| List of ongoing works on the road ( N704 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Revenue Periodic Roads |
04JHRD/2007-2008 L/8 |
11-Apr-2008 |
40 Days |
Carpeting |
LRP001 |
500 |
1.48 |
LRP002 |
850 |
2.693 |
Jhenaidah, (Division Office) |
| Revenue Periodic Roads |
02/JHRD/2007-2008 L/6 |
11-Apr-2008 |
40 Days |
Carpeting |
LRP002 |
850 |
2.693 |
LRP004 |
200 |
4.035 |
Jhenaidah, (Division Office) |
| Revenue |
06 (Main)/KURD/2009-2010; L/15 |
28-Nov-2010 |
60 Days |
Pavement |
LRP002 |
2557 |
4.4 |
LRP002 |
2657 |
4.5 |
Kushtia, (Division Office) |
| Revenue |
10(Main)/KURD/2009-2010; L/2 |
29-Jul-2010 |
60 Days |
Road Embankment |
LRP002 |
16500 |
18.343 |
LRP002 |
22500 |
24.343 |
Kushtia, (Division Office) |
| Deposit Works |
32/KRD/2005-2006 |
18-Jan-2006 |
60 Days |
Road Embankment |
LRP019 |
0 |
18.771 |
LRP020 |
0 |
19.771 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/04 |
25-Mar-2014 |
28 Days |
Carpeting |
LRP002 |
18757 |
20.6 |
LRP002 |
19157 |
21 |
Kushtia, (Division Office) |
| Deposit Works |
50/KRD/2005-2006 |
12-Mar-2006 |
120 Days |
Road Embankment |
LRP021 |
238 |
21 |
LRP027 |
263 |
27 |
Kushtia, (Division Office) |
| Revenue PMP |
PMP 2009-10/18/Overlay |
25-Aug-2010 |
300 Days |
Overlay |
LRP021 |
338 |
21.1 |
LRP044 |
521 |
44.2 |
Kushtia, (Division Office) |
| Revenue |
e-GP/04/ACE Khu/2014-2015 |
3-Mar-2015 |
110 Days |
DBST |
LRP002 |
19672 |
21.515 |
LRP045 |
1114 |
45.775 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/04 |
25-Mar-2014 |
28 Days |
Carpeting |
LRP002 |
19682 |
21.525 |
LRP022 |
117 |
21.875 |
Kushtia, (Division Office) |
| Development |
e-GP-20/ACE Khu/Dev/2019-20 (WD-01) |
|
635 Days |
Carpeting |
LRP021 |
680 |
21.575 |
LRP033 |
1727 |
34.6 |
Kushtia, (Division Office) |
| Revenue |
e-GP/22/ACE Khu/2017-2018 (Re-Tender) |
25-Apr-2018 |
270 Days |
Surfacing |
LRP021 |
680 |
21.575 |
LRP027 |
689 |
27.575 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/02 |
23-Feb-2014 |
21 Days |
Carpeting |
LRP022 |
0 |
21.758 |
LRP022 |
525 |
22.283 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/02 |
23-Feb-2014 |
21 Days |
Carpeting |
LRP022 |
117 |
21.875 |
LRP022 |
592 |
22.35 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/14 |
17-Apr-2014 |
28 Days |
Carpeting |
LRP022 |
592 |
22.35 |
LRP023 |
122 |
22.875 |
Kushtia, (Division Office) |
| Revenue |
e-GPO/R/W-02/KURD/2016-2017 (Re-Tendered) |
10-Apr-2017 |
45 Days |
Carpeting |
LRP022 |
605 |
22.5 |
LRP027 |
0 |
26.886 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/04 |
25-Mar-2014 |
28 Days |
Carpeting |
LRP023 |
122 |
22.875 |
LRP023 |
522 |
23.275 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/14 |
17-Apr-2014 |
28 Days |
Carpeting |
LRP023 |
522 |
23.275 |
LRP024 |
52 |
23.8 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-14/KURD/2017-2018 |
8-Jan-2018 |
30 Days |
Carpeting |
LRP024 |
0 |
23.886 |
LRP050 |
0 |
49.758 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/13 |
17-Apr-2014 |
28 Days |
Carpeting |
LRP024 |
152 |
23.9 |
LRP024 |
452 |
24.2 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/04 |
25-Mar-2014 |
28 Days |
Carpeting |
LRP024 |
452 |
24.2 |
LRP024 |
852 |
24.6 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/13 |
17-Apr-2014 |
28 Days |
Carpeting |
LRP024 |
852 |
24.6 |
LRP025 |
216 |
24.96 |
Kushtia, (Division Office) |
| Deposit Works |
43/KRD/2005-2006 |
12-Feb-2006 |
90 Days |
Road Embankment |
LRP025 |
0 |
24.744 |
LRP028 |
0 |
27.733 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-32/KURD/2016-2017 |
9-May-2017 |
30 Days |
Carpeting |
LRP024 |
980 |
24.866 |
LRP027 |
0 |
26.886 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/03 |
23-Feb-2014 |
28 Days |
Carpeting |
LRP025 |
216 |
24.96 |
LRP025 |
456 |
25.2 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/14 |
17-Apr-2014 |
28 Days |
Carpeting |
LRP025 |
456 |
25.2 |
LRP025 |
556 |
25.3 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/03 |
23-Feb-2014 |
28 Days |
Carpeting |
LRP025 |
556 |
25.3 |
LRP026 |
60 |
25.8 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/13 |
17-Apr-2014 |
28 Days |
Carpeting |
LRP026 |
60 |
25.8 |
LRP026 |
585 |
26.325 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/20 |
4-Jun-2014 |
7 Days |
Carpeting |
LRP026 |
585 |
26.325 |
LRP027 |
588 |
27.325 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/21 |
4-Jun-2014 |
7 Days |
Carpeting |
LRP027 |
588 |
27.325 |
LRP028 |
667 |
28.4 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-35/KURD/2016-2017 |
13-Aug-2017 |
60 Days |
Surfacing |
LRP028 |
67 |
27.8 |
LRP028 |
567 |
28.3 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-17/KURD/2017-2018 |
11-Jan-2018 |
30 Days |
Carpeting |
LRP027 |
1014 |
27.9 |
LRP029 |
624 |
29.5 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/03 |
23-Feb-2014 |
28 Days |
Carpeting |
LRP028 |
667 |
28.4 |
LRP028 |
967 |
28.7 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/22 |
4-Jun-2014 |
7 Days |
Carpeting |
LRP028 |
967 |
28.7 |
LRP029 |
372 |
29.1 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/03 |
23-Feb-2014 |
28 Days |
Carpeting |
LRP029 |
372 |
29.1 |
LRP029 |
572 |
29.3 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/22 |
4-Jun-2014 |
7 Days |
Carpeting |
LRP029 |
572 |
29.3 |
LRP030 |
277 |
30 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-21/KURD/2017-2018 |
4-Jan-2018 |
42 Days |
Carpeting |
LRP029 |
772 |
29.5 |
LRP032 |
11 |
31.725 |
Kushtia, (Division Office) |
| Deposit Works |
27/KRD/2005-2006 (Formal No. 32/KRD/2005-2006); L/2 |
9-Oct-2006 |
30 Days |
Road Embankment |
LRP030 |
0 |
29.723 |
LRP034 |
0 |
33.706 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/03 |
23-Feb-2014 |
28 Days |
Carpeting |
LRP030 |
277 |
30 |
LRP030 |
477 |
30.2 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-19/KURD/2017-2018 |
16-Jan-2018 |
45 Days |
Carpeting |
LRP032 |
24 |
31.9 |
LRP033 |
1127 |
34 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/03 |
23-Feb-2014 |
28 Days |
Carpeting |
LRP032 |
586 |
32.3 |
LRP032 |
786 |
32.5 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/23 |
4-Jun-2014 |
7 Days |
Carpeting |
LRP034 |
234 |
33.94 |
LRP035 |
304 |
35.006 |
Kushtia, (Division Office) |
| Revenue |
e-GP/22/ACE Khu/2017-2018 (Re-Tender) |
25-Apr-2018 |
270 Days |
Surfacing |
LRP033 |
1727 |
34.6 |
LRP037 |
732 |
37.6 |
Kushtia, (Division Office) |
| Revenue |
e-GP/05/EE/KURD/2013-2014 |
24-Feb-2014 |
28 Days |
Carpeting |
LRP035 |
298 |
35 |
LRP035 |
598 |
35.3 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/15 |
18-May-2014 |
21 Days |
Carpeting |
LRP035 |
598 |
35.3 |
LRP036 |
604 |
36.3 |
Kushtia, (Division Office) |
| Deposit Works |
27/KRD/2005-2006 (Formal No. 02/KRD/2006-2007); L/12 |
15-Aug-2006 |
14 Days |
Road Embankment |
LRP036 |
0 |
35.696 |
LRP036 |
662 |
36.358 |
Kushtia, (Division Office) |
| Revenue |
e-GP/05/EE/KURD/2013-2014 |
24-Feb-2014 |
28 Days |
Carpeting |
LRP036 |
604 |
36.3 |
LRP036 |
804 |
36.5 |
Kushtia, (Division Office) |
| Development |
e-GP-21/ACE Khu/Dev/2019-20 (WD-02) |
10-Nov-2020 |
729 Days |
Carpeting |
LRP035 |
1727 |
36.6 |
LRP041 |
122 |
41 |
Kushtia, (Division Office) |
| Revenue |
e-GP/05/EE/KURD/2013-2014 |
24-Feb-2014 |
28 Days |
Carpeting |
LRP037 |
558 |
37.25 |
LRP037 |
808 |
37.5 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-26/KURD/2016-2017 |
11-May-2017 |
30 Days |
Carpeting |
LRP037 |
500 |
37.368 |
LRP039 |
0 |
38.868 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-33/KURD/2018-2019 |
29-May-2019 |
30 Days |
Surfacing |
LRP037 |
532 |
37.4 |
LRP039 |
132 |
39 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/16 |
18-May-2014 |
21 Days |
Carpeting |
LRP037 |
808 |
37.5 |
LRP038 |
112 |
37.8 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-22/KURD/2017-2018 |
16-Apr-2018 |
30 Days |
Carpeting |
LRP037 |
1132 |
38 |
LRP037 |
1732 |
38.6 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/17 |
18-May-2014 |
21 Days |
Carpeting |
LRP039 |
67 |
38.75 |
LRP039 |
817 |
39.5 |
Kushtia, (Division Office) |
| Revenue |
e-GP/05/EE/KURD/2013-2014 |
24-Feb-2014 |
28 Days |
Carpeting |
LRP039 |
817 |
39.5 |
LRP039 |
917 |
39.6 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-38/KURD/2017-2018 |
29-May-2018 |
28 Days |
Carpeting |
LRP039 |
732 |
39.6 |
LRP040 |
642 |
40.5 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/17 |
18-May-2014 |
21 Days |
Carpeting |
LRP039 |
917 |
39.6 |
LRP040 |
135 |
39.8 |
Kushtia, (Division Office) |
| Revenue |
e-GP/05/EE/KURD/2013-2014 |
24-Feb-2014 |
28 Days |
Carpeting |
LRP040 |
135 |
39.8 |
LRP039 |
1517 |
40.2 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/18 |
18-May-2014 |
21 Days |
Carpeting |
LRP040 |
535 |
40.2 |
LRP040 |
1135 |
40.8 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-33/KURD/2018-2019 |
29-May-2019 |
30 Days |
Surfacing |
LRP040 |
742 |
40.6 |
LRP041 |
122 |
41 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/16 |
18-May-2014 |
21 Days |
Carpeting |
LRP041 |
125 |
40.8 |
LRP041 |
825 |
41.5 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-38/KURD/2017-2018 |
29-May-2018 |
28 Days |
Carpeting |
LRP040 |
942 |
40.8 |
LRP041 |
122 |
41 |
Kushtia, (Division Office) |
| Deposit Works |
44/KRD/2005-2006; L/1 |
13-Feb-2006 |
90 Days |
Road Embankment |
LRP041 |
325 |
41 |
LRP044 |
321 |
44 |
Kushtia, (Division Office) |
| Development |
e-GP-22/ACE Khu/Dev/2019-20 (WD-03) |
|
729 Days |
Carpeting |
LRP041 |
122 |
41 |
LRP045 |
1162 |
46 |
Kushtia, (Division Office) |
| Revenue |
e-GP/22/ACE Khu/2017-2018 (Re-Tender) |
25-Apr-2018 |
270 Days |
Surfacing |
LRP041 |
772 |
41.65 |
LRP043 |
792 |
43.65 |
Kushtia, (Division Office) |
| Revenue |
e-GP/05/EE/KURD/2013-2014 |
24-Feb-2014 |
28 Days |
Carpeting |
LRP042 |
26 |
41.7 |
LRP042 |
221 |
41.895 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/18 |
18-May-2014 |
21 Days |
Carpeting |
LRP042 |
221 |
41.895 |
LRP042 |
571 |
42.245 |
Kushtia, (Division Office) |
| Deposit Works |
51/KRD/2005-2006 |
12-Mar-2006 |
120 Days |
Road Embankment |
LRP042 |
326 |
42 |
LRP048 |
412 |
48 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/09 |
12-Mar-2014 |
21 Days |
Carpeting |
LRP041 |
1850 |
42.525 |
LRP041 |
1950 |
42.625 |
Kushtia, (Division Office) |
| Revenue |
e-GP/KURD/13-14/09 |
12-Mar-2014 |
21 Days |
Carpeting |
LRP041 |
1950 |
42.625 |
LRP043 |
875 |
43.545 |
Kushtia, (Division Office) |
| Revenue PMP |
PMP 2007-08/Overlay/06 |
24-Feb-2008 |
150 Days |
Overlay |
LRP043 |
560 |
43.23 |
LRP063 |
10 |
62.377 |
Kushtia, (Division Office) |
| Revenue |
e-GP/22/ACE Khu/2017-2018 (Re-Tender) |
25-Apr-2018 |
270 Days |
Surfacing |
LRP043 |
992 |
43.85 |
LRP048 |
992 |
48.75 |
Kushtia, (Division Office) |
| Revenue |
02 (Main)/KURD/2011-2012; L/3 |
24-Nov-2011 |
60 Days |
Surfacing |
LRP044 |
460 |
44.139 |
LRP045 |
933 |
45.594 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-5 |
29-Feb-2012 |
80 Days |
Surfacing |
LRP045 |
1199 |
45.86 |
LRP045 |
1699 |
46.36 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-5 |
29-Feb-2012 |
80 Days |
Carpeting |
LRP045 |
1699 |
46.36 |
LRP045 |
1999 |
46.66 |
Kushtia, (Division Office) |
| Development |
03/JRC/KURD/2010-2011; Lot No. 1 |
26-Apr-2011 |
365 Days |
Road Rehablitation |
LRP045 |
1699 |
46.36 |
LRP063 |
993 |
63.36 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2013-2014; P-2 |
2-Oct-2013 |
15 Days |
Surfacing |
LRP045 |
1699 |
46.36 |
LRP063 |
993 |
63.36 |
Kushtia, (Division Office) |
| Revenue |
e-GP-01/Khu Zone/2013-2014 |
26-Feb-2014 |
253 Days |
Overlay |
LRP045 |
1699 |
46.36 |
LRP063 |
993 |
63.36 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-04/KURD/2016-2017 (Re-Tendered) |
12-Apr-2017 |
45 Days |
Pavement |
LRP045 |
1700 |
46.361 |
LRP045 |
1860 |
46.521 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-16/KURD/2017-2018 |
28-Feb-2018 |
60 Days |
Carpeting |
LRP045 |
1612 |
46.45 |
LRP049 |
142 |
48.9 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-5 |
29-Feb-2012 |
80 Days |
Pavement |
LRP045 |
1999 |
46.66 |
LRP045 |
2449 |
47.11 |
Kushtia, (Division Office) |
| Deposit Works |
71/KURD/2006-2007 |
5-Jun-2007 |
30 Days |
Pavement |
LRP048 |
-588 |
47 |
LRP048 |
-359 |
47.229 |
Kushtia, (Division Office) |
| Deposit Works |
72/KURD/2006-2007 |
5-Jun-2007 |
30 Days |
Pavement |
LRP048 |
-588 |
47 |
LRP048 |
-367 |
47.221 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-5 |
29-Feb-2012 |
80 Days |
Carpeting |
LRP045 |
2449 |
47.11 |
LRP045 |
2699 |
47.36 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-4 |
14-Aug-2012 |
45 Days |
Pavement |
LRP045 |
2699 |
47.36 |
LRP049 |
1766 |
50.36 |
Kushtia, (Division Office) |
| Revenue |
01/JRC/KURD/2011-2012; Lot No. 03 |
28-Nov-2012 |
365 Days |
Road Embankment |
LRP048 |
426 |
48.014 |
LRP050 |
706 |
50.298 |
Kushtia, (Division Office) |
| Revenue |
e-GP/23/ACE Khu/2017-2018 |
3-May-2018 |
270 Days |
Overlay |
LRP048 |
992 |
48.75 |
LRP050 |
792 |
50.55 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-13/KURD/2017-2018 |
8-Jan-2018 |
30 Days |
Carpeting |
LRP050 |
0 |
49.758 |
LRP059 |
0 |
58.713 |
Kushtia, (Division Office) |
| Revenue |
04/JRC/KURD/2012-2013 |
28-Nov-2012 |
120 Days |
Pavement |
LRP049 |
1704 |
50.298 |
LRP051 |
409 |
51.077 |
Kushtia, (Division Office) |
| Revenue |
LTM-04/JRC/2011-2012 (Lot No. 02) |
19-Apr-2012 |
60 Days |
Pavement |
LRP050 |
768 |
50.36 |
LRP050 |
998 |
50.59 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-4 |
14-Aug-2012 |
45 Days |
Pavement |
LRP050 |
768 |
50.36 |
LRP050 |
998 |
50.59 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-15/KURD/2017-2018 |
15-Feb-2018 |
45 Days |
Carpeting |
LRP050 |
742 |
50.5 |
LRP050 |
1092 |
50.85 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-3 |
7-May-2012 |
45 Days |
Road Rehablitation |
LRP050 |
998 |
50.59 |
LRP051 |
707 |
51.375 |
Kushtia, (Division Office) |
| Revenue |
01/JRC/KURD/2011-2012; Lot No. 01 |
27-Nov-2012 |
365 Days |
Road Embankment |
LRP051 |
409 |
51.077 |
LRP053 |
783 |
53.36 |
Kushtia, (Division Office) |
| Revenue |
e-GP/Rev/W-15/KURD/2017-2018 |
15-Feb-2018 |
45 Days |
Carpeting |
LRP050 |
1392 |
51.15 |
LRP054 |
402 |
54.15 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-2 |
14-Aug-2012 |
45 Days |
Pavement |
LRP051 |
707 |
51.375 |
LRP052 |
563 |
52.16 |
Kushtia, (Division Office) |
| Deposit Works |
27/KRD/2005-2006 (Formal No. 21/KRD/2006-2007); L/6 |
31-Aug-2006 |
30 Days |
Road Embankment |
LRP053 |
-577 |
52 |
LRP053 |
-327 |
52.25 |
Kushtia, (Division Office) |
| Revenue |
LTM-04/JRC/2011-2012 (Lot No. 01) |
19-Apr-2012 |
60 Days |
Pavement |
LRP052 |
563 |
52.16 |
LRP053 |
323 |
52.9 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-1 |
12-Mar-2012 |
45 Days |
Road Rehablitation |
LRP051 |
1492 |
52.16 |
LRP053 |
783 |
53.36 |
Kushtia, (Division Office) |
| Deposit Works |
29/KRD/2005-2006 (Formal No. 16/KRD/2006-2007); L/6 |
29-Aug-2006 |
30 Days |
Road Embankment |
LRP053 |
-322 |
52.255 |
LRP053 |
-67 |
52.51 |
Kushtia, (Division Office) |
| Revenue |
LTM-04/JRC/2011-2012 (Lot No. 02) |
19-Apr-2012 |
60 Days |
Pavement |
LRP053 |
323 |
52.9 |
LRP053 |
783 |
53.36 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-32/KURD/2018-2019 |
29-May-2019 |
30 Days |
Carpeting |
LRP053 |
352 |
53.1 |
LRP054 |
352 |
54.1 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-1 |
12-Mar-2012 |
45 Days |
Road Rehablitation |
LRP052 |
1763 |
53.36 |
LRP054 |
794 |
54.36 |
Kushtia, (Division Office) |
| Revenue |
e-GP/23/ACE Khu/2017-2018 |
3-May-2018 |
270 Days |
Overlay |
LRP054 |
352 |
54.1 |
LRP060 |
3087 |
62.8 |
Kushtia, (Division Office) |
| Revenue |
01-LTM/KURD/2011-2012; P-1 |
12-Mar-2012 |
45 Days |
Road Rehablitation |
LRP054 |
794 |
54.36 |
LRP054 |
894 |
54.46 |
Kushtia, (Division Office) |
| Revenue |
06/JRC/2012-2013; Lot No. 2 |
28-Mar-2013 |
120 Days |
Surfacing |
LRP054 |
894 |
54.46 |
LRP063 |
993 |
63.36 |
Kushtia, (Division Office) |
| Revenue |
DPM-10/KURD/2012-2013 |
3-Dec-2012 |
7 Days |
Road Rehablitation |
LRP054 |
894 |
54.46 |
LRP055 |
89 |
54.65 |
Kushtia, (Division Office) |
| Revenue |
DPM-11/KURD/2012-2013 |
3-Dec-2012 |
7 Days |
Road Rehablitation |
LRP055 |
89 |
54.65 |
LRP055 |
339 |
54.9 |
Kushtia, (Division Office) |
| Revenue |
DPM-12/KURD/2012-2013 |
3-Dec-2012 |
7 Days |
Road Rehablitation |
LRP058 |
625 |
58.17 |
LRP058 |
845 |
58.39 |
Kushtia, (Division Office) |
| Revenue |
DPM-13/KURD/2012-2013 |
3-Dec-2012 |
7 Days |
Road Rehablitation |
LRP058 |
845 |
58.39 |
LRP059 |
143 |
58.655 |
Kushtia, (Division Office) |
| Revenue |
e-GP/R/W-28/KURD/2016-2017 |
4-May-2017 |
30 Days |
Carpeting |
LRP059 |
487 |
59.2 |
LRP060 |
397 |
60.11 |
Kushtia, (Division Office) |
| Revenue |
DPM-14/KURD/2012-2013 |
4-Dec-2012 |
7 Days |
Road Rehablitation |
LRP060 |
474 |
59.98 |
LRP060 |
684 |
60.19 |
Kushtia, (Division Office) |
| Revenue |
DPM-15/KURD/2012-2013 |
4-Dec-2012 |
7 Days |
Road Rehablitation |
LRP060 |
684 |
60.19 |
LRP060 |
904 |
60.41 |
Kushtia, (Division Office) |
| Revenue |
DPM-16/KURD/2012-2013 |
3-Dec-2012 |
7 Days |
Road Rehablitation |
LRP060 |
904 |
60.41 |
LRP061 |
144 |
60.65 |
Kushtia, (Division Office) |
| Revenue |
DPM-17/KURD/2012-2013 |
4-Dec-2012 |
7 Days |
Road Rehablitation |
LRP061 |
144 |
60.65 |
LRP061 |
319 |
60.825 |
Kushtia, (Division Office) |
| Revenue |
DPM-18/KURD/2012-2013 |
4-Dec-2012 |
7 Days |
Road Rehablitation |
LRP061 |
319 |
60.825 |
LRP061 |
504 |
61.01 |
Kushtia, (Division Office) |
| Revenue |
DPM-19/KURD/2012-2013 |
4-Dec-2012 |
7 Days |
Road Embankment |
LRP061 |
504 |
61.01 |
LRP061 |
734 |
61.24 |
Kushtia, (Division Office) |
| Revenue |
e-GP/RJZ/PMP(Road)/02/2018-2019(Re-Tender), ID : 232276 |
15-Jan-2019 |
150 Days |
DBST |
LRP002 |
61717 |
63.56 |
LRP080 |
1192 |
81.53 |
Pabna, (Division Office) |
| Revenue |
e-gp-33-PRD-2015-2016, ID: 40547 |
3-Apr-2016 |
60 Days |
Pavement |
LRP002 |
64587 |
66.43 |
LRP002 |
64787 |
66.63 |
Pabna, (Division Office) |
| Revenue |
46/e-GP/PRD/2017-2018, Tender ID : 180214 |
17-May-2018 |
15 Days |
Road Embankment |
LRP071 |
-4388 |
67 |
LRP073 |
-550 |
72.8 |
Pabna, (Division Office) |
| Revenue |
34/e-GP/PRD-2017-2018, Tender ID : 165196 |
28-Mar-2018 |
30 Days |
Pavement |
LRP071 |
-3500 |
67.888 |
LRP073 |
|
73.35 |
Pabna, (Division Office) |
| Revenue |
32/e-GP/PRD/2019-2020, ID : 408744 |
9-Feb-2020 |
30 Days |
Pavement |
LRP073 |
162 |
72.65 |
LRP073 |
547 |
73.035 |
Pabna, (Division Office) |
| Revenue |
06/E-GP/PRD/2017-2018, ID : 131870 |
7-Dec-2017 |
30 Days |
Pavement |
LRP072 |
750 |
73.1 |
LRP072 |
937 |
73.287 |
Pabna, (Division Office) |
| Revenue |
e-gp-33-PRD-2015-2016, ID: 40547 |
3-Apr-2016 |
60 Days |
Pavement |
LRP073 |
864 |
74.214 |
LRP074 |
14 |
74.364 |
Pabna, (Division Office) |
| Revenue |
e-gp-13-PRD-2016-2017, ID: 79152 |
1-Feb-2017 |
30 Days |
Pavement |
LRP074 |
0 |
74.35 |
LRP078 |
0 |
78.314 |
Pabna, (Division Office) |
| Revenue |
e-gp-29-PRD-2016-2017, ID : 103887 |
26-Sep-2017 |
20 Days |
Pavement |
LRP080 |
2000 |
82.338 |
LRP080 |
2600 |
82.938 |
Pabna, (Division Office) |