Days  Pavement  LRP021  21030 42.038     LRP021  21150 42.158     Gazipur, (Division Office) 
 Revenue  33/Gazipur/2011-2012. LTM Package No. BTJR /03/RDG/2011-2012/18.  11-Oct-2011  10 Days  Pavement  LRP021  21070 42.078     LRP021  21180 42.188     Gazipur, (Division Office) 
 Revenue  10/Joydebpur/2012-2013. LTM Package No. BJMMR /02/RDG/2012-2013/06.  1-Nov-2012  15 Days  Pavement  LRP043  0 42.76     LRP047  0 46.556     Gazipur, (Division Office) 
 Revenue  33/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/10.  1-Nov-2011  30 Days  Pavement  LRP043  0 42.76     LRP045  0 44.54     Gazipur, (Division Office) 
 Revenue  04/Gazipur/2009-2010. (RFQ-01/09)  15-Sep-2009  3 Days  Pavement  LRP021  21800 42.808     LRP021  21885 42.893     Gazipur, (Division Office) 
 Revenue  e-GP/11/RDG/2013-2014. Dated : 09/02/2014. Tender / Proposal ID No. 4246.  19-Feb-2014  30 Days  Pavement  LRP022  21060 43.02     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  e-GP/11/RDG/2013-2014. Tender / Proposal ID No. 4246.  19-Feb-2014  30 Days  Pavement  LRP022  21060 43.02     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  e-GP/13/RDG/work/ 2014-2015. Invitation Ref. e-GP/15/RDG/ 2014-2015. & ID No. 17308.  19-Feb-2015  25 Days  Pavement  LRP022  21200 43.16     LRP022  21255 43.215     Gazipur, (Division Office) 
 Revenue  83/Joydebpur/2006-2007. (04/83)  13-Jun-2007  10 Days  Pavement  LRP022  21450 43.41     LRP022  21575 43.535     Gazipur, (Division Office) 
 Revenue  75/Tongi/2006-2007. (04/48)  25-Mar-2007  10 Days  Pavement  LRP022  21630 43.59     LRP022  21880 43.84     Gazipur, (Division Office) 
 Revenue  55/Tongi/2006-2007. (05/17)  6-Feb-2007  20 Days  Pavement  LRP022  21700 43.66     LRP022  22000 43.96     Gazipur, (Division Office) 
 Revenue  06/Gazipur/2007-2008. DPM - 11.  20-Sep-2007  3 Days  Pavement  LRP022  22000 43.96     LRP023  23980 46.963     Gazipur, (Division Office) 
 Revenue  74/Tongi/2006-2007. (05/55)  18-Feb-2007  15 Days  Pavement  LRP023  22000 44.983     LRP023  22500 45.483     Gazipur, (Division Office) 
 Revenue  04/Tongi/2007-2008. DPM-08.  30-Aug-2007  3 Days  Pavement  LRP023  23000 45.983     LRP030  29000 58.981     Gazipur, (Division Office) 
 Revenue  37/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/13.  1-Nov-2011  30 Days  Pavement  LRP048  0 47.566     LRP049  0 48.58     Gazipur, (Division Office) 
 Revenue  20/Joydebpur/2012-2013. LTM Package No. DBJMR & MSR/02/RDG/2012-2013/13.  7-Nov-2012  25 Days  Pavement  LRP048  0 47.566     LRP052  0 51.573     Gazipur, (Division Office) 
 Revenue  67/Tongi/2006-2007. (05/51)  13-Mar-2007  15 Days  Pavement  LRP023  25000 47.983     LRP023  25500 48.483     Gazipur, (Division Office) 
 Revenue  36/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/12.  1-Nov-2011  30 Days  Pavement  LRP049  0 48.58     LRP050  0 49.578     Gazipur, (Division Office) 
 Revenue  32/Joydebpur/2011-2012. LTM Package No. DBJMR/05/RDG/2011-2012/14.  28-Oct-2011  30 Days  Pavement  LRP049  0 48.58     LRP050  0 49.578     Gazipur, (Division Office) 
 Revenue  30/Joydebpur/2011-2012. LTM Package No. DBJMR/05/RDG/2011-2012/12.  28-Oct-2011  30 Days  Pavement  LRP049  0 48.58     LRP050  0 49.578     Gazipur, (Division Office) 
 Revenue  05/Joydebpur/2010-2011. JMMR/02/RDG/2010-2011.  14-Oct-2010  42 Days  Pavement  LRP023  26750 49.733     LRP030  27060 57.041     Gazipur, (Division Office) 
 Revenue  66/Joydebpur/2009-2010. (RFQ-11/13).  10-Feb-2010  7 Days  Pavement  LRP023  26760 49.743     LRP030  27060 57.041     Gazipur, (Division Office) 
 Revenue  04/Joydebpur/2010-2011. JMMR/01/RDG/2010-2011.  14-Oct-2010  28 Days  Pavement  LRP023  27060 50.043     LRP030  27350 57.331     Gazipur, (Division Office) 
 Revenue  34/Joydebpur/2011-2012. LTM Package No. DBJMR/06/RDG/2011-2012/09.  1-Nov-2011  30 Days  Pavement  LRP051   50.585     LRP052   51.573     Gazipur, (Division Office) 
 Revenue  76/Tongi/2006-2007. (04/52)  25-Mar-2007  10 Days  Pavement  LRP030  24630 54.611     LRP030  24881 54.862     Gazipur, (Division Office) 
 Revenue  58/Joydebpur/2010-2011. JMMR/08/RDG/2010-2011/24.  21-Apr-2011  10 Days  Pavement  LRP030  25000 54.981     LRP030  25400 55.381     Gazipur, (Division Office) 
 Revenue  05/Gazipur/2007-2008. DPM-10.  20-Sep-2007  3 Days  Pavement  LRP030  25000 54.981     LRP030  26850 56.831     Gazipur, (Division Office) 
 Revenue  157/Joydebpur/2003-2004. (T-15/G-36).    8 Days  Pavement  LRP030  25200 55.181     LRP030  25500 55.481     Gazipur, (Division Office) 
 Revenue  178/Joydebpur/2003-2004. (T-16/G-28)    7 Days  Pavement  LRP030  25250 55.231     LRP030  25500 55.481     Gazipur, (Division Office) 
 Revenue  84/Joydebpur/2006-2007. (22/29)  18-Jun-2007  10 Days  Pavement  LRP030  25250 55.231     LRP030  25500 55.481     Gazipur, (Division Office) 
 Revenue  PMP 2007-08/11/DBST  6-Apr-2008  267 Days  DBST  LRP057  1000 56.891     LRP065  2033 65.981     Mymensingh, (Division Office) 
 Revenue  PMP 2007-2008/11/DBST  6-Apr-2008  267 Days  DBST  LRP057  1000 56.891     LRP065  2033 65.981     Mymensingh, (Division Office) 
 Revenue  12/Joydebpur/2010-2011. JMMR/03/RDG/2010-2011/17.  6-Dec-2010  10 Days  Pavement  LRP030  27060 57.041     LRP030  28000 57.981     Gazipur, (Division Office) 
 Revenue  76/Joydebpur/2009-2010. (RFQ-12/04).  11-Mar-2010  7 Days  Pavement  LRP030  27060 57.041     LRP030  27260 57.241     Gazipur, (Division Office) 
 Revenue  50/jJoydebpur/2010-2011. JMMR/08/RDG/2010-2011/13.  21-Apr-2011  10 Days  Pavement  LRP030  27350 57.331     LRP030  27750 57.731     Gazipur, (Division Office) 
 Revenue  50/jJoydebpur/2010-2011. JMMR/08/RDG/2010-2011/13.  21-Apr-2011  10 Days  Pavement  LRP030  27510 57.491     LRP030  27910 57.891     Gazipur, (Division Office) 
 Revenue  84/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/10.  2-Jun-2011  10 Days  Pavement  LRP030  28000 57.981     LRP030  30600 60.581     Gazipur, (Division Office) 
 Revenue  07/Gazipur/2007-2008. DPM - 29.  14-Nov-2007  3 Days  Pavement  LRP030  29000 58.981     LRP031  31000 61.916     Gazipur, (Division Office) 
 Revenue  137/Tongi/2005-2006.  28-May-2006  10 Days  Pavement  LRP030  29270 59.251     LRP030  29490 59.471     Gazipur, (Division Office) 
 Revenue  88/Joydebpur/2006-2007. (08/05)  21-Jun-2007  10 Days  Pavement  LRP030  29500 59.481     LRP030  29750 59.731     Gazipur, (Division Office) 
 Revenue  70/Joydebpur/2010-2011. OTM Package No. JMMR/07/RDG/2010-2011/14.  25-May-2011  15 Days  Pavement  LRP030  29600 59.581     LRP032  31700 63.616     Gazipur, (Division Office) 
 Revenue  15/Tongi//2007-2008. DPM - 07.  30-Aug-2007  3 Days  Pavement  LRP030  30000 59.981     LRP032  32000 63.916     Gazipur, (Division Office) 
 Revenue  68/Tongi/2004-2005. (07/38)  12-May-2005  12 Days  Pavement  LRP031  30700 61.616     LRP031  31000 61.916     Gazipur, (Division Office) 
 Revenue  62/Tongi/2008-2009. (07/38).  12-May-2009  12 Days  Pavement  LRP031  30700 61.616     LRP031  31700 62.616     Gazipur, (Division Office) 
 Revenue  149/Tongi/2005-06.  18-Jun-2006  10 Days  Pavement  LRP031  31035 61.951     LRP031  31051 61.967     Gazipur, (Division Office) 
 Revenue  98/Joydebpur/2009-2010. (RFQ-15/05).  6-May-2010  7 Days  Pavement  LRP032  31000 62.916     LRP032  32000 63.916     Gazipur, (Division Office) 
 Revenue  45/Joydebpur/2010-2011. JMMR/08/RDG/2010-2011/41.  20-Apr-2011  10 Days  Pavement  LRP032  31700 63.616     LRP032  32200 64.116     Gazipur, (Division Office) 
 Revenue  79/Joydebpur/2006-2007. (04/44)  13-Mar-2007  10 Days  Pavement  LRP033  32000 64.915     LRP033  32500 65.415     Gazipur, (Division Office) 
 Revenue  52/Gazipur/2006-2007. (04/77)  23-Nov-2006  15 Days  Pavement  LRP033  32000 64.915     LRP033  32250 65.165     Gazipur, (Division Office) 
 Revenue  05/Road Sub-Division Tongi/2005-06.  8-Mar-2006  3 Days  Road Embankment  LRP030  35000 64.981     LRP030  36000 65.981     Gazipur, (Division Office) 
 Revenue  81/Joydebpur/2010-2011. OTM Package No. JMMR/10/RDG/2010-2011/21.  1-Jun-2011  10 Days  Pavement  LRP033  32200 65.115     LRP034  33450 67.366     Gazipur, (Division Office) 
 Revenue  17/Gazipur/2008-2009. BTJR/08/RDG/2008-2009/01.  7-Jun-2009  25 Days  Pavement  LRP033  32645 65.56     LRP033  32860 65.775     Gazipur, (Division Office) 
 Revenue  35/Gazipur/2008-2009 (RFQ-18/10)  25-Jun-2009  3 Days  Pavement  LRP033  32850 65.765     LRP033  32950 65.865     Gazipur, (Division Office) 
 Revenue  35/Gazipur/2008-09. (RFQ-18/10)  25-Jun-2009  3 Days  Pavement  LRP033  32850 65.765     LRP033  32950 65.865     Gazipur, (Division Office) 
 Revenue  63/Gazipur/2005-06.  12-Mar-2006  10 Days  Pavement  LRP033  33000 65.915     LRP033  33250 66.165     Gazipur, (Division Office) 
 Revenue  80/Joydebpur/2010-2011. JMMR/10/RDG/2010-2011/22.  1-Jun-2011  10 Days  Pavement  LRP034  33450 67.366     LRP035  34600 69.201     Gazipur, (Division Office) 
 Revenue  16/Joydebpur/2010-2011. JMMR/04/RDG/2010-2011/03.  17-Jan-2011  10 Days  Road Embankment  LRP035  34050 68.651     LRP035  34500 69.101     Gazipur, (Division Office) 
 Revenue  PMP 2007-08/11/DBST  6-Apr-2008  267 Days  DBST  LRP070  283 68.981     LRP100  908 98.981     Mymensingh, (Division Office) 
 Revenue  PMP 2007-2008/11/DBST  6-Apr-2008  267 Days  DBST  LRP070  283 68.981     LRP100  908 98.981     Mymensingh, (Division Office) 
 Revenue  PQ No.05(2008-09)  11-Sep-2008  3 Days  Pavement  LRP100  0 98.073     LRP100  200 98.273     Mymensingh, (Division Office) 
 Revenue  PMP 2007-2008/11/DBST  6-Apr-2008  267 Days  DBST  LRP102  917 100.981     LRP104  1963 103.981     Mymensingh, (Division Office) 
 Revenue  PMP 2007-08/11/DBST  6-Apr-2008  267 Days  DBST  LRP102  917 100.981     LRP104  1963 103.981     Mymensingh, (Division Office) 
 Revenue  PMP 2007-08/11/DBST  6-Apr-2008  267 Days  DBST  LRP104  3963 105.981     LRP110  2875 110.891     Mymensingh, (Division Office) 
 Revenue  PMP 2007-2008/11/DBST  6-Apr-2008  267 Days  DBST  LRP104  3963 105.981     LRP110  2875 110.891     Mymensingh, (Division Office) 
 Revenue  PMP-05/2010-11/15/Overlay  3-Oct-2011  270 Days  Overlay  LRP109  994 108     LRP110  1484 109.5     Mymensingh, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division