List of ongoing works on the road ( N102 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
|
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRPS |
|
0 |
LRP009 |
976 |
10 |
Brahmanbaria, (Division Office) |
Revenue |
PMP/Road/ACE/Comilla/DBSW/2014-2015/12 |
10-Feb-2015 |
119 Days |
Overlay |
LRPS |
10000 |
10 |
LRPS |
16000 |
16 |
Cumilla, (Division Office) |
Development |
02/ACE/RHD,Comilla Zone/2010-2011,Package No. DW-P1 |
14-Jul-2011 |
455 Days |
Surfacing |
LRPS |
10000 |
10 |
LRPS |
26000 |
26 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2006-2007/08/DBST |
7-Jun-2007 |
419 Days |
DBST |
LRPS |
10000 |
10 |
LRPS |
27000 |
27 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP010 |
0 |
10.015 |
LRP010 |
500 |
10.515 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP010 |
|
10.015 |
LRP010 |
500 |
10.515 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
64/EE Year 2009-2010 |
25-Nov-2009 |
15 Days |
Surfacing |
LRPS |
10500 |
10.5 |
LRPS |
12000 |
12 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP010 |
1985 |
12 |
LRP013 |
514 |
13.5 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP010 |
1985 |
12 |
LRP013 |
514 |
13.5 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP014 |
24 |
14 |
LRP014 |
524 |
14.5 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP014 |
24 |
14 |
LRP014 |
524 |
14.5 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Reg. for qua. 20/EE. RHD. B-Baria/ 2006-2007. |
28-Mar-2007 |
5 Days |
Carpeting |
LRP001 |
17073 |
18.073 |
LRP001 |
17262 |
18.262 |
Brahmanbaria, (Division Office) |
Revenue |
PMP/Road/ACE/Comilla/DBSW/2014-2015/12 |
10-Feb-2015 |
119 Days |
Overlay |
LRPS |
18500 |
18.5 |
LRPS |
21500 |
21.5 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP020 |
40 |
20 |
LRP021 |
30 |
21 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP020 |
40 |
20 |
LRP021 |
30 |
21 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
47/EE Year 2009-2010 |
12-Jan-2010 |
30 Days |
Surfacing |
LRPS |
21200 |
21.2 |
LRPS |
21500 |
21.5 |
Cumilla, (Division Office) |
Revenue Periodic Roads |
47/EE Year 2009-2010 |
12-Jan-2010 |
30 Days |
Surfacing |
LRPS |
22700 |
22.7 |
LRPS |
23000 |
23 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP023 |
48 |
23 |
LRP023 |
548 |
23.5 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP023 |
48 |
23 |
LRP023 |
548 |
23.5 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
47/EE Year 2009-2010 |
12-Jan-2010 |
30 Days |
Surfacing |
LRPS |
23500 |
23.5 |
LRPS |
23800 |
23.8 |
Cumilla, (Division Office) |
Revenue Periodic Roads |
47/EE Year 2009-2010 |
12-Jan-2010 |
30 Days |
Surfacing |
LRPS |
24300 |
24.3 |
LRPS |
24600 |
24.6 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP025 |
36 |
25 |
LRP026 |
59 |
26 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP025 |
36 |
25 |
LRP026 |
59 |
26 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
47/EE Year 2009-2010 |
12-Jan-2010 |
30 Days |
Surfacing |
LRPS |
26000 |
26 |
LRPS |
26300 |
26.3 |
Cumilla, (Division Office) |
Revenue Others |
138/EE Year 2007-2008 |
5-May-2008 |
30 Days |
Surfacing |
LRPS |
28370 |
28.37 |
LRPS |
40000 |
40 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP028 |
961 |
28.9 |
LRP034 |
943 |
34.9 |
Brahmanbaria, (Division Office) |
Development |
99/EE-Year 2005-2006 |
16-May-2006 |
30 Days |
Road Embankment |
LRPS |
32500 |
32.5 |
LRPS |
32500 |
32.5 |
Cumilla, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP040 |
|
39.961 |
LRP043 |
300 |
43.264 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP040 |
|
39.961 |
LRP043 |
300 |
43.264 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP041 |
41 |
41.015 |
LRP041 |
546 |
41.52 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 22 (OTM) EE.RHD.B-Baria/ 2007-08. Lot 01. |
30-Apr-2008 |
60 Days |
Pavement |
LRP043 |
0 |
42.964 |
LRP046 |
0 |
45.985 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP043 |
|
42.964 |
LRP043 |
500 |
43.464 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP043 |
300 |
43.264 |
LRP044 |
|
43.978 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP044 |
|
43.978 |
LRP046 |
|
45.985 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP044 |
|
43.978 |
LRP046 |
|
45.985 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP044 |
45 |
44.023 |
LRP044 |
350 |
44.328 |
Brahmanbaria, (Division Office) |
Development |
29/EE. RHD. B-Baria/ 2005-2006. |
12-Jun-2006 |
30 Days |
Pavement |
LRP045 |
0 |
44.97 |
LRP047 |
0 |
46.943 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP046 |
|
45.985 |
LRP047 |
500 |
47.443 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP047 |
48 |
46.991 |
LRP047 |
81 |
47.024 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP047 |
581 |
47.524 |
LRP048 |
233 |
48.224 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP048 |
49 |
48.04 |
LRP048 |
235 |
48.226 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP048 |
233 |
48.224 |
LRP050 |
|
49.995 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP048 |
402 |
48.393 |
LRP049 |
2 |
48.993 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP049 |
49 |
49.04 |
LRP049 |
345 |
49.336 |
Brahmanbaria, (Division Office) |
Revenue |
09/(OTM) EE. RHD. B-Baria/2008-2009. Lot No.01(One) |
21-Jan-2009 |
30 Days |
Pavement |
LRP049 |
430 |
49.421 |
LRP050 |
|
49.995 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP050 |
0 |
49.995 |
LRP050 |
700 |
50.695 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP052 |
200 |
52.21 |
LRP053 |
200 |
53.199 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP052 |
300 |
52.31 |
LRP053 |
600 |
53.599 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 22 (OTM) EE.RHD.B-Baria/ 2007-08. Lot 01. |
30-Apr-2008 |
60 Days |
Pavement |
LRP053 |
0 |
52.999 |
LRP054 |
844 |
54.853 |
Brahmanbaria, (Division Office) |
Revenue |
07/(OTM) EE. RHD. B-Baria/2009-2010. Lot 06 (Six) |
11-Jan-2010 |
60 Days |
Surfacing |
LRP054 |
0 |
54.009 |
LRP055 |
500 |
55.508 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 03/(RTM) EE. RHD. B-Baria/ 2007-08. Lot 02 |
10-Apr-2008 |
15 Days |
Road Embankment |
LRP054 |
100 |
54.109 |
LRP054 |
990 |
54.999 |
Brahmanbaria, (Division Office) |
Revenue |
12/(OTM) EE. RHD. B-Baria/2009-2010. Lot 01(One). |
7-Jun-2010 |
30 Days |
Carpeting |
LRP054 |
300 |
54.309 |
LRP054 |
900 |
54.909 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP054 |
600 |
54.609 |
LRP055 |
600 |
55.608 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 03/(RTM) EE. RHD. B-Baria/ 2007-08. Lot 02 |
10-Apr-2008 |
15 Days |
Road Embankment |
LRP055 |
100 |
55.108 |
LRP055 |
900 |
55.908 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 21/(OTM) EE.RHD. B-Baria/ 2007-2008. |
13-May-2008 |
60 Days |
Pavement |
LRP056 |
|
56.019 |
LRP056 |
500 |
56.519 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP056 |
400 |
56.419 |
LRP056 |
700 |
56.719 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP056 |
500 |
56.519 |
LRP057 |
500 |
57.535 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP057 |
500 |
57.535 |
LRP059 |
|
59.036 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP057 |
500 |
57.535 |
LRP059 |
|
59.036 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP059 |
82 |
59.118 |
LRP063 |
340 |
63.434 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 21/(OTM) EE.RHD. B-Baria/ 2007-2008. |
13-May-2008 |
60 Days |
Pavement |
LRP059 |
364 |
59.4 |
LRP060 |
|
60.035 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 03/(RTM) EE. RHD. B-Baria/ 2007-08. Lot 02 |
10-Apr-2008 |
15 Days |
Road Embankment |
LRP060 |
100 |
60.135 |
LRP060 |
970 |
61.005 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 21/(OTM) EE.RHD. B-Baria/ 2007-2008. |
13-May-2008 |
60 Days |
Pavement |
LRP060 |
700 |
60.735 |
LRP063 |
300 |
63.394 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 03/(RTM) EE. RHD. B-Baria/ 2007-08. Lot 02 |
10-Apr-2008 |
15 Days |
Road Embankment |
LRP061 |
50 |
61.033 |
LRP061 |
950 |
61.933 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 03/(RTM) EE. RHD. B-Baria/ 2007-08. Lot 02 |
10-Apr-2008 |
15 Days |
Road Embankment |
LRP062 |
100 |
62.144 |
LRP062 |
990 |
63.034 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP062 |
700 |
62.744 |
LRP063 |
300 |
63.394 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 03/(RTM) EE. RHD. B-Baria/ 2007-08. Lot 02 |
10-Apr-2008 |
15 Days |
Road Embankment |
LRP063 |
50 |
63.144 |
LRP063 |
900 |
63.994 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP063 |
340 |
63.434 |
LRP064 |
340 |
64.398 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP063 |
340 |
63.434 |
LRP064 |
340 |
64.398 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP064 |
30 |
64.088 |
LRP064 |
530 |
64.588 |
Brahmanbaria, (Division Office) |
Revenue |
12/(OTM) EE. RHD. B-Baria/2009-2010. Lot 01(One). |
7-Jun-2010 |
30 Days |
Carpeting |
LRP064 |
100 |
64.158 |
LRP064 |
360 |
64.418 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP064 |
340 |
64.398 |
LRP066 |
0 |
66.061 |
Brahmanbaria, (Division Office) |
Revenue |
17/(OTM) EE. RHD. B-Baria/2008-2009. Lot. 02. |
2-Jun-2009 |
30 Days |
Carpeting |
LRP066 |
|
66.061 |
LRP068 |
|
68.062 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP066 |
0 |
66.061 |
LRP070 |
446 |
70.541 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
20/EE/RHD/B-Baria/2005 - 2006. |
18-May-2006 |
90 Days |
Pavement |
LRP066 |
0 |
66.061 |
LRP067 |
0 |
67.061 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP066 |
|
66.061 |
LRP070 |
446 |
70.541 |
Brahmanbaria, (Division Office) |
Revenue |
06/(OTM) EE. RHD. B-Baria/2008-2009. Lot No-01. |
1-Feb-2009 |
102 Days |
Carpeting |
LRP067 |
886 |
67.947 |
LRP067 |
946 |
68.007 |
Brahmanbaria, (Division Office) |
Revenue |
06/(OTM) EE. RHD. B-Baria/2008-2009. Lot No-01. |
1-Feb-2009 |
102 Days |
Pavement |
LRP067 |
976 |
68.037 |
LRP068 |
66 |
68.128 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Accepted Quotetion No.30/EE. RHD. B-Baria/2006-2007. |
10-May-2007 |
5 Days |
Carpeting |
LRP054 |
17073 |
71.082 |
LRP054 |
17262 |
71.271 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Accepted Quotetion No.29/EE.RHD.B-Baria/ 2006-2007. |
7-May-2007 |
5 Days |
Carpeting |
LRP071 |
0 |
71.095 |
LRP071 |
0 |
71.095 |
Brahmanbaria, (Division Office) |
Revenue |
07/(OTM). EE. RHD. B-Baria/2009-2010. Lot. 01 (One). |
4-Jan-2010 |
60 Days |
Surfacing |
LRP072 |
0 |
71.491 |
LRP074 |
500 |
73.989 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP072 |
634 |
72.125 |
LRP073 |
133 |
72.625 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP072 |
634 |
72.125 |
LRP073 |
133 |
72.625 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST |
26-Apr-2010 |
270 Days |
DBST |
LRP074 |
878 |
74.367 |
LRP077 |
11 |
76.367 |
Brahmanbaria, (Division Office) |
Revenue PMP |
PMP 2009-10/09/DBST - |
26-Apr-2010 |
400 Days |
DBST |
LRP074 |
878 |
74.367 |
LRP077 |
11 |
76.367 |
Brahmanbaria, (Division Office) |
Revenue |
07/(OTM). EE. RHD. B-Baria/2009-2010. Lot. 01 (One). |
4-Jan-2010 |
60 Days |
Surfacing |
LRP077 |
0 |
76.356 |
LRP078 |
500 |
77.859 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No. 21/(OTM) EE.RHD. B-Baria/ 2007-2008. |
13-May-2008 |
60 Days |
Pavement |
LRP077 |
|
76.356 |
LRP079 |
|
78.359 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP078 |
78 |
77.437 |
LRP078 |
141 |
77.5 |
Brahmanbaria, (Division Office) |
Revenue |
PMP : 2008-09/12/DBST. |
7-Aug-2009 |
270 Days |
DBST |
LRP078 |
500 |
77.859 |
LRP082 |
330 |
81.696 |
Brahmanbaria, (Division Office) |
Revenue |
05/(OTM) EE. RHD. B-Baria/2008-2009. |
28-Jan-2009 |
90 Days |
Pavement |
LRP079 |
|
78.359 |
LRPE |
|
82.33 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP079 |
78 |
78.437 |
LRP079 |
905 |
79.264 |
Brahmanbaria, (Division Office) |
Revenue |
PMP (B & C) 2009-10/07. |
19-Aug-2010 |
661 Days |
Carpeting |
LRP080 |
80 |
79.445 |
LRP080 |
109 |
79.474 |
Brahmanbaria, (Division Office) |
Development |
09/EE(RHD) /B-Baria/ 2006-2007 |
8-Feb-2007 |
120 Days |
Pavement |
LRP040 |
40000 |
79.961 |
LRP042 |
41000 |
82.976 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No-07(OTM) EE.RHD.B-Baria/2007-08. In 08 Lots Lot.01 |
14-Feb-2008 |
30 Days |
Pavement |
LRP048 |
47750 |
95.741 |
LRP048 |
48402 |
96.393 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No-07(OTM) EE.RHD.B-Baria/2007-08. In 08 Lots Lot. 2. |
17-Feb-2008 |
30 Days |
Pavement |
LRP050 |
50000 |
99.995 |
LRP050 |
50700 |
100.695 |
Brahmanbaria, (Division Office) |
Revenue Periodic Roads |
Tender No-07(OTM) EE.RHD.B-Baria/2007-08. In 08.Lots Lot.5. |
19-Feb-2008 |
30 Days |
Pavement |
LRP060 |
60000 |
120.035 |
LRP060 |
60700 |
120.735 |
Brahmanbaria, (Division Office) |