List of ongoing works on the road ( N5 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Revenue  DAR(84)/EE/RDD/2011-2012 (Lot No-02)  8-Dec-2011  7 Days  Carpeting  LRPS  0 0     LRPS  3500 3.5     Dhaka, (Division Office) 
 Revenue  DAR(16)/RDD/2006-207 (Lot No-50)  14-Oct-2009  30 Days  Carpeting  LRPS  0 0     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  DAR(17)/EE/RDD/2009-2010 (Lot No-01)  20-Oct-2009  7 Days  Carpeting  LRPS  0 0     LRPS  500 0.5     Dhaka, (Division Office) 
 Revenue  DAR(90)/EE/RDD/2011-2012. (Lot No-15)  8-Dec-2011  7 Days  Carpeting  LRPS  0 0     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  DAR(152)/EE/RDD/2011-2012. (Lot No-01)  22-Mar-2012  3 Days  Carpeting  LRPS  0 0     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  DAR(15)/RDD/2006-2007 (Lot No-49)  14-Oct-2009  30 Days  Carpeting  LRPS  0 0     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  DAR(106)/EE/RDD/2011-2012. (Lot No-09)  12-Dec-2011  5 Days  Carpeting  LRPS  0 0     LRPS  3500 3.5     Dhaka, (Division Office) 
 Revenue  PMP/DZ/07/2012-2013/01/DBST and DBSW  9-Feb-2014  150 Days  Carpeting  LRPS  1 0.001     LRPS  22 0.022     Dhaka, (Division Office) 
 Revenue  DAR(06)/24/EE/RDD/2011-2012 (Lot No 18)  25-Aug-2011  20 Days  Carpeting  LRPS  400 0.4     LRPS  900 0.9     Dhaka, (Division Office) 
 Revenue  DMSMR/(115)/EE/2009-2010 (Lot No-05)  12-Apr-2010  3 Days  Carpeting  LRPS  400 0.4     LRPS  500 0.5     Dhaka, (Division Office) 
 Revenue  DAR(18)/01/EE/RDD/2013-2014 (Lot No 02)  9-Sep-2013  20 Days  Carpeting  LRPS  500 0.5     LRPS  700 0.7     Dhaka, (Division Office) 
 Revenue  DAR(04)/26/EE/RDD/2011-2012 (Lot No 29)  27-Aug-2011  20 Days  Carpeting  LRPS  500 0.5     LRPS  750 0.75     Dhaka, (Division Office) 
 Revenue  DAHR(131)/RDD/2011-2012 (Lot No 02)  27-Apr-2012  15 Days  Carpeting  LRPS  500 0.5     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  e-GP/30/EE/DRD/2017-2018 ID No-138405  11-Dec-2017  7 Days  Carpeting  LRPS  500 0.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  e-GP/18/EE/DRD/2017-2018, ID No-138196  11-Dec-2017  15 Days  Carpeting  LRPS  500 0.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  e-GP/92/EE/DRD/2017-2018 (ID 195306)  5-Jun-2018  15 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  e-GP/65/EE/DRD/2017-2018 ID No-159187  4-Mar-2018  25 Days  Carpeting  LRPS  500 0.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  DAR(02)/23/EE/RDD/2010-2011 (Lot No 01)  21-Aug-2011  20 Days  Carpeting  LRPS  500 0.5     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  e-GP/29/EE/DRD/2017-2018 ID No-138402  11-Dec-2017  10 Days  Carpeting  LRPS  500 0.5     LRPS  2900 2.9     Dhaka, (Division Office) 
 Revenue  DAR(10)/02/EE/RDD/2012-2013 (Lot No 02)  26-Sep-2012  7 Days  Carpeting  LRPS  500 0.5     LRPS  700 0.7     Dhaka, (Division Office) 
 Revenue  DAR(86)/08/EE/RDD/2013-2014 (Lot No. 06)  6-Apr-2014  15 Days  Carpeting  LRPS  500 0.5     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  DMSMR/(126)/EE/RDD/2009-2010 (Lot No-10)  10-Jun-2010  5 Days  Carpeting  LRPS  800 0.8     LRPS  1000 1     Dhaka, (Division Office) 
 Revenue  DAR(126)/13/EE/RDD/2011-2012 (Lot No 36)  1-Feb-2012  10 Days  Carpeting  LRPS  1000 1     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  BTJR-08/10/EE/RDD/2013-2014 (Lot No 02)  7-Jul-2013  45 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  DNR(45)/EE/RDD/2011-2012 (LOt No-05)  15-Nov-2011  20 Days  Carpeting  LRPS  1000 1     LRPS  1400 1.4     Dhaka, (Division Office) 
 Revenue  e-GP/88/EE/DRD/2017-2018 (ID 183379)  27-May-2018  26 Days  Carpeting  LRPS  1000 1     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  DAR(143)/12/EE/RDD/2011-2012 (Lot No 07)  19-Jan-2012  7 Days  Carpeting  LRPS  1000 1     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  BTJR(64)/09/EE/RDD/2013-2014 (Lot No. 02)  8-May-2014  15 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  DAR(22)/24/EE/RDD/2011-2012 (Lot No 35)  28-Aug-2011  20 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  DAR-HSMR-DMS(146)/13/EE/RDD/2011-2012 (Lot No 29)  30-Jan-2012  7 Days  Carpeting  LRPS  1000 1     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  e-GP/113/EE/DRD/2017-2018 (ID 200677)  19-Jun-2018  7 Days  Carpeting  LRPS  1000 1     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  e-GP/27/EE/DRD/2016-2017 (72589)  29-Nov-2016  15 Days  Carpeting  LRPS  1000 1     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  e-GP/50/*EE/DRD/2017-2018 (ID 145506)  3-Jan-2018  7 Days  Carpeting  LRPS  1000 1     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  DAHR(49)/RDD/2009-2010 (Lot No-05)-1  9-Dec-2009  6 Days  Carpeting  LRPS  1000 1     LRPS  1100 1.1     Dhaka, (Division Office) 
 Revenue  BTJR(63)/09/EE/RDD/2013-2014 (Lot No 14)  8-May-2014  10 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  GSB( ) /KSD/RDD/2009-2010 ( Lot No. 03)  10-Nov-2009  6 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  DAR(09)/24/EE/RDD/2010-2011 (Lot No 27)  25-Aug-2011  30 Days  Carpeting  LRPS  1000 1     LRPS  1200 1.2     Dhaka, (Division Office) 
 Revenue  GSB(43)/EE/KSD/2009-2010 (Lot No-01)  14-Dec-2009  5 Days  Carpeting  LRPS  1000 1     LRPS  10500 10.5     Dhaka, (Division Office) 
 Revenue  DAR(115)/11/EE/RDD/2011-2012 (Lot No 13)  4-Jan-2012  7 Days  Carpeting  LRPS  1000 1     LRPS  1700 1.7     Dhaka, (Division Office) 
 Revenue  BTJ-38/RDD/2014-2015  11-Dec-2014  3 Days  Carpeting  LRPS  1000 1     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  DAR(16)/RDD/2006-2007 (Lot No-50)  14-Oct-2009  28 Days  Carpeting  LRPS  1000 1     LRPS  1500 1.5     Dhaka, (Division Office) 
 Revenue  DMSMR/(114)/EE/RDD/2009-2010 (Lot No-07)  18-Mar-2010  3 Days  Carpeting  LRPS  1100 1.1     LRPS  1150 1.15     Dhaka, (Division Office) 
 Revenue  DNR(77)/EE/RDD/2011-2012. (Lot No-06)  3-Nov-2011  15 Days  Carpeting  LRPS  1100 1.1     LRPS  1300 1.3     Dhaka, (Division Office) 
 Revenue  DAR(79)/08/EE/RDD/2011-2012 (Lot No 06)  8-Dec-2011  5 Days  Carpeting  LRPS  1300 1.3     LRPS  2200 2.2     Dhaka, (Division Office) 
 Revenue  DAR(74)/12/EE/RDD/2010-2011 (Lot No 03)  8-Feb-2011  30 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  MPDKR(106)d  15-Mar-2007  1690 Days  Carpeting  LRPS  1500 1.5     LRPS  1700 1.7     Dhaka, (Division Office) 
 Revenue  DAR(26)/EE/RDD/2011-2012. (Lot No-36)  26-Aug-2011  20 Days  Carpeting  LRPS  1500 1.5     LRPS  16520 16.52     Dhaka, (Division Office) 
 Revenue  da/2016  20-Dec-2016  15 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  DAR(131)/10/EE/RDD/2011-2012 (Lot No 04)  13-Dec-2011  5 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  DAR(111)/08/EE/RDD/2011-2012 (Lot No 13)  11-Dec-2011  7 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  Departmental(58)/02/EE/RDD/2011-2012 (Lot No 09)  16-Nov-2011  10 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  e-GP/11/EE/DRD/2017-2018  18-Dec-2017  25 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  e-GP/11/EE/DRD/2017-2018(ID 137838)  18-Dec-2017  25 Days  Carpeting  LRPS  1500 1.5     LRPS  2000 2     Dhaka, (Division Office) 
 Revenue  37/RDD/2008-2009 (Lot No-13)  4-Feb-2009  20 Days  Carpeting  LRPS  1550 1.55     LRPS  2500 2.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(12)/RDD/Kallyanpur/2009-2010  9-Dec-2009  3 Days  Carpeting  LRPS  1650 1.65     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  test  20-Oct-2013  30 Days  Carpeting  LRP002  0 1.937     LRP023  0 22.925     Manikganj, (Division Office) 
 Revenue  LTM No. 3-EE/PRD/2012-2013, Lot No. 3/2  8-Nov-2012  15 Days  Road Rehablitation  LRP002  0 1.937     LRP002  500 2.437     Pabna, (Division Office) 
 Revenue  OTM-04-EE/GRD/2009-2010,Package No.04  25-Mar-2010  60 Days  Carpeting  LRP002  0 1.937     LRP002  2000 3.937     Gaibanda, (Division Office) 
 Revenue  EST 50 SRD (Ullapara) 2004-2005  25-May-2005  7 Days  Road Embankment  LRP002  0 1.937     LRP002  500 2.437     Sirajganj, (Division Office) 
 Revenue  TEST-001  10-Sep-2013  60 Days  Carpeting  LRP002  0 1.937     LRP024  0 23.925     Manikganj, (Division Office) 
 Revenue  sharif005    50 Days  Carpeting  LRP002  0 1.937     LRP023  0 22.925     Manikganj, (Division Office) 
 Revenue  001/Zakir    0 Days  Carpeting  LRP002  0 1.937     LRP025  0 24.928     Manikganj, (Division Office) 
 Revenue  009    0 Days  Carpeting  LRP002  0 1.937     LRP024  0 23.925     Manikganj, (Division Office) 
 Revenue  31-EE/BRD/2015-2016  17-Apr-2016  30 Days  Carpeting  LRP002  0 1.937     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  ZAKIR-1    365 Days  Carpeting  LRP002  0 1.937     LRP023  0 22.925     Manikganj, (Division Office) 
 Revenue  DMSMLR(28)/RDD/Kallyanpur/2010-2011 (Lot No 10)  23-Nov-2010  15 Days  Carpeting  LRPS  2000 2     LRPS  2200 2.2     Dhaka, (Division Office) 
 Revenue  PMP/DZ/07/2012-2013/01DBST & DBSW  10-Feb-2014  241 Days  Carpeting  LRPS  2000 2     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  P-14-SE/BRD/2009-2010(Lot No.02)  23-May-2010  45 Days  Carpeting  LRP002  100 2.037     LRP248  2458 247.973     Gaibanda, (Division Office) 
 Revenue  QT No-3(S-2) 207-2008  26-May-2008  3 Days  Road Embankment  LRP002  150 2.087     LRP002  250 2.187     Sirajganj, (Division Office) 
 Revenue  QT No 3 A (S-2) 2007-2008  20-May-2008  2 Days  Road Embankment  LRP002  170 2.107     LRP002  180 2.117     Sirajganj, (Division Office) 
 Revenue  Tender Package No.egp-PMP(Road)-RZ-02(137)/2014-2015/Re-tender  9-Apr-2015  216 Days  Surfacing  LRP002  210 2.147     LRP002  215 2.152     Gaibanda, (Division Office) 
 Revenue  DAR(145)/EE/RDD/2011-2012. (Lot No-04)  18-Dec-2011  5 Days  Carpeting  LRPS  2350 2.35     LRPS  3800 3.8     Dhaka, (Division Office) 
 Revenue  DAR(91)/08/EE/RDD/2011-2012 (Lot No 18)  11-Dec-2011  7 Days  Carpeting  LRPS  2400 2.4     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  EST 50a SRD (Ullapara) 2004-2005  25-May-2009  7 Days  Road Embankment  LRP002  500 2.437     LRP002  800 2.737     Sirajganj, (Division Office) 
 Revenue  DAR(57)/EE/RDD/2009-2010 (Lot no 07)  15-Oct-2010  15 Days  Carpeting  LRPS  2500 2.5     LRPS  30000 30     Dhaka, (Division Office) 
 Revenue  DAR(89)/08/EE/RDD/2011-2012 (Lot No 09)  8-Dec-2011  5 Days  Carpeting  LRPS  2500 2.5     LRPS  4800 4.8     Dhaka, (Division Office) 
 Revenue  DAR(01)/EE/DRD/2015-2015 (Lot No 01)  9-Sep-2015  7 Days  Carpeting  LRPS  2500 2.5     LRPS  26000 26     Dhaka, (Division Office) 
 Revenue  ZKDR(102)/RDD/2009-2010 (Lot No-09)  30-Jan-2010  3 Days  Carpeting  LRPS  2500 2.5     LRPS  2800 2.8     Dhaka, (Division Office) 
 Revenue  ZKDR/17/EE/RDD/2009-2010 (Lot No-14)  17-Jul-2011  15 Days  Carpeting  LRPS  2500 2.5     LRPS  3500 3.5     Dhaka, (Division Office) 
 Revenue  e-GP/24/EE/DRD/2017-2018 (ID 154288)  4-Mar-2018  15 Days  Carpeting  LRPS  2500 2.5     LRPS  3000 3     Dhaka, (Division Office) 
 Revenue  DAR(19)/EE/RDD/2009-2010 (Lot No 51)  17-Oct-2010  30 Days  Carpeting  LRPS  2500 2.5     LRPS  3000 3     Dhaka, (Division Office) 
 Revenue  DMR(05/RDD/2009-2010 (Lot No-22)  23-Jul-2009  5 Days  Carpeting  LRPS  2500 2.5     LRPS  3000 3     Dhaka, (Division Office) 
 Revenue  DA(25)/02/EE/RDD/2013-2014 (Lot No 03)  19-Sep-2013  10 Days  Carpeting  LRPS  2600 2.6     LRPS  2800 2.8     Dhaka, (Division Office) 
 Revenue  DA(17)/02/EE/RDD/2013--2014 (Lot No 06)  1-Sep-2013  15 Days  Carpeting  LRPS  2600 2.6     LRPS  2800 2.8     Dhaka, (Division Office) 
 Revenue  e-GP/109/EE/DRD/207-2018 ID No-196530  5-Jun-2018  20 Days  Carpeting  LRPS  3100 3.1     LRPS  3900 3.9     Dhaka, (Division Office) 
 Revenue  DAR(118)/07/EE/RDD/2011-2012 (Lot No 02)  5-Dec-2011  10 Days  Carpeting  LRPS  3180 3.18     LRPS  4780 4.78     Dhaka, (Division Office) 
 Revenue  DAR(44)/19/EE/RDD/2011-2012 (Lot no 25)  5-Jul-2011  30 Days  Carpeting  LRPS  3200 3.2     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  34/MKG of 2011-2012  7-Oct-2011  30 Days  Pavement  LRP002  1263 3.2     LRP002  2613 4.55     Manikganj, (Division Office) 
 Revenue  DAR(116)/11/EE/RDD/2011-2012 (Lot No 12)  4-Jan-2012  7 Days  Carpeting  LRPS  3350 3.35     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(08)/03/EE/RDD/2010-2011 (Lot No 04)  30-Aug-2011  7 Days  Carpeting  LRPS  3350 3.35     LRPS  3400 3.4     Dhaka, (Division Office) 
 Revenue  DAR(105)/10/EE/RDD/2011-2012 (Lot No 10)  12-Dec-2011  5 Days  Carpeting  LRPS  3500 3.5     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  DAR(18)/RDD/2009-2010 (Lot No 52)  25-Oct-2010  30 Days  Carpeting  LRPS  3500 3.5     LRPS  3900 3.9     Dhaka, (Division Office) 
 Revenue  HSMR(31)/EE/Kallyanpur/2009-2010 (Lot No-10)  19-Nov-2009  3 Days  Carpeting  LRPS  3500 3.5     LRPS  3900 3.9     Dhaka, (Division Office) 
 Revenue  37/MKG of 2011-2012  5-Oct-2011  21 Days  Carpeting  LRP002  1863 3.8     LRP002  2863 4.8     Manikganj, (Division Office) 
 Revenue  19/MKG of 2011-2012  26-Sep-2011  350 Days  Pavement  LRP002  2024 3.961     LRP002  2304 4.241     Manikganj, (Division Office) 
 Revenue  DAR(25)/EE/RDD/2010-2011 (Lot NO-02)  8-Nov-2010  7 Days  Carpeting  LRPS  4000 4     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  DAR(78)/09/EE/RDD/2011-2012 (Lot No 06)  11-Dec-2011  5 Days  Carpeting  LRPS  4200 4.2     LRPS  4700 4.7     Dhaka, (Division Office) 
 Revenue  38/MKG of 2011-2012  18-Oct-2011  21 Days  Pavement  LRP002  2550 4.487     LRP002  2800 4.737     Manikganj, (Division Office) 
 Revenue  DAR(109)/EE/RDD/2011-2012. (Lot No-05)  11-Dec-2011  5 Days  Carpeting  LRPS  4500 4.5     LRPS  5500 5.5     Dhaka, (Division Office) 
 Revenue  DDS(R/RFQ(29)//RDD/2009-2010 (Lot No-21)  23-Jul-2009  5 Days  Carpeting  LRPS  4500 4.5     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  BTJR(86)/12/EE/RDD/2012-2013 (Lot No 08)  13-Jun-2013  30 Days  Carpeting  LRPS  4500 4.5     LRPS  5000 5     Dhaka, (Division Office) 
 Revenue  150/RDD/2005-2006 (Lot No-19)  3-Jul-2008  15 Days  Carpeting  LRPS  5060 5.06     LRPS  5260 5.26     Dhaka, (Division Office) 
 Revenue  GSB(36)/KSD/RDD/2009-2010 (Lot No-05)  10-Dec-2009  5 Days  Carpeting  LRPS  5500 5.5     LRPS  6500 6.5     Dhaka, (Division Office) 
 Revenue  e-GP/36/EE/DRD/2017-2018 (ID 142442)  31-Dec-2017  7 Days  Carpeting  LRPS  5500 5.5     LRPS  6000 6     Dhaka, (Division Office) 
 Revenue  e-GP/49/EE/DRD/2017-2018, ID No-142481  14-Dec-2017  10 Days  Carpeting  LRPS  5500 5.5     LRPS  6500 6.5     Dhaka, (Division Office) 
 Revenue  21/MKG of 2011-2012  7-Jul-2011  30 Days  Pavement  LRP002  3713 5.65     LRP002  4313 6.25     Manikganj, (Division Office) 
 Revenue  e-GP/23/EE/DRD/-2016-2017 (66420)  24-Oct-2016  7 Days  Carpeting  LRPS  6000 6     LRPS  9000 9     Dhaka, (Division Office) 
 Revenue  FML/LTM(186)/EE/RDD/2009-2010 (Lot No 11)  16-Oct-2010  30 Days  Carpeting  LRPS  6500 6.5     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  DAR(90)/EE/RDD/kallyanpur-2009-2010 (Lot -04)  18-Oct-2010  3 Days  Carpeting  LRPS  6500 6.5     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  e-GP/51/EE/DRD/2017-2018 (ID 146462)  3-Jan-2018  7 Days  Carpeting  LRPS  6500 6.5     LRPS  7000 7     Dhaka, (Division Office) 
 Revenue  DAR(18)/EE/RDD/2014-2015. (Lot No-01)  3-Dec-2014  10 Days  Carpeting  LRPS  7000 7     LRPS  14640 14.64     Dhaka, (Division Office) 
 Revenue  DAR(19)/EE/RDD/2014-2015. (Lot No-03)  3-Dec-2014  10 Days  Carpeting  LRPS  7000 7     LRPS  14640 14.64     Dhaka, (Division Office) 
 Revenue  e-GP/42/EE/DRD/2017-2018 (ID 142296)  27-Dec-2017  7 Days  Carpeting  LRPS  7500 7.5     LRPS  8000 8     Dhaka, (Division Office) 
 Revenue  DMSAMLR/RDD/2007-2008 (Lot No-06)  19-Jul-2008  10 Days  Carpeting  LRPS  7500 7.5     LRPS  8500 8.5     Dhaka, (Division Office) 
 Revenue  e-GP/43/EE/DRD/2017-2018 (ID 142444)  28-Dec-2017  7 Days  Carpeting  LRPS  7500 7.5     LRPS  8000 8     Dhaka, (Division Office) 
 Revenue  ZKDR/RFQ(163)//EE/RDD/2009-2010 (Lot No-05)  20-Apr-2010  3 Days  Carpeting  LRPS  7500 7.5     LRPS  7800 7.8     Dhaka, (Division Office) 
 Revenue  GSB(37)/EE/KSD/RDD/2009-2010 (Lot No-02)  9-Dec-2009  15 Days  Carpeting  LRPS  7500 7.5     LRPS  8500 8.5     Dhaka, (Division Office) 
 Revenue  e-GP/37/EE/DRD/2017-2018 (ID 142238)  31-Dec-2017  7 Days  Carpeting  LRPS  7500 7.5     LRPS  8000 8     Dhaka, (Division Office) 
 Revenue  DNR(19)/EE/RDD/2010-2011. (Lot No-28)  18-Apr-2011  20 Days  Carpeting  LRPS  8000 8     LRPS  8140 8.14     Dhaka, (Division Office) 
 Revenue  GSB(44)/EE/KSD/2009-2010 (Lot No-01)  10-Dec-2009  5 Days  Carpeting  LRPS  8500 8.5     LRPS  9500 9.5     Dhaka, (Division Office) 
 Revenue  DNR(75)/EE/RDD/2011-2012. (Lot No-34)  27-Nov-2011  20 Days  Carpeting  LRPS  8680 8.68     LRPS  8960 8.96     Dhaka, (Division Office) 
 Revenue  BTJR(82)17/EE/RDD/2010-2011 (Lot No 29)-1  24-Oct-2011  10 Days  Carpeting  LRPS  9500 9.5     LRPS  10000 10     Dhaka, (Division Office) 
 Revenue  GSB(82)/EE/KSD/2009-2010 (Lot No-01)  17-Dec-2009  4 Days  Carpeting  LRPS  9500 9.5     LRPS  10500 10.5     Dhaka, (Division Office) 
 Revenue  DDSR/RFQ(139)/RDD/2009-2010 (Lot No-26)  24-Mar-2010  5 Days  Carpeting  LRPS  9500 9.5     LRPS  10500 10.5     Dhaka, (Division Office) 
 Revenue  DDSR/RFQ(43)/RDD/2009-2010 (Lot No-01)  5-Aug-2009  5 Days  Carpeting  LRPS  10500 10.5     LRPS  11000 11     Dhaka, (Division Office) 
 Revenue  DAR(24)/EE/RDD/2010-2011 (Lto No-01)  8-Nov-2010  7 Days  Carpeting  LRPS  11000 11     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  TAEPZR(23)/EE/RDD/2009-2010 (Lot No-02)  10-Nov-2009  6 Days  Carpeting  LRPS  11325 11.325     LRPS  11625 11.625     Dhaka, (Division Office) 
 Revenue  DAR(24)/EE/RDD/2010-2011 (Lto No-01)-1  8-Nov-2010  7 Days  Carpeting  LRPS  11500 11.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  DAR(62)/EE/RDD/2011-2012 (Lot No-07)  16-Nov-2011  20 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  e-GP/24/EE/DRD/2016-2017, Tender ID No.72583  1-Dec-2016  7 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  e-GP/44/EE/DRD/2016-2017 Tender ID-75670  18-Dec-2016  7 Days  Carpeting  LRPS  11500 11.5     LRPS  12500 12.5     Dhaka, (Division Office) 
 Revenue  DAR(60)EE/RDD/2008-2009 ( Lot No-01)  22-Mar-2009  7 Days  Carpeting  LRPS  11500 11.5     LRPS  21500 21.5     Dhaka, (Division Office) 
 Revenue  DAR(03)/EE/DRD/2016-2017 (Lot No-05)  9-Oct-2016  3 Days  Carpeting  LRPS  11500 11.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  e-GP/10/EE/DRD/2015-2016  2-Dec-2015  15 Days  Carpeting  LRPS  12000 12     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(50)/07/EE/RDD/2012-2013 (Lot No 08)  2-Apr-2013  7 Days  Carpeting  LRPS  12000 12     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(68)/EE/RDD/2012-2013. (Lot No-10)  18-Jun-2013  10 Days  Carpeting  LRPS  12000 12     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(28)/EE/RDD/2014-2015 (Lot No-05)  7-Jun-2015  7 Days  Carpeting  LRPS  12000 12     LRPS  32000 32     Dhaka, (Division Office) 
 Revenue  DAR(05)/15/EE/RDD/2013-2014 (Lot No 11)  5-Aug-2013  7 Days  Carpeting  LRPS  12000 12     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(48)/07/EE/RDD/2012-2013 (Lot No 13)  31-Mar-2013  7 Days  Carpeting  LRPS  12000 12     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  DAR(51)/EE/RDD/2013-2014. (Lot No-01)  23-Oct-2013  10 Days  Carpeting  LRPS  12000 12     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(101)/RDD/2009-2010 (Lot No-08)  21-Oct-2009  5 Days  Carpeting  LRPS  12000 12     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  egp/12/EE/DRD/2014-2015  3-Dec-2014  10 Days  Carpeting  LRPS  12000 12     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(61)/EE/RDD/2011-2012 (Lot No-19)  22-Nov-2011  20 Days  Carpeting  LRPS  12000 12     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  DAR(60)/EE/RDD/2012-2013. (Lot No-01)  7-May-2013  7 Days  Carpeting  LRPS  12300 12.3     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(50)/Kallyanpur/2009-2010 (Lot No-02)  10-Dec-2009  5 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  DAR(50)/Kallyanpur/2009-2010 (Lot No-02)  10-Dec-2009  5 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(21)/RDD/Kallyanpur/2009-2010  18-Mar-2010  3 Days  Carpeting  LRPS  12500 12.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(30)/EE/RDD/2010-2011 (Lot No 11)  5-Jan-2011  15 Days  Carpeting  LRPS  12500 12.5     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  GSB(81)/EE/KSD/2009-2010 (Lot No-02)  17-Dec-2009  5 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  DAR(100)/EE/RDD/2013-2014. (Lot No-01)  12-Jun-2014  10 Days  Carpeting  LRPS  12500 12.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  DAR(34)/EE/Kallyanpur/2009-2010 (Lot No-01)  8-Dec-2009  6 Days  Carpeting  LRPS  12500 12.5     LRPS  13700 13.7     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(11)/RDD/Kallyanpur/2008-2009  15-Nov-2008  7 Days  Carpeting  LRPS  12500 12.5     LRPS  13500 13.5     Dhaka, (Division Office) 
 Revenue  BTJR(167)/13/EE/RDD/2011-2012 (Lot No 41)  29-Jan-2012  5 Days  Carpeting  LRPS  12500 12.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  DAR(02)/EE/RDD/2011-2012.  11-Oct-2011  3 Days  Carpeting  LRPS  12500 12.5     LRPS  12600 12.6     Dhaka, (Division Office) 
 Revenue  DAR(39)/EE/RDD/2012-2013. (Lot No-03)  28-Feb-2013  7 Days  Carpeting  LRPS  12500 12.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(58)/EE/RDD/2012-2013. (Lot No-04)  7-May-2013  7 Days  Carpeting  LRPS  12500 12.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAHR(59)/RDD/2009-2010 (Lot No-15)  9-Dec-2009  6 Days  Carpeting  LRPS  12500 12.5     LRPS  12800 12.8     Dhaka, (Division Office) 
 Revenue  DAR(53)/EE/RDD/2012-2013. (Lot No-07)  10-Apr-2013  7 Days  Carpeting  LRPS  12500 12.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(33)/07/EE/RDD/2010-2011 (Lot No-04)  12-Dec-2010  7 Days  Carpeting  LRPS  12500 12.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  e-GP/89/EE/DRD/2016-2017 ()ID No 85942)  6-Aug-2017  5 Days  Carpeting  LRPS  12500 12.5     LRPS  12750 12.75     Dhaka, (Division Office) 
 Revenue  BTJR(113)/04/EE/RDD/2011-2012 (Lot No 36)  4-Dec-2011  20 Days  Carpeting  LRPS  12500 12.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  DAR(76)/02/EE/RDD/2011-2012 (Lot No 11)  29-Dec-2011  20 Days  Carpeting  LRPS  12610 12.61     LRPS  12980 12.98     Dhaka, (Division Office) 
 Revenue  e-GP/93/EE/DRD/2016-2017 ( ID No. 85953)  7-Aug-2017  5 Days  Carpeting  LRPS  12750 12.75     LRPS  13000 13     Dhaka, (Division Office) 
 Revenue  DAR(05)/23/EE/RDD/2010-2011(Lot No 19)  24-Aug-2011  20 Days  Carpeting  LRPS  13000 13     LRPS  34400 34.4     Dhaka, (Division Office) 
 Revenue  DAR(02)/EE/RDD/2014-2015 (Lot No. 02)  30-Oct-2014  10 Days  Carpeting  LRPS  13000 13     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(71)/05/EE/RDD/2013-2014 (Lot No. 10)  20-Feb-2014  15 Days  Carpeting  LRPS  13000 13     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(19)/03/EE/RDD/2012-2013 (Lot No 01)  29-Oct-2012  10 Days  Carpeting  LRPS  13000 13     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(82)08/EE/RDD/2012-2013 (Lot No 02)  6-Jun-2013  7 Days  Carpeting  LRPS  13000 13     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(50)/03/EE/RDD/2013-2014 (Lot No 03)  10-Oct-2013  10 Days  Carpeting  LRPS  13000 13     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  DA-33-02-EE-RDD-2013-2014, Lot 1  1-Oct-2013  15 Days  Carpeting  LRPS  13000 13     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DA(92)/09/EE/RDD/2013-2014 (Lot No 01)  29-Apr-2014  10 Days  Carpeting  LRPS  13000 13     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(125)/13//EE/RDD/2011-2012 (Lot No 14)  22-Jan-2012  7 Days  Carpeting  LRPS  13000 13     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  e-GP/42/EE/DRD/2015-2016 (ID No 49832)  22-Mar-2016  10 Days  Carpeting  LRPS  13000 13     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DA(33)/02/EE/RDD/2013-2014(Lot No 01)  1-Oct-2013  15 Days  Carpeting  LRPS  13000 13     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  e-GP/12/EE/DRD/2015-2016  6-Dec-2015  15 Days  Carpeting  LRPS  13000 13     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  e-GP/19/EE/DRD/2015-2016 (36146)  15-Dec-2015  10 Days  Carpeting  LRPS  13000 13     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  e-GP/19/EE/DRD/2015-2016  15-Dec-2015  10 Days  Carpeting  LRPS  13000 13     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(15)/EE/RDD/2014-2015. (Lot No-04)  2-Nov-2014  10 Days  Carpeting  LRPS  13000 13     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  e-GP/25/EE/DRD/2016-2017 (72586)  23-Nov-2016  7 Days  Carpeting  LRPS  13000 13     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(03)/15/EE/RDD/2012-2013 (Lot No 10)  5-Aug-2013  10 Days  Carpeting  LRPS  13000 13     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  e-GP/42/EE/DRD/2015-2016 (49832)  21-Mar-2016  10 Days  Carpeting  LRPS  13000 13     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(94)/09/EE/RDD/2013-2014 (Lot No. 03)  24-Apr-2014  10 Days  Carpeting  LRPS  13000 13     LRPS  30000 30     Dhaka, (Division Office) 
 Revenue  DAR(33)/02/EE/RDD/2013-2014 (Lot No. 01)    15 Days  Carpeting  LRPS  13000 13     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(28)/02/EE/DRD/2015-2016 (Lot No. 01)  12-Nov-2015  65 Days  Carpeting  LRPS  13000 13     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  DAR(70)/07/EE/RDD/2012-2013 (Lot No 06)  4-Jun-2013  7 Days  Carpeting  LRPS  13000 13     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(65)/02/EE/RDD/2011-2012 (Lot No 16)  28-Nov-2011  20 Days  Carpeting  LRPS  13400 13.4     LRPS  13790 13.79     Dhaka, (Division Office) 
 Revenue  DAR(34)/EE/Kallyanpur(Lot No-01)  8-Dec-2009  5 Days  Carpeting  LRPS  13500 13.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  DAR(12)/26/EE/RDD/2011-2012 (Lot No 11)  21-Aug-2011  20 Days  Carpeting  LRPS  13500 13.5     LRPS  33900 33.9     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(14)/RDD/Kallyanpur/2009-2010  10-Dec-2009  3 Days  Carpeting  LRPS  13500 13.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  DAR(96)/08/EE/RDD/2011-2012 (Lot No 14)  11-Dec-2011  7 Days  Carpeting  LRPS  13500 13.5     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  e-GP/84/EE/DRD/2016-2017 (ID 85925)  6-Aug-2017  5 Days  Carpeting  LRPS  13500 13.5     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(20)/RDD/Kallyanpur/2009-2010  18-Mar-2010  3 Days  Carpeting  LRPS  13500 13.5     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  DAR(80)/11/EE/RDD/2010-2011(Lot No 20)  27-Feb-2011  20 Days  Carpeting  LRPS  13500 13.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(151)/03/EE/RDD/2011-2012 (Lot No 02)  22-Mar-2012  3 Days  Carpeting  LRPS  13500 13.5     LRPS  23000 23     Dhaka, (Division Office) 
 Revenue  DAR(82)/11/EE/RDD/2010-20111 (Lot No 07)  27-Feb-2011  30 Days  Carpeting  LRPS  13500 13.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  DAR(08)/EE/RDD/2013-2014 (Lot No-09)  19-Aug-2013  10 Days  Carpeting  LRPS  13500 13.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  DAR(108)/EE/Kallyanpur/2009-10(Lot No-09)  21-Mar-2010  3 Days  Carpeting  LRPS  13500 13.5     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  DAR(148)/04/EE/RDD/2011-2012 (Lot No 34)  14-Nov-2011  360 Days  Carpeting  LRPS  13500 13.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(03)/EE/RDD/2011-2012  11-Oct-2011  3 Days  Carpeting  LRPS  13500 13.5     LRPS  13600 13.6     Dhaka, (Division Office) 
 Revenue  DAR(26)/EE/RDD/2009-2010 (Lot No.-06)  23-Nov-2009  5 Days  Carpeting  LRPS  13500 13.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(91)/EE/RDD/2013-2014. (Lot No-11)  13-Feb-2014  10 Days  Carpeting  LRPS  13500 13.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(36)/26/EE/RDD/2011-2012 (Lot No 28)  27-Sep-2011  20 Days  Carpeting  LRPS  13500 13.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  DAR(76)/EE/RDD/2013-2014. (Lot No-04)  20-Jan-2014  15 Days  Carpeting  LRPS  13500 13.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(08)/RDD/Kallyanpur/2009-2010  10-Dec-2009  2 Days  Carpeting  LRPS  13500 13.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(80)/EE/RDD/2009-2010 (Lot No-02)  21-Dec-2009  7 Days  Carpeting  LRPS  13500 13.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(60)/EE/RDD/2009-2010 (Lot No-06)  9-Dec-2009  5 Days  Carpeting  LRPS  13500 13.5     LRPS  14500 14.5     Dhaka, (Division Office) 
 Revenue  DAR(03)/26/EE/RDD/2011-2012 (Lot No 30)  21-Aug-2011  20 Days  Carpeting  LRPS  13500 13.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(02)/EE/RDD/2010-2011 (Lot No 10)  10-Jan-2011  30 Days  Carpeting  LRPS  13500 13.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  e-GP/37/EE/DRD/2016-2017 (75158)  18-Dec-2016  5 Days  Carpeting  LRPS  13700 13.7     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  e-GP/85/EE/DRD/2016-2017 (ID No 85927)  6-Aug-2017  5 Days  Carpeting  LRPS  13750 13.75     LRPS  14000 14     Dhaka, (Division Office) 
 Revenue  e-GP/86/EE/DRD/2017-2018 (ID 178925)  7-May-2018  15 Days  Carpeting  LRPS  14000 14     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  DAR(66)/05/EE/RDD/2013-2014 (Lot No. 17)  12-Feb-2014  10 Days  Carpeting  LRPS  14000 14     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  e-GP/83/EE/DRD/2016-2017 (ID No. 85922)  6-Aug-2017  5 Days  Carpeting  LRPS  14200 14.2     LRPS  14450 14.45     Dhaka, (Division Office) 
 Revenue  DAR(52)/08/EE/RDD/2012-2013 (Lot No 01)  10-Apr-2013  15 Days  Carpeting  LRPS  14350 14.35     LRPS  15350 15.35     Dhaka, (Division Office) 
 Revenue  e-GP/86/EE/DRD/2016-2017 (ID 85929)  6-Aug-2017  5 Days  Carpeting  LRPS  14450 14.45     LRPS  14700 14.7     Dhaka, (Division Office) 
 Revenue  DAR(79)/EE/RDD/2009-2010 (Lot No-03)  9-Dec-2009  5 Days  Carpeting  LRPS  14500 14.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(46)/05/EE/RDD/2010-2011 (Lot No 21)  19-Dec-2010  20 Days  Carpeting  LRPS  14500 14.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  DAR(62)/EE/RDD/Kallyanpur 2009-2010 (Lot no-02)  13-Dec-2009  5 Days  Carpeting  LRPS  14500 14.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(26)/04/EE/RDD/2012-2013 (Lot No 03)  1-Nov-2012  10 Days  Carpeting  LRPS  14500 14.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  DAR(108/17/EE/RDD/2010-2011 (Lot No 05)  6-Apr-2011  20 Days  Carpeting  LRPS  14500 14.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(61)/EE/RDD/2009-2010 (Lot No-03)  10-Dec-2009  5 Days  Carpeting  LRPS  14500 14.5     LRPS  15500 15.5     Dhaka, (Division Office) 
 Revenue  DAR(53)/07/EE/RDD/2010-2011 (Lot No 14)  13-Dec-2010  20 Days  Carpeting  LRPS  14500 14.5     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  DAR(20)/08/EE/DRD/2014-2015 (Lot No 02)  31-Dec-2014  10 Days  Carpeting  LRPS  14640 14.64     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  DAR-20(08/EE/DRD/2014-2015 -Lot no.02  3-Dec-2014  10 Days  Carpeting  LRPS  14640 14.64     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  e-GP/31/EE/DRD/2016-2017 (75108)  18-Dec-2016  5 Days  Carpeting  LRPS  14700 14.7     LRPS  15000 15     Dhaka, (Division Office) 
 Revenue  DAR(62)/05/EE/RDD/2013-2014 (Lot No. 19)  12-Feb-2014  10 Days  Carpeting  LRPS  15000 15     LRPS  15200 15.2     Dhaka, (Division Office) 
 Revenue  DAR(93)/EE/RDD/2011-2012. (Lot NO-22)  22-Dec-2011  30 Days  Carpeting  LRPS  15000 15     LRPS  15990 15.99     Dhaka, (Division Office) 
 Revenue  DAR(122)/12/EE/RDD/2011-2012 (Lot No 04)  16-Jan-2012  7 Days  Carpeting  LRPS  15000 15     LRPS  15390 15.39     Dhaka, (Division Office) 
 Revenue  DAR(38)/EE/2009-2010 (Lot No-02)  8-Dec-2009  5 Days  Carpeting  LRPS  15500 15.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  DAR(94)/08/EE/RDD/2011-2012 (Lot No 23)  11-Dec-2011  7 Days  Carpeting  LRPS  15500 15.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(33)/Kallyanpur/2009-2010 (Lot No-03)  8-Dec-2009  5 Days  Carpeting  LRPS  15500 15.5     LRPS  16500 16.5     Dhaka, (Division Office) 
 Revenue  DAR(54)/07/EE/RDD/2012-2013 (Lot No 12)  10-Apr-2013  7 Days  Carpeting  LRPS  15500 15.5     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(78)/EE/RDD/2013-2014. (Lot No-12)  20-Feb-2014  15 Days  Carpeting  LRPS  15500 15.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  e-GP/71/EE/DRD/2016-2017 (ID No. 85455)  6-Aug-2017  4 Days  Carpeting  LRPS  15500 15.5     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  DAR/EE/100/RDD/2011-2012.(Lot No-25)  4-Dec-2011  20 Days  Carpeting  LRPS  15593 15.593     LRPS  16000 16     Dhaka, (Division Office) 
 Revenue  DAR(24)/03/EE/RDD/2012-2013 (Lot No 11)  5-Nov-2012  10 Days  Carpeting  LRPS  16000 16     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  DAR(144)/EE/RDD/2011-2012. (Lot No-03)  19-Jan-2012  7 Days  Carpeting  LRPS  16000 16     LRPS  16195 16.195     Dhaka, (Division Office) 
 Revenue  DAR(135)/EE/RDD/Kallyanpur-2009-2010 (Lot No 05)  17-Jul-2011  15 Days  Carpeting  LRPS  16500 16.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  DAR(47)/07/EE/RDD/2010-2011 (Lot No 03)  14-Dec-2010  7 Days  Carpeting  LRPS  16500 16.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  DAR(90)/EE/RDD/Kallyanpur-2009-2010 (Lot No 04)  12-Jul-2011  7 Days  Carpeting  LRPS  16500 16.5     LRPS  17000 17     Dhaka, (Division Office) 
 Revenue  DAR(15)/EE/RDD/2013-2014 (Lot No-07)  1-Sep-2013  15 Days  Carpeting  LRPS  16500 16.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  DAR(93)/EE/RDD/2009-2010 (Lot No-01)  21-Mar-2010  6 Days  Carpeting  LRPS  16500 16.5     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  DAR(52)/RDD/2008-2009(Lot No-07)  21-Oct-2010  7 Days  Carpeting  LRPS  16500 16.5     LRPS  16800 16.8     Dhaka, (Division Office) 
 Revenue  DAR(24)/21/EE/RDD/2011-2012 (Lot No 33)  20-Aug-2011  20 Days  Carpeting  LRPS  16800 16.8     LRPS  17950 17.95     Dhaka, (Division Office) 
 Revenue  e-GP/121/EE/DRD/2016-2017 (ID 100940)  12-Oct-2017  10 Days  Carpeting  LRPS  17000 17     LRPS  19000 19     Dhaka, (Division Office) 
 Revenue  DAR(46)/EE/RDD/2011-2012 (Lot No-06)  20-Oct-2011  20 Days  Carpeting  LRPS  17000 17     LRPS  17500 17.5     Dhaka, (Division Office) 
 Revenue  DAR(25)/EE/RDD/2012-2013. (Lot No-18)  5-Nov-2012  10 Days  Carpeting  LRPS  17000 17     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  DAR(24)/Kallyanpur/2009-2010 (Lot No-06)  15-Nov-2009  5 Days  Carpeting  LRPS  17500 17.5     LRPS  18500 18.5     Dhaka, (Division Office) 
 Revenue  DAR(28)/29/EE/RDD/2011-2012 (Lot No 01)  21-Sep-2011  20 Days  Carpeting  LRPS  17500 17.5     LRPS  17800 17.8     Dhaka, (Division Office) 
 Revenue  DARR/18/EE/RDD/2010-2011 (Lot No-06)  29-Sep-2010  25 Days  Carpeting  LRPS  17500 17.5     LRPS  18000 18     Dhaka, (Division Office) 
 Revenue  e-GP/26/EE/DRD/2016-2017 TID-72600  1-Dec-2016  10 Days  Carpeting  LRPS  18100 18.1     LRPS  18900 18.9     Dhaka, (Division Office) 
 Revenue  DAHR(66)/RDD/2009-2010 (Lot No-14)  10-Dec-2009  6 Days  Carpeting  LRPS  18500 18.5     LRPS  18700 18.7     Dhaka, (Division Office) 
 Revenue  DZ(e-GP)/22-Contract/PMP(Road)/2017-2018 (No-125329)  21-Dec-2017  180 Days  Carpeting  LRPS  18500 18.5     LRPS  26500 26.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(09)/RDD/Kallyanpur/2009-2010  10-Dec-2009  3 Days  Carpeting  LRPS  18500 18.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(85)/RDD/2009-2010 (Lot No-02)  21-Jan-2010  6 Days  Carpeting  LRPS  18500 18.5     LRPS  19500 19.5     Dhaka, (Division Office) 
 Revenue  DAR(11)/RDD/2011-2012 (Kallyanpur)  11-Mar-2012  3 Days  Carpeting  LRPS  18500 18.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(32)/EE/RDD/2007-2008 (DTM)  1-Jul-2008  15 Days  Carpeting  LRPS  18500 18.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(112)/15/EE/RDD/2010-2011(Lot No 04)  3-Apr-2011  209 Days  Carpeting  LRPS  19000 19     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(99)/08/EE/RDD/2011-2012 (Lot No 24)  11-Dec-2011  7 Days  Carpeting  LRPS  19000 19     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  DAR(01)/EE/DRD/2016-2017 (Lot No 03)  9-Oct-2016  3 Days  Carpeting  LRPS  19000 19     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DA(46)/07/EE/RDD/2012-2013 (Lot No 10)  21-Mar-2013  7 Days  Carpeting  LRPS  19000 19     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(41)/07/EE/RDD/2012-2013 (Lot No 05)  14-Mar-2013  7 Days  Carpeting  LRPS  19000 19     LRPS  29500 29.5     Dhaka, (Division Office) 
 Revenue  DAR(68)/05/EE/RDD/2013-2014 (Lot No. 07)  12-Feb-2014  10 Days  Carpeting  LRPS  19000 19     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(12)/EE/DRD/2015-2016. (Lot No-05)  4-Oct-2015  7 Days  Carpeting  LRPS  19250 19.25     LRPS  21250 21.25     Dhaka, (Division Office) 
 Revenue  DAR(88)/EE/RDD/2011-2012. (Lot No-16)  11-Dec-2011  5 Days  Carpeting  LRPS  19500 19.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DAR(36)/EE/RDD/2012-2013. (Lot No-29)  22-Nov-2012  10 Days  Carpeting  LRPS  19500 19.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(19)/EE/Kallyanpur/2010-2011 (Lot No-26)  18-Oct-2009  10 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(101)/EE/RDD/2010-2011 (Lot No-21)  24-Mar-2011  20 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(109)/EE/RDD/2010-2011 (Lot NO-13)  14-Mar-2011  20 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(05)/EE/RDD/2010-2011 (Lot No-16)  10-Jan-2011  20 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DA(67)04/EE/RDD/2010-2011 (Lot No 23)  13-Dec-2010  30 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  DAR(67)/04/EE/RDD/2010-2011 (Lot No 23)  13-Dec-2011  30 Days  Carpeting  LRPS  19500 19.5     LRPS  20000 20     Dhaka, (Division Office) 
 Revenue  JUDBNM(17)/EE/RDD/2009-2010- Lot No 07-1  3-Jun-2010  20 Days  Carpeting  LRPS  19500 19.5     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  DAR(83)/EE/RDD/2011-2012. (Lot No-01)  8-Dec-2011  5 Days  Carpeting  LRPS  19500 19.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DAR(21)/EE/RDD/2012-2013. (Lot No-07)  4-Nov-2012  10 Days  Carpeting  LRPS  19500 19.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(98)/EE/RDD/2011-2012. (Lot No-11)  12-Dec-2011  5 Days  Carpeting  LRPS  19500 19.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DZ(e-GP)/22-Contract/PMP(Road)/2017-2018(TID-125329)  21-Dec-2017  180 Days  Carpeting  LRPS  19550 19.55     LRPS  26100 26.1     Dhaka, (Division Office) 
 Revenue  DA(94)/11/EE/RDD/2010-2011 (Lot No 05)  14-Mar-2011  20 Days  Carpeting  LRPS  20000 20     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  DAR(08)/17/EE/RDD/2012-2013 (Lot No 03)  6-Aug-2012  7 Days  Carpeting  LRPS  20000 20     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  egp/13/EE/DRD/2014-2015  3-Dec-2014  10 Days  Carpeting  LRPS  20000 20     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(103)/EE/RDD/Kallyanpur/2009-2010 (Lot No-11)  22-Mar-2010  3 Days  Carpeting  LRPS  20000 20     LRPS  20500 20.5     Dhaka, (Division Office) 
 Revenue  DAR(02)/15/EE/RDD/2013-2014 (Lot No 02)  7-Aug-2013  10 Days  Carpeting  LRPS  20000 20     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  e-GP/11/EE/DRD/2015-2016 (34893)  6-Dec-2015  15 Days  Carpeting  LRPS  20000 20     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(12)/01/EE/RDD/2012-2013 (Lot No 02)  11-Oct-2012  7 Days  DBST  LRPS  20000 20     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(48)/08/EE/RDD/2010-2011 (Lot No-16)  12-Dec-2010  7 Days  Carpeting  LRPS  20500 20.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  DA(46)/07/EE/RDD/2012-2013 (Lot No 10)-1  28-Mar-2013  3 Days  Carpeting  LRPS  20500 20.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(130)/08/EE/RDD/2011-2012 (Lot No 21)  11-Dec-2011  5 Days  Carpeting  LRPS  20500 20.5     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(76)/EE/Kallyanpur/2009-2010 (Lot No 03)  13-Oct-2010  30 Days  Carpeting  LRPS  20500 20.5     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  DAR(68)/05/EE/RDD/2010-2011 (Lot No 27)  28-Dec-2010  20 Days  Carpeting  LRPS  20500 20.5     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  DAR(112)/08/EE/RDD/2011-2012 (Lot No 12)  11-Dec-2011  7 Days  Carpeting  LRPS  20500 20.5     LRPS  21900 21.9     Dhaka, (Division Office) 
 Revenue  DAR(105)/EE/RDD/2010-2011 (Lot No-10)  17-Apr-2011  30 Days  Carpeting  LRPS  20500 20.5     LRPS  21000 21     Dhaka, (Division Office) 
 Revenue  DAR(30)/EE/RDD/2012-2013. (Lot No-09)  6-Nov-2012  10 Days  Carpeting  LRPS  20500 20.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(156)/EE/RDD/2011-2012 (Lot No-07)  20-May-2012  15 Days  Carpeting  LRPS  20600 20.6     LRPS  20900 20.9     Dhaka, (Division Office) 
 Revenue  DAR(117)/EE/RDD/2011-2012 (Lot No-11)  17-Jan-2012  20 Days  Carpeting  LRPS  21000 21     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  DAR(137)/11/EE/RDD/2011-2012 (Lot No 11)  12-Jan-2012  7 Days  Carpeting  LRPS  21000 21     LRPS  24000 24     Dhaka, (Division Office) 
 Revenue  DAR(77)/EE/RDD/2011-2012 (Lot No-08)  27-Dec-2011  20 Days  Carpeting  LRPS  21000 21     LRPS  23850 23.85     Dhaka, (Division Office) 
 Revenue  DAR(103)/EE/Kallyanpur/2009-2010 (Lot No-11)  22-Mar-2010  5 Days  Carpeting  LRPS  21000 21     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(59)/EE/RDD/2011-2012 (Lot No-38)  22-Nov-2011  20 Days  Carpeting  LRPS  21000 21     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(101)/EE/RDD/2011-2012. (Lot No-08)  4-Dec-2011  10 Days  Carpeting  LRPS  21000 21     LRPS  22320 22.32     Dhaka, (Division Office) 
 Revenue  DAR(81)/RDD/Kallyanpur/2010-2011 (Lot No -21)  22-Oct-2011  10 Days  Carpeting  LRPS  21000 21     LRPS  23000 23     Dhaka, (Division Office) 
 Revenue  DAR(157)/13/EE/RDD/2011-2012 (Lot No 08)  22-May-2012  15 Days  Carpeting  LRPS  21200 21.2     LRPS  21600 21.6     Dhaka, (Division Office) 
 Revenue  DAR(91)/EE/RDD/2009-2010 (Lot No-12)  11-Mar-2010  6 Days  Carpeting  LRPS  21500 21.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(19)/RDD/Kallyanpur/2009-2010  21-Mar-2010  2 Days  Carpeting  LRPS  21500 21.5     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  DAR(110)/EE/2009-2010 (Lot No-01)  29-Apr-2010  5 Days  Carpeting  LRPS  21500 21.5     LRPS  21700 21.7     Dhaka, (Division Office) 
 Revenue  DAR(110)/EE/2009-2010 (Lot No-01)  29-Apr-2010  5 Days  Carpeting  LRPS  21500 21.5     LRPS  21700 21.7     Dhaka, (Division Office) 
 Revenue  DARR(61)/EE/RDD/2011-2012. (Lot No-19)  22-Nov-2011  20 Days  Carpeting  LRPS  21500 21.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(73)/EE/RDD/2010-2011 (Lot No-04)  2-Feb-2011  20 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  DAR(95)/EE/RDD/2011-2012 (Lot No-17)  11-Dec-2011  5 Days  Carpeting  LRPS  21500 21.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no (161)/RDD/2007-2008    5 Days  Carpeting  LRPS  21500 21.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  DAR(14)/EE/RDD/2010-2011 (Lot No-09)  20-Nov-2010  10 Days  Carpeting  LRPS  21500 21.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  DAR(56)/05/EE/RDD/2010-2011 (Lot No-25)  3-Oct-2010  20 Days  Carpeting  LRPS  21500 21.5     LRPS  21700 21.7     Dhaka, (Division Office) 
 Revenue  DAR(76)/EE/Kallyanpur/2009-10 (Lot No-03)  9-Dec-2009  5 Days  Carpeting  LRPS  21500 21.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  DAR(58)/Kallyanpur/2009-2010 (Lot No-01)  10-Dec-2009  4 Days  Carpeting  LRPS  21500 21.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(107)/EE/RDD/2009-2010 (Lot No-13)  24-Mar-2010  3 Days  Carpeting  LRPS  21500 21.5     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  DAR(111)/EE/2009-2010 (Lot No-02)  29-Apr-2010  3 Days  Carpeting  LRPS  21500 21.5     LRPS  21700 21.7     Dhaka, (Division Office) 
 Revenue  DAR(38)/01/EE/RDD/2011-2012  4-Oct-2011  60 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  DAR(146)/RDD/Kallyanpur/2010-2011 (Lot No -14)  21-Jul-2009  10 Days  Carpeting  LRPS  21500 21.5     LRPS  22000 22     Dhaka, (Division Office) 
 Revenue  DAR(75)/Kallyanpur/2009-10 (Lot No-11)  9-Dec-2009  5 Days  Carpeting  LRPS  21500 21.5     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  DAR(07)/RDD/2010/2011 (Lot No-07)  30-Aug-2010  5 Days  Carpeting  LRPS  22200 22.2     LRPS  22500 22.5     Dhaka, (Division Office) 
 Revenue  BTJR(15)/RDD/2009-2010 (RSD-1)  23-Nov-2010  3 Days  Carpeting  LRPS  22500 22.5     LRPS  22800 22.8     Dhaka, (Division Office) 
 Revenue  DAR(73)/RDD/2008-2009 (Lot No-03)  18-Jun-2009  5 Days  DBST  LRPS  22500 22.5     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(67)/02/EE/RDD/2011-2012 (Lot No 09)  17-Nov-2011  30 Days  Carpeting  LRPS  22500 22.5     LRPS  33800 33.8     Dhaka, (Division Office) 
 Revenue  DAR(76)/05/EE/RDD/2010-2011 (Lot No 18)  7-Feb-2011  20 Days  Carpeting  LRPS  22500 22.5     LRPS  23000 23     Dhaka, (Division Office) 
 Revenue  DAR(20)/EE/RDD/2013-2014 (Lot No-01)  3-Sep-2013  10 Days  Carpeting  LRPS  22500 22.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  19    0 Days  Carpeting  LRP023  0 22.925     LRP024  0 23.925     Manikganj, (Division Office) 
 Revenue  t01  30-Sep-2013  60 Days  Carpeting  LRP023  0 22.925     LRP026  0 25.933     Manikganj, (Division Office) 
 Revenue  sharif001  5-Nov-2013  60 Days  Carpeting  LRP023  0 22.925     LRP024  0 23.925     Manikganj, (Division Office) 
 Revenue  04/mannan  5-Aug-2013  45 Days  Carpeting  LRP023  0 22.925     LRP025  0 24.928     Manikganj, (Division Office) 
 Revenue  am/1  12-Nov-2013  60 Days  Carpeting  LRP023  0 22.925     LRP028  0 27.94     Manikganj, (Division Office) 
 Revenue  DAR(109)/EE/RDD/2010-2011. (Lot No-03)  6-Apr-2011  30 Days  Carpeting  LRPS  23000 23     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  DAR(96)/09/EE/RDD/2013-2014 (Lot No 12)  16-Apr-2014  10 Days  Carpeting  LRPS  23000 23     LRPS  23500 23.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(13)/RDD/Kallyanpur/2009-2010  10-Dec-2009  3 Days  Carpeting  LRPS  23500 23.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(86)/RDD/2008-2009 (Lot No-08)  22-Jun-2009  5 Days  Carpeting  LRPS  23500 23.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DAR(12)/EE/RDD/2011-2012  11-Mar-2012  3 Days  Carpeting  LRPS  23500 23.5     LRPS  27500 27.5     Dhaka, (Division Office) 
 Revenue  DAHR(48)/RDD/2009-2010 (Lot No 09)  10-Dec-2009  5 Days  Carpeting  LRPS  23500 23.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DAR(29)/04/EE/RDD/2010-2011 (Lot No 04)  28-Nov-2010  30 Days  Carpeting  LRPS  23500 23.5     LRPS  23800 23.8     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(06)/RDD/Kallyanpur/2009-2010  8-Dec-2009  2 Days  Carpeting  LRPS  23500 23.5     LRPS  27500 27.5     Dhaka, (Division Office) 
 Revenue  DAR(87)/08/EE/RDD/2011-2012 (Lot No 04)  5-Dec-2011  5 Days  Carpeting  LRPS  23500 23.5     LRPS  24800 24.8     Dhaka, (Division Office) 
 Revenue  DAR(50)/EE/RDD/2008-2009 (Lot No-03)  4-Mar-2009  20 Days  Carpeting  LRPS  23500 23.5     LRPS  27500 27.5     Dhaka, (Division Office) 
 Revenue  DAR(44)/07/EE/RDD/2010-2011 (Lot No 08)  12-Dec-2010  7 Days  Carpeting  LRPS  23500 23.5     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  DAR(25)/Kallyanpur/2009-2010 (Lot No-02)  15-Nov-2009  3 Days  Carpeting  LRPS  23500 23.5     LRPS  24000 24     Dhaka, (Division Office) 
 Revenue  DAR(121)/EE/RDD/Kallyanpur/2009-2010 (Lot No-17)  18-Jul-2010  7 Days  Carpeting  LRPS  23500 23.5     LRPS  23800 23.8     Dhaka, (Division Office) 
 Revenue  DAHR(49)/RDD/2009-2010 (Lot No-05)  10-Dec-2009  3 Days  Carpeting  LRPS  23500 23.5     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DANR(84)/EE/RDD/2010-2011 (Lot No-11)  24-Feb-2011  20 Days  Carpeting  LRPS  23500 23.5     LRPS  24000 24     Dhaka, (Division Office) 
 Revenue  004/EE/MRD/2013-2014  27-Dec-2013  45 Days  Carpeting  LRP024  0 23.925     LRP026  0 25.933     Manikganj, (Division Office) 
 Revenue  Jhangir01    0 Days  Carpeting  LRP024  0 23.925     LRP026  0 25.933     Manikganj, (Division Office) 
 Revenue  DAR(103)/EE/RDD/2011-2012 (Lot No-07)  11-Dec-2011  5 Days  Carpeting  LRPS  24000 24     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(153)/EE/RDD/2011-2012. (Lot No-03)  22-Mar-2012  3 Days  Carpeting  LRPS  24000 24     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(51)/EE/RDD/2011-2012 (Lot No-12)  30-Oct-2011  30 Days  Carpeting  LRPS  24000 24     LRPS  24500 24.5     Dhaka, (Division Office) 
 Revenue  DAR(79)/EE/RDD/2010-2011 (Lot No-15)  15-Feb-2011  30 Days  Carpeting  LRPS  24500 24.5     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DAR(03)/EE/RDD/2015-2016 (Lot No-03)  9-Sep-2015  7 Days  Carpeting  LRPS  24500 24.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(67)/EE/RDD/Kallyanpur 2009-2010 (Lot No-01)  10-Dec-2009  5 Days  Carpeting  LRPS  24500 24.5     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  DAR(56)/EE/RDD/2012-2013. (Lot No-03)  1-Apr-2013  7 Days  Carpeting  LRPS  24500 24.5     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  DMSMLR(99)/RDD/Kallyanpur/2010-2011 (Lot No 21)  22-Mar-2011  30 Days  Carpeting  LRPS  24500 24.5     LRPS  25000 25     Dhaka, (Division Office) 
 Revenue  egp/27/EE/DRD/2014-2015  30-Jul-2015  45 Days  Carpeting  LRPS  24500 24.5     LRPS  27500 27.5     Dhaka, (Division Office) 
 Revenue  002/EE/MRD/2013-2014  21-Jan-2014  90 Days  Carpeting  LRP025  0 24.928     LRP028  0 27.94     Manikganj, (Division Office) 
 Revenue  DAR(07)/02/EE/DRD/2015-2015 (Lot No 04)  14-Sep-2015  7 Days  Carpeting  LRPS  25000 25     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  DAR(69)/05/EE/RDD/2013-2014 (Lot No-13)  12-Feb-2014  15 Days  Carpeting  LRPS  25000 25     LRPS  28000 28     Dhaka, (Division Office) 
 Revenue  DAR/04/EE/DRD/2014-2015 (Lot No 06)  29-Sep-2014  10 Days  Carpeting  LRPS  25000 25     LRPS  26000 26     Dhaka, (Division Office) 
 Revenue  DAR(51)/EE/RDD/2012-2013. (Lot No-03)  9-Apr-2013  7 Days  Carpeting  LRPS  25000 25     LRPS  30900 30.9     Dhaka, (Division Office) 
 Revenue  DAR(82)/EE/RDD/2011-2012. (Lot No-08)  8-Dec-2011  5 Days  Carpeting  LRPS  25000 25     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(47)/09/EE/RDD/2012-2013 (Lot No09  31-Mar-2013  15 Days  Carpeting  LRPS  25000 25     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(14)/EE/RDD/2013-2014 (Lot No-01)  22-Aug-2013  21 Days  Carpeting  LRPS  25000 25     LRPS  25900 25.9     Dhaka, (Division Office) 
 Revenue  DAR(07)/EE/RDD/2013-2014 (Lot No-03)  9-Aug-2013  10 Days  Carpeting  LRPS  25000 25     LRPS  29000 29     Dhaka, (Division Office) 
 Revenue  DAR(80)/EE/RDD/2013-2014. (Lot No-18)  23-Feb-2014  15 Days  Carpeting  LRPS  25000 25     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(24)/EE/RDD/2014-2015.  3-Dec-2014  3 Days  Carpeting  LRPS  25000 25     LRPS  25500 25.5     Dhaka, (Division Office) 
 Revenue  e-GP/32/EE/DRD/2016-2017 (75130)  18-Dec-2016  5 Days  Carpeting  LRPS  25200 25.2     LRPS  25400 25.4     Dhaka, (Division Office) 
 Revenue  DAR(80)/EE/RDD/2011-2012 (Lot No-05)  8-Dec-2011  5 Days  Carpeting  LRPS  25500 25.5     LRPS  26500 26.5     Dhaka, (Division Office) 
 Revenue  DAR(42)/EE/RDD/2010-2011 (Lot No-12)  12-Dec-2010  7 Days  Carpeting  LRPS  25500 25.5     LRPS  28500 28.5     Dhaka, (Division Office) 
 Revenue  DAR(133)/EE/RDD/2011-2012. (Lot No-02)  15-Dec-2011  5 Days  Carpeting  LRPS  25500 25.5     LRPS  28500 28.5     Dhaka, (Division Office) 
 Revenue  DAR(25)/Kallyanpur/2009-2010 (Lot no-02)  15-Nov-2009  5 Days  Carpeting  LRPS  25500 25.5     LRPS  26500 26.5     Dhaka, (Division Office) 
 Revenue  DAR(139)/EE/RDD/2011-2012. (Lot No-11)  3-Nov-2011  30 Days  Carpeting  LRPS  25500 25.5     LRPS  26000 26     Dhaka, (Division Office) 
 Revenue  DAR(42)/EE/2009-2010 (Lot No 04)  17-Oct-2010  15 Days  Carpeting  LRPS  25500 25.5     LRPS  26500 26.5     Dhaka, (Division Office) 
 Revenue  DAR(63)/04/EE/RDD/2011-2012 (Lot No 06)  16-Nov-2011  20 Days  Carpeting  LRPS  25500 25.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  egp/14/EE/RDD/2014-2015.  3-Dec-2014  10 Days  Carpeting  LRPS  25500 25.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(78)/11/EE/RDD/2010-2011 (Lot No-01)  24-Feb-2011  30 Days  Carpeting  LRPS  25500 25.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  e-GP/33/EE/DRD/2016-2017(75134)  18-Dec-2016  5 Days  Carpeting  LRPS  25500 25.5     LRPS  26000 26     Dhaka, (Division Office) 
 Revenue  DAR(74)/02/EE/RDD/2011-2012 (Lot No 30)  15-Dec-2011  20 Days  Carpeting  LRPS  25500 25.5     LRPS  26000 26     Dhaka, (Division Office) 
 Revenue  e-GP/13/EE/DRD/2015-2016  3-Dec-2015  15 Days  Carpeting  LRPS  25500 25.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(71)/04/EE/RDD/1011-2012 (Lot No 05)  20-Oct-2011  20 Days  Carpeting  LRPS  25500 25.5     LRPS  25700 25.7     Dhaka, (Division Office) 
 Revenue  DAR(132)/08/EE/RDD/2011-2012 (Lot No 22)  8-Dec-2011  7 Days  Carpeting  LRPS  25500 25.5     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(32)/03/EE/RDD/2012-2013 (Lot No. 25)  5-Nov-2012  10 Days  Carpeting  LRPS  25540 25.54     LRPS  26545 26.545     Dhaka, (Division Office) 
 Revenue  DAR(81)/EE/RDD/2011-2012. (Lot No-14)  5-Dec-2011  30 Days  Carpeting  LRPS  25600 25.6     LRPS  25834 25.834     Dhaka, (Division Office) 
 Revenue  DAR(55)EE/RDD/2009-2010(Lot No 05)  9-Dec-2009  4 Days  Carpeting  LRPS  25600 25.6     LRPS  26500 26.5     Dhaka, (Division Office) 
 Revenue  DAR(110)/10/EE/RDD/2011-2012 (Lot No 03)  11-Dec-2011  5 Days  Carpeting  LRPS  25756 25.756     LRPS  25899 25.899     Dhaka, (Division Office) 
 Revenue  DAR(74)08/EE/RDD/2013-2014  2-Feb-2014  10 Days  Carpeting  LRPS  25825 25.825     LRPS  26020 26.02     Dhaka, (Division Office) 
 Revenue  DAR(12)15/EE/RDD/2012-2013 (Lot No 14)  18-Aug-2013  15 Days  Carpeting  LRPS  26000 26     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(65)/10/EE/RDD/2012-2013 (Lot No 03)  27-May-2013  7 Days  Carpeting  LRPS  26000 26     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(07)/17/EE/RDD/2012-2013 (Lot No 04)  6-Aug-2012  7 Days  Carpeting  LRPS  26000 26     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(49)/07/EE/RDD/2012-2013 (Lot No 14)  3-Apr-2013  7 Days  Carpeting  LRPS  26000 26     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(11)/03/EE/DRD/2015-2016 (Lot No 04)  1-Oct-2015  7 Days  Carpeting  LRPS  26000 26     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(04)/10/EE/RDD/2012-2013 (Lot No-01)  8-Jul-2013  10 Days  Carpeting  LRPS  26000 26     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(95)/09/EE/RDD/2013-2014 (Lot No 02)  24-Apr-2014  10 Days  Carpeting  LRPS  26000 26     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DA(4)/10/EE/RDD/RDD-2013-2014 (Lot No 01)  7-Jul-2013  10 Days  Carpeting  LRPS  26000 26     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(24)/04/EE/RDD/2013-2014 (Lot No 05)  12-Sep-2013  15 Days  Carpeting  LRPS  26200 26.2     LRPS  27430 27.43     Dhaka, (Division Office) 
 Revenue  DZ(e-GP)-29/PMP (Road)/2015-2016  24-Mar-2016  120 Days  Carpeting  LRPS  26300 26.3     LRPS  34800 34.8     Dhaka, (Division Office) 
 Revenue  DAR(104)/EE/RDD/2007-2008 (Lot No-12)  22-Mar-2010  5 Days  Carpeting  LRPS  26500 26.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(65)/RDD/2008-2009 (Lot No-09)  25-Jun-2009  5 Days  Carpeting  LRPS  26500 26.5     LRPS  27500 27.5     Dhaka, (Division Office) 
 Revenue  DAR(55)/EE/RDD/2012-2013. (Lot No-06)  10-Apr-2013  7 Days  Carpeting  LRPS  26500 26.5     LRPS  29100 29.1     Dhaka, (Division Office) 
 Revenue  DAR(86)09/EE/RDD/2011-2012 (Lot No 03)  15-Dec-2011  5 Days  Carpeting  LRPS  26500 26.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(45)/EE/RDD/2009-2010( Lot No-04)  10-Dec-2009  5 Days  Carpeting  LRPS  26500 26.5     LRPS  29500 29.5     Dhaka, (Division Office) 
 Revenue  DAR(51)/07/EE/RDD/2010-2011 (Lot No 18)  13-Dec-2010  7 Days  Carpeting  LRPS  26500 26.5     LRPS  29500 29.5     Dhaka, (Division Office) 
 Revenue  DAR(49)/07/EE/RDD/2010-2011 (Lot No-15)  12-Dec-2010  7 Days  Carpeting  LRPS  26500 26.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  DAR(48)/03/EE/RDD/2013-2014 (Lot No 04)  10-Oct-2013  10 Days  Carpeting  LRPS  26500 26.5     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(133)10/EE/RDD/2011-2012 (Lot No 02)  15-Dec-2011  5 Days  Carpeting  LRPS  26500 26.5     LRPS  29000 29     Dhaka, (Division Office) 
 Revenue  DAR(113)/11/EE/RDD/2011-2012 (Lot No 01)  8-Jan-2012  7 Days  Carpeting  LRPS  26500 26.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(50)/07/EE/RDD/2010-2011 (Lot No 07)  13-Dec-2010  7 Days  Carpeting  LRPS  26500 26.5     LRPS  27000 27     Dhaka, (Division Office) 
 Revenue  DAR(41)/07/EE/RDD/2012-2013 (Lot No 06)  14-Mar-2013  7 Days  Carpeting  LRPS  26500 26.5     LRPS  29100 29.1     Dhaka, (Division Office) 
 Revenue  DAR(29)/03/EE/RDD/2012-2013 (Lot No 10)  6-Nov-2012  10 Days  Carpeting  LRPS  26550 26.55     LRPS  27215 27.215     Dhaka, (Division Office) 
 Revenue  sharif002    45 Days  Carpeting  LRP027  0 26.935     LRP036  0 36.013     Manikganj, (Division Office) 
 Revenue  DAR(08)/EE/RDD/2015-2016 (Lot No-05)  14-Sep-2015  7 Days  Carpeting  LRPS  27000 27     LRPS  29000 29     Dhaka, (Division Office) 
 Revenue  e-GP/45/EE/DRD/2016-2017 (75706)  11-Dec-2016  7 Days  Carpeting  LRPS  27000 27     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(67)/05/EE/RDD/2013-2014 (Lot No. 15)  12-Feb-2014  10 Days  Carpeting  LRPS  27000 27     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(128)/EE/RDD/2010-2011 (Lot No-12)  6-Apr-2011  20 Days  Carpeting  LRPS  27100 27.1     LRPS  27545 27.545     Dhaka, (Division Office) 
 Revenue  DAR(22)/EE/RDD/2012-2013. (Lot No-08)  4-Nov-2012  7 Days  Carpeting  LRPS  27210 27.21     LRPS  27550 27.55     Dhaka, (Division Office) 
 Revenue  DAR(45)/07/EE/RDD/2012-2013 (Lot No 11)  25-Mar-2013  7 Days  Carpeting  LRPS  27240 27.24     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(02)/EE/DRD/2016-2017 (Lot No-4)  9-Oct-2016  3 Days  Carpeting  LRPS  27500 27.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP028  0 27.94     LRP030  0 29.945     Manikganj, (Division Office) 
 Revenue  DAR(63)/EE/RDD/2013-2014. (Lot No-16)  12-Feb-2014  10 Days  Carpeting  LRPS  28000 28     LRPS  32000 32     Dhaka, (Division Office) 
 Revenue  DAR(104)/08/EE/RDD/2011-2012 (Lot No 19)  11-Dec-2011  7 Days  Carpeting  LRPS  28500 28.5     LRPS  30000 30     Dhaka, (Division Office) 
 Revenue  DAR(33)/23/EE/RDD/2011-2012 (Lot No 21)  25-Sep-2011  20 Days  Carpeting  LRPS  28500 28.5     LRPS  28900 28.9     Dhaka, (Division Office) 
 Revenue  DAR(134)/10/EE/RDD/2011-2012 (Lot No 05)  15-Dec-2011  5 Days  Carpeting  LRPS  28500 28.5     LRPS  33000 33     Dhaka, (Division Office) 
 Revenue  Pad Quotation no (10)/Kallyanpur/RDD/2009-2010  6-Dec-2009  5 Days  Carpeting  LRPS  28500 28.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation No (10)/Kall/RDD/2009-2010-1  6-Dec-2009  2 Days  Carpeting  LRPS  28500 28.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(47)/EE/RDD/Kallyanpur 2009-2010 (Lot No-01)  10-Dec-2009  5 Days  Carpeting  LRPS  28500 28.5     LRPS  29500 29.5     Dhaka, (Division Office) 
 Revenue  DAR(74)/EE/Kallyanpur/2009-2010 (Lot No-01)  9-Dec-2009  3 Days  Carpeting  LRPS  28500 28.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  DAR/128/RDD/2009-2010 Lot No-06)-1  20-Jun-2010  4 Days  Carpeting  LRPS  28500 28.5     LRPS  29000 29     Dhaka, (Division Office) 
 Revenue  DAR(35)/EE/RDD/Kallayanpur/2010-2011 (Lot No-07)  27-Dec-2010  261 Days  Carpeting  LRPS  28500 28.5     LRPS  28920 28.92     Dhaka, (Division Office) 
 Revenue  DAR(129)/EE/RDD/2010-2011 (Lot No-11)  6-Apr-2011  20 Days  Carpeting  LRPS  28700 28.7     LRPS  28840 28.84     Dhaka, (Division Office) 
 Revenue  54/MKG.Rd/2017-2018 (e-GP T. ID no. 173800)  26-Apr-2018  30 Days  Pavement  LRP029  0 28.944     LRP046  0 44.988     Manikganj, (Division Office) 
 Revenue  DAR(147)/EE/RDD/2011-2012 (Lot No-04)  29-Jan-2012  5 Days  Carpeting  LRPS  29000 29     LRPS  29900 29.9     Dhaka, (Division Office) 
 Revenue  DAR(09)/EE/RDD/2013-2014 (Lot No-06)  19-Aug-2013  7 Days  Carpeting  LRPS  29000 29     LRPS  33900 33.9     Dhaka, (Division Office) 
 Revenue  DAR(63)/EE/RD/2010-2011 (Lot No-11)  5-Jan-2011  20 Days  Carpeting  LRPS  29200 29.2     LRPS  29500 29.5     Dhaka, (Division Office) 
 Revenue  DAR(52)/EE/RDD/2009-2010 (Lot No-06)  8-Dec-2009  5 Days  Carpeting  LRPS  29500 29.5     LRPS  30500 30.5     Dhaka, (Division Office) 
 Revenue  DAR(100)/EE/RDD/2010-2011. (Lot No-25)  4-Dec-2011  20 Days  Carpeting  LRPS  29500 29.5     LRPS  29907 29.907     Dhaka, (Division Office) 
 Revenue  DAR(25)/EE/RDD/2014-2015.  3-Dec-2014  3 Days  Carpeting  LRPS  29500 29.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP030  0 29.945     LRP041  0 39.976     Manikganj, (Division Office) 
 Revenue  DAR(18)/EE/RDD/2015-2016 (Lot No-05)  7-Oct-2015  7 Days  Carpeting  LRPS  30000 30     LRPS  31000 31     Dhaka, (Division Office) 
 Revenue  e-GP/15/EE/DRD/2015-2015 (35718)  15-Dec-2015  10 Days  Carpeting  LRPS  30000 30     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(114)08/EE/RDD/2011-2012 (Lot No 11)  8-Dec-2011  5 Days  Carpeting  LRPS  30000 30     LRPS  32000 32     Dhaka, (Division Office) 
 Revenue  DAR(111)/17/EE/RDD/2010-2011 (Lot No 26)  11-Apr-2011  20 Days  Carpeting  LRPS  30500 30.5     LRPS  31000 31     Dhaka, (Division Office) 
 Revenue  DAR(52)/EE/RDD/2010-2011 (Lot No-13)  12-Dec-2010  7 Days  Carpeting  LRPS  30500 30.5     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(110)/17/EE/RDD/2010-2011 (Lot No 26)  11-Apr-2011  20 Days  Carpeting  LRPS  30500 30.5     LRPS  31000 31     Dhaka, (Division Office) 
 Revenue  DAR(57)/EE/RDD/2009-2010 (Lot No-07)  9-Dec-2009  5 Days  Carpeting  LRPS  30500 30.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(123)/EE/RDD/2011-2012. (Lot No-05)  25-Jan-2012  7 Days  Carpeting  LRPS  31500 31.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(46)/EE/RDD/2009-2010 (Lot No-05)-1  10-Dec-2009  5 Days  Carpeting  LRPS  31500 31.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(104)/EE/RDD/2007-2008 (Lot No -12)-1  21-Oct-2009  3 Days  Carpeting  LRPS  31500 31.5     LRPS  32000 32     Dhaka, (Division Office) 
 Revenue  DAR(53)/EE/RDD/2009-2010 (Lot No-03)  8-Dec-2009  5 Days  Carpeting  LRPS  31500 31.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  DAR(33)/RDD/2008-2009 (Lot No-07)  22-Jan-2009  7 Days  Carpeting  LRPS  31500 31.5     LRPS  32500 32.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(02)/RDD/Kallyanpur/2009-2010  25-Oct-2009  3 Days  Carpeting  LRPS  31500 31.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  DAR(02)/EE/RDD/2015-2016. (Lot no-02)  9-Sep-2015  7 Days  Carpeting  LRPS  32000 32     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(141)/EE/RDD/2011-2012. (Lot No-35)  14-Nov-2011  360 Days  Carpeting  LRPS  32000 32     LRPS  33900 33.9     Dhaka, (Division Office) 
 Revenue  DAR(77)/05/EE/RDD/2013-2014 (Lot No 06)  20-Feb-2014  15 Days  Carpeting  LRPS  32000 32     LRPS  33940 33.94     Dhaka, (Division Office) 
 Revenue  DAR(21)/01/EE/RDD/2013-2014 (Lot No 05)  3-Sep-2013  10 Days  Carpeting  LRPS  32000 32     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(69)/EE/Kallyanpur/2009-10 (Lot No-16)-1  10-Dec-2009  4 Days  Carpeting  LRPS  32000 32     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  Pad Quotation no-(07)/RDD/Kallyanpur/2009-2010  8-Dec-2009  3 Days  Carpeting  LRPS  32500 32.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(96)/EE/Kallyanpur/2009-10 (Lot No-17)  21-Mar-2010  5 Days  Carpeting  LRPS  32500 32.5     LRPS  32700 32.7     Dhaka, (Division Office) 
 Revenue  DAR((46)/EE/RDD/2009-2010 (Lot No-05)  10-Dec-2009  5 Days  Carpeting  LRPS  32500 32.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(64)/EE/RDD/2012-2013. (Lot No-04)  7-May-2013  7 Days  Carpeting  LRPS  32500 32.5     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(69)/EE/Kallyanpur/2009-10 (Lot No-16)  10-Dec-2009  5 Days  Carpeting  LRPS  32500 32.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  RFQ Circular No (87)/EE/RDD/2007-2008 (Lot No-01)  1-Jul-2008  7 Days  Carpeting  LRPS  32500 32.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(40)/EE/RDD/Kallyanpur/2009-2010 (Lot No 10)  16-Jul-2011  30 Days  Carpeting  LRPS  32500 32.5     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(62)/10/EE/RDD/2012-2013 (Lot No 02)  13-May-2013  7 Days  Carpeting  LRPS  33000 33     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(58)/20/EE/RDD/2009-2010 (Lot No 19)  11-Nov-2010  20 Days  Carpeting  LRPS  33000 33     LRPS  33500 33.5     Dhaka, (Division Office) 
 Revenue  DAR(83)/11/EE/RDD/2010-2011 (Lot No-27)  27-Feb-2011  20 Days  Carpeting  LRPS  33000 33     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(138)/11/EE/RDD/2011-2012 (Lot No 10)  11-Jan-2012  7 Days  Carpeting  LRPS  33500 33.5     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(79)/EE/RDD/2008-2009 (Lot No-04)  21-Jun-2009  5 Days  Carpeting  LRPS  33500 33.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  DAR(33)/03/EE/RDD/2012-2013 (Lot No 26)  8-Nov-2012  10 Days  Carpeting  LRPS  33500 33.5     LRPS  34000 34     Dhaka, (Division Office) 
 Revenue  DAR(56)/EE/RDD/2009-2010 (Lot No 07)-1  18-Oct-2010  7 Days  Carpeting  LRPS  33500 33.5     LRPS  34500 34.5     Dhaka, (Division Office) 
 Revenue  99/MKG of 2005-06  27-Apr-2006  7 Days  Carpeting  LRP034  0 33.961     LRP034  110 34.071     Manikganj, (Division Office) 
 Revenue  119/MKJ of 2007-2008  4-May-2008  15 Days  Pavement  LRP034  0 33.961     LRP037  1000 37.968     Manikganj, (Division Office) 
 Revenue  77/MKG.RD/2017-2018 (e-GP T. ID no. 197413)  18-Jun-2018  10 Days  Carpeting  LRP034  600 34.561     LRP034  900 34.861     Manikganj, (Division Office) 
 Revenue  101/MKJ of 2005-06  3-May-2006  7 Days  Carpeting  LRP035  170 35.131     LRP035  208 35.169     Manikganj, (Division Office) 
 Revenue  100/MKJ of 2005-06  30-Apr-2006  7 Days  Carpeting  LRP035  370 35.331     LRP035  538 35.499     Manikganj, (Division Office) 
 Revenue  149/MKG of 2011-2012  21-Jun-2012  60 Days  Pavement  LRP037  860 37.828     LRP037  980 37.948     Manikganj, (Division Office) 
 Revenue  77/MKG.RD/2017-2018 (e-GP T. ID no. 197413)  18-Jun-2018  10 Days  Carpeting  LRP039  210 38.221     LRP040  0 38.973     Manikganj, (Division Office) 
 Revenue  77/MKG.RD/2017-2018 (e-GP T. ID no. 197413)  18-Jun-2018  10 Days  Carpeting  LRP040  0 38.973     LRP040  530 39.503     Manikganj, (Division Office) 
 Revenue  06/MKJ of 2007-08  10-Dec-2007  7 Days  Pavement  LRP036  3800 39.813     LRP056  56000 111.007     Manikganj, (Division Office) 
 Revenue  54/MKG of 2013-2014 (OTM)  2-Mar-2014  30 Days  Pavement  LRP042  0 40.978     LRP042  150 41.128     Manikganj, (Division Office) 
 Revenue  32/MKJ of 2009-2010  30-Sep-2009  7 Days  Pavement  LRP042  200 41.178     LRP042  400 41.378     Manikganj, (Division Office) 
 Revenue  32/MKJ of 2009-2010  30-Sep-2009  7 Days  Pavement  LRP042  900 41.878     LRP043  0 41.981     Manikganj, (Division Office) 
 Revenue  20/MKJ of 2005-06  27-Oct-2005  20 Days  Carpeting  LRP044  500 43.484     LRP044  1000 43.984     Manikganj, (Division Office) 
 Revenue  77/MKG.RD/2017-2018 (e-GP T. ID no. 197413)  18-Jun-2018  10 Days  Carpeting  LRP044  550 43.534     LRP044  750 43.734     Manikganj, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP045  0 43.986     LRP046  0 44.988     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2009-2010  27-Sep-2009  7 Days  Pavement  LRP045  900 44.886     LRP046  0 44.988     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2009-2010  27-Sep-2009  7 Days  Pavement  LRP046  0 44.988     LRP046  178 45.166     Manikganj, (Division Office) 
 Revenue  155/MKG of 2011-2012  21-Jun-2012  45 Days  Pavement  LRP046  550 45.538     LRP046  800 45.788     Manikganj, (Division Office) 
 Revenue  34/MKJ of 2009-2010  13-Oct-2009  7 Days  Pavement  LRP047  500 46.491     LRP047  848 46.839     Manikganj, (Division Office) 
 Revenue  37/MKJ of 2009-2010  27-Sep-2009  7 Days  Pavement  LRP048  500 47.493     LRP048  700 47.693     Manikganj, (Division Office) 
 Revenue  37/MKJ of 2009-2010  27-Sep-2009  7 Days  Pavement  LRP048  950 47.943     LRP049  0 47.991     Manikganj, (Division Office) 
 Revenue  33/MKJ of 2009-2010  13-Oct-2009  7 Days  Pavement  LRP052  0 51.002     LRP052  100 51.102     Manikganj, (Division Office) 
 Revenue  75/MKJ of 2007-08.  6-Apr-2008  15 Days  Carpeting  LRP052  300 51.302     LRP052  745 51.747     Manikganj, (Division Office) 
 Revenue  207/MKJ of 2009-2010  14-Jun-2010  7 Days  Pavement  LRP052  1098 52.1     LRP053  993 53     Manikganj, (Division Office) 
 Revenue  207/MKJ of 2009-2010  14-Jun-2010  7 Days  Pavement  LRP053  993 53     LRP054  990 54     Manikganj, (Division Office) 
 Revenue  17/MKJ of 2008-2009  26-Jan-2009  45 Days  Pavement  LRP054  230 53.24     LRP054  1000 54.01     Manikganj, (Division Office) 
 Revenue  100/MKJ of 2007-2008  11-May-2008  30 Days  Pavement  LRP054  500 53.51     LRP054  1000 54.01     Manikganj, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP054  1000 54.01     LRP062  0 61.028     Manikganj, (Division Office) 
 Revenue  17/MKJ of 2008-2009  26-Jan-2009  45 Days  Pavement  LRP054  1000 54.01     LRP054  1950 54.96     Manikganj, (Division Office) 
 Revenue  207/MKJ of 2009-2010  14-Jun-2010  7 Days  Pavement  LRP054  1040 54.05     LRP054  1990 55     Manikganj, (Division Office) 
 Revenue  38/MKJ of 2009-2010  27-Sep-2009  7 Days  Pavement  LRP054  1500 54.51     LRP054  1782 54.792     Manikganj, (Division Office) 
 Revenue  17/MKJ of 2008-2009  26-Jan-2009  45 Days  Pavement  LRP056  0 55.007     LRP056  980 55.987     Manikganj, (Division Office) 
 Revenue  78/MKJ of 2007-08  9-Apr-2008  7 Days  Pavement  LRP056  500 55.507     LRP056  1000 56.007     Manikganj, (Division Office) 
 Revenue  146/MKG of 2011-2012  26-Jun-2012  60 Days  Pavement  LRP056  730 55.737     LRP056  930 55.937     Manikganj, (Division Office) 
 Revenue  63/MKJ of 2008-2009  9-Apr-2009  30 Days  Pavement  LRP058  0 57.017     LRP059  200 58.222     Manikganj, (Division Office) 
 Revenue  103/MKJ of 2007-08  12-May-2008  30 Days  Pavement  LRP058  500 57.517     LRP058  1000 58.017     Manikganj, (Division Office) 
 Revenue  150/MKG of 2011-2012  26-Jun-2012  60 Days  Pavement  LRP059  670 58.692     LRP059  970 58.992     Manikganj, (Division Office) 
 Revenue  151/MKG of 2011-2012  26-Jun-2012  60 Days  Pavement  LRP061  70 60.097     LRP061  170 60.197     Manikganj, (Division Office) 
 Revenue  87/MKJ of 2007-08  29-Apr-2008  20 Days  Pavement  LRP061  500 60.527     LRP061  800 60.827     Manikganj, (Division Office) 
 Revenue  151/MKG of 2011-2012  26-Jun-2012  60 Days  Pavement  LRP061  800 60.827     LRP062  0 61.028     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2007-2008  30-Jan-2008  30 Days  Road Embankment  LRP062  500 61.528     LRP062  1000 62.028     Manikganj, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP063  0 62.032     LRP064  0 63.033     Manikganj, (Division Office) 
 Revenue  97/MKJ of 2008-2009  13-Apr-2009  7 Days  Pavement  LRP063  0 62.032     LRP063  100 62.132     Manikganj, (Division Office) 
 Revenue  73/MKJ of 2008-2009  15-Apr-2009  30 Days  Pavement  LRP063  780 62.812     LRP064  200 63.233     Manikganj, (Division Office) 
 Revenue  95/MKJ of 2007-2008  5-May-2008  15 Days  Pavement  LRP064  0 63.033     LRP064  1000 64.033     Manikganj, (Division Office) 
 Revenue  38/MKJ of 2007-08  17-Dec-2007  7 Days  Pavement  LRP059  5800 63.822     LRP069  6900 74.948     Manikganj, (Division Office) 
 Revenue  69/MKJ of 2008-2009  8-Apr-2009  30 Days  Pavement  LRP065  200 64.236     LRP065  1000 65.036     Manikganj, (Division Office) 
 Revenue  156/MKG of 2011-2012  21-Jun-2012  45 Days  Pavement  LRP066  620 65.663     LRP066  870 65.913     Manikganj, (Division Office) 
 Revenue  97/MKJ of 2008-2009  13-Apr-2009  7 Days  Pavement  LRP066  900 65.943     LRP067  50 66.094     Manikganj, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP067  0 66.044     LRP070  0 69.053     Manikganj, (Division Office) 
 Revenue  217/MKG of 2010-2011  22-Jun-2011  15 Days  Pavement  LRP067  75 66.119     LRP067  475 66.519     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2007-2008  30-Jan-2008  30 Days  Road Embankment  LRP061  6100 66.127     LRP061  6115 66.142     Manikganj, (Division Office) 
 Revenue  97/MKJ of 2008-2009  13-Apr-2009  7 Days  Pavement  LRP068  800 67.849     LRP068  1000 68.049     Manikganj, (Division Office) 
 Revenue  173/MKG of 2010-2011  10-May-2011  15 Days  Pavement  LRP069  360 68.408     LRP069  714 68.762     Manikganj, (Division Office) 
 Revenue  154/MKG of 2011-2012  21-Jun-2012  60 Days  Pavement  LRP070  190 69.243     LRP070  590 69.643     Manikganj, (Division Office) 
 Revenue  001/EE/MRD/2013-2014  6-Jan-2014  45 Days  Carpeting  LRP071  0 70.054     LRP073  0 72.059     Manikganj, (Division Office) 
 Revenue  PMP:2008-09/08/DBST & Overlay  2-Apr-2009  360 Days  DBST  LRP071  0 70.054     LRP076  3000 78.248     Manikganj, (Division Office) 
 Revenue  80/MKG.RD/2017-2018 (e-GP T. ID no. 197414)  14-Jun-2018  15 Days  Pavement  LRP071  500 70.554     LRP072  450 71.507     Manikganj, (Division Office) 
 Revenue  145/MKG of 2011-2012  26-Jun-2012  60 Days  Pavement  LRP072  250 71.307     LRP072  500 71.557     Manikganj, (Division Office) 
 Revenue  DZ(e-GP)-06/PMP(Road)/2015-2016 (ID no. 27913)  9-Nov-2015  180 Days  Overlay  LRP072  250 71.307     LRP076  1550 76.798     Manikganj, (Division Office) 
 Revenue  96/MKJ of 2008-2009  13-Apr-2009  7 Days  Pavement  LRP072  500 71.557     LRP072  700 71.757     Manikganj, (Division Office) 
 Revenue  137/MKJ of 2009-2010  24-Feb-2010  7 Days  Pavement  LRP073  855 72.914     LRP073  1000 73.059     Manikganj, (Division Office) 
 Revenue  102/MKJ of 2007-2008  11-May-2008  45 Days  Pavement  LRP074  0 73.229     LRP076  0 75.248     Manikganj, (Division Office) 
 Revenue  96/MKJ of 2008-2009  13-Apr-2009  7 Days  Pavement  LRP074  800 74.029     LRP075  200 74.432     Manikganj, (Division Office) 
 Revenue  191/MKG of 2010-2011  6-Jun-2011  21 Days  Pavement  LRP074  800 74.029     LRP075  890 75.122     Manikganj, (Division Office) 
 Revenue  286/MKJ of 2004-05  30-May-2005  30 Days  Pavement  LRP037  37455 74.423     LRP037  38000 74.968     Manikganj, (Division Office) 
 Revenue  147/MKG of 2011-2012  21-Jun-2012  45 Days  Pavement  LRP075  580 74.812     LRP075  780 75.012     Manikganj, (Division Office) 
 Revenue  72/MKJ of 2008-2009  15-Apr-2009  7 Days  Pavement  LRP076  0 75.248     LRP076  250 75.498     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2008-2009  5-Apr-2009  21 Days  Pavement  LRP076  500 75.748     LRP076  1000 76.248     Manikganj, (Division Office) 
 Revenue  117/MKJ of 2007-2008  18-May-2008  45 Days  Pavement  LRP076  550 75.798     LRP076  750 75.998     Manikganj, (Division Office) 
 Revenue  81/MKJ of 2007-2008.  15-Apr-2008  15 Days  Carpeting  LRP037  39000 75.968     LRP037  39500 76.468     Manikganj, (Division Office) 
 Revenue  159/MKG of 2011-2012 (OTM)  26-Jul-2011  30 Days  Pavement  LRP076  750 75.998     LRP076  1000 76.248     Manikganj, (Division Office) 
 Revenue  58/MKJ of 2008-2009  8-Apr-2009  21 Days  Pavement  LRP076  941 76.189     LRP076  9129 84.377     Manikganj, (Division Office) 
 Revenue  80/MKG.RD/2017-2018 (e-GP T. ID no. 197414)  14-Jun-2018  15 Days  Pavement  LRP076  1600 76.848     LRP076  2000 77.248     Manikganj, (Division Office) 
 Revenue  81/MKJ of 2007-2008.  15-Apr-2008  15 Days  Carpeting  LRP039  39000 77.011     LRP039  39700 77.711     Manikganj, (Division Office) 
 Revenue  106/MKJ of 2008-2009  5-May-2009  30 Days  Pavement  LRP076  2000 77.248     LRP076  2500 77.748     Manikganj, (Division Office) 
 Revenue  47/MKG.RD/2016-2017 (e-GP ID no. 92623)  23-May-2017  30 Days  Pavement  LRP076  2050 77.298     LRP076  2130 77.378     Manikganj, (Division Office) 
 Revenue  12/2009-2010/EE/PRD  8-Mar-2010  15 Days  Pavement  LRP079  0 78.236     LRP079  160 78.396     Pabna, (Division Office) 
 Revenue  45/MKG.RD/2017-2018 (e-GP ID no.138807)  19-Mar-2018  15 Days  Pavement  LRP076  3000 78.248     LRP076  3610 78.858     Manikganj, (Division Office) 
 Revenue  160/MKG of 2011-2012 (OTM)  26-Jul-2011  30 Days  Pavement  LRP076  3360 78.608     LRP076  3700 78.948     Manikganj, (Division Office) 
 Revenue  157/MKG of 2011-2012  21-Jun-2012  45 Days  Pavement  LRP079  900 79.136     LRP079  1100 79.336     Manikganj, (Division Office) 
 Revenue  218/MKG of 2010-2011  21-Jun-2011  30 Days  Pavement  LRP076  4075 79.323     LRP076  5650 80.898     Manikganj, (Division Office) 
 Revenue  95/MKJ of 2008-2009  12-Apr-2009  7 Days  Pavement  LRP076  4700 79.948     LRP076  5200 80.448     Manikganj, (Division Office) 
 Revenue  95/MKJ of 2008-2009  12-Apr-2009  7 Days  Pavement  LRP076  6500 81.748     LRP076  7300 82.548     Manikganj, (Division Office) 
 Revenue  104/MKJ of 2007-08  13-May-2008  30 Days  Pavement  LRP076  7000 82.248     LRP076  7900 83.148     Manikganj, (Division Office) 
 Revenue  152/MKG of 2011-2012  21-Jun-2012  45 Days  Pavement  LRP079  9600 87.836     LRP079  9800 88.036     Manikganj, (Division Office) 
 Revenue  13-RFQ-PRD/2016-2017, Lot No. 13/1  21-Sep-2016  10 Days  Pavement  LRP100  -874 98.742     LRP100  -616 99     Pabna, (Division Office) 
 Revenue  e-gp-05-PRD/2013-2014  6-Mar-2014  45 Days  Pavement  LRP002  97000 98.937     LRP107  0 106.605     Pabna, (Division Office) 
 Revenue  12-RFQ-PRD/2016-2017, Lot No. 12/2  19-Sep-2016  10 Days  Pavement  LRP100  -616 99     LRP100  -366 99.25     Pabna, (Division Office) 
 Revenue  12-RFQ-PRD/2016-2017, Lot No. 12/1  19-Sep-2016  10 Days  Pavement  LRP100  -366 99.25     LRP100  -86 99.53     Pabna, (Division Office) 
 Revenue  DC-7/PRSD-I/2012-2013  30-Aug-2012  7 Days  Road Embankment  LRP100  0 99.616     LRP101  -899 99.717     Pabna, (Division Office) 
 Revenue  8-RFQ-PRD/2014-2015, Lot No. 8/1  23-Oct-2014  10 Days  Road Rehablitation  LRP100  0 99.616     LRP100  170 99.786     Pabna, (Division Office) 
 Revenue  10-RFQ-PRD/2014-2015, Lot No. 10/2  16-Nov-2014  10 Days  Pavement  LRP100  0 99.616     LRP100  500 100.116     Pabna, (Division Office) 
 Revenue  56/2007-2008/EE/PRD  10-Apr-2008  30 Days  Pavement  LRP079  22000 100.236     LRP079  22669 100.905     Pabna, (Division Office) 
 Revenue  19-RFQ-PRD/2015-2016  26-Jun-2016  10 Days  Pavement  LRP101  0 100.616     LRP101  200 100.816     Pabna, (Division Office) 
 Revenue  2/2011-2012/EE/PRD(Fresh Call)  19-Mar-2012  30 Days  Pavement  LRP101  0 100.616     LRP104  0 103.612     Pabna, (Division Office) 
 Revenue  DC-15/PRSD-I/2011-2012  17-Jun-2012  7 Days  Road Rehablitation  LRP101  0 100.616     LRP101  300 100.916     Pabna, (Division Office) 
 Revenue  29/e-GP/PRD/2017-2018, Tender ID : 158221  12-Mar-2018  30 Days  Pavement  LRP101  0 100.616     LRP101  1000 101.616     Pabna, (Division Office) 
 Revenue  DC-12/PRSD-I/2012-2013  24-Jun-2013  7 Days  Road Embankment  LRP101  0 100.616     LRP101  150 100.766     Pabna, (Division Office) 
 Revenue  127/MKJ of 2007-08.  3-Jun-2008  45 Days  Pavement  LRP051  51068 101.07     LRP051  51558 101.56     Manikganj, (Division Office) 
 Revenue  6-RFQ-PRD/2014-2015, Lot No. 6/2  24-Sep-2014  10 Days  Road Rehablitation  LRP101  500 101.116     LRP101  650 101.266     Pabna, (Division Office) 
 Revenue  e-GP/RJZ/PMP(Road)/07/2015-2016, ID : 32002  18-Jan-2016  181 Days  Overlay  LRP101  500 101.116     LRP104  500 104.112     Pabna, (Division Office) 
 Revenue  16/2011-2012/EE/PRD, Lot No. 16/2  2-Oct-2012  30 Days  Pavement  LRP104  0 103.612     LRP106  0 105.607     Pabna, (Division Office) 
 Revenue  16/2011-2012/EE/PRD, Lot No. 16/4  3-Oct-2012  30 Days  Pavement  LRP104  0 103.612     LRP104  50 103.662     Pabna, (Division Office) 
 Revenue  DC-16/PRSD-I/2012-2013  24-Jun-2013  7 Days  Road Embankment  LRP104  0 103.612     LRP104  200 103.812     Pabna, (Division Office) 
 Revenue  27/e-GP/PRD/2017-2018, Tender ID : 158219  29-Mar-2018  30 Days  Pavement  LRP104  888 104.5     LRP106  893 106.5     Pabna, (Division Office) 
 Revenue  e-gp-09-PRD-2015-2016, ID: 34579  18-Feb-2016  20 Days  Pavement  LRP104  888 104.5     LRP106  393 106     Pabna, (Division Office) 
 Revenue  10-RFQ-PRD/2016-2017, Lot No. 10/1  18-Sep-2016  10 Days  Pavement  LRP104  1088 104.7     LRP104  1348 104.96     Pabna, (Division Office) 
 Revenue  10-RFQ-PRD/2016-2017, Lot No. 10/2  20-Sep-2016  10 Days  Pavement  LRP104  508 104.96     LRP104  788 105.24     Pabna, (Division Office) 
 Revenue  65/e-GP/PRD/2017-2018, Tender ID : 197770  11-Jun-2018  15 Days  Pavement  LRP104  1388 105     LRP104  1638 105.25     Pabna, (Division Office) 
 Revenue  9-RFQ-PRD/2016-2017, Lot No. 9/2  18-Sep-2016  10 Days  Pavement  LRP104  788 105.24     LRP104  1058 105.51     Pabna, (Division Office) 
 Revenue  9-RFQ-PRD/2016-2017, Lot No. 9/1  18-Sep-2016  10 Days  Pavement  LRP106  -97 105.51     LRP106  189 105.796     Pabna, (Division Office) 
 Revenue  11-RFQ-PRD/2016-2017, Lot No. 11/1  20-Sep-2016  10 Days  Pavement  LRP106  183 105.79     LRP106  443 106.05     Pabna, (Division Office) 
 Revenue  13-RFQ-PRD/2016-2017, Lot No. 13/2  21-Sep-2016  10 Days  Pavement  LRP107  -555 106.05     LRP107  -265 106.34     Pabna, (Division Office) 
 Revenue  11-RFQ-PRD/2016-2017 Lot No. 11/2  19-Sep-2016  10 Days  Pavement  LRP107  -275 106.33     LRP107  -25 106.58     Pabna, (Division Office) 
 Revenue  44/e-GP/ PRD/2017-2018, Tender ID : 180213  30-Apr-2018  30 Days  Pavement  LRP107  0 106.605     LRP107  500 107.105     Pabna, (Division Office) 
 Revenue  1-PRD/2005-2006, Lot No. 1/15  29-Dec-2005  60 Days  Pavement  LRP107  123 106.728     LRP107  391 106.996     Pabna, (Division Office) 
 Revenue  4-RFQ-PRD/2016-2017, Lot No. 4/1  22-Sep-2016  10 Days  Pavement  LRP107  903 108.35     LRP108  153 108.6     Pabna, (Division Office) 
 Revenue  8-RFQ-PRD/2015-2016, Lot No. 8/1  14-Sep-2015  10 Days  Pavement  LRP108  0 108.447     LRP108  18 108.465     Pabna, (Division Office) 
 Revenue  113/2007-2008/EE/PRD  12-Jun-2008  30 Days  Pavement  LRP107  1880 108.485     LRP107  2000 108.605     Pabna, (Division Office) 
 Revenue  113/2007-2008/EE/PRD  12-Jun-2008  30 Days  Pavement  LRP107  1930 108.535     LRP107  2000 108.605     Pabna, (Division Office) 
 Revenue  49/2007-2008/EE/PRD  6-Mar-2008  30 Days  Pavement  LRP107  2000 108.605     LRP107  3000 109.605     Pabna, (Division Office) 
 Revenue  87/2007-2008/EE/PRD  15-May-2008  30 Days  Pavement  LRP107  2022 108.627     LRP107  2158 108.763     Pabna, (Division Office) 
 Revenue  Tender No-21/EE SRD/ Lot No 05/2008-2009  31-Dec-2009  30 Days  Road Embankment  LRP111  117 110.054     LRP162  162 159.742     Sirajganj, (Division Office) 
 Revenue  52/207-2008/EE/PRD  11-Mar-2008  30 Days  Pavement  LRP107  4000 110.605     LRP107  5000 111.605     Pabna, (Division Office) 
 Revenue  14/2012-2013/EE/PRD, Lot No. 14/2  23-Jun-2013  30 Days  Road Embankment  LRP107  4000 110.605     LRP107  4600 111.205     Pabna, (Division Office) 
 Revenue  8-RFQ-PRD/2006-2007, Lot No. 8/1  21-Jul-2007  10 Days  Pavement  LRP107  5000 111.605     LRP107  7000 113.605     Pabna, (Division Office) 
 Revenue  54/2007-2008/EE/PRD  11-Mar-2008  30 Days  Pavement  LRP107  5000 111.605     LRP107  6000 112.605     Pabna, (Division Office) 
 Revenue  94/2007-2008/EE/PRD  13-May-2008  30 Days  Pavement  LRP107  6000 112.605     LRP107  8680 115.285     Pabna, (Division Office) 
 Revenue  24/MKJ of 2007-08  24-Dec-2007  7 Days  Pavement  LRP058  57233 114.25     LRP058  57243 114.26     Manikganj, (Division Office) 
 Revenue  RFQ-19 SRD-2006-07/G-one    7 Days  Carpeting  LRP116  0 114.934     LRP116  1 114.935     Sirajganj, (Division Office) 
 Revenue  RFQ-19 SRD-2006-07/G-1(one)    7 Days  Carpeting  LRP116  0 114.934     LRP116  1 114.935     Sirajganj, (Division Office) 
 Revenue  RFQ-19 SRD-2006-07/G-1-T    0 Days  Carpeting  LRP116  0 114.934     LRP116  1 114.935     Sirajganj, (Division Office) 
 Revenue  est no 04/srd/2005-2006  23-Aug-2008  5 Days  Road Embankment  LRP116  200 115.134     LRP116  3500 118.434     Sirajganj, (Division Office) 
 Revenue  96/2007-2008/EE/PRD  13-May-2008  30 Days  Pavement  LRP107  8680 115.285     LRP107  11350 117.955     Pabna, (Division Office) 
 Revenue  PMP-2006-2007/11/Overlay  25-Jun-2007  150 Days  Overlay  LRP107  8829 115.434     LRP107  37829 144.434     Pabna, (Division Office) 
 Revenue  e-GP/RJZ/PMP(Road)/07/2015-2016, ID : 32002  18-Jan-2016  181 Days  Overlay  LRP116  632 116.632     LRP126  532 126.532     Pabna, (Division Office) 
 Revenue  12/2008-2009/EE/PRD  29-Mar-2009  45 Days  Pavement  LRP107  11350 117.955     LRP107  14772 121.377     Pabna, (Division Office) 
 Revenue  RFQ No. 10-RFQ-PRD/2006-2007, Lot No. 10/1  17-Aug-2007  7 Days  Pavement  LRP107  11600 118.205     LRP107  11785 118.39     Pabna, (Division Office) 
 Revenue  2-RFQ-PRD/2012-2013, Package No. 2/1  20-Feb-2013  15 Days  Pavement  LRP107  12000 118.605     LRP107  14000 120.605     Pabna, (Division Office) 
 Revenue  69/2007-2008/EE/PRD  9-Apr-2008  30 Days  Pavement  LRP107  13000 119.605     LRP107  14000 120.605     Pabna, (Division Office) 
 Revenue  6/2011-2012/EE/PRD  3-May-2012  90 Days  Pavement  LRP107  14000 120.605     LRP107  16300 122.905     Pabna, (Division Office) 
 Revenue  46/MKJ of 2007-2008  30-Jan-2008  30 Days  Road Embankment  LRP061  61180 121.207     LRP061  61345 121.372     Manikganj, (Division Office) 
 Revenue  39th&44th Km. of NSG Road  15-Mar-2009  15 Days  Road Embankment  LRP111  11339 121.276     LRP111  11450 121.387     Sirajganj, (Division Office) 
 Revenue  46/MKJ of 2007-2008  30-Jan-2008  30 Days  Road Embankment  LRP061  61290 121.317     LRP061  61400 121.427     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2007-2008  30-Jan-2008  30 Days  Road Embankment  LRP061  61310 121.337     LRP061  61330 121.357     Manikganj, (Division Office) 
 Revenue  46/MKJ of 2007-2008  30-Jan-2008  30 Days  Road Embankment  LRP061  61345 121.372     LRP061  61361 121.388     Manikganj, (Division Office) 
 Revenue  37/2008-2009/EE/PRD  28-Jun-2009  30 Days  Pavement  LRP107  14772 121.377     LRP107  15772 122.377     Pabna, (Division Office) 
 Revenue  4/2009-2010/EE/PRD  21-Jan-2010  30 Days  Pavement  LRP107  15772 122.377     LRP107  16372 122.977     Pabna, (Division Office) 
 Revenue  5-RFQ-PRD/2014-2015, Lot No. 5/1  28-Aug-2014  10 Days  Road Embankment  LRP124  0 124     LRP124  141 124.141     Pabna, (Division Office) 
 Revenue  10/eeshid/2017-2018 Tender ID 137272  14-Feb-2018  10 Days  Road Embankment  LRP128  0 126.915     LRP154  0 151.99     Sirajganj, (Division Office) 
 Revenue  LTM 02 EE SRD/2011-2012 Lot 08 FT 41 U/11-12  15-Jan-2012  30 Days  Road Embankment  LRP129  0 127.913     LRP134  0 131.987     Sirajganj, (Division Office) 
 Revenue  RFQ 10/EE/SRD/2015-2016 FT 16 U /15-16  17-Sep-2015  15 Days  Road Embankment  LRP131  0 129.524     LRP131  1000 130.524     Sirajganj, (Division Office) 
 Revenue  RT No-12-SRD/2005-2006 Gr. No-2  13-Mar-2008  30 Days  Road Embankment  LRP131  485 130.009     LRP131  1326 130.85     Sirajganj, (Division Office) 
 Revenue  DPM No-10/2008-2009  24-May-2009  3 Days  Road Embankment  LRP131  500 130.024     LRP131  5600 135.124     Sirajganj, (Division Office) 
 Revenue  RFQ 12/EE/SRD/2015-16 Lot No-12 FT 25 U/15-16  1-Nov-2015  15 Days  Road Embankment  LRP131  800 130.324     LRP131  950 130.474     Sirajganj, (Division Office) 
 Revenue  RFQ No-01/SRD-2008-2009  6-Aug-2008  5 Days  Road Embankment  LRP131  850 130.374     LRP131  1400 130.924     Sirajganj, (Division Office) 
 Revenue  24 EE SRD/2008-2009 Lot 08 FT No 73 U /10-11  20-Dec-2010  30 Days  Road Embankment  LRP131  950 130.474     LRP131  1060 130.584     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 09 FT 74 U /11-12  23-Nov-2011  30 Days  Road Embankment  LRP131  1000 130.524     LRP131  1350 130.874     Sirajganj, (Division Office) 
 Revenue  LTM No 03/EE SRD/2011-2012 Lot No 07 FT No 29 U /11-12  30-Nov-2011  15 Days  Road Embankment  LRP131  1000 130.524     LRP136  0 133.985     Sirajganj, (Division Office) 
 Revenue  RFQ 14/EE/SRD/2015-16 Lot No12 FT 68 U/15-16  4-Nov-2015  15 Days  Road Embankment  LRP131  1000 130.524     LRP133  0 130.987     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 10 FT 70 U /11-12  21-Nov-2011  30 Days  Road Embankment  LRP131  1350 130.874     LRP131  1700 131.224     Sirajganj, (Division Office) 
 Revenue  RFQ 15 EE SRD/14-15 FT 44 U /14-15  23-Sep-2014  15 Days  Road Embankment  LRP133  200 131.187     LRP133  600 131.587     Sirajganj, (Division Office) 
 Revenue  LTM 26 EE SRD/2009-2010 Lot 02 FT No116 U /09-10  25-Jan-2010  15 Days  Road Embankment  LRP131  1700 131.224     LRP131  2050 131.574     Sirajganj, (Division Office) 
 Revenue  RFQ No-02/SRD-2008-2009  20-Aug-2008  5 Days  Road Embankment  LRP133  500 131.487     LRP149  200 147.175     Sirajganj, (Division Office) 
 Revenue  RFQ 16 EE SRD/14-15 FT 45 U /14-15  25-Sep-2014  15 Days  Road Embankment  LRP133  600 131.587     LRP134  0 131.987     Sirajganj, (Division Office) 
 Revenue  RFQ 47 EE SRD/14-15 FT 49 U /14-15  14-Oct-2014  15 Days  Road Embankment  LRP134  400 132.387     LRP135  100 133.087     Sirajganj, (Division Office) 
 Revenue  08 EE SRD/2010-2011 F T No -124 U/10-11  21-Jun-2011  15 Days  Road Embankment  LRP135  0 132.987     LRP141  100 139.082     Sirajganj, (Division Office) 
 Revenue  09/e-GP/EE/Siraj/2013-2014  24-Feb-2014  60 Days  Road Embankment  LRP135  0 132.987     LRP137  0 134.984     Sirajganj, (Division Office) 
 Revenue  LTM No 02 EE SRD/2011-2012 Lot No 04 FT No 16 U/ 11-12  21-Nov-2011  30 Days  Road Embankment  LRP135  0 132.987     LRP137  0 134.984     Sirajganj, (Division Office) 
 Revenue  RTM No 56 EE SRD/2008-2009 FT 10 U /09-10  29-Jul-2009  15 Days  Road Embankment  LRP135  425 133.412     LRP135  535 133.522     Sirajganj, (Division Office) 
 Revenue  RFQ No - 10 SRD / 2006-2007 Gr- 02  15-Aug-2007  7 Days  Road Embankment  LRP135  500 133.487     LRP135  550 133.537     Sirajganj, (Division Office) 
 Revenue  RTM No 52 EE SRD/2008-2009 FT No- 102 U /08/09  28-Jun-2009  15 Days  Road Embankment  LRP135  535 133.522     LRP135  645 133.632     Sirajganj, (Division Office) 
 Revenue  RTM 57 EE SRD /2008-2009 FT 11 U/09-10  30-Jul-2009  15 Days  Road Embankment  LRP135  645 133.632     LRP135  755 133.742     Sirajganj, (Division Office) 
 Revenue  18 EE SRD/2009-2010 Lot No 06 FT No 23 U /10-11  15-Sep-2010  30 Days  Road Embankment  LRP135  740 133.727     LRP135  960 133.947     Sirajganj, (Division Office) 
 Revenue  RTM 54 EE SRD/2008-2009 FT No 104 U /08-09  30-Jun-2009  15 Days  Road Embankment  LRP135  755 133.742     LRP135  865 133.852     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD 2012-2013/01 FT 60 U /12-13  20-Feb-2013  90 Days  Road Embankment  LRP136  0 133.985     LRP137  1000 135.984     Sirajganj, (Division Office) 
 Revenue  LTM No 31 EE SRD/2009-2010 Lot No-01 FT No 02 C-1 /09-10  14-Oct-2010  15 Days  Road Embankment  LRP136  25 134.01     LRP136  135 134.12     Sirajganj, (Division Office) 
 Revenue  LTM No 31 EE SRD 2009-2010 Lot No 01 FT 2 C-1/10-11  14-Oct-2010  15 Days  Road Embankment  LRP136  25 134.01     LRP136  135 134.12     Sirajganj, (Division Office) 
 Revenue  OTM 03 EE SRD 2013-2014/22 FT 128 U/13-14  25-Mar-2014  120 Days  Road Embankment  LRP136  195 134.18     LRP136  305 134.29     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 22 FT 93 U /11-12  20-Nov-2011  30 Days  Road Embankment  LRP136  635 134.62     LRP136  867 134.852     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 23 FT 75 U /11-12  17-Nov-2011  30 Days  Road Embankment  LRP136  867 134.852     LRP137  99 135.083     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 24 FT 76 U /11-12  16-Nov-2011  30 Days  Road Embankment  LRP137  99 135.083     LRP137  331 135.315     Sirajganj, (Division Office) 
 Revenue  RTM Tender No 30/EE/SRD/2008-2009  16-Jun-2009  30 Days  Road Embankment  LRP137  500 135.484     LRP137  900 135.884     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD 2012-2013/02 FT 61 U /12-13  19-Feb-2013  90 Days  Road Embankment  LRP137  550 135.534     LRP139  0 136.982     Sirajganj, (Division Office) 
 Revenue  LTM No 03/EE SRD/2011-2012 Lot No 11 FT No 28 U /11-12  30-Nov-2011  15 Days  Road Embankment  LRP137  1000 135.984     LRP141  0 138.982     Sirajganj, (Division Office) 
 Revenue  LTM 04 EE SRD 2011-2012 Lot No 02 FT No 58 U/11-12  9-Dec-2011  30 Days  Road Embankment  LRP137  1000 135.984     LRP141  0 138.982     Sirajganj, (Division Office) 
 Revenue  20/MKJ of 2007-08  24-Dec-2007  7 Days  Pavement  LRP069  68000 136.048     LRP069  69000 137.048     Manikganj, (Division Office) 
 Revenue  RFQ 13 EE SRD/14-15 FT 43 U /14-15  25-Sep-2014  15 Days  Road Embankment  LRP137  1200 136.184     LRP139  200 137.182     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD/2012-2013/03 FT No 63 U /12-13  24-Feb-2013  90 Days  Road Embankment  LRP139  0 136.982     LRP140  180 138.163     Sirajganj, (Division Office) 
 Revenue  RTM No 92 SRD 2007-2008  10-Apr-2008  10 Days  Road Embankment  LRP139  475 137.457     LRP139  690 137.672     Sirajganj, (Division Office) 
 Revenue  RFQ 14 EE SRD/14-15 FT 46 U /14-15  25-Sep-2014  15 Days  Road Embankment  LRP139  500 137.482     LRP140  600 138.583     Sirajganj, (Division Office) 
 Revenue  10/e-GP/EE/Siraj/2013-2014  18-Feb-2014  30 Days  Road Embankment  LRP139  600 137.582     LRP139  900 137.882     Sirajganj, (Division Office) 
 Revenue  04/eeshid/2016-2017 Tender ID 88958  16-Jul-2017  30 Days  Road Embankment  LRP139  600 137.582     LRP139  858 137.84     Sirajganj, (Division Office) 
 Revenue  RTM No-85/SRD-2207-2008  15-Apr-2008  30 Days  Road Embankment  LRP139  700 137.682     LRP139  790 137.772     Sirajganj, (Division Office) 
 Revenue  10/e-GP/EE/Siraj/2013-2014  18-Feb-2014  30 Days  Road Embankment  LRP140  180 138.163     LRP140  880 138.863     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD/2012-2013/04 FT No 66 U /12-13  25-Feb-2013  90 Days  Road Embankment  LRP140  180 138.163     LRP142  340 140.322     Sirajganj, (Division Office) 
 Revenue  RTM No 19 SRD 2007-2008  4-Oct-2007  3 Days  Road Embankment  LRP141  100 139.082     LRP141  169 139.151     Sirajganj, (Division Office) 
 Revenue  RTM 07 EE SRD/2009-2010 FT No 27 U/2009-2010  8-Dec-2009  50 Days  Road Embankment  LRP141  500 139.482     LRP141  865 139.847     Sirajganj, (Division Office) 
 Revenue  RTM No- 06 EE SRD/2009-2010 FT No 26 U/09-10  10-Dec-2009  50 Days  Road Embankment  LRP141  865 139.847     LRP142  230 140.212     Sirajganj, (Division Office) 
 Revenue  15/eeshid/2016-2017 ID No 89216  4-Jun-2017  30 Days  Road Embankment  LRP142  0 139.982     LRP145  0 142.983     Sirajganj, (Division Office) 
 Revenue  RTM No 19... A /SRD 2007-2008  4-Oct-2007  3 Days  Road Embankment  LRP141  1100 140.082     LRP141  1169 140.151     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 04 FT 72 U /11-12  27-Nov-2011  30 Days  Road Embankment  LRP142  450 140.432     LRP142  690 140.672     Sirajganj, (Division Office) 
 Revenue  OTM 04 EE SRD 2013-2014/14 FT 142 U/13-14  26-Feb-2014  30 Days  Road Embankment  LRP142  690 140.672     LRP142  950 140.932     Sirajganj, (Division Office) 
 Revenue  RFQ No 14 SRD 2007-2008  26-Sep-2007  3 Days  Road Embankment  LRP142  800 140.782     LRP142  821 140.803     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD/11-12 Lot 18 FT 64 U/12-13  28-Nov-2011  30 Days  Road Embankment  LRP142  950 140.932     LRP143  180 141.162     Sirajganj, (Division Office) 
 Revenue  37/MKJ of 2007-08  17-Dec-2007  7 Days  Pavement  LRP071  71000 141.054     LRP076  78000 153.248     Manikganj, (Division Office) 
 Revenue  DPM Tender No-33/2008-2009  23-Jun-2009  3 Days  Road Embankment  LRP143  207 141.189     LRP143  276 141.258     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 20 FT 91 U /11-12  23-Nov-2011  30 Days  Road Embankment  LRP143  220 141.202     LRP143  490 141.472     Sirajganj, (Division Office) 
 Revenue  DPM No34/SRD/2008-2009  23-Jun-2009  3 Days  Road Embankment  LRP143  276 141.258     LRP143  345 141.327     Sirajganj, (Division Office) 
 Revenue  DPM 35 U /2008-2009 FT No 40 U/08-09  23-Jun-2009  3 Days  Road Embankment  LRP143  345 141.327     LRP143  414 141.396     Sirajganj, (Division Office) 
 Revenue  DPM No-24/SRD/2008-2009 Ull  22-Jun-2009  3 Days  Road Embankment  LRP143  393 141.375     LRP143  427 141.409     Sirajganj, (Division Office) 
 Revenue  DPM No 25 SRD/2008-2009 U  22-Jun-2009  3 Days  Road Embankment  LRP143  414 141.396     LRP143  447 141.429     Sirajganj, (Division Office) 
 Revenue  RFQ 01 EE SRD/13-14 FT 35 U /13-14  18-Sep-2013  15 Days  Road Embankment  LRP143  500 141.482     LRP143  900 141.882     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 21 FT 92 U /11-12  22-Nov-2011  30 Days  Road Embankment  LRP143  830 141.812     LRP144  170 142.191     Sirajganj, (Division Office) 
 Revenue  DPM Tender No-01(Ullapara) /2008-2009  16-May-2009  3 Days  Road Embankment  LRP131  13150 142.674     LRP133  13250 144.237     Sirajganj, (Division Office) 
 Revenue  DPM No-09/2008-2009  26-May-2009  3 Days  Road Embankment  LRP131  13200 142.724     LRP131  13269 142.793     Sirajganj, (Division Office) 
 Revenue  RTM Tender No 13 /EE/SRD-2008-2009  11-Jun-2009  30 Days  Road Embankment  LRP131  13800 143.324     LRP131  13950 143.474     Sirajganj, (Division Office) 
 Revenue  RTM No 93 SRD 2007-2008  31-Mar-2008  10 Days  Road Embankment  LRP145  500 143.483     LRP145  715 143.698     Sirajganj, (Division Office) 
 Revenue  LTM No 29 EE SRD 09-10 Lot No 03 FT No 243 U /09-10  27-Jun-2010  15 Days  Road Embankment  LRP145  500 143.483     LRP145  865 143.848     Sirajganj, (Division Office) 
 Revenue  LTM No 29a EE SRD 09-10 Lot No 03 FT No 243 U /09-10  27-Jun-2010  15 Days  Road Embankment  LRP145  500 143.483     LRP145  865 143.848     Sirajganj, (Division Office) 
 Revenue  PMP 2009-10/13/DBST  5-Apr-2010  523 Days  DBST  LRP145  507 143.49     LRP154  1500 153.49     Rajshahi, (Division Office) 
 Revenue  RTM No 96 SRD 2007-2008  1-Apr-2008  10 Days  Road Embankment  LRP145  715 143.698     LRP145  920 143.903     Sirajganj, (Division Office) 
 Revenue  RFQ 03 EE SRD /2014-2015 FT 19 U/14-15  3-Aug-2014  15 Days  Road Embankment  LRP146  0 143.972     LRP150  0 147.975     Sirajganj, (Division Office) 
 Revenue  RFQ 14/EE/SRD/2015-16 Lot No-10 FT 66 U/15-16  4-Nov-2015  15 Days  Road Embankment  LRP146  140 144.112     LRP146  530 144.502     Sirajganj, (Division Office) 
 Revenue  LTM 03 EE SRD/2011-2012 Lot 05 FT 48 U/11-12  17-Jan-2012  30 Days  Road Embankment  LRP146  230 144.202     LRP146  315 144.287     Sirajganj, (Division Office) 
 Revenue  DPM No 07 (Ullapara)/2008-2009  22-May-2009  3 Days  Road Embankment  LRP133  13300 144.287     LRP133  13450 144.437     Sirajganj, (Division Office) 
 Revenue  DPM No-06 (Ullapara ) /2008-2009  22-May-2009  3 Days  Road Embankment  LRP133  13322 144.309     LRP133  13625 144.612     Sirajganj, (Division Office) 
 Revenue  DPM No-08(Ullapara ) /SRD/2008-2009  22-May-2009  3 Days  Road Embankment  LRP133  13345 144.332     LRP133  13750 144.737     Sirajganj, (Division Office) 
 Revenue  RFQ 14/EE/SRD/2015-16 Lot No-09 FT 65 U/15-16  4-Nov-2015  15 Days  Road Embankment  LRP146  608 144.58     LRP146  980 144.952     Sirajganj, (Division Office) 
 Revenue  OTM 09 EE SRD 2012-2013 Lot 02 FT 94 U/12-13  6-Mar-2013  20 Days  Road Embankment  LRP146  710 144.682     LRP146  950 144.922     Sirajganj, (Division Office) 
 Revenue  14/eeshid/2016-2017 Tender ID 89215  3-Jul-2017  90 Days  Road Embankment  LRP147  0 144.972     LRP149  0 146.975     Sirajganj, (Division Office) 
 Revenue  RFQ 14/EE/SRD/2015-16 Lot No11 FT 67 U/15-16  4-Nov-2015  15 Days  Road Embankment  LRP147  350 145.322     LRP147  772 145.744     Sirajganj, (Division Office) 
 Revenue  LTM No 28/EE SRD/2009-2010 Lot No 03 FT No 21 U /10-11  14-Nov-2010  15 Days  Road Embankment  LRP147  570 145.542     LRP147  860 145.832     Sirajganj, (Division Office) 
 Revenue  RFQ 50 EE SRD/10-11 FT 110 U /10-11  6-Jan-2011  7 Days  Road Embankment  LRP148  0 145.973     LRP148  300 146.273     Sirajganj, (Division Office) 
 Revenue  22 EE SRD/2008-2009 Lot No 07 FT No 73 U /09-10  28-Jan-2010  30 Days  Road Embankment  LRP148  150 146.123     LRP148  390 146.363     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 28 FT 84 U /11-12  18-Nov-2011  30 Days  Road Embankment  LRP148  340 146.313     LRP149  0 146.975     Sirajganj, (Division Office) 
 Revenue  Planation at 47,48 & 67 km of NSG Road 2003-2004  27-Jul-2007  365 Days  Road Embankment  LRP148  500 146.473     LRP162  200 159.78     Sirajganj, (Division Office) 
 Revenue  RTM No 109/2007-2008  27-Oct-2008  7 Days  Road Embankment  LRP135  13500 146.487     LRP135  13750 146.737     Sirajganj, (Division Office) 
 Revenue  RFQ 02 EE SRD/13-14 FT 24 U /13-14  18-Sep-2013  15 Days  Road Embankment  LRP148  600 146.573     LRP148  800 146.773     Sirajganj, (Division Office) 
 Revenue  RTM Tender No 31/EE/SRD-2008-2009  11-Jun-2009  30 Days  Road Embankment  LRP148  600 146.573     LRP148  710 146.683     Sirajganj, (Division Office) 
 Revenue  OTM 07 EE SRD 2013-2014/14 FT 08 U/14-15  11-Jul-2014  90 Days  Road Embankment  LRP149  200 147.175     LRP149  600 147.575     Sirajganj, (Division Office) 
 Revenue  RtM No-109 SRD/007-2008  27-Oct-2008  7 Days  Road Embankment  LRP136  13525 147.51     LRP136  13750 147.735     Sirajganj, (Division Office) 
 Revenue  CRN 27 EE SRD 2008-2009 Lot No- 27/4 FT No 85 C-2 /09-10  24-Jan-2010  30 Days  Road Embankment  LRP149  550 147.525     LRP149  798 147.773     Sirajganj, (Division Office) 
 Revenue  RFQ 17 EE SRD/14-15 FT 47 U /14-15  25-Sep-2014  15 Days  Road Embankment  LRP149  600 147.575     LRP150  700 148.675     Sirajganj, (Division Office) 
 Revenue  OTM 07 EE SRD 2013-2014/14 FT 08 U/14-15  11-Jul-2014  90 Days  Road Embankment  LRP150  200 148.175     LRP150  480 148.455     Sirajganj, (Division Office) 
 Revenue  RTM No-115/SRD-2007-2008  21-Nov-2008  7 Days  Road Embankment  LRP137  13600 148.584     LRP137  13800 148.784     Sirajganj, (Division Office) 
 Revenue  RFQ 03 EE SRD/13-14 FT 25 U /13-14  19-Sep-2013  15 Days  Road Embankment  LRP150  700 148.675     LRP150  950 148.925     Sirajganj, (Division Office) 
 Revenue  RTM No-114/SRD/2007-2008  28-Oct-2008  7 Days  Road Embankment  LRP137  13750 148.734     LRP137  14500 149.484     Sirajganj, (Division Office) 
 Revenue  RFQ 18 EE SRD/14-15 FT 48 U /14-15  25-Sep-2014  15 Days  Road Embankment  LRP150  1300 149.275     LRP152  350 150.325     Sirajganj, (Division Office) 
 Revenue  RFQ 04 EE SRD/13-14 FT 36 U /13-14  18-Sep-2013  15 Days  Road Embankment  LRP150  1500 149.475     LRP152  0 149.975     Sirajganj, (Division Office) 
 Revenue  RFQ 15/EE/SRD/2015-16 Lot No-15 FT 90 U/15-16  28-Dec-2015  15 Days  Road Embankment  LRP152  0 149.975     LRP152  300 150.275     Sirajganj, (Division Office) 
 Revenue  PMP-03/2011-12/06/Overlay    180 Days  Overlay  LRP152  9 149.984     LRP154  509 152.499     Sirajganj, (Division Office) 
 Revenue  PMP 03/2011-2012/06/Overlay  20-Feb-2012  180 Days  Overlay  LRP152  9 149.984     LRP154  509 152.499     Sirajganj, (Division Office) 
 Revenue  e-GP/RJZ/PMP(Road)-02/2014-2015  3-Nov-2014  180 Days  DBST  LRP152  578 150.553     LRP154  1553 153.543     Sirajganj, (Division Office) 
 Revenue  RTM No-16/EE/SRD/2008-2009  15-Apr-2009  30 Days  Road Embankment  LRP139  13870 150.852     LRP139  14020 151.002     Sirajganj, (Division Office) 
 Revenue  49/eeshid/2016-2017 Tender ID 105045  9-Jul-2017  60 Days  Road Embankment  LRP153  0 150.99     LRP154  1000 152.99     Sirajganj, (Division Office) 
 Revenue  RFQ 01 EE SRD /2014-2015 FT 17 U/14-15  3-Aug-2014  15 Days  Road Embankment  LRP153  0 150.99     LRP154  1000 152.99     Sirajganj, (Division Office) 
 Revenue  e-GP/RJZ/PMP(Road)/06/2016/2017( Re-Tendered) Tender ID- 99008  20-Jul-2017  234 Days  Overlay  LRP153  40 151.03     LRP162  2242 161.822     Sirajganj, (Division Office) 
 Revenue  RFQ 98 EE SRD/2014-2015, Lot-03 FT 158 U/14-15  15-Jun-2015  15 Days  Road Embankment  LRP153  200 151.19     LRP154  800 152.79     Sirajganj, (Division Office) 
 Revenue  RFQ 13 SRD 2007-2008  27-Sep-2007  3 Days  Road Embankment  LRP153  200 151.19     LRP153  260 151.25     Sirajganj, (Division Office) 
 Revenue  DPM No-38/SRD-2007-2008  15-Aug-2007  3 Days  Road Embankment  LRP153  250 151.24     LRP158  780 156.341     Sirajganj, (Division Office) 
 Revenue  ST No 52 SRD/2004-2005  10-Jul-2007  30 Days  Road Embankment  LRP126  26500 151.418     LRP160  900 158.466     Sirajganj, (Division Office) 
 Revenue  RFQ 01/EE/SRD/2016-2017/03 FT 29U/16-17  18-Aug-2016  7 Days  Road Embankment  LRP153  560 151.55     LRP153  900 151.89     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 29 FT 79 U /11-12  23-Nov-2011  30 Days  Road Embankment  LRP153  700 151.69     LRP154  0 151.99     Sirajganj, (Division Office) 
 Revenue  RFQ 01/EE/SRD/2016-2017/02 FT 28U/16-17  18-Aug-2016  7 Days  Road Embankment  LRP154  0 151.99     LRP154  700 152.69     Sirajganj, (Division Office) 
 Revenue  RFQ 02/EE/SRD/2015-2016 FT 9 U /15-16  15-Sep-2015  15 Days  Road Embankment  LRP154  0 151.99     LRP154  1000 152.99     Sirajganj, (Division Office) 
 Revenue  RTM Tender No 27/EE/SRD/2008-2009  16-Jun-2009  30 Days  Road Embankment  LRP154  150 152.14     LRP154  280 152.27     Sirajganj, (Division Office) 
 Revenue  RFQ No-13 SRD/20072008  29-Sep-2007  3 Days  Road Embankment  LRP154  200 152.19     LRP154  260 152.25     Sirajganj, (Division Office) 
 Revenue  RFQ No- 12 SRD/2007-2008  25-Sep-2007  3 Days  Road Embankment  LRP154  200 152.19     LRP154  230 152.22     Sirajganj, (Division Office) 
 Revenue  RFQ 01/EE/SRD/2016-2017/01 FT 27U/16-17  18-Aug-2016  7 Days  Road Embankment  LRP154  1000 152.99     LRP154  1800 153.79     Sirajganj, (Division Office) 
 Revenue  50/eeshid/2016-2017 Tender ID 105048  9-Jul-2017  60 Days  Road Embankment  LRP154  1000 152.99     LRP156  1000 154.61     Sirajganj, (Division Office) 
 Revenue  RFQ 12/EE/SRD/2015-2016 Lot No-09 FT 35 U/15-16  1-Nov-2015  15 Days  Road Embankment  LRP154  1000 152.99     LRP156  0 153.61     Sirajganj, (Division Office) 
 Revenue  RTM No-110/SRD-2007-2008  15-Apr-2008  30 Days  Road Embankment  LRP154  1200 153.19     LRP154  1300 153.29     Sirajganj, (Division Office) 
 Revenue  RFQ 16/EE/SRD/2015-16 Lot No-01 FT 107 U/15-16  28-Dec-2015  15 Days  Road Embankment  LRP154  1220 153.21     LRP154  1530 153.52     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 26 FT 82 U /11-12  27-Nov-2011  30 Days  Road Embankment  LRP154  1540 153.53     LRP154  1820 153.81     Sirajganj, (Division Office) 
 Revenue  OTM 09 EE SRD 2012-2013 Lot 07 FT 106 U/12-13  17-Apr-2013  20 Days  Road Embankment  LRP154  1540 153.53     LRP154  1820 153.81     Sirajganj, (Division Office) 
 Revenue  PMP-03/2011-12/06/Overlay    180 Days  Overlay  LRP154  1563 153.553     LRP162  4298 163.878     Sirajganj, (Division Office) 
 Revenue  PMP 03/2011-2012/06/Overlay  20-Feb-2012  180 Days  Overlay  LRP154  1563 153.553     LRP162  4298 163.878     Sirajganj, (Division Office) 
 Revenue  RFQ 98 EE SRD/2014-2015, Lot-02 FT 156 U/14-15  15-Jun-2015  15 Days  Road Embankment  LRP156  0 153.61     LRP156  900 154.51     Sirajganj, (Division Office) 
 Revenue  RFQ 02 EE SRD /2014-2015 FT 18 U/14-15  3-Aug-2014  15 Days  Road Embankment  LRP156  0 153.61     LRP158  0 155.561     Sirajganj, (Division Office) 
 Revenue  19 EE SRD/2009-2010 Lot No 06 FT No 160 U /09-10  26-May-2010  30 Days  Road Embankment  LRP154  1810 153.8     LRP154  1920 153.91     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 11 FT 96 U /11-12  20-Nov-2011  30 Days  Road Embankment  LRP156  625 154.235     LRP156  880 154.49     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 27 FT 83 U /11-12  27-Nov-2011  30 Days  Road Embankment  LRP156  900 154.51     LRP156  1200 154.81     Sirajganj, (Division Office) 
 Revenue  19 EE SRD 2008-2009 Lot No 01 FT No 232 U 09-10  15-Jun-2010  30 Days  Carpeting  LRP156  1000 154.61     LRP162  100 159.68     Sirajganj, (Division Office) 
 Revenue  RFQ 12/EE/SRD/2015-16 Lot No-02 FT 23 S-2/15-16  1-Nov-2015  15 Days  DBST  LRP156  1180 154.79     LRP156  1925 155.535     Sirajganj, (Division Office) 
 Revenue  RFQ 12/EE/SRD/2015-2016 Lot No-08 FT 33 U/15-16  1-Nov-2015  15 Days  Road Embankment  LRP156  1200 154.81     LRP158  1000 156.561     Sirajganj, (Division Office) 
 Revenue  41/MKJ of 2007-08  26-Dec-2007  7 Days  Carpeting  LRP076  79800 155.048     LRP076  83500 158.748     Manikganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 19 FT 80 U /11-12  28-Nov-2011  30 Days  Road Embankment  LRP156  1450 155.06     LRP156  1610 155.22     Sirajganj, (Division Office) 
 Revenue  25 EE SRD 2008-2009 Lot No- 07 FT No 190 U/ 09-10  20-Dec-2009  30 Days  Road Embankment  LRP156  1550 155.16     LRP156  1970 155.58     Sirajganj, (Division Office) 
 Revenue  RTM No-108 SRD-2007-2008  30-Apr-2008  7 Days  Road Embankment  LRP156  1645 155.255     LRP156  1775 155.385     Sirajganj, (Division Office) 
 Revenue  RTM No 129 EE SRD/2007-2008 FT 35 U /08-09  16-Dec-2008  7 Days  Road Embankment  LRP158  200 155.761     LRP158  325 155.886     Sirajganj, (Division Office) 
 Revenue  LTM 02 EE SRD 2011-2012 Lot No 03 FT No 30 U/11-12  30-Nov-2011  30 Days  Road Embankment  LRP156  2183 155.793     LRP156  2325 155.935     Sirajganj, (Division Office) 
 Revenue  LTM 04 EE SRD 2012-2013 Lot 17 FT 22 U /13-14  5-Aug-2013  30 Days  Road Embankment  LRP158  256 155.817     LRP158  536 156.097     Sirajganj, (Division Office) 
 Revenue  RTM No 131 SRD/2007-2008 FT 36 U /08-09  25-Dec-2008  7 Days  Road Embankment  LRP158  500 156.061     LRP158  625 156.186     Sirajganj, (Division Office) 
 Revenue  LTM 30 EE SRD 2009-2010 Lot No 04 FT No 35 S-2/11-12  23-Mar-2012  15 Days  Road Embankment  LRP158  660 156.221     LRP158  900 156.461     Sirajganj, (Division Office) 
 Revenue  51/eeshid/2016-2017 Tender ID 105052  9-Jul-2017  60 Days  Road Embankment  LRP158  1000 156.561     LRP160  1000 158.566     Sirajganj, (Division Office) 
 Revenue  RFQ 10 EE SRD /2014-2015 FT 27 U/14-15  7-Aug-2014  15 Days  Road Embankment  LRP158  1000 156.561     LRP160  1000 158.566     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 30 FT 85 U /11-12  16-Nov-2011  30 Days  Road Embankment  LRP158  1150 156.711     LRP158  1300 156.861     Sirajganj, (Division Office) 
 Revenue  RFQ 98 EE SRD/2014-2015, Lot-05 FT 160 U/14-15  15-Jun-2015  15 Days  Road Embankment  LRP158  1200 156.761     LRP160  900 158.466     Sirajganj, (Division Office) 
 Revenue  RFQ No- 12 SRD/2007-2008  25-Sep-2007  3 Days  Road Embankment  LRP158  1300 156.861     LRP158  1350 156.911     Sirajganj, (Division Office) 
 Revenue  RTM No 10 EE/SRD/2008-2009  2-Jun-2009  30 Days  Road Embankment  LRP158  1300 156.861     LRP158  1850 157.411     Sirajganj, (Division Office) 
 Revenue  96/MKJ of 2007-2008  8-May-2008  30 Days  Pavement  LRP076  82000 157.248     LRP076  82900 158.148     Manikganj, (Division Office) 
 Revenue  RFQ 15/EE/SRD/2015-16 Lot No-20 FT 110 U/15-16  28-Dec-2015  15 Days  Road Embankment  LRP158  1900 157.461     LRP160  100 157.666     Sirajganj, (Division Office) 
 Revenue  25 EE SRD/2008-2009 Lot No- 03 FT No 72 U/ 09-10 (dage 19-01-10 )  28-Jan-2010  30 Days  Road Embankment  LRP160  100 157.666     LRP160  350 157.916     Sirajganj, (Division Office) 
 Revenue  60/egp/EE/Siraj/2015-2016 Tender ID 51628  2-Aug-2016  30 Days  Road Embankment  LRP160  1000 158.566     LRP162  1000 160.58     Sirajganj, (Division Office) 
 Revenue  RFQ 15/EE/SRD/2015-16 Lot No-14 FT 109 U/15-16  28-Dec-2015  15 Days  Road Embankment  LRP160  1000 158.566     LRP160  1200 158.766     Sirajganj, (Division Office) 
 Revenue  CRN 23 EE SRD/2008-2009 Lot 04 FT 68 U /09-10  31-Jan-2010  30 Days  Road Embankment  LRP160  1030 158.596     LRP160  10150 167.716     Sirajganj, (Division Office) 
 Revenue  17 EE SRD/2009-2010 Lot No-12 FT No-18 (U) /10-11  11-Nov-2010  30 Days  Road Embankment  LRP160  1050 158.616     LRP160  1170 158.736     Sirajganj, (Division Office) 
 Revenue  RTM No-126/SRD-2007-2008  11-May-2008  7 Days  Road Embankment  LRP146  14700 158.672     LRP146  14950 158.922     Sirajganj, (Division Office) 
 Revenue  RFQ 16/EE/SRD/2015-16 Lot No-12 FT 105 S-2/15-16  28-Dec-2015  15 Days  Road Embankment  LRP160  1110 158.676     LRP160  1490 159.056     Sirajganj, (Division Office) 
 Revenue  EF/a2/e-GP/EE/Siraj/2014-2015 Tender ID-24647  15-Jun-2015  30 Days  Road Embankment  LRP160  1500 159.066     LRP162  2390 161.97     Sirajganj, (Division Office) 
 Revenue  RFQ 98/EE/SRD/2014-2015 Lot No-06 FT 06 U/15-16  17-Jul-2015  15 Days  Road Embankment  LRP162  0 159.58     LRP162  1000 160.58     Sirajganj, (Division Office) 
 Revenue  RFQ 20 EE SRD/14-15 FT 37 U /14-15  18-Sep-2014  15 Days  Road Embankment  LRP162  0 159.58     LRP162  2000 161.58     Sirajganj, (Division Office) 
 Revenue  RTM No-117/SRD-2007-2008  26-Nov-2008  7 Days  Road Embankment  LRP147  14700 159.672     LRP147  14763 159.735     Sirajganj, (Division Office) 
 Revenue  LTM No 31 EE SRD 09-10 Lot No 04 FT No 235 U /09-10  25-Jun-2010  15 Days  Road Embankment  LRP162  100 159.68     LRP162  900 160.48     Sirajganj, (Division Office) 
 Revenue  F T no 181/ C-2 /1998-1999 Gr-04  25-Aug-2007  60 Days  Road Embankment  LRP162  300 159.88     LRP162  900 160.48     Sirajganj, (Division Office) 
 Revenue  OTM 04 EE SRD 2013-2014/17 FT 186 U/13-14  19-Mar-2014  150 Days  Road Embankment  LRP162  310 159.89     LRP162  500 160.08     Sirajganj, (Division Office) 
 Revenue  LTM 01 EE SRD 2011-2012 Lot 13 FT 94 U /11-12  18-Nov-2011  30 Days  Road Embankment  LRP162  350 159.93     LRP162  650 160.23     Sirajganj, (Division Office) 
 Revenue  LTM 03 EE SRD 2012-2013 Lot 07 FT 16 U /13-14  10-Jul-2013  30 Days  Road Embankment  LRP162  525 160.105     LRP162  630 160.21     Sirajganj, (Division Office) 
 Revenue  -DPM No-62 /SRD /2007-2008  22-Aug-2007  3 Days  Road Embankment  LRP162  725 160.305     LRP162  750 160.33     Sirajganj, (Division Office) 
 Revenue  RFQ No-06 SRD/2007-2008  25-Sep-2007  3 Days  Road Embankment  LRP162  1200 160.78     LRP162  1300 160.88     Sirajganj, (Division Office) 
 Revenue  DPM No-29/SRD /2007-2008  13-Aug-2007  10 Days  Road Embankment  LRP162  1665 161.245     LRP162  1675 161.255     Sirajganj, (Division Office) 
 Revenue  DPM No-30 /SRd 2007-2008  13-Aug-2007  3 Days  Road Embankment  LRP162  1674 161.254     LRP162  1725 161.305     Sirajganj, (Division Office) 
 Revenue  DPM No-32-A/SRD-2007-2008  15-Aug-2007  3 Days  Road Embankment  LRP162  1724 161.304     LRP162  1754 161.334     Sirajganj, (Division Office) 
 Revenue  DPM NO-32 SRd/2007-2008  15-Aug-2007  3 Days  Road Embankment  LRP162  1724 161.304     LRP162  1754 161.334     Sirajganj, (Division Office) 
 Revenue  05 u/e-GP/EE/Siraj/2014-2015 ID No- 25580  12-Nov-2015  30 Days  Road Embankment  LRP162  1800 161.38     LRP162  2000 161.58     Sirajganj, (Division Office) 
 Revenue  61/egp/EE/Siraj/2015-2016 ID No- 53047  23-Jun-2016  30 Days  Road Embankment  LRP162  2000 161.58     LRP162  2242 161.822     Sirajganj, (Division Office) 
 Revenue  06/eeshid/2016-2017 ID No 89139  1-Jun-2017  30 Days  Road Embankment  LRP162  2000 161.58     LRP162  3000 162.58     Sirajganj, (Division Office) 
 Revenue  LTM 03 EE SRD 2012-2013 Lot 10 FT 138 U /12-13  30-May-2013  30 Days  Road Embankment  LRP162  2020 161.6     LRP162  2145 161.725     Sirajganj, (Division Office) 
 Revenue  RFQ 85 EE SRD/14-15 FT 107 S-2 /14-15  28-Nov-2014  15 Days  Road Embankment  LRP162  2100 161.68     LRP162  2242 161.822     Sirajganj, (Division Office) 
 Revenue  RTM No-130/SRD-2007-2008  9-Feb-2009  7 Days  Road Embankment  LRP162  2100 161.68     LRP162  2200 161.78     Sirajganj, (Division Office) 
 Revenue  RFQ 89 EE SRD/14-15 FT 111 S-2 /14-15  3-Dec-2014  15 Days  Carpeting  LRP162  2100 161.68     LRP162  2241 161.821     Sirajganj, (Division Office) 
 Revenue  LTM 02 EE SRD/2011-2012 Lot 07 FT 20 S-2/11-12  23-Nov-2011  30 Days  Road Embankment  LRP162  2200 161.78     LRP162  8100 167.68     Sirajganj, (Division Office) 
 Revenue  63/egp/EE/Siraj/2015-2016 Tender ID 53069  2-Aug-2016  30 Days  Road Embankment  LRP162  2242 161.822     LRP162  8000 167.58     Sirajganj, (Division Office) 
 Revenue  RFQ 27 EE SRD/14-15 FT 52 S-2 /14-15  10-Oct-2014  15 Days  Road Embankment  LRP162  2242 161.822     LRP162  4392 163.972     Sirajganj, (Division Office) 
 Revenue  RTM No 109/SRD/2007-2008  28-Oct-2008  7 Days  Road Embankment  LRP162  2300 161.88     LRP162  2700 162.28     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD 2012-2013/05 FT 65 S-2 /12-13  26-Feb-2013  90 Days  Road Embankment  LRP162  2475 162.055     LRP162  3535 163.115     Sirajganj, (Division Office) 
 Revenue  RTM No-40 SRD/2007-2008 Gr-03 (Three)  1-Oct-2007  30 Days  Road Embankment  LRP162  2674 162.254     LRP162  2725 162.305     Sirajganj, (Division Office) 
 Revenue  RTM No-40/SRD-2007-2008 Gr. No-1  27-Sep-2007  10 Days  Road Embankment  LRP162  2750 162.33     LRP162  18625 178.205     Sirajganj, (Division Office) 
 Revenue  32/MKG of 2007-2008  27-Dec-2007  7 Days  Pavement  LRP076  87184 162.432     LRP076  87414 162.662     Manikganj, (Division Office) 
 Revenue  OTM 05/EE/SRD/2013-14/26 FT 112 S-2/13-14  3-Mar-2014  30 Days  Road Embankment  LRP162  3000 162.58     LRP162  19000 178.58     Sirajganj, (Division Office) 
 Revenue  08/eeshid/2017-2018 Tender ID 137264  22-Feb-2018  10 Days  Road Embankment  LRP162  3000 162.58     LRP162  21000 180.58     Sirajganj, (Division Office) 
 Revenue  OTM 05/EE/SRD/2013-14/25 FT 115 S-2/13-14  3-Mar-2014  30 Days  Road Embankment  LRP162  3000 162.58     LRP162  13000 172.58     Sirajganj, (Division Office) 
 Revenue  -DPM No-62 /SRD /2007-2008  22-Aug-2007  3 Days  Road Embankment  LRP162  3260 162.84     LRP162  3430 163.01     Sirajganj, (Division Office) 
 Revenue  e-GP/RJZ/PMP (Road)/02/2017-2018 ID No-125174  4-Mar-2018  180 Days  Road Embankment  LRP162  3320 162.9     LRP162  10590 170.17     Sirajganj, (Division Office) 
 Revenue  OTM 09 EE SRD 2012-2013 Lot 05 FT 92 S-2/12-13  28-Feb-2013  20 Days  Road Embankment  LRP162  3330 162.91     LRP162  3538 163.118     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD 2012-2013/06 FT 69 S-2/12-13  26-Feb-2013  90 Days  Road Embankment  LRP162  3535 163.115     LRP162  4820 164.4     Sirajganj, (Division Office) 
 Revenue  19/MKJ of 2007-2008  26-Dec-2007  7 Days  Pavement  LRP076  88214 163.462     LRP076  88274 163.522     Manikganj, (Division Office) 
 Revenue  02/eeshid/2016-2017 ID No 88945  1-Jun-2017  30 Days  Road Embankment  LRP162  4000 163.58     LRP162  8000 167.58     Sirajganj, (Division Office) 
 Revenue  RFQ 26 EE SRD/14-15 FT 51 S-2 /14-15  2-Oct-2014  15 Days  Road Embankment  LRP162  4000 163.58     LRP162  9000 168.58     Sirajganj, (Division Office) 
 Revenue  RTM No-69 SRD/2007-2008  24-Oct-2007  3 Days  Road Embankment  LRP162  4000 163.58     LRP162  17000 176.58     Sirajganj, (Division Office) 
 Revenue  DPM No-87 SRD/2007-2008  27-Aug-2007  3 Days  Road Embankment  LRP162  4133 163.713     LRP162  4777 164.357     Sirajganj, (Division Office) 
 Revenue  RFQ 84 EE SRD/14-15 FT 106 S-2 /14-15  4-Nov-2014  15 Days  Road Embankment  LRP162  4200 163.78     LRP162  4500 164.08     Sirajganj, (Division Office) 
 Revenue  DPM No 96 SRD/2007-2008  27-Aug-2007  3 Days  Road Embankment  LRP162  4306 163.886     LRP162  4350 163.93     Sirajganj, (Division Office) 
 Revenue  RFQ 28 EE SRD/14-15 FT 53 S-2 /14-15  10-Oct-2014  15 Days  Road Embankment  LRP162  4392 163.972     LRP162  6542 166.122     Sirajganj, (Division Office) 
 Revenue  RFQ 15/EE/SRD/2015-16 Lot No-07 FT 94 S-2/15-16  28-Dec-2015  15 Days  Road Embankment  LRP162  4400 163.98     LRP162  4800 164.38     Sirajganj, (Division Office) 
 Revenue  05 S /e-GP/EE/Siraj/2014-2015 ID No- 25578  4-Nov-2015  30 Days  Road Embankment  LRP162  4520 164.1     LRP162  4850 164.43     Sirajganj, (Division Office) 
 Revenue  PMP 2008-09/19/Overlay  23-Apr-2009  433 Days  Overlay  LRP162  4662 164.242     LRP162  21976 181.556     Sirajganj, (Division Office) 
 Revenue  RFQ 91 EE SRD/14-15 FT 113 S-2 /14-15  7-Nov-2014  15 Days  Road Embankment  LRP162  4700 164.28     LRP162  5000 164.58     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD 2012-2013/07 FT 62 S-2/12-13  20-Feb-2013  90 Days  Road Embankment  LRP162  4820 164.4     LRP162  8160 167.74     Sirajganj, (Division Office) 
 Revenue  LTM No 25a EE SRD 2009-2010 Lot No 01 FT No 114 C-2 /09-10  16-Sep-2010  15 Days  Road Embankment  LRP162  4915 164.495     LRP162  5572 165.152     Sirajganj, (Division Office) 
 Revenue  LTM No 25 EE SRD 2009-2010 Lot No 01 FT No 114 C-2 /09-10  16-Sep-2010  15 Days  Road Embankment  LRP162  4915 164.495     LRP162  5572 165.152     Sirajganj, (Division Office) 
 Revenue  30/eeshid/2017-2018 Tender ID 142033  13-Feb-2018  10 Days  Road Embankment  LRP162  5000 164.58     LRP162  7000 166.58     Sirajganj, (Division Office) 
 Revenue  LTM 02 EE SRD/2011-2012 Lot 09 FT 21 S-2/11-12  23-Nov-2011  30 Days  Road Embankment  LRP162  5000 164.58     LRP162  8000 167.58     Sirajganj, (Division Office) 
 Revenue  DPM No-88 /SRD/2007-2008  27-Aug-2007  3 Days  Road Embankment  LRP162  5173 164.753     LRP162  5218 164.798     Sirajganj, (Division Office) 
 Revenue  RTM :75 A/SRD-2007-2008  4-May-2008  30 Days  Road Embankment  LRP160  7250 164.816     LRP160  7550 165.116     Sirajganj, (Division Office) 
 Revenue  DPM No-98/SRD-2007-2008  23-Aug-2007  3 Days  Road Embankment  LRP162  5299 164.879     LRP162  5350 164.93     Sirajganj, (Division Office) 
 Revenue  OTM 09 EE SRD 2012-2013 Lot 01 FT 93 S-2/12-13  28-Feb-2013  20 Days  Road Embankment  LRP162  5321 164.901     LRP162  5448 165.028     Sirajganj, (Division Office) 
 Revenue  13-SRD-2006-07  1-Aug-2007  25 Days  Road Embankment  LRP162  5350 164.93     LRP162  5500 165.08     Sirajganj, (Division Office) 
 Revenue  05t/e-GP/EE/Siraj/2014-2015 ID No- 25579  4-Nov-2015  30 Days  Road Embankment  LRP162  5400 164.98     LRP162  8350 167.93     Sirajganj, (Division Office) 
 Revenue  05 S /e-GP/EE/Siraj/2014-2015 ID No- 25578 a  4-Nov-2015  30 Days  Road Embankment  LRP162  5520 165.1     LRP162  5850 165.43     Sirajganj, (Division Office) 
 Revenue  OTM 04 EE SRD 2013-2014/15 FT 102 S-2/13-14  24-Jan-2014  30 Days  Road Embankment  LRP162  5572 165.152     LRP162  5922 165.502     Sirajganj, (Division Office) 
 Revenue  OTM 04 EE SRD 2013-2014/18 FT 183 S-2/13-14  14-Mar-2014  150 Days  Road Embankment  LRP162  5922 165.502     LRP162  6272 165.852     Sirajganj, (Division Office) 
 Revenue  DPM No 97/SRD-2007-2008  27-Aug-2007  3 Days  Pavement  LRP162  6200 165.78     LRP162  6500 166.08     Sirajganj, (Division Office) 
 Revenue  DPM No-86 SRD/2007-2008  27-Aug-2007  3 Days  Road Embankment  LRP162  6217 165.797     LRP162  6560 166.14     Sirajganj, (Division Office) 
 Revenue  RFQ 25 EE SRD/14-15 FT 50 S-2 /14-15  2-Oct-2014  15 Days  Road Embankment  LRP162  6542 166.122     LRP162  8692 168.272     Sirajganj, (Division Office) 
 Revenue  RFQ- 07 SRD/2006-2007 Gr-01  9-Jul-2007  15 Days  Road Embankment  LRP162  6700 166.28     LRP162  6750 166.33     Sirajganj, (Division Office) 
 Revenue  IFT No 19 SRD 2007-2008 Gr-02  18-May-2008  30 Days  Road Embankment  LRP162  6747 166.327     LRP162  6927 166.507     Sirajganj, (Division Office) 
 Revenue  RTM No-75 Aa/SRD/2007-2008  4-May-2008  30 Days  Road Embankment  LRP162  7250 166.83     LRP162  7550 167.13     Sirajganj, (Division Office) 
 Revenue  RTM No-40/SRD-2007-2008Gr No-2  30-Sep-2007  10 Days  Road Embankment  LRP162  7270 166.85     LRP162  7313 166.893     Sirajganj, (Division Office) 
 Revenue  RTM No-40 /SRD-2007-2008 Gr No-4  3-Oct-2007  30 Days  Road Embankment  LRP162  7425 167.005     LRP162  13000 172.58     Sirajganj, (Division Office) 
 Revenue  RFQ 19 SRD/2006-2007 Gr-02  16-Aug-2007  7 Days  Road Embankment  LRP162  7500 167.08     LRP162  7600 167.18     Sirajganj, (Division Office) 
 Revenue  LTM No 25 EE SRD 2009-2010 Lot No-02 FT No 113 C-1/09-10  16-Sep-2010  15 Days  Road Embankment  LRP162  7555 167.135     LRP162  8212 167.792     Sirajganj, (Division Office) 
 Revenue  03/eeshid/2016-2017 ID No 88957  31-May-2017  30 Days  Road Embankment  LRP162  8000 167.58     LRP162  12000 171.58     Sirajganj, (Division Office) 
 Revenue  RTM No-40/SRD-2007-2008Gr No-2  30-Sep-2007  10 Days  Road Embankment  LRP162  8020 167.6     LRP162  8040 167.62     Sirajganj, (Division Office) 
 Revenue  LTM No 25 EE SRD/2009-2010 Lot No 03 F T No 115 C-2/09-10  16-Sep-2010  15 Days  Road Embankment  LRP162  8041 167.621     LRP162  9000 168.58     Sirajganj, (Division Office) 
 Revenue  OTM 13 EE SRD 2012-2013/13 FT 81 S-2/13-14  29-Dec-2013  15 Days  Road Embankment  LRP162  8300 167.88     LRP162  8500 168.08     Sirajganj, (Division Office) 
 Revenue  RFQ 45 EE SRD/14-15 FT 73 S-2 /14-15  24-Sep-2014  15 Days  Road Embankment  LRP162  8300 167.88     LRP162  10800 170.38     Sirajganj, (Division Office) 
 Revenue  08/eeshid/2016-2017 Tender ID 89144  17-Jul-2017  90 Days  Road Embankment  LRP162  8350 167.93     LRP162  9100 168.68     Sirajganj, (Division Office) 
 Revenue  RFQ 29 EE SRD/14-15 FT 64 S-2 /14-15  14-Oct-2014  15 Days  Road Embankment  LRP162  8692 168.272     LRP162  10828 170.408     Sirajganj, (Division Office) 
 Revenue  62/egp/EE/Siraj/2015-2016 ID 53062  11-Jul-2016  30 Days  Road Embankment  LRP162  9000 168.58     LRP162  20000 179.58     Sirajganj, (Division Office) 
 Revenue  CRN 19 EE SRD/2008-2009 Lot No 02 FT No 54 C-2 /09-10  28-Jan-2010  15 Days  Road Embankment  LRP162  9358 168.938     LRP162  9558 169.138     Sirajganj, (Division Office) 
 Revenue  OTM 07 EE SRD 2013-2014/07 FT 09 S-2/14-15  20-Jul-2014  90 Days  Road Embankment  LRP162  9660 169.24     LRP162  9960 169.54     Sirajganj, (Division Office) 
 Revenue  RTM No 107/SRD-2007-2008  9-Feb-2009  7 Days  Road Embankment  LRP156  15645 169.255     LRP156  15715 169.325     Sirajganj, (Division Office) 
 Revenue  02 EE SRD/2011-2012 Lot 05 FT 17 S-2/11-12  21-Nov-2011  30 Days  Road Embankment  LRP162  10000 169.58     LRP162  19000 178.58     Sirajganj, (Division Office) 
 Revenue  LTM 04 EE SRD/2011-2012 Lot No 01 FT 52 S-2  8-Dec-2011  30 Days  Road Embankment  LRP162  10050 169.63     LRP162  10550 170.13     Sirajganj, (Division Office) 
 Revenue  09/eeshid/2017-2018 Tender ID 137269  13-Feb-2018  60 Days  Road Embankment  LRP162  10800 170.38     LRP162  10926 170.506     Sirajganj, (Division Office) 
 Revenue  08/e-GP/EE/Siraj/2013-2014  6-Feb-2014  60 Days  Road Embankment  LRP162  11000 170.58     LRP162  13000 172.58     Sirajganj, (Division Office) 
 Revenue  OTM 02 EE SRD 2012-2013/08 FT 64 S-2/12-13  19-Feb-2013  90 Days  Road Embankment  LRP162  11000 170.58     LRP162  18000 177.58     Sirajganj, (Division Office) 
 Revenue  07/eeshid/2017-2018 Tender ID 137256  13-Feb-2018  10 Days  Road Embankment  LRP162  11000 170.58     LRP162  13000 172.58     Sirajganj, (Division Office) 
 Revenue  RTM No 73 SRD/2007-2008  2-Mar-2008  30 Days  Road Embankment  LRP162  11058 170.638     LRP162  11080 170.66     Sirajganj, (Division Office) 
 Revenue  RTM No 73 SRD/2007-2008  2-Mar-2008  30 Days  Road Embankment  LRP162  11127 170.707     LRP162  11227 170.807     Sirajganj, (Division Office) 
 Revenue  RFQ 06 EE SRD /2014-2015 FT 30 S-2/14-15  3-Sep-2014  15 Days  Road Embankment  LRP162  11350 170.93     LRP162  13135 172.715     Sirajganj, (Division Office) 
 Revenue  06/eeshid/2017-2018 Tender ID 158427  20-Feb-2018  10 Days  Road Embankment  LRP162  12000 171.58     LRP162  20000 179.58     Sirajganj, (Division Office) 
 Revenue  OTM 12 EE SRD 2012-2013/ 01 FT 85 S-2/13-14  17-Jan-2014  30 Days  Road Embankment  LRP162  12600 172.18     LRP162  13000 172.58     Sirajganj, (Division Office) 
 Revenue  RTM No-03 SRD/2007-2008  31-Dec-2007  3 Days  Road Embankment  LRP162  12900 172.48     LRP162  12960 172.54     Sirajganj, (Division Office) 
 Revenue  RFQ 08 EE SRD /2014-2015 FT 33 S-2/14-15  8-Sep-2014  15 Days  Road Embankment  LRP162  13135 172.715     LRP162  14135 173.715     Sirajganj, (Division Office) 
 Revenue  RTM No-40/SRD-2007-2008Gr No-2  30-Sep-2007  10 Days  Road Embankment  LRP162  13260 172.84     LRP162  13280 172.86     Sirajganj, (Division Office) 
 Revenue  PMP - 2006-07/05/Overlay  1-Aug-2007  280 Days  Carpeting  LRP174  1632 173.2     LRP188  3193 188.75     Bogura, (Division Office) 
 Revenue  RFQ 41 EE SRD/14-15 FT 60 S-2 /14-15  20-Oct-2014  15 Days  Road Embankment  LRP162  14150 173.73     LRP162  15135 174.715     Sirajganj, (Division Office) 
 Revenue  03v/e-GP/EE/Siraj/2014-2015 ID 25584  4-Nov-2015  30 Days  Road Embankment  LRP162  14250 173.83     LRP162  15000 174.58     Sirajganj, (Division Office) 
 Revenue  RTM No 32 SRD 2007-2008  3-Sep-2007  3 Days  Road Embankment  LRP162  14900 174.48     LRP162  14960 174.54     Sirajganj, (Division Office) 
 Revenue  07/e-GP/EE/Siraj/2013-2014  6-Feb-2014  60 Days  Road Embankment  LRP162  15000 174.58     LRP162  19000 178.58     Sirajganj, (Division Office) 
 Revenue  PMP-03/2011-12/06/Overlay    180 Days  Overlay  LRP162  15555 175.135     LRP162  17555 177.135     Sirajganj, (Division Office) 
 Revenue  PMP 03/2011-2012/06/Overlay  20-Feb-2012  180 Days  Overlay  LRP162  15555 175.135     LRP162  17555 177.135     Sirajganj, (Division Office) 
 Revenue  RTM No-99/SRD-2007-2008  2-Oct-2008  7 Days  Road Embankment  LRP162  15600 175.18     LRP162  15700 175.28     Sirajganj, (Division Office) 
 Revenue  RFQ 09 EE SRD /2014-2015 FT 34 S-2/14-15  9-Sep-2014  15 Days  Road Embankment  LRP162  16135 175.715     LRP162  18335 177.915     Sirajganj, (Division Office) 
 Revenue  IFT No-17 SRD-2007-2008 Gr no 1  14-May-2008  30 Days  Road Rehablitation  LRP162  16265 175.845     LRP162  16270 175.85     Sirajganj, (Division Office) 
 Revenue  IFT No.20.SRD-2007-08;Group No.1  18-May-2008  30 Days  Surfacing  LRP162  16271 175.851     LRP162  16272 175.852     Sirajganj, (Division Office) 
 Revenue  RFQ 19 SRD/2006-2007 Gr-1  16-Aug-2007  7 Days  Road Embankment  LRP162  16300 175.88     LRP162  16350 175.93     Sirajganj, (Division Office) 
 Revenue  RFQ 07 EE SRD /2014-2015 FT 32 S-2/14-15  5-Sep-2014  15 Days  Road Embankment  LRP162  17335 176.915     LRP162  19155 178.735     Sirajganj, (Division Office) 
 Revenue  19 EE SRD/2008-2009 Lot No 08 FT No 90-C-2 /09-10  7-Jan-2010  15 Days  Road Embankment  LRP162  17600 177.18     LRP162  17700 177.28     Sirajganj, (Division Office) 
 Revenue  eGP-20/RHD/ACE/RZ/2016-2017 (ID No. 84155)  4-May-2017  395 Days  DBST  LRP180  0 177.567     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  05r/e-GP/EE/Siraj/2014-2015 Tender ID 25551  4-Nov-2015  30 Days  Road Embankment  LRP162  18360 177.94     LRP162  18585 178.165     Sirajganj, (Division Office) 
 Revenue  OTM 03 EE SRD 2013-2014/ 19 FT 153 S-2/13-14  6-Mar-2014  150 Days  Road Embankment  LRP162  18700 178.28     LRP162  19000 178.58     Sirajganj, (Division Office) 
 Revenue  19 EE SRD/2008-2009 Lot No- 11 FT No 55 C-2/2009-10  24-Jan-2010  15 Days  Road Embankment  LRP162  18815 178.395     LRP162  18971 178.551     Sirajganj, (Division Office) 
 Revenue  RTM No-40/SRD-2007-2008Gr No-2  30-Sep-2007  10 Days  Road Embankment  LRP162  19025 178.605     LRP162  19045 178.625     Sirajganj, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  DBST  LRP182  1934 181.5     LRP188  2588 188.145     Bogura, (Division Office) 
 Revenue  32-EE/BRD/2012-13  27-Mar-2013  60 Days  Surfacing  LRP184  0 181.556     LRP188  2650 188.207     Bogura, (Division Office) 
 Revenue  02-EE/BRD/2011-12  5-Sep-2011  3 Days  Surfacing  LRP184  0 181.556     LRP188  3600 189.157     Bogura, (Division Office) 
 Revenue  04--SE/BRC/2011-12  11-Dec-2011  10 Days  Surfacing  LRP184  0 181.556     LRP222  27000 246.536     Bogura, (Division Office) 
 Revenue  54-EE/BRD/2012-13  23-Jun-2013  60 Days  Surfacing  LRP182  2000 181.566     LRP188  2000 187.557     Bogura, (Division Office) 
 Revenue  eGP-37/EE/BRD/2016-2017 (ID No. 92599)  14-May-2017  29 Days  Carpeting  LRP186  0 183.556     LRP204  0 201.562     Bogura, (Division Office) 
 Revenue  RTM No 116/SRD-2007/2008  26-Nov-2008  7 Days  Carpeting  LRP143  43870 184.852     LRP143  43917 184.899     Sirajganj, (Division Office) 
 Revenue  29-EE/BRD/2015-2016  4-Apr-2016  30 Days  Carpeting  LRP188  0 185.557     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  PMP-2006-07/13/Overlay  1-Aug-2007  288 Days  Road Rehablitation  LRP188  3193 188.75     LRP208  1787 207.35     Bogura, (Division Office) 
 Revenue  51-EE/BRD/2012-13  11-Jun-2013  100 Days  Surfacing  LRP192  0 189.554     LRP204  0 201.562     Bogura, (Division Office) 
 Revenue  07-EE/BRD/2013-2014  19-Sep-2013  60 Days  Surfacing  LRP192  0 189.554     LRP212  0 209.56     Bogura, (Division Office) 
 Revenue  DPM No.19-EE/BRD/2009-10  24-Jun-2010  4 Days  Carpeting  LRP192  0 189.554     LRP192  753 190.307     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Road Rehablitation  LRP192  146 189.7     LRP192  546 190.1     Bogura, (Division Office) 
 Revenue  34-EE/BRD/2015-2016  27-Apr-2016  30 Days  Carpeting  LRP194  0 191.556     LRP196  0 193.557     Bogura, (Division Office) 
 Revenue  04-EE/BRD/2011-12  5-Sep-2011  3 Days  Surfacing  LRP196  1500 195.057     LRP202  23 199.59     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Road Rehablitation  LRP196  1688 195.245     LRP198  189 195.745     Bogura, (Division Office) 
 Revenue  35-EE/BRD/2015-2016  11-May-2016  30 Days  Carpeting  LRP198  0 195.556     LRP206  0 203.568     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Road Rehablitation  LRP198  994 196.55     LRP198  1655 197.211     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Road Rehablitation  LRP198  1655 197.211     LRP198  2710 198.266     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Overlay  LRP198  2710 198.266     LRP202  840 200.407     Bogura, (Division Office) 
 Revenue  18-SE/BRC/2012-13  9-Jun-2013  100 Days  Carpeting  LRP204  1250 202.812     LRP212  0 209.56     Bogura, (Division Office) 
 Revenue  09-EE/BRD/2015-2016  12-Jan-2016  30 Days  Carpeting  LRP206  0 203.568     LRP210  0 207.557     Bogura, (Division Office) 
 Revenue  36-EE/BRD/2015-2016  18-May-2016  30 Days  Carpeting  LRP206  0 203.568     LRP210  0 207.557     Bogura, (Division Office) 
 Revenue  17-SE/BRC/2012-13  9-Jun-2013  100 Days  Surfacing  LRP206  0 203.568     LRP212  1200 210.76     Bogura, (Division Office) 
 Revenue  26-EE/BRD/2010-11  24-Feb-2011  7 Days  Carpeting  LRP210  0 207.557     LRP216  3000 216.549     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Overlay  LRP210  1300 208.857     LRP212  805 210.365     Bogura, (Division Office) 
 Revenue  DPM No.18-EE/BRD/2009-10  24-Jun-2010  4 Days  Carpeting  LRP212  0 209.56     LRP212  763 210.323     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Road Rehablitation  LRP212  805 210.365     LRP212  1870 211.43     Bogura, (Division Office) 
 Revenue  eGP-02/EE/BRD/2016-2017 (TID-54887)  20-Jul-2016  29 Days  Carpeting  LRP216  0 213.549     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  eGP-12/RHD/ACE/RZ/2016-2017 (Re-Tender) (ID-73804)  7-Feb-2017  179 Days  Overlay  LRP216  0 213.549     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  PMP 2007-08/01/Overlay & DBST  17-Feb-2008  683 Days  Overlay  LRP216  801 214.35     LRP216  1641 215.19     Bogura, (Division Office) 
 Revenue  PMP 2007-08/23/Overlay & DBST  18-Jun-2008  484 Days  Overlay  LRP216  1641 215.19     LRP222  1504 221.04     Bogura, (Division Office) 
 Revenue  PMP-2007-08/23/ DBST and Overlay  18-Jun-2008  926 Days  Overlay  LRP216  1641 215.19     LRP373  559 371.06     Bogura, (Division Office) 
 Revenue  RFQ 01/EE/BRD/2015-2016.  21-Sep-2015  3 Days  Surfacing  LRP218  0 215.527     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  38-EE/BRD/2015-2016  31-May-2016  30 Days  Carpeting  LRP220  0 217.543     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  39-EE/BRD/2015-2016  2-Jun-2016  15 Days  Carpeting  LRP220  0 217.543     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  eGP-24/EE/BRD/2016-2017 (ID No. 85487)  4-Apr-2017  29 Days  Carpeting  LRP220  0 217.543     LRP222  0 219.536     Bogura, (Division Office) 
 Revenue  12-SE/BRC/2011-12  19-Feb-2012  60 Days  Carpeting  LRP220  500 218.043     LRP220  1000 218.543     Bogura, (Division Office) 
 Revenue  PMP 2007-08/23/Overlay & DBST  18-Jun-2008  484 Days  DBST  LRP222  1504 221.04     LRP238a  1482 237     Bogura, (Division Office) 
 Revenue  SRFQ-06-EE/GRD/2007-2008,Gr.No.03  17-Oct-2007  3 Days  Carpeting  LRP222  2220 221.756     LRP224  2240 223.762     Gaibanda, (Division Office) 
 Revenue  RTM No-16/SRD-2007-2008  9-Oct-2007  3 Days  Road Embankment  LRP162  68600 228.18     LRP162  68825 228.405     Sirajganj, (Division Office) 
 Revenue  01--ACE/RGZ/2011-2012  1-Jul-2012  300 Days  Overlay  LRP222  14464 234     LRP222  20364 239.9     Bogura, (Division Office) 
 Revenue  SRFQ-05-EE/GRD/2007-08 Gr.No.7(Seven)  10-Mar-2007  3 Days  Carpeting  LRP222  22140 241.676     LRP254  25340 276.848     Gaibanda, (Division Office) 
 Revenue  SRFQ-04-EE/GRD/2007-2008,Gr.No.07  10-Mar-2007  3 Days  Carpeting  LRP222  22200 241.736     LRP236  23600 257.113     Gaibanda, (Division Office) 
 Revenue  Pad.QTN.02-SDE/PALAS/RHD/2007-2008  18-Sep-2007  10 Days  Carpeting  LRP222  22200 241.736     LRP228  22800 248.308     Gaibanda, (Division Office) 
 Revenue  SRFQ-03-EE/GRD/2007-2008,Gr.No.08  21-Nov-2007  3 Days  Carpeting  LRP222  22200 241.736     LRP224  22400 243.922     Gaibanda, (Division Office) 
 Revenue  Pab QN.02-SDE/RHD/Palash/2007-08  26-Sep-2007  10 Days  Carpeting  LRP222  22250 241.786     LRP236  23600 257.113     Gaibanda, (Division Office) 
 Revenue  Pad QN-11-SDE/RHD/PALASH/2007-08  29-Nov-2007  7 Days  Carpeting  LRP222  22270 241.806     LRP226  22680 246.216     Gaibanda, (Division Office) 
 Revenue  Pad QN-02/SDE/RHD/PALASH/2007-08  27-Sep-2007  7 Days  Carpeting  LRP222  22280 241.816     LRP224  22490 244.012     Gaibanda, (Division Office) 
 Revenue  PQN.05-SDE/GRD/PALASH/2007-08  28-Oct-2007  7 Days  Carpeting  LRP222  22500 242.036     LRP224  24900 246.422     Gaibanda, (Division Office) 
 Revenue  Pad QN-03/SDE/RHD/Palash/07-08  16-Sep-2007  7 Days  Carpeting  LRP222  22550 242.086     LRP236  23600 257.113     Gaibanda, (Division Office) 
 Revenue  RFQ-03-EE/GRD/2011-2012  26-Jul-2011  7 Days  Carpeting  LRP246  30 243.542     LRP250  30 247.541     Gaibanda, (Division Office) 
 Revenue  03-SE/BRC/2013-2014  22-Oct-2013  60 Days  Surfacing  LRP222  24300 243.836     LRP222  27300 246.836     Bogura, (Division Office) 
 Revenue  40/e-GP/EE/GRD/2017-2018  29-Mar-2018  40 Days  Carpeting  LRP248  3 245.518     LRP272  3 269.516     Gaibanda, (Division Office) 
 Revenue  04/e-GP/EE/GRD/2017-2018  26-Nov-2017  45 Days  Carpeting  LRP248  3 245.518     LRP250  3 247.514     Gaibanda, (Division Office) 
 Revenue  27/e-GP/EE/GRD/2017-2018  14-Dec-2017  45 Days  Carpeting  LRP248  15 245.53     LRP256  35 253.546     Gaibanda, (Division Office) 
 Revenue  RFQ-02-EE/GRD/2010-2011  18-Aug-2010  21 Days  Carpeting  LRP248  247 245.762     LRP248  248 245.763     Gaibanda, (Division Office) 
 Revenue  22/e-GP/EE/GRD/2015-2016  28-Apr-2016  60 Days  Carpeting  LRP248  249 245.764     LRP252  250 249.759     Gaibanda, (Division Office) 
 Revenue  PQN-08-SDE/RHD/PALASH/2007-08  20-Nov-2007  10 Days  Carpeting  LRP226  22600 246.136     LRP228  22850 248.358     Gaibanda, (Division Office) 
 Revenue  22e-GP/EE/GRD/2014-2015  2-Sep-2015  20 Days  Carpeting  LRP248  758 246.273     LRP270  779 268.294     Gaibanda, (Division Office) 
 Revenue  39/e-GP/EE/GRD/2017-2018  28-May-2018  40 Days  Carpeting  LRP250  2 247.513     LRP260  3 257.515     Gaibanda, (Division Office) 
 Revenue  OTM-03-EE/GRD/2012-2013,Package No.02  8-Oct-2012  30 Days  Carpeting  LRP250  3 247.514     LRP270  3 267.518     Gaibanda, (Division Office) 
 Revenue  SRFQ-4-EE/GRD/2007-2008,Gr.No.05  10-Jul-2007  3 Days  Carpeting  LRP228  22400 247.908     LRP234  23400 254.907     Gaibanda, (Division Office) 
 Revenue  Srfq-01-EE/GRD/2009-2010  27-Aug-2009  3 Days  Carpeting  LRP248  2485 248     LRP248  2585 248.1     Gaibanda, (Division Office) 
 Revenue  Tender ID No.148132,Package No.E-gp-32/RHD/ACE/RZ/2017-2018  19-Feb-2018  548 Days  Carpeting  LRP248  2485 248     LRP276  2487 276     Gaibanda, (Division Office) 
 Revenue  `Re-Tender No.01-ACE/RGZ/2012-2013  6-Nov-2013  365 Days  Overlay  LRP248  2531 248.046     LRP270  3985 271.5     Gaibanda, (Division Office) 
 Revenue  SRFQ-06-EE/GRD/2007-2008,Gr.No.06  27-Nov-2007  3 Days  Carpeting  LRP228  22800 248.308     LRP236  23600 257.113     Gaibanda, (Division Office) 
 Revenue  SRFQ-06-EE/GRD/2007-2008,Gr.No.04  27-Nov-2007  3 Days  Carpeting  LRP228  22800 248.308     LRP230  23050 250.556     Gaibanda, (Division Office) 
 Revenue  27/e-GP/EE/GRD/2015-2016  19-Jul-2016  45 Days  Carpeting  LRP252  25 249.534     LRP254  25 251.533     Gaibanda, (Division Office) 
 Revenue  RTM No-75/SRD-2007-2008  4-May-2008  30 Days  Road Embankment  LRP162  92250 251.83     LRP162  92550 252.13     Sirajganj, (Division Office) 
 Revenue  05/e-GP/EE/GRD/2017-2018  30-Nov-2017  45 Days  Carpeting  LRP254  1150 252.658     LRP266  249 263.766     Gaibanda, (Division Office) 
 Revenue  PQN-07-SDE/RHD/PALASH/2007-08  18-Nov-2007  7 Days  Carpeting  LRP232  23280 252.788     LRP234  23490 254.997     Gaibanda, (Division Office) 
 Revenue  OTM-15-EE/GRD/2011-2012  6-Aug-2012  60 Days  Carpeting  LRP256  3 253.514     LRP258  3 255.514     Gaibanda, (Division Office) 
 Revenue  DPM.09/EE/GRD/2015-2016  15-May-2016  10 Days  Carpeting  LRP256  49 253.56     LRP258  249 255.76     Gaibanda, (Division Office) 
 Revenue  DPM-08/EE/GRD/2015-2016  12-May-2016  10 Days  Carpeting  LRP256  49 253.56     LRP258  249 255.76     Gaibanda, (Division Office) 
 Revenue  23/e-GP/EE/GRD/2015-2016  19-Apr-2016  45 Days  Carpeting  LRP256  200 253.711     LRP258  249 255.76     Gaibanda, (Division Office) 
 Revenue  10/e-GP/EE/GRD/2015-16  24-Dec-2015  45 Days  Carpeting  LRP256  245 253.756     LRP260  249 257.761     Gaibanda, (Division Office) 
 Revenue  18/e-GP/EE/GRD/2016-2017  27-Mar-2017  30 Days  Carpeting  LRP258  14 255.525     LRP272  3 269.516     Gaibanda, (Division Office) 
 Revenue  20/e-GP/EE/GRD/2016-2017  22-Mar-2017  30 Days  Carpeting  LRP258  224 255.735     LRP262  249 259.767     Gaibanda, (Division Office) 
 Revenue  Agreement Package No.22-SE/BRC/2012-2013( Tender Package No.LTM-01-EE/GRD/2012-13)  18-Jun-2013  30 Days  Carpeting  LRP258  248 255.759     LRP258  249 255.76     Gaibanda, (Division Office) 
 Revenue  DPM.11/EE/GRD/2015-2016  16-May-2016  10 Days  Carpeting  LRP258  249 255.76     LRP260  149 257.661     Gaibanda, (Division Office) 
 Revenue  02-ACE/RGZ/2013-2014 (PMP Road works)  9-Apr-2014  240 Days  DBST  LRP256  3459 256.97     LRP362  2599 362.1     Rangpur, (Division Office) 
 Revenue  RFQ-06-EE/GRD/2011-2012  28-Aug-2011  7 Days  Carpeting  LRP260  3 257.515     LRP264  3 261.52     Gaibanda, (Division Office) 
 Revenue  DPM.19/EE/GRD/2015-2016  30-May-2016  5 Days  Carpeting  LRP260  249 257.761     LRP262  149 259.667     Gaibanda, (Division Office) 
 Revenue  34/e-GP/EE/GRD/2017-2018  4-Apr-2018  45 Days  Carpeting  LRP262  49 259.567     LRP268  149 265.663     Gaibanda, (Division Office) 
 Revenue  16/e-GP/EE/GRD/2015-16  31-Jan-2016  45 Days  Carpeting  LRP262  249 259.767     LRP268  249 265.763     Gaibanda, (Division Office) 
 Revenue  DPM.16/EE/GRD/2015-2016  22-May-2016  5 Days  Carpeting  LRP262  349 259.867     LRP264  249 261.766     Gaibanda, (Division Office) 
 Revenue  RFQ-02-EE/GRD/2012-2013  6-Sep-2012  7 Days  Carpeting  LRP262  360 259.878     LRP264  248 261.765     Gaibanda, (Division Office) 
 Revenue  26/e-GP/EE/GRD/2017-2018  17-Dec-2017  45 Days  Carpeting  LRP266  15 263.532     LRP268  25 265.539     Gaibanda, (Division Office) 
 Revenue  35/e-GP/EE/GRD/2017-2018  2-Apr-2018  45 Days  Carpeting  LRP266  249 263.766     LRP278  149 275.66     Gaibanda, (Division Office) 
 Revenue  RFQ-01-(One)-EE/GRD/2011-2012  24-Jul-2011  7 Days  Carpeting  LRP266  266 263.783     LRP270  269 267.784     Gaibanda, (Division Office) 
 Revenue  24/e-GP/EE/GRD/2017-2018  17-Dec-2017  60 Days  Carpeting  LRP270  25 267.54     LRP272  55 269.568     Gaibanda, (Division Office) 
 Revenue  25/e-GP/EE/GRD/2017-2018  24-Dec-2017  60 Days  Carpeting  LRP270  25 267.54     LRP272  75 269.588     Gaibanda, (Division Office) 
 Revenue  RFQ-02-(Two)-EE/GRD/2011-2012  24-Jul-2011  7 Days  Carpeting  LRP270  271 267.786     LRP290  279 287.784     Gaibanda, (Division Office) 
 Revenue  Package No.14-SE/BRC/2009-2010,Lot No.02  23-May-2010  45 Days  Carpeting  LRP246  24800 268.312     LRP248  24800 270.315     Gaibanda, (Division Office) 
 Revenue  OTM-15(Fifteen)-EE/GRD/2012-2013  16-Jun-2013  60 Days  Carpeting  LRP268  3217 268.731     LRP276  2211 275.724     Gaibanda, (Division Office) 
 Revenue  17/e-GP/EE/GRD/2016-2017(Re-Tender-1)  9-Mar-2017  75 Days  Carpeting  LRP276  4 273.517     LRP278  3 275.514     Gaibanda, (Division Office) 
 Revenue  06/e-GP/EE/GRD/2017-2018  26-Nov-2017  45 Days  Carpeting  LRP274  3469 275     LRP276  2487 276     Gaibanda, (Division Office) 
 Revenue  07/e-GP/EE/GRD/2017-2018  26-Nov-2017  45 Days  Carpeting  LRP276  2487 276     LRP278  1489 277     Gaibanda, (Division Office) 
 Revenue  01(LTM)-EE/RRD/2012-2013, Lot no. 01(One).  16-Sep-2012  20 Days  Carpeting  LRP282  -509 279     LRP290  -505 287     Rangpur, (Division Office) 
 Revenue  eGP no.18/RHD/RRD/EE/Rang/2016-2017 (ID-88744)  12-Apr-2017  60 Days  DBST  LRP282  0 279.509     LRP299  0 296.494     Rangpur, (Division Office) 
 Revenue  e-GP no. 13/RHD/EE/Rang/2015-2016 (ID-37227)  16-Feb-2016  60 Days  Carpeting  LRP281  0 280.7     LRP283  0 282.7     Rangpur, (Division Office) 
 Revenue  16-EE/RRD/2011-2012.  4-Apr-2012  90 Days  Road Rehablitation  LRP288  0 285.504     LRP320  0 317.463     Rangpur, (Division Office) 
 Revenue  09-EE/RRD/2010-2011  14-Feb-2011  90 Days  Carpeting  LRP293  -3507 287     LRP323  541 321     Rangpur, (Division Office) 
 Revenue  24-EE/RRD/2012-2013. Lot no. 02(Two).  16-Jun-2013  20 Days  Road Embankment  LRP290  0 287.505     LRP297  0 294.499     Rangpur, (Division Office) 
 Revenue  14-EE/RRD/2012-2013.  24-Apr-2013  30 Days  Carpeting  LRP296  -498 293     LRP301  506 299     Rangpur, (Division Office) 
 Revenue  06-EE/RRD/2013-2014. Lot no. 03(Three).  17-Apr-2014  75 Days  Carpeting  LRP298  0 295.496     LRP321  0 318.476     Rangpur, (Division Office) 
 Revenue  eGP no. 17/RHD/EE/Rang/2017-2018 (ID-136216)  8-Jan-2018  60 Days  Carpeting  LRP298  0 295.496     LRP307  0 304.482     Rangpur, (Division Office) 
 Revenue  eGP no. 22/RHD/EE/Rang/2015-2016 (ID no. 54252)  19-May-2016  75 Days  DBST  LRP301  0 298.494     LRP323  0 320.459     Rangpur, (Division Office) 
 Revenue  eGP no. 22/RHD/EE/Rang/2015-2016 (ID-54252)  19-May-2016  45 Days  DBST  LRP301  2506 301     LRP302  23509 323     Rangpur, (Division Office) 
 Revenue  05-EE/RRD/2013-2014. Lot no. 08(Eight).  27-Mar-2014  40 Days  Carpeting  LRP321  0 318.476     LRP324  0 321.153     Rangpur, (Division Office) 
 Revenue  05-EE/RRD/2013-2014. Lot no. 09(Nine).  2-Mar-2014  30 Days  Road Embankment  LRP323  0 320.459     LRP325  0 322.156     Rangpur, (Division Office) 
 Revenue  01-EE/RRD/2008-2009. Lot no. 03(Three).  24-Nov-2008  45 Days  Pavement  LRP328  170 325.317     LRP328  360 325.507     Rangpur, (Division Office) 
 Revenue  E-gp no. 07/RHD/EERANG/2014-2015  2-Feb-2015  60 Days  Carpeting  LRP329  0 326.145     LRP349  0 346.512     Rangpur, (Division Office) 
 Revenue  04-EE/RRD/2013-2014. Lot no. 03(Three).  16-Feb-2014  70 Days  Carpeting  LRP332  0 329.527     LRP333  0 330.527     Rangpur, (Division Office) 
 Revenue  04-EE/RRD/2006-2007. Lot no. 05(Five).  22-Apr-2007  45 Days  Carpeting  LRP347  -8980 335.534     LRP353  -1500 349.008     Rangpur, (Division Office) 
 Revenue  01-EE/RRD/2008-2009, Lot no.01(One).  7-Jan-2009  45 Days  Pavement  LRP341  -228 338.292     LRP341  -174 338.346     Rangpur, (Division Office) 
 Revenue  03-EE/RRD/2013-2014. Lot no. 09(Nine).  8-Mar-2014  30 Days  Carpeting  LRP344  0 341.516     LRP344  100 341.616     Rangpur, (Division Office) 
 Revenue  03-EE/RRD/2013-2014. Lot no. 06(Six).  3-Mar-2014  40 Days  Carpeting  LRP349  0 346.512     LRP349  150 346.662     Rangpur, (Division Office) 
 Revenue  Egp no. 05/RHD/eeran/2013-2014  20-Feb-2014  45 Days  Carpeting  LRP349  0 346.512     LRP349  10 346.522     Rangpur, (Division Office) 
 Revenue  Egp no. 06/RHD/eeran/2013-2014  20-Feb-2014  30 Days  Carpeting  LRP349  0 346.512     LRP349  30 346.542     Rangpur, (Division Office) 
 Revenue  04-EE/RRD/2007-2008. Lot no. 02(Two).  19-Feb-2008  45 Days  Road Embankment  LRP350   347.509     LRP354   351.507     Rangpur, (Division Office) 
 Revenue  03-EE/RRD/2008-2009. Lot no.01(One).  7-Jan-2009  45 Days  Road Embankment  LRP351  -17 348.6     LRP351  35 348.652     Rangpur, (Division Office) 
 Revenue  DPM No- 01/EE/NRD/2016-2017  7-Aug-2016  7 Days  Road Embankment  LRP361  0 358.501     LRP362  0 359.501     Nilphamari, (Division Office) 
 Revenue  DPM No- 001/EE/NRD/2016-2017  7-Aug-2016  7 Days  Road Embankment  LRP361  0 358.501     LRP362  0 359.501     Nilphamari, (Division Office) 
 Revenue  DPM No-0001/EE/NRD/2016-2017  7-Aug-2016  7 Days  Road Embankment  LRP360  0 358.95     LRP361  0 359.95     Nilphamari, (Division Office) 
 Revenue  Package No.03-Egp/RHD/EE/NIL/2016-2017.  12-Mar-2017  45 Days  Carpeting  LRP362  0 359.501     LRP363  0 360.501     Nilphamari, (Division Office) 
 Revenue  DPM No- 16/EE/NRD/2015-2016  16-May-2016  7 Days  Road Embankment  LRP363  0 360.501     LRP364  0 361.496     Nilphamari, (Division Office) 
 Revenue  DPM No- 03/EE/NRD/2015-2016  17-Aug-2015  7 Days  Pavement  LRP365  0 362.592     LRP366  0 363.572     Nilphamari, (Division Office) 
 Revenue  DPM No- 02/EE/NRD/2016-2017  7-Aug-2016  7 Days  Road Embankment  LRP364  0 362.95     LRP365  0 364     Nilphamari, (Division Office) 
 Revenue  DPM No- 04/EE/NRD/2015-2016  8-Nov-2015  7 Days  Road Embankment  LRP366  0 363.572     LRP367  0 364.533     Nilphamari, (Division Office) 
 Revenue  DPM No- 02/EE/NRD/2016-2017  7-Aug-2016  7 Days  Road Embankment  LRP365  0 364     LRP366  0 364.955     Nilphamari, (Division Office) 
 Revenue  DPM No- 002/EE/NRD/2016-2017  7-Aug-2016  7 Days  Road Embankment  LRP368  0 365.522     LRP369  0 366.516     Nilphamari, (Division Office) 
 Revenue  PMP 2007-08/23/Overlay & DBST  18-Jun-2008  484 Days  DBST  LRP371  700 369.2     LRP373  559 371.06     Bogura, (Division Office) 
 Revenue  Tender Package No.19- Egp/RHD/EE/Nil/2017-2018.(Tender ID No. 152215)  22-Mar-2018  60 Days  Pavement  LRP372  0 369.497     LRP373  0 370.501     Nilphamari, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP376  0 373.082     LRP394  0 390.895     Dinajpur, (Division Office) 
 Revenue  11/EE/DRD/2011-2012  14-Jun-2012  30 Days  Carpeting  LRP376  0 373.082     LRP376  650 373.732     Dinajpur, (Division Office) 
 Revenue  DPM No-17/EE/DRD/2016-17  5-Feb-2017  5 Days  Carpeting  LRP376  300 373.382     LRP382  500 379.514     Dinajpur, (Division Office) 
 Revenue  34/e-GP/RHD/EE/DRD/2015-2016  29-May-2016  30 Days  Carpeting  LRP376  368 373.45     LRP400  4548 401.327     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP376  622 373.704     LRP376  668 373.75     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP376  749 373.831     LRP376  764 373.846     Dinajpur, (Division Office) 
 Revenue  10/EE/DRD/2009-2010  6-Jun-2010  30 Days  Road Embankment  LRP376  980 374.062     LRP394  680 391.575     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP376  1268 374.35     LRP376  1668 374.75     Dinajpur, (Division Office) 
 Revenue  20/e-GP/RHD/EE/DRD/2015-2016  1-Feb-2016  60 Days  Carpeting  LRP373  0 374.522     LRP387  0 388.502     Dinajpur, (Division Office) 
 Revenue  10/EE/DRD/2011-2012  11-May-2012  40 Days  Carpeting  LRP378  0 375.059     LRP384  642 381.636     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP378  261 375.32     LRP378  361 375.42     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP378  339 375.398     LRP378  385 375.444     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP378  515 375.574     LRP378  615 375.674     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP378  1141 376.2     LRP378  1701 376.76     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP378  2001 377.06     LRP378  2741 377.8     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP378  3763 378.822     LRP378  3803 378.862     Dinajpur, (Division Office) 
 Revenue  03/EE/DRD/2011-2012  16-Feb-2012  15 Days  Carpeting  LRP382  0 379.014     LRP384  0 380.994     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP382  412 379.426     LRP382  459 379.473     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP382  480 379.494     LRP382  500 379.514     Dinajpur, (Division Office) 
 Revenue  03/EE/DRD/2010-2011  15-Mar-2011  75 Days  Pavement  LRP382  586 379.6     LRP382  1236 380.25     Dinajpur, (Division Office) 
 Revenue  11/EE/DRD/2011-2012  14-Jun-2012  30 Days  Carpeting  LRP382  1351 380.365     LRP382  1788 380.802     Dinajpur, (Division Office) 
 Revenue  03/EE/DRD/2010-2011  15-Mar-2011  75 Days  Pavement  LRP382  1486 380.5     LRP384  506 381.5     Dinajpur, (Division Office) 
 Revenue  11/EE/DRD/2011-2012  14-Jun-2012  30 Days  Carpeting  LRP384  456 381.45     LRP384  816 381.81     Dinajpur, (Division Office) 
 Revenue  11/EE/DRD/2011-2012  14-Jun-2012  30 Days  Carpeting  LRP386  930 383.9     LRP387  907 384.92     Dinajpur, (Division Office) 
 Revenue  01-eGP/RHD/EE/DRD/2014-15  8-Oct-2014  30 Days  Carpeting  LRP387  0 384.013     LRP387  36 384.049     Dinajpur, (Division Office) 
 Revenue  11/EE/DRD/2011-2012  14-Jun-2012  30 Days  Carpeting  LRP387  1247 385.26     LRP387  1887 385.9     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP387  1928 385.941     LRP387  1948 385.961     Dinajpur, (Division Office) 
 Revenue  DRD-2006-2007/15  10-Jun-2007  25 Days  Carpeting  LRP387  2165 386.178     LRP387  2205 386.218     Dinajpur, (Division Office) 
 Revenue  DPM No.-03/SDE/DIN/2011-2012  10-Jun-2012  5 Days  Carpeting  LRP387  2193 386.206     LRP387  2213 386.226     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP390  931 387.86     LRP390  1691 388.62     Dinajpur, (Division Office) 
 Revenue  03/EE/DRD/2010-2011  15-Mar-2011  75 Days  Pavement  LRP392  389 389.3     LRP392  689 389.6     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP392  572 389.483     LRP392  802 389.713     Dinajpur, (Division Office) 
 Revenue  02/EE/DRD/2011-2012  26-Feb-2012  60 Days  Carpeting  LRP392  869 389.78     LRP392  1099 390.01     Dinajpur, (Division Office) 
 Revenue  12/EE/DRD/2009-2010 (Lot 02)  17-Jun-2010  20 Days  Carpeting  LRP392  911 389.822     LRP394  226 391.121     Dinajpur, (Division Office) 
 Revenue  03/EE/DRD/2010-2011  15-Mar-2011  75 Days  Pavement  LRP392  939 389.85     LRP392  1539 390.45     Dinajpur, (Division Office) 
 Revenue  11/EE/DRD/2011-2012  14-Jun-2012  30 Days  Carpeting  LRP390  3046 389.975     LRP390  4371 391.3     Dinajpur, (Division Office) 
 Revenue  10/EE/DRD/2011-2012  11-May-2012  40 Days  Carpeting  LRP394  225 391.12     LRP394  1717 392.612     Dinajpur, (Division Office) 
 Revenue  19/e-GP/RHD/EE/DRD/2016-2017  13-Feb-2017  30 Days  Carpeting  LRP394  2805 393.7     LRP394  3105 394     Dinajpur, (Division Office) 
 Revenue  19/e-GP/RHD/EE/DRD/2016-2017  13-Feb-2017  30 Days  Carpeting  LRP394  3505 394.4     LRP398  238 395     Dinajpur, (Division Office) 
 Revenue  19/e-GP/RHD/EE/DRD/2016-2017  13-Feb-2017  30 Days  Carpeting  LRP398  688 395.45     LRP398  1158 395.92     Dinajpur, (Division Office) 
 Revenue  DRD/D/01/2006-2007  28-May-2007  30 Days  Carpeting  LRP398  1561 396.323     LRP398  1611 396.373     Dinajpur, (Division Office) 
 Revenue  DRD/D/01/2006-2007  28-May-2007  30 Days  Carpeting  LRP400  722 397.501     LRP400  772 397.551     Dinajpur, (Division Office) 
 Revenue  DRD/D/01/2006-2007  28-May-2007  30 Days  Carpeting  LRP400  2391 399.17     LRP400  2780 399.559     Dinajpur, (Division Office) 
 Revenue  DPM No.-02/SDE/DIN/2011-2012  10-Jun-2012  5 Days  Road Embankment  LRP400  2981 399.76     LRP400  3481 400.26     Dinajpur, (Division Office) 
 Revenue  02/EE/TRD/2006-07. Lot No. 01 (One)  24-Apr-2007  45 Days  Pavement  LRP410  0 406.683     LRP412  0 408.666     Thakurgaon, (Division Office) 
 Revenue  30/EE/NRD/2007-2008  2-Jun-2008  15 Days  Road Embankment  LRP373  37200 407.701     LRP373  37230 407.731     Nilphamari, (Division Office) 
 Revenue  04/TRD/2005-2006  17-May-2006  30 Days  Pavement  LRP428  0 424.513     LRP432  900 429.375     Thakurgaon, (Division Office) 
 Revenue  02/EE/TRD/2006-07, Lot 01  24-Apr-2007  45 Days  Road Rehablitation  LRP432  0 428.475     LRP432  800 429.275     Thakurgaon, (Division Office) 
 Revenue  10/TRD/2005-2006  20-Jun-2006  30 Days  Carpeting  LRP434  0 430.457     LRP434  250 430.707     Thakurgaon, (Division Office) 
 Revenue  05/EE/TRD/2006-07, Lot no : 04 (Four)  11-Jun-2007  15 Days  Road Rehablitation  LRP434  1724 432.181     LRP434  2024 432.481     Thakurgaon, (Division Office) 
 Revenue  05/EE/TRD/2006-07 , Lot no : 01 (one)  11-Jun-2007  15 Days  Road Rehablitation  LRP440  483 436.891     LRP440  633 437.041     Thakurgaon, (Division Office) 
 Revenue  05/EE/TRD/2006-07. Lot no : 02 (Two)  11-Jun-2007  15 Days  Road Rehablitation  LRP440  633 437.041     LRP440  783 437.191     Thakurgaon, (Division Office) 
 Revenue  05/EE/TRD/2006-07, Lot no : 03 ( Three)  11-Jun-2007  15 Days  Road Rehablitation  LRP440  783 437.191     LRP440  933 437.341     Thakurgaon, (Division Office) 
 Revenue  08/E.E/P R D/2006-2007, Lot No-1(One).  1-Aug-2007  45 Days  Carpeting  LRP442  20 438.404     LRP446  10000 452.351     Panchgarh, (Division Office) 
 Revenue  08/E.E/PRD/2006-2007, Lot No-01  20-Jun-2007  45 Days  Carpeting  LRP442  20 438.404     LRP442  1000 439.384     Panchgarh, (Division Office) 
 Revenue  07/E.E/PRD/2006-2007, Lot No-02  24-Jun-2007  30 Days  Carpeting  LRP442  200 438.584     LRP442  100 438.484     Panchgarh, (Division Office) 
 Revenue  08/E.E/PRD/2006-2007, Lot No-2  20-Jun-2007  45 Days  Carpeting  LRP442  1080 439.464     LRP442  800 439.184     Panchgarh, (Division Office) 
 Revenue  DPM No-04/SDE/Panchagarh/2012-2013.  22-Apr-2013  7 Days  Carpeting  LRP444  1 440.368     LRP448  22 444.356     Panchgarh, (Division Office) 
 Revenue  07/ E.E/P R D/2006-2007 , Lot No-2(Two)  21-Jul-2007  30 Days  Carpeting  LRP442  2700 441.084     LRP446  2400 444.751     Panchgarh, (Division Office) 
 Revenue  DPM No-08/SDE/Panchagarh/2012-2013  26-May-2013  7 Days  Carpeting  LRP446  1 442.352     LRP452  1 448.302     Panchgarh, (Division Office) 
 Revenue  DPM No-08/SDE/Panchagarh/2012-2013  26-May-2013  7 Days  Road Embankment  LRP446  1 442.352     LRP450  1 446.414     Panchgarh, (Division Office) 
 Revenue  DPM No-41/PRD/2014-2015  10-Jun-2015  7 Days  Carpeting  LRP454  1 450.468     LRP456  1 452.263     Panchgarh, (Division Office) 
 Revenue  RFQ No-03/EE/PRD/2012-2013  24-Jan-2013  5 Days  Carpeting  LRP454  455 450.922     LRP470  300 466.43     Panchgarh, (Division Office) 
 Revenue  DPM No-02/PRD/2015-2016  15-Sep-2015  7 Days  Carpeting  LRP456  10 452.272     LRP458  0 454.227     Panchgarh, (Division Office) 
 Revenue  DPM No-04/SDE/Panch/2013-2014  29-Aug-2013  7 Days  Carpeting  LRP456  100 452.362     LRP458  100 454.327     Panchgarh, (Division Office) 
 Revenue  eGP No-06/PRD/2014-2015  4-Feb-2015  30 Days  Carpeting  LRP458  1 454.228     LRP464  1 460.191     Panchgarh, (Division Office) 
 Revenue  e-GP/08/EE/PRD/2015-2016  1-Feb-2016  45 Days  Carpeting  LRP458  120 454.347     LRP462  200 458.4     Panchgarh, (Division Office) 
 Revenue  DPM No-12/SDE/Panch/2011-2012  7-Jun-2012  7 Days  Road Embankment  LRP460  1 456.229     LRP462  1 458.201     Panchgarh, (Division Office) 
 Revenue  DPM No-04/PRD/2015-2016  22-Sep-2015  7 Days  Carpeting  LRP460  10 456.238     LRP462  10 458.21     Panchgarh, (Division Office) 
 Revenue  DPM No-12/PRD/2016-2017  10-Nov-2016  7 Days  Carpeting  LRP457  1 458.843     LRP459  1 460.843     Panchgarh, (Division Office) 
 Revenue  DPM No-21/PRD/2014-2015  23-Mar-2015  7 Days  Carpeting  LRP464  1 460.191     LRP466  1 462.17     Panchgarh, (Division Office) 
 Revenue  DPM 14-SDE-Pancha-2011-2012  10-Jun-2012  7 Days  Pavement  LRP462  2000 460.2     LRP464  2000 462.19     Panchgarh, (Division Office) 
 Revenue  07/E.E/P R D/2006-2007, Lot No-3 (Three).  20-Jul-2007  30 Days  Carpeting  LRP442  23775 462.159     LRP444  25300 465.667     Panchgarh, (Division Office) 
 Revenue  11-eGP/EE/PRD/2016-2017  11-May-2017  30 Days  Carpeting  LRP466  1 462.17     LRP479  1 474.724     Panchgarh, (Division Office) 
 Revenue  e-GP No-06/PRD/2015-2016  25-Apr-2016  30 Days  Carpeting  LRP466  1 462.17     LRP470  1 466.131     Panchgarh, (Division Office) 
 Revenue  05/EE/PRD/2011-2012  5-Jun-2012  60 Days  Carpeting  LRP466  500 462.669     LRP470  0 466.13     Panchgarh, (Division Office) 
 Revenue  DPM No-46/PRD/2014-2015  18-Jun-2015  7 Days  Carpeting  LRP468  1 464.15     LRP470  1 466.131     Panchgarh, (Division Office) 
 Revenue  09/EE/PRD/2010-2011  26-Apr-2011  40 Days  Carpeting  LRP468  1000 465.149     LRP456  3000 455.262     Panchgarh, (Division Office) 
 Revenue  DPM NO--14/PRD/2014-2015.  8-Feb-2015  7 Days  Carpeting  LRP470  1 466.131     LRP470  1 466.131     Panchgarh, (Division Office) 
 Revenue  DPM No-43/PRD/2014-2015  11-Jun-2015  7 Days  Carpeting  LRP470  1 466.131     LRP470  1 466.131     Panchgarh, (Division Office) 
 Revenue  02-eGP/EE/PRD/2016-2017  3-Jan-2017  25 Days  Carpeting  LRP465  1 466.893     LRP467  1 468.913     Panchgarh, (Division Office) 
 Revenue  e-GP No-07/EE/PRD/2015-2016  2-Feb-2016  45 Days  Carpeting  LRP472  1 468.12     LRP499  1 494.375     Panchgarh, (Division Office) 
 Revenue  eGP/01/Panch/2013-2014, In 01(One) Lot.  6-Mar-2014  75 Days  Pavement  LRP472  10 468.129     LRP475  100 470.972     Panchgarh, (Division Office) 
 Revenue  DPM No-13/PRD/2014-2015  8-Feb-2015  7 Days  Carpeting  LRP475  1 470.873     LRP475  1 470.873     Panchgarh, (Division Office) 
 Revenue  RFQ No-01/EE/PRD/2016-2017  15-Jan-2017  15 Days  Carpeting  LRP472  1 473.743     LRP473  1 474.743     Panchgarh, (Division Office) 
 Revenue  DPM No-09/PRD/2016-2017  6-Oct-2016  7 Days  Carpeting  LRP473  1 474.743     LRP474  1 475.743     Panchgarh, (Division Office) 
 Revenue  DPM No-02/PRD/2016-2017  20-Sep-2016  7 Days  Carpeting  LRP474  1 475.743     LRP475  1 476.743     Panchgarh, (Division Office) 
 Revenue  DPM No-02/PRD/2016-2017  20-Sep-2016  7 Days  Carpeting  LRP474  1 475.743     LRP475  1 476.743     Panchgarh, (Division Office) 
 Revenue  DPM No-03/PRD/2016-2017  21-Sep-2016  7 Days  Carpeting  LRP474  1 475.743     LRP475  1 476.743     Panchgarh, (Division Office) 
 Revenue  DPM No-06/PRD/2015-2016  28-Feb-2016  7 Days  Carpeting  LRP480  11 475.752     LRP481  1 476.733     Panchgarh, (Division Office) 
 Revenue  03/EE/PRD/2007-2008 (RFQ)  9-Jun-2007  7 Days  Carpeting  LRP480  14 475.755     LRP480  28 475.769     Panchgarh, (Division Office) 
 Revenue  05/EE/PRD/2007-2008 (TFQ)  17-Sep-2007  7 Days  Carpeting  LRP480  14 475.755     LRP480  28 475.769     Panchgarh, (Division Office) 
 Revenue  Quotation No-02/EE/PRD/2007-2008  29-Aug-2007  7 Days  Carpeting  LRP480  14 475.755     LRP480  28 475.769     Panchgarh, (Division Office) 
 Revenue  04/EE/PRD/2007-2008 (RFQ)  9-Oct-2007  7 Days  Carpeting  LRP480  14 475.755     LRP480  28 475.769     Panchgarh, (Division Office) 
 Revenue  DPM No-05/PRD/2015-2016  24-Feb-2016  7 Days  Carpeting  LRP483  1 478.686     LRP484  1 479.693     Panchgarh, (Division Office) 
 Revenue  DPM No-50/PRD/2014-2015  25-Jun-2015  7 Days  Carpeting  LRP484  1 479.693     LRP485  1 480.692     Panchgarh, (Division Office) 
 Revenue  DPM No-14/PRD/2016-2017  21-Nov-2016  7 Days  Carpeting  LRP479  1 480.773     LRP488  1 489.793     Panchgarh, (Division Office) 
 Revenue  DPM No-10/PRD/2014-2015  15-Jan-2015  7 Days  Carpeting  LRP487  10 482.61     LRP487  20 482.62     Panchgarh, (Division Office) 
 Revenue  DPM-03/PRD/2014-2015  18-Dec-2014  7 Days  Carpeting  LRP493  1 488.463     LRP497  2 492.303     Panchgarh, (Division Office) 
 Revenue  DPM No-52/PRD/2014-2015  25-Jun-2015  7 Days  Carpeting  LRP493  1 488.463     LRP494  1 489.51     Panchgarh, (Division Office) 
 Revenue  RFQ No-03/EE/PRD/2013-2014  10-Feb-2014  7 Days  Carpeting  LRP493  1 488.463     LRP494  1 489.51     Panchgarh, (Division Office) 
 Revenue  DPM No-09/PRD/2014-2015  15-Jan-2015  7 Days  Road Embankment  LRP493  10 488.472     LRP493  100 488.562     Panchgarh, (Division Office) 
 Revenue  DPM No-9/PRD/2014-2015  15-Jan-2015  7 Days  Pavement  LRP493  11 488.473     LRP494  1 489.51     Panchgarh, (Division Office) 
 Revenue  DPM No-13/PRD/2016-2017  17-Nov-2016  7 Days  Carpeting  LRP487  1 488.823     LRP488  1 489.793     Panchgarh, (Division Office) 
 Revenue  eGP No-15/PRD/2014-2015  17-May-2015  30 Days  Carpeting  LRP496  1 491.403     LRP506  1 501.378     Panchgarh, (Division Office) 
 Revenue  RFQ No-03/EE/PRD/2015-2016  26-May-2016  7 Days  Carpeting  LRP496  1 491.403     LRP513  1 508.722     Panchgarh, (Division Office) 
 Revenue  03/EE/PRD/2005-2006 (Lot No-4)  29-May-2006  25 Days  Carpeting  LRP442  53825 492.209     LRP442  56000 494.384     Panchgarh, (Division Office) 
 Revenue  DPM No-49/PRD/2014-2015  21-Jun-2015  7 Days  Carpeting  LRP502  1 497.639     LRP503  1 498.56     Panchgarh, (Division Office) 
 Revenue  DPM No-38/PRD/2014-2015  4-Jun-2015  7 Days  Carpeting  LRP504  1 499.581     LRP506  1 501.378     Panchgarh, (Division Office) 
 Revenue  eGP No-07/PRD/2014-2015  4-Feb-2015  30 Days  Carpeting  LRP505  1 500.569     LRP511  1 506.356     Panchgarh, (Division Office) 
 Revenue  e-GP/01/PRD/2012-2013  11-Mar-2013  30 Days  Carpeting  LRP505  3000 503.568     LRP509  200 504.56     Panchgarh, (Division Office) 
 Revenue  19/EE/PRD/2007-2008, Lot No-02 (Two).  6-Feb-2008  20 Days  Carpeting  LRP508  300 503.659     LRP509  799 505.159     Panchgarh, (Division Office) 
 Revenue  03/EE/PRD/2011-2012  14-Mar-2012  90 Days  Carpeting  LRP508  580 503.939     LRP509  0 504.36     Panchgarh, (Division Office) 
 Revenue  07/EE/PRD/2010-2011  8-Mar-2011  40 Days  Pavement  LRP508  788 504.147     LRP510  189 505.513     Panchgarh, (Division Office) 
 Revenue  04/EE/PRD/2008-2009  6-Apr-2009  40 Days  Carpeting  LRP508  788 504.147     LRP510  134 505.458     Panchgarh, (Division Office) 
 Revenue  04/EE/P R D/2008-09.  6-Apr-2009  40 Days  Carpeting  LRP508  788 504.147     LRP510  147 505.471     Panchgarh, (Division Office) 
 Revenue  eGP/02/PANCH/2013-2014  10-Mar-2014  30 Days  Carpeting  LRP509  0 504.36     LRP510  0 505.324     Panchgarh, (Division Office) 
 Revenue  03/EE/PRD/2005-2006, Lot No-2 , ( RTM)  22-Jun-2006  7 Days  Carpeting  LRP504  5420 505     LRP506  5243 506.62     Panchgarh, (Division Office) 
 Revenue  19-EE/PRD/2007-2008, Lot No-02  6-Feb-2008  20 Days  Carpeting  LRP509  700 505.06     LRP509  800 505.16     Panchgarh, (Division Office) 
 Revenue  11/EE/PRD/2007-2008.  25-Jun-2008  25 Days  Carpeting  LRP509  990 505.35     LRP510  700 506.024     Panchgarh, (Division Office) 
 Revenue  RFQ-05/EE/PRD/2010-2011  21-Jun-2011  30 Days  Carpeting  LRP511  0 506.355     LRP511  10 506.365     Panchgarh, (Division Office) 
 Revenue  07/EE/PRD/2010-2011  8-Mar-2011  40 Days  Pavement  LRP512  1149 508.473     LRP515  220 510.847     Panchgarh, (Division Office) 
 Revenue  RFQ-07/EE/PRD/2010-2011  22-Jun-2011  30 Days  Road Embankment  LRP513  0 508.721     LRP515  0 510.627     Panchgarh, (Division Office) 
 Revenue  DPM No-24/PRD/2014-2015  27-Apr-2015  7 Days  Carpeting  LRP513  1 508.722     LRP515  12 510.639     Panchgarh, (Division Office) 
 Revenue  DPM No-07/SDE/Panchagarh/2012-2013  26-May-2013  7 Days  Road Embankment  LRP516  1 511.614     LRP527  1 522.012     Panchgarh, (Division Office) 
 Revenue  02/EE/PRD/2013-2014  31-Dec-2013  30 Days  Carpeting  LRP516  11 511.624     LRP527  1 522.012     Panchgarh, (Division Office) 
 Revenue  DPM No-39/PRD/2014-2015  4-Jun-2015  7 Days  Carpeting  LRP517  1 512.527     LRP519  1 514.427     Panchgarh, (Division Office) 
 Revenue  DPM No-14/PRD/2014-2015  8-May-2015  7 Days  Carpeting  LRP519  1 514.427     LRP519  11 514.437     Panchgarh, (Division Office) 
 Revenue  05/EE/PRD/2012-2013  13-Feb-2013  30 Days  Carpeting  LRP519  1500 515.926     LRP521  50 516.38     Panchgarh, (Division Office) 
 Revenue  12/EE/PRD/2009-2010  25-Apr-2010  60 Days  Carpeting  LRP521  0 516.33     LRP512  426 507.75     Panchgarh, (Division Office) 
 Revenue  eGP No-05/PRD/2014-2015  1-Jan-2015  30 Days  Carpeting  LRP527  1 522.012     LRP527  2 522.013     Panchgarh, (Division Office) 
 Revenue  DPM No-25/EE/PRD/2016-2017  4-May-2017  7 Days  Carpeting  LRP527  1 522.012     LRP528  1 522.929     Panchgarh, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division