List of ongoing works on the road ( N302 ) |
Fund Source |
Contract no. |
St. Date |
Duration |
Type of work |
Start location |
End location |
Res.Division |
|
|
|
|
|
LRP |
Offset |
Chainage |
LRP |
Offset |
Chainage |
|
Revenue |
TAEPZ(41)/EE/RDD/2011-2012 (Lot No-14) |
25-Aug-2011 |
30 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
80 |
0.08 |
Dhaka, (Division Office) |
Revenue |
DAR(96)/RDD/2006-2007 (Lot No-02) (DTM) |
1-Jul-2008 |
15 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
1234 |
1-Jul-2008 |
15 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
500 |
0.5 |
Dhaka, (Division Office) |
Revenue |
DZ(e-GP)-23/PMP(Road)/2015-2016 |
15-Feb-2016 |
180 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
19000 |
19 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(179)/13/EE/RDD/2011-2012 (Lot No 37) |
24-May-2012 |
20 Days |
Carpeting |
LRPS |
190 |
0.19 |
LRPS |
245 |
0.245 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(151)13/EE/RDD/2011-2012 (Lot No 23) |
29-Jan-2012 |
7 Days |
Carpeting |
LRPS |
200 |
0.2 |
LRPS |
300 |
0.3 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(118)/EE/RDD/2010-2011 (Lot No-02) |
13-Apr-2011 |
20 Days |
Carpeting |
LRPS |
350 |
0.35 |
LRPS |
600 |
0.6 |
Dhaka, (Division Office) |
Revenue |
e-GP/20/EE/DRD/2017-2018. |
11-Dec-2017 |
10 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
5900 |
5.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(04)/EE/RDD/2015-2016 (Lot No-01) |
30-Sep-2015 |
7 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR 11)/RDD/2008-2009 (Lot No 06) |
23-Aug-2011 |
30 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
700 |
0.7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(124)/EE/SDE-1/2009-2010 (Lot No-06) |
2-May-2010 |
7 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
8500 |
8.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/172/EE/DRD/2019-2020 (ID 469200) |
12-Jul-2020 |
3 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
1000 |
1 |
Dhaka, (Division Office) |
Revenue |
e-GP/33/EE/DRD/2019-2020 ID No-373239 |
3-Feb-2020 |
20 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
18500 |
18.5 |
Dhaka, (Division Office) |
Revenue |
DZ(e-GP)29/Contract/PMP(Road)/2017-2018 |
19-Feb-2018 |
180 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/47/EE/DRD/2015-2016 |
19-Jun-2016 |
20 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
8500 |
8.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(132)/EE/SDE-1/2009-2010 (Lot No 06) |
12-Jul-2011 |
30 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
700 |
0.7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(123)/19/EE/RDD/2010-2011 (Lot No 08) |
11-Apr-2011 |
20 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
900 |
0.9 |
Dhaka, (Division Office) |
Revenue |
TWSD(01)/02/EE/RDD/2012-2013 (Lot No 01) |
1-Oct-2012 |
10 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
700 |
0.7 |
Dhaka, (Division Office) |
Revenue |
e-GP/62/EE/DRD/2015-2016 |
18-Jul-2016 |
20 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
1500 |
1.5 |
Dhaka, (Division Office) |
Revenue |
Departmental(103)/03/EE/RDD/2011-2012 (Lot No 13) |
21-Nov-2011 |
20 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
900 |
0.9 |
Dhaka, (Division Office) |
Revenue |
RHDRSD-1(33)/EE/SDE-1/2009-2010 (Lot No.-04) |
17-Nov-2009 |
5 Days |
Carpeting |
LRPS |
500 |
0.5 |
LRPS |
1000 |
1 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(47)/25/EE/RDD/2011-2012 (Lot No 09) |
24-Aug-2011 |
30 Days |
Carpeting |
LRPS |
550 |
0.55 |
LRPS |
950 |
0.95 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(154)/17/EE/RDD/2010-2011 (Lot No 25) |
6-Apr-2011 |
20 Days |
Carpeting |
LRPS |
575 |
0.575 |
LRPS |
1000 |
1 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(95)/EE/RDD/2011-2012 (Lot No-14) |
10-Oct-2011 |
30 Days |
Carpeting |
LRPS |
870 |
0.87 |
LRPS |
1130 |
1.13 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(65)/RDD/2008-2009 (Lot No-11) |
27-Jan-2009 |
7 Days |
Carpeting |
LRPS |
950 |
0.95 |
LRPS |
2550 |
2.55 |
Dhaka, (Division Office) |
Revenue |
e-GP/62/EE/DRD/2017-2018 (ID 154050) |
15-Feb-2018 |
15 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
e-GP/96/EE/DRD/2020-2021 (ID 578099) |
8-Jun-2021 |
10 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(95)/RDD/2008-2009 (Lot No-14) |
17-Jul-2009 |
24 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
1100 |
1.1 |
Dhaka, (Division Office) |
Revenue |
e-GP/07/EE/DRD/2016-2017 (66203) |
24-Oct-2016 |
7 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
e-GP/71/EE/DRD/2018-2019 (297337) |
2-May-2019 |
90 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
3000 |
3 |
Dhaka, (Division Office) |
Revenue |
ASY(89)/11/EE/RDD/2010-2011 (Lot No 14) |
22-Mar-2011 |
20 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
1500 |
1.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/115/EE/DRD/2016-2017 (ID 100994) |
29-Oct-2017 |
15 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
6000 |
6 |
Dhaka, (Division Office) |
Revenue |
TAEPR(86)/RDD/2008-2009 (Lot No-16) |
27-Jul-2009 |
15 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
1500 |
1.5 |
Dhaka, (Division Office) |
Revenue |
TAR(32)/RDD/KSD/2010-2011 (Lot No-08) |
14-Dec-2010 |
7 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
1500 |
1.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/06/EE/DRD/2016-2016 ( 66196) |
27-Oct-2016 |
7 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
2000 |
2 |
Dhaka, (Division Office) |
Revenue |
e-GP/07/EE/DRD/2016-2017 (ID 66203) |
23-Oct-2016 |
7 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(32)/01/EE/RDD/2012-2013 (Lot No 03) |
24-Sep-2012 |
7 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
2000 |
2 |
Dhaka, (Division Office) |
Revenue |
PMP/DZ/02/2012-2013/01/(DBST)-TAEPZ Road |
2-May-2013 |
164 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
PMP/DZ/02/2012-2013/01/DBST/TAEPZR |
2-May-2013 |
120 Days |
Carpeting |
LRPS |
1000 |
1 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
DAR(47)/EE/RDD/2008-2009 (Lot No-04) |
26-Feb-2009 |
7 Days |
Carpeting |
LRPS |
1100 |
1.1 |
LRPS |
1500 |
1.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(62)/EE/RDD/2011-2012 (Lot No-04) |
28-Sep-2011 |
20 Days |
Carpeting |
LRPS |
1100 |
1.1 |
LRPS |
1450 |
1.45 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(83)/08/EE/RDD/2010-2011 (Lot No 11) |
9-Mar-2011 |
7 Days |
Carpeting |
LRPS |
1200 |
1.2 |
LRPS |
1500 |
1.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(77)/21/EE/RDD/2011-2012 (Lot No 07) |
9-Oct-2011 |
30 Days |
Carpeting |
LRPS |
1450 |
1.45 |
LRPS |
1800 |
1.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZ/RDD/2008-2009 (Lot No-01) |
27-Nov-2008 |
7 Days |
Carpeting |
LRPS |
1450 |
1.45 |
LRPS |
1600 |
1.6 |
Dhaka, (Division Office) |
Revenue |
e-GP/87/EE/DRD/2019-2020 ID No-422955 |
5-May-2020 |
7 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
3900 |
3.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(65)/RDD/2008-2009. (Lot No-11)-1 |
28-Jan-2009 |
7 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
2500 |
2.5 |
Dhaka, (Division Office) |
Revenue |
PKASNK/DPM/(05)/RDD/2009-2010 |
17-Nov-2010 |
15 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
2000 |
2 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(57)/RDD/2008-2009 (Lot No-06) |
4-Jan-2009 |
5 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
2500 |
2.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ/RDD/2008-2009 (Lot No-02) |
25-Nov-2008 |
5 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
2500 |
2.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/100/EE/DRD/2019-2020 ID No-438975 |
19-May-2020 |
20 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/25/EE/DRD/2019-2020 ID No-369851 |
9-Dec-2019 |
10 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
4500 |
4.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(138)/RDD/2008-2009. (Lot No-02) |
21-Apr-2009 |
7 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
1800 |
1.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(77)/EE/SDE-1/2009-2010 (Lot No-02) |
10-Mar-2010 |
7 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
1800 |
1.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(103)/17/EE/RDD/2010-2011 (Lot No 23) |
5-Apr-2011 |
20 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
2000 |
2 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(131)/EE/SDE-1/2009-2010 (Lot No-04) |
26-May-2010 |
5 Days |
Carpeting |
LRPS |
1578 |
1.578 |
LRPS |
2500 |
2.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/06/EE/DRD/2019-2020 ID No-357415 |
28-Nov-2019 |
10 Days |
Carpeting |
LRPS |
1960 |
1.96 |
LRP001 |
1970 |
2.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(78)/07/EE/RDD/2012-2013 (Lot No 02) |
9-Apr-2013 |
15 Days |
Carpeting |
LRPS |
2000 |
2 |
LRPS |
2500 |
2.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(68)/EE/RDD/2006-2007 (Lot No -39) |
20-Jan-2010 |
30 Days |
Carpeting |
LRPS |
2000 |
2 |
LRPS |
2971 |
2.971 |
Dhaka, (Division Office) |
Revenue |
e-GP/12/EE/DRD/2019-2020 ID No-368676 |
28-Nov-2019 |
10 Days |
Carpeting |
LRPS |
2470 |
2.47 |
LRP001 |
2480 |
3.41 |
Dhaka, (Division Office) |
Revenue |
PQ(11)/RDD/2008-2009. |
16-Nov-2008 |
7 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
2900 |
2.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/147(17)/EE/RDD/2009-2010 (Lot No-03) |
6-Jun-2010 |
20 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
3000 |
3 |
Dhaka, (Division Office) |
Revenue |
Pad Quotation no (31)/RDD/Kallyanpur /2009-2010 |
23-Mar-2010 |
3 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
3600 |
3.6 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(24)/RDD/2008-2009 |
9-Jun-2009 |
5 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
3500 |
3.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR (56)/RDD/2008-2009 (Lot No. 07)-1 |
4-Jan-2009 |
7 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
2900 |
2.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR (56)/RDD/2008-2009 (Lot No. 07) |
3-Jan-2009 |
7 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
3500 |
3.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(44)/RDD/2008-2009 (Lot No-02) |
27-Nov-2008 |
3 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
2900 |
2.9 |
Dhaka, (Division Office) |
Revenue |
e-GP/28/EE/DRD/2015-2016 |
8-Feb-2016 |
30 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(58)/21/EE/RDD/2011-2012(Lot No 22) |
22-Sep-2011 |
20 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
3000 |
3 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(82)/RDD/2008-2009 (Lot No-05) |
22-Jul-2009 |
24 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(115)/04/EE/RDD/2011-2012 (Lot No 25) |
8-Dec-2011 |
20 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
2900 |
2.9 |
Dhaka, (Division Office) |
Revenue |
TAEPR(77)/RDD/2007-2008 (Lot No-05) |
5-Feb-2009 |
7 Days |
Carpeting |
LRPS |
2500 |
2.5 |
LRPS |
2800 |
2.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZ-44-01/EE/RDD/2012-2013/Lot No 09 |
17-Sep-2012 |
7 Days |
Carpeting |
LRPS |
3000 |
3 |
LRPS |
4000 |
4 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(44)/01/EE/RDD/2012-2013 (Lot No 09) |
23-Sep-2012 |
7 Days |
Carpeting |
LRPS |
3000 |
3 |
LRPS |
4000 |
4 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(54)/EE/RDD/2011-2012 (Lot No-07) |
14-Sep-2011 |
30 Days |
Carpeting |
LRPS |
3150 |
3.15 |
LRPS |
3650 |
3.65 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(13)/EE/RDD/2011-2012 (Lot No-38) |
25-Aug-2011 |
30 Days |
Carpeting |
LRPS |
3300 |
3.3 |
LRPS |
3700 |
3.7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/RDD/2001-2001(A) |
12-Jul-2009 |
15 Days |
Carpeting |
LRPS |
3500 |
3.5 |
LRPS |
4500 |
4.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(183)/EE/RDD/2009-2010 (Lot No-05) |
15-Dec-2009 |
7 Days |
Carpeting |
LRPS |
3500 |
3.5 |
LRPS |
3800 |
3.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR)97)/RDD/2009-2010(RSD-1) (Lot No-07) -1 |
12-Apr-2010 |
6 Days |
Carpeting |
LRPS |
3500 |
3.5 |
LRPS |
4500 |
4.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(48)/23/EE/RDD/2011-2012 (Lot no 33) |
4-Sep-2011 |
20 Days |
Carpeting |
LRPS |
3500 |
3.5 |
LRPS |
4500 |
4.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(53)/02/EE/RDD/2012-2013 (Lot No 05) |
20-Nov-2012 |
7 Days |
Carpeting |
LRPS |
3800 |
3.8 |
LRPS |
4050 |
4.05 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(54)/02/EE/RDD/2012-2013 (Lot No 06) |
20-Nov-2012 |
7 Days |
Carpeting |
LRPS |
3800 |
3.8 |
LRPS |
4050 |
4.05 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(136)/EE/SDE-1/2009-2010 (Lot No 4) |
7-Jan-2011 |
30 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(42)/RDD/2009-2010 (RSD-1). (Lot No-10) |
8-Dec-2009 |
5 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(102)/03/EE/RDD/2011-2012 (Lot No-15) |
17-Nov-2011 |
30 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(38)/EE/RDD/2012-2013 (Lot No-01) |
26-Sep-2012 |
7 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
4900 |
4.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(07)/RDD/2009-2010 (RSD-1) |
15-Nov-2009 |
3 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(07)/RDD/2009-2010 (RSD-1) |
15-Nov-2009 |
3 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(160)/EE/SDE-1/2009-2010 (Lot No 01) |
12-Aug-2011 |
30 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(137)/19/EE/RDD/2010-2011 (Lot No 20) |
18-Apr-2011 |
20 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(137)/RDD/2008-2009 (Lot No 07) |
25-Jul-2011 |
30 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEZPR(33)/EE/RDD/2012-2013 (Lot No-01) |
24-Sep-2012 |
7 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5200 |
5.2 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(116)/EE/SDE-1/2009-2010 (Lot No-02) |
3-May-2010 |
6 Days |
Carpeting |
LRPS |
4500 |
4.5 |
LRPS |
5000 |
5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(62)/EE/RDD/2013-2014. (Lot No-13) |
6-May-2014 |
45 Days |
Carpeting |
LRPS |
5000 |
5 |
LRPS |
5900 |
5.9 |
Dhaka, (Division Office) |
Revenue |
DZ(e-GP)/29-Contract/PMP(Road)/2017-2018(TID-147978) |
19-Feb-2018 |
180 Days |
Carpeting |
LRPS |
5100 |
5.1 |
LRPS |
17000 |
17 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(06)/RDD/2009-2010 (Lot No-06) |
23-Jul-2009 |
7 Days |
Carpeting |
LRPS |
5100 |
5.1 |
LRPS |
5800 |
5.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(135)/EE/SDE-1/2009-2010 (Lot No-02) |
30-Jul-2010 |
5 Days |
Carpeting |
LRPS |
5200 |
5.2 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(53)/EE/RDD/2011-2012 (Lot No-08) |
14-Sep-2011 |
30 Days |
Carpeting |
LRPS |
5300 |
5.3 |
LRPS |
5500 |
5.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(60)/06/EE/RDD/2010-2011 (Lot no 02) |
24-Jan-2011 |
30 Days |
Carpeting |
LRPS |
5453 |
5.453 |
LRPS |
5542 |
5.542 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(136)/EE/SDE-1/2009-2010 (Lot No-04) |
10-Jul-2010 |
5 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
6000 |
6 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(04)/RDD/2008-2009 |
21-Sep-2008 |
3 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
5900 |
5.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(136)/RDD/2008-2009. (Lot No-05) |
21-Apr-2009 |
7 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
5800 |
5.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(70)/RDD/2009-2010 (Lot No 10) |
21-Oct-2010 |
30 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
6000 |
6 |
Dhaka, (Division Office) |
Revenue |
UATRMUR(15)/RDD/2008-2009 (Lot No-01) |
18-Jun-2009 |
5 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
6500 |
6.5 |
Dhaka, (Division Office) |
Revenue |
TAEPR(175)/RDD/2008-2009 (Lot No-17) |
16-Oct-2009 |
5 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
6500 |
6.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(51)/RDD/2009-2010 (RSD-1)(Lot No-11) |
27-Dec-2009 |
5 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
5700 |
5.7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(158)/13/EE/RDD/2011-2012 (Lot No 12) |
19-Jan-2012 |
15 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
6000 |
6 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(42)/RDD/2009-2010 |
4-Jul-2010 |
3 Days |
Carpeting |
LRPS |
5500 |
5.5 |
LRPS |
5900 |
5.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(143)/EE/RDD/2010-2011 (Lot No-04) |
12-Jun-2011 |
30 Days |
Carpeting |
LRPS |
5550 |
5.55 |
LRPS |
6350 |
6.35 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(87)/RDD/2008-2009 (Lot No-06) |
26-Feb-2009 |
15 Days |
Carpeting |
LRPS |
5600 |
5.6 |
LRPS |
6500 |
6.5 |
Dhaka, (Division Office) |
Revenue |
01/EE/DRD/2015-2016/DZ |
12-Nov-2015 |
90 Days |
Carpeting |
LRPS |
6000 |
6 |
LRPS |
7000 |
7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(176)/EE/RDD/2011-2012. (Lot No-02) |
22-Mar-2012 |
7 Days |
Carpeting |
LRPS |
6100 |
6.1 |
LRPS |
6900 |
6.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(26)/RDD/2008-2009 (Lot No-06) |
9-Nov-2008 |
7 Days |
Carpeting |
LRPS |
6100 |
6.1 |
LRPS |
6800 |
6.8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(166)/EE/RDD/2011-2012 (Lot No-18) |
19-Jan-2012 |
15 Days |
Carpeting |
LRPS |
6200 |
6.2 |
LRPS |
6900 |
6.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(72)/RDD/2008-2009 (Lot No-08)-1 |
28-Jan-2009 |
7 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
7500 |
7.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(32)/EE/SDE-1/2009-2010 (Lot No.-01) |
17-Nov-2009 |
5 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(173)/EE/RDD/2009-2010 (Lot No-05) |
20-Jun-2010 |
10 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
6900 |
6.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(53)/02/EE/RDD/2010-2011 (Lot No-12) |
5-Jan-2011 |
45 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
6700 |
6.7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(72)/RDD/2008-2009 (Lot No-08) |
27-Jan-2009 |
7 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
7500 |
7.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(43)/RDD/2009-2010 |
7-Jul-2010 |
3 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
6900 |
6.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(70)/17/EE/RDD/2009-2010 (Lot No 02) |
19-Jan-2011 |
20 Days |
Carpeting |
LRPS |
6500 |
6.5 |
LRPS |
7000 |
7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(88)/EE/RDD/2010-2011. (Lot No-03) |
2-Feb-2011 |
20 Days |
Carpeting |
LRPS |
6850 |
6.85 |
LRPS |
7350 |
7.35 |
Dhaka, (Division Office) |
Revenue |
e-GP/142/EE/DRD/2016-2017 (ID 109119) |
29-Oct-2017 |
7 Days |
Carpeting |
LRPS |
7000 |
7 |
LRPS |
9000 |
9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(40)/01/EE/RDD/2012-2013 (Lot No 04) |
7-Oct-2012 |
7 Days |
Carpeting |
LRPS |
7000 |
7 |
LRPS |
9000 |
9 |
Dhaka, (Division Office) |
Revenue |
e-GP/07/EE/DRD/2020-2021 (ID 508572) |
30-Nov-2020 |
6 Days |
Carpeting |
LRPS |
7000 |
7 |
LRPS |
8000 |
8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR-40-01/EE/RDD/2012-2013 (Lot No 4) |
7-Oct-2012 |
7 Days |
Carpeting |
LRPS |
7000 |
7 |
LRPS |
9000 |
9 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(26)/EE/RDD/2009-2010 (Lot No-01) |
14-Nov-2010 |
20 Days |
Carpeting |
LRPS |
7350 |
7.35 |
LRPS |
7950 |
7.95 |
Dhaka, (Division Office) |
Revenue |
TAEPZR (30)/RDD/2008-2009 (Lot No-08) |
13-Nov-2008 |
7 Days |
Carpeting |
LRPS |
7500 |
7.5 |
LRPS |
8500 |
8.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(111)/13/EE/RDD/2010-2011 (Lot No 12) |
27-Mar-2011 |
20 Days |
Carpeting |
LRPS |
7500 |
7.5 |
LRPS |
8000 |
8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(342)/RDD/2005-2006 (Lot No-02) (DTM) |
1-Jul-2008 |
15 Days |
Carpeting |
LRPS |
7500 |
7.5 |
LRPS |
8500 |
8.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(06)/RDD/2009-2010 (Lot No 6) |
17-Oct-2010 |
15 Days |
Carpeting |
LRPS |
7500 |
7.5 |
LRPS |
8000 |
8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(61)/RDD/2008-2009 (Lot No-02) |
14-Jan-2009 |
7 Days |
Carpeting |
LRPS |
7500 |
7.5 |
LRPS |
8500 |
8.5 |
Dhaka, (Division Office) |
Revenue |
TAZR(42)/05/EE/RDD/2010-2011 (Lot No 20) |
29-Dec-2010 |
20 Days |
Carpeting |
LRPS |
7500 |
7.5 |
LRPS |
8000 |
8 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(126)/19/EE/RDD/2011-2012 (Lot No 03) |
21-Nov-2011 |
20 Days |
Carpeting |
LRPS |
7850 |
7.85 |
LRPS |
8270 |
8.27 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(57)/EE/RDD/2009-2010 (Lot No-08) |
4-Jan-2011 |
20 Days |
Carpeting |
LRPS |
7950 |
7.95 |
LRPS |
8750 |
8.75 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(90)/EE/RDD/2012-2013. (Lot No-09) |
13-Jun-2013 |
20 Days |
Carpeting |
LRPS |
8000 |
8 |
LRPS |
8900 |
8.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(64)/RDD/2009-2010. (RSD-1) (Lot No-03) |
13-Jan-2010 |
7 Days |
Carpeting |
LRPS |
8200 |
8.2 |
LRPS |
8800 |
8.8 |
Dhaka, (Division Office) |
Revenue |
(97)/KSD/2008-2009 (Lot No. 05) |
17-Jul-2008 |
7 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
14500 |
14.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(165)/EE/SDE-1/2009-2010 (Lot No 03) |
17-Aug-2009 |
10 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9000 |
9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(31)/03/EE/RDD/2013-2014 (Lot No 03) |
29-Oct-2013 |
20 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9800 |
9.8 |
Dhaka, (Division Office) |
Revenue |
(24)/KSD/2008-2009 (Lot No-09) |
4-Jan-2009 |
7 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(63)/EE/RDD/2012-2013 (Lot No-09) |
15-May-2013 |
20 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
13500 |
13.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(90)/13/EE/RDD/2010-2011 (Lot No 04) |
22-Mar-2011 |
30 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9000 |
9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(64)/RDD/2009-2010(RSD-1) (Lot No-03)-1 |
20-Oct-2009 |
10 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9000 |
9 |
Dhaka, (Division Office) |
Revenue |
(27)/KSD/2008-2009 (Lot No-08) |
4-Jan-2009 |
7 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(43)/10/EE/RDD/2012-2013 (Lot No 13) |
3-Sep-2012 |
15 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
8900 |
8.9 |
Dhaka, (Division Office) |
Revenue |
(25)/RDD/KSD/2008-2009 (Lot No-01) |
4-Jan-2009 |
7 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(112)/04/EE/RDD/2011-2012 (Lot No 03) |
28-Nov-2011 |
20 Days |
Carpeting |
LRPS |
8500 |
8.5 |
LRPS |
8990 |
8.99 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(79)/09/EE/RDD/2010-2011 (Lot No 06) |
13-Mar-2011 |
30 Days |
Carpeting |
LRPS |
8600 |
8.6 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(45)/21/EE/RDD/2011-2012 (Lot No 21) |
17-Oct-2011 |
20 Days |
Carpeting |
LRPS |
9000 |
9 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(27)/EE/RDD/2012-2013. (Lot No-23) |
8-Nov-2012 |
10 Days |
Carpeting |
LRPS |
9000 |
9 |
LRPS |
10350 |
10.35 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(143)/20/EE/RDD/2010-2011 (Lot no 15) |
18-Apr-2011 |
142 Days |
Carpeting |
LRPS |
9000 |
9 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(09)/EE/RDD/2015-2016. (Lot No-06) |
14-Sep-2015 |
7 Days |
Carpeting |
LRPS |
9000 |
9 |
LRPS |
9500 |
9.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/76/EE/DRD/2019-2020 9(ID 416798) |
25-Mar-2020 |
56 Days |
Carpeting |
LRPS |
9000 |
9 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(10)/EE/RDD/2015-2016 (Lot No-07) |
15-Sep-2015 |
7 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
10000 |
10 |
Dhaka, (Division Office) |
Revenue |
e-gp/(38)/EE/DRD/2016-2017 (75767) |
18-Dec-2016 |
25 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
13500 |
13.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/118/EE/DRD/2016-2017 |
25-Oct-2017 |
15 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
15500 |
15.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/38/EE/DRD/2016-2017, Tender ID No-75167 |
18-Dec-2016 |
25 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
13500 |
13.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(83)/EE/RDD/2013-2014 (Lot No-09) |
26-Jun-2013 |
20 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/80/EE/DRD/2020-2021 ID No-569762 |
24-May-2021 |
27 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
12500 |
12.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(27)/EE/RDD/2009-2010 (Lot No-03) |
2-Nov-2010 |
20 Days |
Carpeting |
LRPS |
9535 |
9.535 |
LRPS |
9880 |
9.88 |
Dhaka, (Division Office) |
Revenue |
e-GP/30/EE/DRD/2020-2021 (ID 528917) |
24-Jan-2021 |
15 Days |
Carpeting |
LRPS |
10000 |
10 |
LRPS |
11000 |
11 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(82)/06/EE/RDD/2013-2014 (Lot No 02) |
2-Apr-2014 |
10 Days |
Carpeting |
LRPS |
10000 |
10 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(23)/01/EE/DRD/2014-2015 (Lot No 05) |
11-Mar-2015 |
15 Days |
Carpeting |
LRPS |
10000 |
10 |
LRPS |
16000 |
16 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(69)/13/EE/RDD/2013-2013 (Lot no 11) |
18-Jun-2013 |
10 Days |
Carpeting |
LRPS |
10000 |
10 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(15)/EE/RDD/2015-2016. (Lot No-01) |
6-Oct-2015 |
7 Days |
Carpeting |
LRPS |
10000 |
10 |
LRPS |
10500 |
10.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(36)/02/EE/RDD/2010-2011 (Lot No 14) |
27-Dec-2010 |
45 Days |
Carpeting |
LRPS |
10300 |
10.3 |
LRPS |
10650 |
10.65 |
Dhaka, (Division Office) |
Revenue |
(48)/RDD/KSD/2008-2009 (Lot No-02) |
26-Feb-2009 |
20 Days |
Carpeting |
LRPS |
10500 |
10.5 |
LRPS |
13500 |
13.5 |
Dhaka, (Division Office) |
Revenue |
(26)/RDD/KSD/2008-2009 (Lot No-02) |
18-Jul-2009 |
3 Days |
Carpeting |
LRPS |
10500 |
10.5 |
LRPS |
11000 |
11 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(68)/02/EE/RDD/2011-2012 (Lot No 06) |
17-Nov-2011 |
20 Days |
Carpeting |
LRPS |
10500 |
10.5 |
LRPS |
11000 |
11 |
Dhaka, (Division Office) |
Revenue |
e-gp/19/EE/DRD/2019-2020 ID No-369188 |
10-Dec-2019 |
45 Days |
Carpeting |
LRPS |
10500 |
10.5 |
LRPS |
11500 |
11.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(15)/EE/RDD/2012-2013 (Lot No-02) |
10-Oct-2012 |
7 Days |
Carpeting |
LRPS |
10500 |
10.5 |
LRPS |
16500 |
16.5 |
Dhaka, (Division Office) |
Revenue |
(26)/RDD/KSD/2008-2009 (Lot No-02)-1 |
17-Jul-2009 |
3 Days |
Carpeting |
LRPS |
10500 |
10.5 |
LRPS |
11000 |
11 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(14)/EE/RDD/2012-2013. (Lot No-08) |
3-Oct-2012 |
10 Days |
Carpeting |
LRPS |
10740 |
10.74 |
LRPS |
11240 |
11.24 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(40)/EE/RDD/2013-2014 (Lot No-14) |
29-Oct-2013 |
15 Days |
Carpeting |
LRPS |
10950 |
10.95 |
LRPS |
15815 |
15.815 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(24)/01/EE/DRD/2014-2015 (Lot No 06) |
11-Mar-2015 |
15 Days |
Carpeting |
LRPS |
11000 |
11 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
e-GP/119/EE/DRD/2016-2017 (ID10790) |
18-Sep-2017 |
15 Days |
Carpeting |
LRPS |
11000 |
11 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(22)/05/EE/DRD/2015-2016 (Lot No 01) |
15-Oct-2015 |
7 Days |
Carpeting |
LRPS |
11000 |
11 |
LRPS |
11500 |
11.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(22)/EE/RDD/2009-2010 (Lot No-20) |
19-Oct-2010 |
20 Days |
Carpeting |
LRPS |
11450 |
11.45 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(23)/RDD/2009-2010 (Lot No 02) |
5-Jan-2011 |
30 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(23)/EE/RDD/2015-2016. (Lot No-02) |
18-Oct-2015 |
7 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
TAER(23)/RDD-2009-2010 (Lot No 02) |
17-Oct-2010 |
30 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(103)/08/EE/RDD/2010-2011 (Lot No 02) |
4-Apr-2011 |
30 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
12000 |
12 |
Dhaka, (Division Office) |
Revenue |
e-GP/44/EE/DRD/2020-2021 ID No-543257 |
24-Mar-2021 |
20 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
Mtc/01/e-GP/SE/DRC/2015-16 |
2-Dec-2015 |
15 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
16500 |
16.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(13)/EE/RDD/2012-2013. (Lot No-07) |
3-Oct-2012 |
7 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
(28)/KSD/2008-2009 (Lot No-03 |
4-Jan-2009 |
7 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
12500 |
12.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ/18/K/EE/2008-2009 (Lot No-07) |
29-Nov-2008 |
7 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
14500 |
14.5 |
Dhaka, (Division Office) |
Revenue |
DAR(60)/RDD/2008-2009 (Lot No-01) |
22-Mar-2009 |
7 Days |
Carpeting |
LRPS |
11500 |
11.5 |
LRPS |
22000 |
22 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(129)/05/EE/RDD/2011-2012 (Lot No 02) |
16-Oct-2011 |
60 Days |
Carpeting |
LRPS |
11800 |
11.8 |
LRPS |
15150 |
15.15 |
Dhaka, (Division Office) |
Revenue |
e-GP/95/EE/DRD/2017-2018 (ID 195483) |
21-Jun-2018 |
14 Days |
Carpeting |
LRPS |
12000 |
12 |
LRPS |
14000 |
14 |
Dhaka, (Division Office) |
Revenue |
e-GP/60/EE/DRD/2015-2016 (55677) |
19-Jun-2016 |
20 Days |
Carpeting |
LRPS |
12000 |
12 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(83)/06/EE/RDD/2013-2014 (Lot No. 03) |
2-Apr-2014 |
10 Days |
Carpeting |
LRPS |
12000 |
12 |
LRPS |
16000 |
16 |
Dhaka, (Division Office) |
Revenue |
e-GP/142/EE/DRD/2019-2020 ( ID No. 460294) |
16-Jun-2020 |
15 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/04/EE/DRD/2014-2015 (Lot No 07) |
29-Sep-2014 |
10 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(02)/EE/RDD/2014-2015 (Lot No-04) |
28-Sep-2014 |
10 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
12900 |
12.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(39)/20/EE/RDD/2009-2010 (Lot No-01) |
28-Oct-2010 |
20 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
e-GP/79/EE/DRD/2020-2021. ID No-569761 |
24-May-2021 |
22 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
13500 |
13.5 |
Dhaka, (Division Office) |
Revenue |
TAER(16)/EE/KSD/2010-2011 (Lot No 02) |
23-Sep-2011 |
30 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
14500 |
14.5 |
Dhaka, (Division Office) |
Revenue |
e-gp-142-EE-DRD/2019-2020 (ID 460294) |
16-Jun-2020 |
10 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(01)/EE/RDD/2014-2015 (Lot No-08) |
29-Sep-2014 |
10 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
12900 |
12.9 |
Dhaka, (Division Office) |
Revenue |
DN(20)/EE/RDD/2007-2008 (Lot No-6) |
7-Jan-2011 |
30 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
TAR(49)/EE/RDD/2008-2009 (Lot No-01) |
16-Oct-2009 |
7 Days |
Carpeting |
LRPS |
12500 |
12.5 |
LRPS |
15500 |
15.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/07/EE/RDD/2012-2013, (Package No-1) |
16-Jul-2013 |
180 Days |
Carpeting |
LRPS |
12900 |
12.9 |
LRPS |
13000 |
13 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(93)/09/EE/RDD/2013-2014 (Lot No. 10) |
28-Apr-2014 |
10 Days |
Carpeting |
LRPS |
13000 |
13 |
LRPS |
13500 |
13.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/28/EE/DRD/2018-2019 (ID 262059) |
14-Jan-2019 |
10 Days |
Carpeting |
LRPS |
13000 |
13 |
LRPS |
14000 |
14 |
Dhaka, (Division Office) |
Revenue |
e-GP/43/EE/DRD/2018-2019 ID No-267245 |
10-Apr-2019 |
30 Days |
Carpeting |
LRPS |
13500 |
13.5 |
LRPS |
16500 |
16.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/147/EE/DRD/2018-2019 (ID 329779) |
22-Aug-2019 |
10 Days |
Carpeting |
LRPS |
13500 |
13.5 |
LRPS |
14000 |
14 |
Dhaka, (Division Office) |
Revenue |
DN(20)/EE/RDD/2007-2008 (Lot No 07) |
7-Jan-2011 |
30 Days |
Carpeting |
LRPS |
13500 |
13.5 |
LRPS |
14000 |
14 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(161)/RDD/2008-2009 (Lot No-11) |
1-Jul-2009 |
5 Days |
Carpeting |
LRPS |
13500 |
13.5 |
LRPS |
13800 |
13.8 |
Dhaka, (Division Office) |
Revenue |
e-GP/10/EE/DRD/2017-2018 ID No-154314 |
27-Feb-2018 |
45 Days |
Carpeting |
LRPS |
14000 |
14 |
LRPS |
14900 |
14.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(67)/11/EE/RDD/2012-2013 (Lot No 04) |
18-Jun-2013 |
10 Days |
Carpeting |
LRPS |
14000 |
14 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(18)/EE/RDD/2012-2013. (Lot No-04) |
13-Nov-2012 |
15 Days |
Carpeting |
LRPS |
14350 |
14.35 |
LRPS |
17121 |
17.121 |
Dhaka, (Division Office) |
Revenue |
TAER(88)/EE/KSD/2009-2010 (Lot No-08)-1 |
15-Oct-2010 |
30 Days |
Carpeting |
LRPS |
14500 |
14.5 |
LRPS |
15000 |
15 |
Dhaka, (Division Office) |
Revenue |
(42)/KSD/RDD/2008-2009 (Lot No-03) |
11-Feb-2009 |
7 Days |
Carpeting |
LRPS |
14500 |
14.5 |
LRPS |
15500 |
15.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(27)/EE/RDD/2014-2015. |
1-Jun-2015 |
20 Days |
Carpeting |
LRPS |
14500 |
14.5 |
LRPS |
15500 |
15.5 |
Dhaka, (Division Office) |
Revenue |
e-GP/116/EE/DRD/2017-2018 ID No-202233 |
27-Sep-2018 |
7 Days |
Carpeting |
LRPS |
14500 |
14.5 |
LRPS |
15500 |
15.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(27)/EE/RDD/2014-2015 |
1-Jun-2015 |
20 Days |
Carpeting |
LRPS |
14500 |
14.5 |
LRPS |
16500 |
16.5 |
Dhaka, (Division Office) |
Revenue |
TAER(88)/EE/KSD/2009-2010 (Lot No-08) |
14-Feb-2010 |
45 Days |
Carpeting |
LRPS |
14500 |
14.5 |
LRPS |
14900 |
14.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(28)/03/EE/RDD/2012-2013 (Lot No 05) |
6-Nov-2012 |
10 Days |
Carpeting |
LRPS |
14550 |
14.55 |
LRPS |
15250 |
15.25 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(135)/19/EE/RDD/2010-2011 (Lot No 24) |
18-Apr-2011 |
184 Days |
Carpeting |
LRPS |
15000 |
15 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(139)/12/EE/RDD/2010-2011 (Lot No 02) |
4-Apr-2011 |
320 Days |
Carpeting |
LRPS |
15015 |
15.015 |
LRPS |
15175 |
15.175 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(128)/05/EE/RDD/2011-2012 (Lot No 01) |
16-Oct-2011 |
60 Days |
Carpeting |
LRPS |
15150 |
15.15 |
LRPS |
16302 |
16.302 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(42)/02/EE/RDD/2013-2014 (Lot No 15) |
29-Oct-2013 |
15 Days |
Carpeting |
LRPS |
15300 |
15.3 |
LRPS |
16630 |
16.63 |
Dhaka, (Division Office) |
Revenue |
Pad Quotation no (01)/RDD/2009-2010 (Kallyanpur) |
17-Oct-2010 |
30 Days |
Carpeting |
LRPS |
15500 |
15.5 |
LRPS |
16000 |
16 |
Dhaka, (Division Office) |
Revenue |
TAR(83)/RDD/KSD/2008-2009 (Lot No-03) |
27-Jul-2009 |
5 Days |
Carpeting |
LRPS |
15500 |
15.5 |
LRPS |
16500 |
16.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(08)/03/EE/RDD/2011-2012 |
3-Sep-2011 |
10 Days |
Carpeting |
LRPS |
15500 |
15.5 |
LRPS |
16700 |
16.7 |
Dhaka, (Division Office) |
Revenue |
TAR(86)/EE/RDD/2009-2010 (Lot No-01) |
20-Dec-2009 |
3 Days |
Carpeting |
LRPS |
15500 |
15.5 |
LRPS |
15700 |
15.7 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(41)/EE/RDD/2013-2014 (Lot No-16) |
29-Oct-2013 |
15 Days |
Carpeting |
LRPS |
15815 |
15.815 |
LRPS |
16045 |
16.045 |
Dhaka, (Division Office) |
Revenue |
egp/29/EE/DRD/2014-2015 |
2-Aug-2015 |
45 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
17000 |
17 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(59)/07/EE/RDD/2013-2014 (Lot No. 03) |
1-Jan-2014 |
10 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/05/RDD/2010-2011 (Kallyanpur) |
21-Apr-2011 |
3 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
16500 |
16.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(130)/13/EE/RDD/2010-2011 (Lot No 19) |
4-Apr-2011 |
30 Days |
Carpeting |
LRPS |
16050 |
16.05 |
LRPS |
16170 |
16.17 |
Dhaka, (Division Office) |
Revenue |
TAEPZ(129)/19/EE/RDD/2009-2010 (Lot No 09) |
20-Jun-2011 |
10 Days |
Carpeting |
LRPS |
16250 |
16.25 |
LRPS |
17750 |
17.75 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/129(19)/EE/RDD/2009-2010 (Lot No 09) |
20-Jul-2010 |
10 Days |
Carpeting |
LRPS |
16250 |
16.25 |
LRPS |
17750 |
17.75 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(129)/19/EE/RDD/2010-2011 (Lot No 09) |
20-Jun-2011 |
10 Days |
DBST |
LRPS |
16250 |
16.25 |
LRPS |
17750 |
17.75 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(05)/02/EE/DRD/2015-2015 (Lot No 02) |
13-Sep-2015 |
7 Days |
Carpeting |
LRPS |
16300 |
16.3 |
LRPS |
16800 |
16.8 |
Dhaka, (Division Office) |
Revenue |
TAER(84)/EE/KSD/2009-2010 |
21-Jan-2010 |
30 Days |
Carpeting |
LRPS |
16500 |
16.5 |
LRPS |
17000 |
17 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(06)/RDD/2010-2011 (Kallyanpur) |
21-Apr-2011 |
3 Days |
Carpeting |
LRPS |
16500 |
16.5 |
LRPS |
17500 |
17.5 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(04)/RDD/2010-2011 |
26-May-2011 |
3 Days |
Carpeting |
LRPS |
16500 |
16.5 |
LRPS |
16900 |
16.9 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(69)/02/EE/RDD/2011-2012 (Lot No 07) |
17-Nov-2011 |
20 Days |
Carpeting |
LRPS |
16500 |
16.5 |
LRPS |
17000 |
17 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(25)/01/EE/DRD/2014-2015 (Lot No 04) |
11-Mar-2015 |
15 Days |
Carpeting |
LRPS |
17000 |
17 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(06)/02/EE/DRD/2015-2016 (Lot No 03) |
13-Sep-2015 |
7 Days |
Carpeting |
LRPS |
17000 |
17 |
LRPS |
17650 |
17.65 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(25)/22/EE/RDD/2011-2012 (Lot No 08) |
25-Jul-2011 |
30 Days |
Carpeting |
LRPS |
17000 |
17 |
LRPS |
17550 |
17.55 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(17)/03/EE/RDD/2012-2013 (Lot No 13) |
25-Oct-2012 |
10 Days |
Carpeting |
LRPS |
17510 |
17.51 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
TAEPZR(70)/02/EE/RDD/2011-2012 (Lot No 08) |
17-Nov-2011 |
20 Days |
Carpeting |
LRPS |
17700 |
17.7 |
LRPS |
18000 |
18 |
Dhaka, (Division Office) |
Revenue |
Pad Quotation no (19)/RDD/2008-2009 (Kallyanpur) |
20-Jul-2009 |
3 Days |
Carpeting |
LRPS |
18500 |
18.5 |
LRPS |
19000 |
19 |
Dhaka, (Division Office) |
Revenue |
TAEPZR/RDD/1999-2000/10(A) |
9-Jul-2009 |
10 Days |
Carpeting |
LRPS |
20000 |
20 |
LRPS |
21000 |
21 |
Dhaka, (Division Office) |
Revenue |
PAD Q(161)/RDD/2007-2008 |
1-Jul-2008 |
3 Days |
Carpeting |
LRPS |
21500 |
21.5 |
LRPS |
22500 |
22.5 |
Dhaka, (Division Office) |