| List of ongoing works on the road ( N2 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Revenue |
DPM 08(Eight)/EE, RHD/HRD/2008-2009 |
14-May-2009 |
7 Days |
Road Rehablitation |
LRP002 |
0 |
1.142 |
LRP002 |
5 |
1.147 |
Habiganj, (Division Office) |
| Revenue |
WD 22(Twenty two)/2016-2017/EE, RHD/Sylhet |
7-Jun-2017 |
15 Days |
Pavement |
LRP002 |
0 |
1.142 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue |
TEST |
1-Aug-2019 |
270 Days |
Carpeting |
LRP002 |
|
1.142 |
LRPE |
|
286.409 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 03/2015-2016/EE, RHD/Sylhet, Lot No. 01 |
24-Aug-2015 |
7 Days |
Pavement |
LRP002 |
0 |
1.142 |
LRP192 |
0 |
191.174 |
Sylhet, (Division Office) |
| Revenue |
10l/EE, RHD/Sylhet/2012-2013 |
8-Nov-2012 |
30 Days |
Pavement |
LRP002 |
0 |
1.142 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue |
36d/EE, RHD/Sylhet/2012-2013 |
23-Sep-2012 |
7 Days |
Pavement |
LRP002 |
0 |
1.142 |
LRP002 |
858 |
2 |
Sylhet, (Division Office) |
| Revenue |
e-GP-03/EE/KRD/2017-2018 (Tender ID : 138183) |
10-Jan-2018 |
30 Days |
Carpeting |
LRP002 |
0 |
1.166 |
LRP002 |
1000 |
2.166 |
Kishoreganj, (Division Office) |
| Revenue |
MZ(e-GP)-07/PMP(Road)/2014-2015 |
11-Dec-2014 |
180 Days |
Carpeting |
LRP002 |
1000 |
2.142 |
LRP073 |
|
73 |
Kishoreganj, (Division Office) |
| Revenue |
36/2004-2005/EE.RHD/HRD (D to R) |
17-May-2009 |
90 Days |
Pavement |
LRP002 |
9400 |
10.542 |
LRP111 |
|
110.556 |
Habiganj, (Division Office) |
| Revenue |
DPM 13(Thirteen)/EE, RHD/HRD/2008-2009 |
17-May-2009 |
7 Days |
Pavement |
LRP002 |
10400 |
11.542 |
LRP002 |
10600 |
11.742 |
Habiganj, (Division Office) |
| Revenue |
27/PMP-Minor/e-GP/HRD/2019-20. (462661) |
22-Jun-2020 |
30 Days |
Road Rehablitation |
LRP002 |
12034 |
13.2 |
LRP002 |
14734 |
15.9 |
Habiganj, (Division Office) |
| Revenue |
43/NRD/2014-2015 |
26-Oct-2014 |
7 Days |
Pavement |
LRPS |
13600 |
13.6 |
LRPS |
14000 |
14 |
Narayanganj, (Division Office) |
| Revenue |
42/NRD/2014-2015 |
27-Oct-2014 |
7 Days |
Pavement |
LRPS |
14000 |
14 |
LRPS |
14400 |
14.4 |
Narayanganj, (Division Office) |
| Revenue |
5/NRD/2015-2016 |
13-Jul-2015 |
30 Days |
Pavement |
LRPS |
14500 |
14.5 |
LRPS |
15600 |
15.6 |
Narayanganj, (Division Office) |
| Revenue |
97/NRD/2012-2013 |
4-Dec-2012 |
25 Days |
Pavement |
LRPS |
15500 |
15.5 |
LRPS |
16000 |
16 |
Narayanganj, (Division Office) |
| Deposit Works |
135/NRD/2006-2007 |
7-Jan-2007 |
25 Days |
Road Embankment |
LRPS |
16350 |
16.35 |
LRPS |
16500 |
16.5 |
Narayanganj, (Division Office) |
| Revenue |
100/NRD/2013-2014 |
28-Oct-2013 |
7 Days |
Pavement |
LRPS |
16600 |
16.6 |
LRPS |
16850 |
16.85 |
Narayanganj, (Division Office) |
| Revenue |
122/NRD/2013-2014 |
3-Feb-2014 |
20 Days |
Pavement |
LRPS |
18100 |
18.1 |
LRPS |
18850 |
18.85 |
Narayanganj, (Division Office) |
| Revenue PMP |
PMP 2009-10/06/Overlay |
5-Apr-2010 |
726 Days |
Overlay |
LRP019 |
|
18.22 |
LRP019 |
800 |
19.02 |
Narayanganj, (Division Office) |
| Deposit Works |
132/NRD/2006-2007 |
1-Feb-2007 |
25 Days |
Pavement |
LRPS |
20000 |
20 |
LRPS |
22000 |
22 |
Narayanganj, (Division Office) |
| Revenue |
11/NRD/2011-2012 |
21-Nov-2011 |
15 Days |
Pavement |
LRPS |
23000 |
23 |
LRPS |
30000 |
30 |
Narayanganj, (Division Office) |
| Revenue |
83/NRD/2015-2016 |
7-Oct-2015 |
7 Days |
Pavement |
LRPS |
23250 |
23.25 |
LRPS |
23350 |
23.35 |
Narayanganj, (Division Office) |
| Revenue |
92/NRD/2013-2014 |
9-Oct-2013 |
7 Days |
Pavement |
LRPS |
23500 |
23.5 |
LRPS |
24500 |
24.5 |
Narayanganj, (Division Office) |
| Deposit Works |
106/NRD/2006-2007 |
16-Jan-2007 |
30 Days |
Pavement |
LRPS |
24000 |
24 |
LRPS |
25000 |
25 |
Narayanganj, (Division Office) |
| Revenue |
73/NRD/2015-2016 |
24-Sep-2015 |
7 Days |
Pavement |
LRPS |
24085 |
24.085 |
LRPS |
24130 |
24.13 |
Narayanganj, (Division Office) |
| Revenue |
67/NRD/2015-2016 |
24-Sep-2015 |
7 Days |
Pavement |
LRPS |
24130 |
24.13 |
LRPS |
24185 |
24.185 |
Narayanganj, (Division Office) |
| Revenue |
70/NRD/2015-2016 |
24-Sep-2015 |
7 Days |
Pavement |
LRPS |
24185 |
24.185 |
LRPS |
24250 |
24.25 |
Narayanganj, (Division Office) |
| Revenue |
100/NRD/2015-2016 |
26-Oct-2015 |
7 Days |
Pavement |
LRPS |
24350 |
24.35 |
LRPS |
24420 |
24.42 |
Narayanganj, (Division Office) |
| Revenue PMP |
PMP 2009-10/06/Overlay |
5-Apr-2010 |
726 Days |
Overlay |
LRP027 |
|
26.254 |
LRP030 |
595 |
29.854 |
Narayanganj, (Division Office) |
| Deposit Works |
122/NRD/2006-2007 |
18-Jan-2007 |
30 Days |
Pavement |
LRPS |
28000 |
28 |
LRPS |
31000 |
31 |
Narayanganj, (Division Office) |
| Deposit Works |
151/NRD/2006-2007 |
15-Feb-2007 |
30 Days |
Pavement |
LRPS |
31000 |
31 |
LRPS |
32500 |
32.5 |
Narayanganj, (Division Office) |
| Deposit Works |
56/NRD/2006-2007 |
10-Jan-2007 |
30 Days |
Road Embankment |
LRPS |
32000 |
32 |
LRPS |
33000 |
33 |
Narayanganj, (Division Office) |
| Revenue PMP |
PMP 2009-10/06/Overlay |
5-Apr-2010 |
726 Days |
Overlay |
LRP034 |
4512 |
37.83 |
LRP039 |
|
38.33 |
Narayanganj, (Division Office) |
| Revenue PMP |
PMP 2009-10/06/Overlay |
5-Apr-2010 |
726 Days |
Overlay |
LRP034 |
4512 |
37.83 |
LRP039 |
|
38.33 |
Narayanganj, (Division Office) |
| Revenue |
13/e-GP/EE/HRD/2016-2017/ 91317 |
3-May-2017 |
30 Days |
Carpeting |
LRP002 |
56000 |
57.142 |
LRP002 |
56800 |
57.942 |
Habiganj, (Division Office) |
| Revenue Periodic Roads |
110/EE/KRD/2007-08 |
9-Mar-2008 |
3 Days |
Carpeting |
LRP068 |
0 |
67.407 |
LRP073 |
0 |
73 |
Kishoreganj, (Division Office) |
| Revenue Periodic Roads |
172/EE/KRD/2007-08 |
26-Jun-2008 |
3 Days |
Carpeting |
LRP068 |
0 |
67.407 |
LRP073 |
0 |
73 |
Kishoreganj, (Division Office) |
| Revenue |
53/EE/KRD/2011-12. |
13-Sep-2011 |
15 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
1000 |
74 |
Kishoreganj, (Division Office) |
| Revenue |
112/EE/KRD/2008-09 |
22-Jun-2009 |
30 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
87 |
73.087 |
Kishoreganj, (Division Office) |
| Revenue |
14/EE/KRD/2013-14 |
30-Oct-2013 |
3 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
1000 |
74 |
Kishoreganj, (Division Office) |
| Revenue |
23/EE/KRD/2010-11 |
13-Feb-2011 |
5 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
500 |
73.5 |
Kishoreganj, (Division Office) |
| Revenue |
91/EE/KRD/2009-2010 |
7-Jun-2010 |
5 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
11000 |
84 |
Kishoreganj, (Division Office) |
| Revenue |
108/EE/KRD/2008-09 |
22-Jun-2009 |
30 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
1000 |
74 |
Kishoreganj, (Division Office) |
| Revenue |
13/EE/KRD/2009-10 |
14-Jan-2010 |
3 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
1000 |
74 |
Kishoreganj, (Division Office) |
| Revenue |
101/EE/KRD/2009- 2010. |
14-Jun-2010 |
5 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
100 |
73.1 |
Kishoreganj, (Division Office) |
| Revenue |
24/EE/KRD/2010-11. |
13-Feb-2011 |
5 Days |
Carpeting |
LRP073 |
0 |
73 |
LRP073 |
500 |
73.5 |
Kishoreganj, (Division Office) |
| Revenue |
04/(OTM) EE. RHD. B-Baria /2008-2009 Lot No.-02. |
4-Jan-2009 |
30 Days |
Carpeting |
LRP078 |
-4000 |
74 |
LRP109 |
|
108.549 |
Brahmanbaria, (Division Office) |
| Revenue |
07/(OTM) EE. RHD. B-Baria. 2009-2010. Lot 07 (Seven). |
14-Jan-2010 |
60 Days |
Carpeting |
LRP078 |
-3820 |
74.18 |
LRP109 |
201 |
108.75 |
Brahmanbaria, (Division Office) |
| Revenue |
20/EE/KRD/2010-11 |
7-Feb-2011 |
3 Days |
Carpeting |
LRP073 |
9000 |
82 |
LRP073 |
10000 |
83 |
Kishoreganj, (Division Office) |
| Revenue |
02/SE/MRC/2011-2012, Lot No. - 01 (one). |
14-Mar-2012 |
180 Days |
Carpeting |
LRP073 |
10000 |
83 |
LRP073 |
12000 |
85 |
Kishoreganj, (Division Office) |
| Revenue |
MRC/e-GP/06/PMP(Road)KRD/2018-2019, Tender ID No.- 292759 |
12-Jun-2019 |
90 Days |
Carpeting |
LRP073 |
10000 |
83 |
LRP073 |
12000 |
85 |
Kishoreganj, (Division Office) |
| Revenue |
MRC(e-GP)-25/Rev(KRD)/2017-2018, Tender ID No.- 191225 |
5-Jun-2018 |
15 Days |
Carpeting |
LRP002 |
82000 |
83.166 |
LRP002 |
85000 |
86.166 |
Kishoreganj, (Division Office) |
| Revenue |
185/EE/KRD/2011-12 |
13-Jun-2012 |
365 Days |
Carpeting |
LRP073 |
12000 |
85 |
LRP073 |
13000 |
86 |
Kishoreganj, (Division Office) |
| Revenue |
23.../EE/KRD/2010-11 |
13-Feb-2011 |
5 Days |
Carpeting |
LRP073 |
12000 |
85 |
LRP073 |
13000 |
86 |
Kishoreganj, (Division Office) |
| Revenue |
80/EE/KRD/2008-09 |
27-Apr-2009 |
30 Days |
Carpeting |
LRP073 |
12001 |
85.001 |
LRP073 |
13000 |
86 |
Kishoreganj, (Division Office) |
| Revenue |
80.../EE/KRD/2008-09 |
27-Apr-2009 |
30 Days |
Carpeting |
LRP073 |
12001 |
85.001 |
LRP073 |
13000 |
86 |
Kishoreganj, (Division Office) |
| Revenue |
70/EE/KRD/2009-10. |
28-Apr-2010 |
60 Days |
Carpeting |
LRP073 |
13000 |
86 |
LRP073 |
14000 |
87 |
Kishoreganj, (Division Office) |
| Revenue Periodic Roads |
86/EE/KRD-2007 - 08. |
2-Mar-2008 |
3 Days |
Carpeting |
LRP068 |
19000 |
86.407 |
LRP073 |
15000 |
88 |
Kishoreganj, (Division Office) |
| Revenue |
166/EE/KRD/2009-2010. |
24-Jun-2010 |
5 Days |
Carpeting |
LRP073 |
14000 |
87 |
LRP073 |
14500 |
87.5 |
Kishoreganj, (Division Office) |
| Revenue |
18/e-GP/PMP (Road)/ACE/RHD/Sylhet/2017-2018/151613 |
15-Mar-2018 |
274 Days |
DBST |
LRP002 |
99999 |
101.165 |
LRP146 |
984 |
146.025 |
Habiganj, (Division Office) |
| Revenue |
e-GP19/RHD/HRD/2017-2018 (149734) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP110 |
0 |
108.906 |
LRP111 |
0 |
109.906 |
Habiganj, (Division Office) |
| Revenue |
e-GP19/RHD/HRD/2017-2018 (149734) |
8-Mar-2018 |
30 Days |
Pavement |
LRP110 |
0 |
108.906 |
LRP111 |
0 |
109.906 |
Habiganj, (Division Office) |
| Revenue |
e-GP20/RHD/HRD/2017-2018 (149735) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP110 |
0 |
108.906 |
LRP127 |
0 |
125.951 |
Habiganj, (Division Office) |
| Revenue |
e-GP20/RHD/HRD/2017-2018 (149735) |
8-Mar-2018 |
30 Days |
Pavement |
LRP110 |
0 |
108.906 |
LRP127 |
0 |
125.951 |
Habiganj, (Division Office) |
| Revenue |
15/PMP-Minor/e-GP/HRD/2019-20 (410336) |
9-Feb-2020 |
60 Days |
Carpeting |
LRP110 |
0 |
108.906 |
LRP113 |
960 |
112.871 |
Habiganj, (Division Office) |
| Revenue |
e-GP/01/PMP Road/MRC/2018-19/218320 |
10-Jan-2019 |
180 Days |
Overlay |
LRP110 |
|
108.906 |
LRP132 |
14 |
131 |
Habiganj, (Division Office) |
| Revenue |
e-GP45/RHD/HRD/2017-2018 (194040) |
3-Jun-2018 |
21 Days |
Carpeting |
LRP110 |
0 |
108.906 |
LRP112 |
819 |
111.73 |
Habiganj, (Division Office) |
| Revenue |
37/EE, RHD/HRD/2004-2005 (D to R) |
17-May-2009 |
90 Days |
Carpeting |
LRP110 |
14 |
109.563 |
LRP126 |
2128 |
127.128 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP110 |
89 |
109.638 |
LRP111 |
582 |
111.138 |
Moulvi Bazar, (Division Office) |
| Revenue |
02(Two)/SE/MRC/2011-2012 |
5-Jul-2011 |
210 Days |
Overlay |
LRP110 |
489 |
110.038 |
LRP110 |
589 |
110.138 |
Habiganj, (Division Office) |
| Revenue |
02(Two)/SE/MRC/2011-2012 |
5-Jul-2011 |
210 Days |
Overlay |
LRP110 |
589 |
110.138 |
LRP110 |
989 |
110.538 |
Habiganj, (Division Office) |
| Revenue |
41(Forty One)/2008-2009/EE, RHD/HRD |
25-Jun-2009 |
30 Days |
Carpeting |
LRP111 |
47 |
110.603 |
LRP111 |
649 |
111.205 |
Habiganj, (Division Office) |
| Revenue |
DPM 15(Fifteen)/ EE, HRD/HRD/2008-2009 |
17-May-2009 |
7 Days |
Carpeting |
LRP111 |
111 |
110.667 |
LRP111 |
114 |
110.67 |
Habiganj, (Division Office) |
| Revenue |
DPM 14(Forteen)/EE, RHD/HRD/2008-2009 |
17-May-2009 |
7 Days |
Carpeting |
LRP111 |
115 |
110.671 |
LRP111 |
120 |
110.676 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP111 |
1182 |
111.738 |
LRP111 |
2182 |
112.738 |
Moulvi Bazar, (Division Office) |
| Revenue |
e-GP46/RHD/HRD/2017-2018 (194041) |
7-Jun-2018 |
21 Days |
Carpeting |
LRP113 |
339 |
112.25 |
LRP116 |
0 |
114.916 |
Habiganj, (Division Office) |
| Revenue |
e-GP30/RHD/HRD/2017-2018 (177164) |
10-May-2018 |
30 Days |
Carpeting |
LRP115 |
0 |
113.916 |
LRP116 |
0 |
114.916 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP111 |
3382 |
113.938 |
LRP111 |
3882 |
114.438 |
Moulvi Bazar, (Division Office) |
| Revenue |
e-GP-10(ten)/ACE/SZ/2015-2016/28109 |
19-Nov-2015 |
408 Days |
DBST |
LRP116 |
126 |
115.126 |
LRP181 |
5570 |
185.57 |
Habiganj, (Division Office) |
| Revenue |
02(Two)/SE/MRC/2011-2012 |
5-Jul-2011 |
210 Days |
Overlay |
LRP116 |
1962 |
116.962 |
LRP116 |
3738 |
118.738 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP116 |
3738 |
118.738 |
LRP116 |
4738 |
119.738 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM- 83(Eighty Three)/HRD/2016-2017 |
15-Jun-2017 |
5 Days |
Road Rehablitation |
LRP120 |
0 |
118.921 |
LRP121 |
0 |
119.921 |
Habiganj, (Division Office) |
| Revenue |
02(Two)/SE/MRC/2011-2012 |
5-Jul-2011 |
210 Days |
Overlay |
LRP116 |
4738 |
119.738 |
LRP116 |
5100 |
120.1 |
Habiganj, (Division Office) |
| Revenue |
25/PMP-Minor/e-GP/HRD/2020-21 (554871) |
25-May-2021 |
31 Days |
Road Rehablitation |
LRP121 |
0 |
119.921 |
LRP176 |
0 |
175.268 |
Habiganj, (Division Office) |
| Revenue |
31/PMP-Minor-SS/e-GP/HRD/2020-21 (570097) |
6-Jun-2021 |
22 Days |
Road Rehablitation |
LRP121 |
0 |
119.921 |
LRP155 |
0 |
154.051 |
Habiganj, (Division Office) |
| Revenue |
20(Twenty)/2011-2012/ E.E. RHD/ HRD |
1-Mar-2012 |
30 Days |
Carpeting |
LRP121 |
0 |
120 |
LRP131 |
0 |
130 |
Habiganj, (Division Office) |
| Revenue |
18(Eighteen)/2013-2014/ E.E. RHD/ HRD |
29-Jan-2014 |
90 Days |
Road Rehablitation |
LRP121 |
0 |
120 |
LRP191 |
5000 |
195 |
Habiganj, (Division Office) |
| Revenue |
e-GP/13/ACE/SZ/2013-2014/6747 |
5-May-2014 |
240 Days |
DBST |
LRP121 |
280 |
120.28 |
LRP146 |
900 |
145.9 |
Habiganj, (Division Office) |
| Revenue |
DPM- 19(Nineteen)-2017-2018. |
6-Aug-2017 |
3 Days |
Carpeting |
LRP122 |
0 |
120.921 |
LRP123 |
0 |
121.911 |
Habiganj, (Division Office) |
| Revenue |
e-GP/04/PMP(Road-Major)/ACE/SZ/M.Bazar/2019-2020/350483 |
16-Mar-2020 |
349 Days |
Overlay |
LRP122 |
|
120.921 |
LRP163 |
|
162.091 |
Habiganj, (Division Office) |
| Revenue |
DPM- 19(Nineteen)-2017-18. |
6-Aug-2017 |
3 Days |
Pavement |
LRP122 |
0 |
120.921 |
LRP123 |
0 |
121.911 |
Habiganj, (Division Office) |
| Revenue |
02(Two)/SE/MRC/2011-2012 |
5-Jul-2011 |
210 Days |
Overlay |
LRP116 |
6200 |
121.2 |
LRP116 |
8560 |
123.56 |
Habiganj, (Division Office) |
| Revenue |
30(Thirty)/2012-2013/ E.E. RHD/ HRD |
21-Apr-2013 |
30 Days |
Road Rehablitation |
LRP121 |
1350 |
121.35 |
LRP131 |
1850 |
131.85 |
Habiganj, (Division Office) |
| Revenue |
35-G(Thirty Five-G)/2012-2013/ E.E. RHD/ HRD |
18-Jun-2013 |
30 Days |
Road Rehablitation |
LRP121 |
2000 |
122 |
LRP151 |
3000 |
153 |
Habiganj, (Division Office) |
| Revenue |
20/E(Twenty / E)/2011-2012/ E.E. RHD/ HRD |
22-Mar-2012 |
30 Days |
Road Rehablitation |
LRP121 |
2000 |
122 |
LRP121 |
2600 |
122.6 |
Habiganj, (Division Office) |
| Revenue |
DPM- 09(Nine)/HRD/2016-17 |
17-Aug-2016 |
3 Days |
Road Rehablitation |
LRP121 |
4250 |
124.25 |
LRP121 |
4440 |
124.44 |
Habiganj, (Division Office) |
| Revenue |
12(Twelve)/2012-2013/ E.E. RHD/ HRD |
21-Oct-2012 |
30 Days |
Carpeting |
LRP121 |
4450 |
124.45 |
LRP161 |
1650 |
161.65 |
Habiganj, (Division Office) |
| Revenue |
12(Twelve)/2008-2009/EE, RHD/HRD |
11-Mar-2009 |
45 Days |
Pavement |
LRP126 |
|
125 |
LRP126 |
18 |
125.018 |
Habiganj, (Division Office) |
| Revenue |
35-E(Thirty Five-E)/2012-2013/ E.E. RHD/ HRD |
18-Jun-2013 |
30 Days |
Road Rehablitation |
LRP121 |
5000 |
125 |
LRP146 |
5000 |
150 |
Habiganj, (Division Office) |
| Revenue |
DPM- 90(Ninety)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Pavement |
LRP127 |
0 |
125.951 |
LRP128 |
0 |
126.951 |
Habiganj, (Division Office) |
| Revenue |
DPM- 52(Fifty-Two)/HRD/2016-17 |
8-Jan-2017 |
3 Days |
Road Rehablitation |
LRP126 |
1450 |
126.45 |
LRP126 |
2585 |
127.585 |
Habiganj, (Division Office) |
| Revenue |
35-D(Thirty Five-D)/2012-2013/ E.E. RHD/ HRD |
18-Jun-2013 |
90 Days |
Pavement |
LRP126 |
2800 |
127.8 |
LRP126 |
3150 |
128.15 |
Habiganj, (Division Office) |
| Revenue |
e-GP21/RHD/HRD/2017-2018 (149738) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP129 |
44 |
128 |
LRP129 |
444 |
128.4 |
Habiganj, (Division Office) |
| Revenue |
e-GP21/RHD/HRD/2017-2018 (149738) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP128 |
1049 |
128 |
LRP128 |
1449 |
128.4 |
Habiganj, (Division Office) |
| Revenue |
e-GP21/RHD/HRD/2017-2018 (149738) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP130 |
24 |
129 |
LRP130 |
409 |
129.385 |
Habiganj, (Division Office) |
| Revenue |
e-GP21/RHD/HRD/2017-2018 (149738) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP130 |
74 |
129.05 |
LRP130 |
414 |
129.39 |
Habiganj, (Division Office) |
| Revenue |
e-GP21/RHD/HRD/2017-2018 (149738) |
8-Mar-2018 |
30 Days |
Carpeting |
LRP130 |
124 |
129.1 |
LRP130 |
174 |
129.15 |
Habiganj, (Division Office) |
| Revenue |
19(Nineteen)/2008-2009/EE, RHD/HRD (Final) |
29-May-2009 |
30 Days |
Surfacing |
LRP131 |
0 |
130 |
LRP131 |
22 |
130.022 |
Habiganj, (Division Office) |
| Revenue |
19(Nineteen) 2008-2009/EE, RHD/HRD (Final approved) |
29-Apr-2009 |
30 Days |
Carpeting |
LRP131 |
0 |
130 |
LRP131 |
22 |
130.022 |
Habiganj, (Division Office) |
| Revenue |
14-A(Fourteen-A)/2013-2014/ E.E. RHD/ HRD |
6-Oct-2013 |
60 Days |
Pavement |
LRP126 |
5000 |
130 |
LRP126 |
5100 |
130.1 |
Habiganj, (Division Office) |
| Revenue |
DPM-19(Nineteen)/SE/Habi/ 2020-2021 |
18-May-2021 |
7 Days |
Carpeting |
LRP132 |
0 |
130.986 |
LRP133 |
0 |
131.996 |
Habiganj, (Division Office) |
| Revenue |
17/e-GP/EE/HRD/2014-2015 |
8-Mar-2015 |
30 Days |
Carpeting |
LRP131 |
1000 |
131 |
LRP136 |
1000 |
136 |
Habiganj, (Division Office) |
| Revenue |
02(Two)/2011-2012/ E.E. RHD/ HRD |
7-Jul-2011 |
150 Days |
Pavement |
LRP131 |
1779 |
131.779 |
LRP131 |
1879 |
131.879 |
Habiganj, (Division Office) |
| Revenue |
09-A(Nine-A)/2012-2013/ E.E. RHD/ HRD |
10-Sep-2012 |
30 Days |
Road Rehablitation |
LRP131 |
2250 |
132.25 |
LRP131 |
4200 |
134.2 |
Habiganj, (Division Office) |
| Revenue |
13(Thirteen)/2013-2014/ E.E. RHD/ HRD |
31-Jul-2013 |
60 Days |
Carpeting |
LRP131 |
3800 |
133.8 |
LRP146 |
4375 |
149.375 |
Habiganj, (Division Office) |
| Revenue |
DPM-18(Eighteen)/SE/Habi/ 2020-2021 |
11-May-2021 |
7 Days |
Carpeting |
LRP135 |
0 |
134.016 |
LRP135 |
150 |
134.166 |
Habiganj, (Division Office) |
| Revenue |
DPM-20(Twenty)/SE/Habi/ 2020-2021 |
2-Jun-2021 |
7 Days |
Carpeting |
LRP135 |
0 |
134.016 |
LRP135 |
500 |
134.516 |
Habiganj, (Division Office) |
| Revenue |
16-B(Sixteen-B)/2013-2014/ E.E. RHD/ HRD |
15-Oct-2013 |
30 Days |
Carpeting |
LRP136 |
0 |
135 |
LRP146 |
3000 |
148 |
Habiganj, (Division Office) |
| Revenue |
DPM. 02(Two)/EE, HRD/HRD/2009-2010 |
24-Dec-2009 |
7 Days |
Road Rehablitation |
LRP136 |
1 |
135.001 |
LRP136 |
750 |
135.75 |
Habiganj, (Division Office) |
| Revenue |
DPM- 49(Forty-Nine)/HRD/2016-17 |
24-Nov-2016 |
3 Days |
Road Rehablitation |
LRP137 |
0 |
136.016 |
LRP139 |
979 |
139 |
Habiganj, (Division Office) |
| Revenue |
07/PMP-Minor/e-GP/HRD/2018-19 (223590) |
29-Nov-2018 |
30 Days |
Carpeting |
LRP138 |
999 |
138 |
LRP138 |
1749 |
138.75 |
Habiganj, (Division Office) |
| Revenue |
27/PMP-Minor/e-GP/HRD/2018-19 (313217) |
30-May-2019 |
28 Days |
Road Rehablitation |
LRP139 |
0 |
138.021 |
LRP139 |
300 |
138.321 |
Habiganj, (Division Office) |
| Revenue |
DPM- 46(Forty-Six)/HRD/2016-17 |
23-Nov-2016 |
3 Days |
Road Rehablitation |
LRP140 |
0 |
139.031 |
LRP142 |
0 |
141.031 |
Habiganj, (Division Office) |
| Revenue |
36(Thirty Six)/2008-2009/EE, RHD/HRD |
17-Jun-2009 |
30 Days |
Road Embankment |
LRP141 |
71 |
140.071 |
LRP141 |
72 |
140.072 |
Habiganj, (Division Office) |
| Revenue |
30/e-GP/EE/HRD/2016-2017/99628 |
24-May-2017 |
30 Days |
Overlay |
LRP141 |
200 |
140.2 |
LRP141 |
1069 |
141.069 |
Habiganj, (Division Office) |
| Revenue |
RFQ-03(Three) EE.RHD.HRD-2017-2018. |
26-Oct-2017 |
10 Days |
Pavement |
LRP141 |
964 |
141 |
LRP141 |
1894 |
141.93 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-03(Three) EE.RHD,HRD -2017-2018. |
26-Oct-2017 |
10 Days |
Pavement |
LRP142 |
0 |
141.031 |
LRP142 |
899 |
141.93 |
Habiganj, (Division Office) |
| Revenue |
03(Three)/2012-2013/ E.E. RHD/ HRD |
10-Jul-2012 |
30 Days |
Pavement |
LRP141 |
1069 |
141.069 |
LRP141 |
1099 |
141.099 |
Habiganj, (Division Office) |
| Revenue |
RFQ-02(Two) EE.RHD.HRD-2017-2018. |
26-Oct-2017 |
10 Days |
Pavement |
LRP141 |
1894 |
141.93 |
LRP145 |
1769 |
145.8 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-02(Two) EE.RHD,HRD -2017-2018. |
26-Oct-2017 |
10 Days |
Pavement |
LRP142 |
899 |
141.93 |
LRP146 |
759 |
145.8 |
Habiganj, (Division Office) |
| Revenue |
26(Twenty Six)/2012-2013/ E.E. RHD/ HRD |
13-Feb-2013 |
30 Days |
Road Rehablitation |
LRP141 |
2045 |
142.045 |
LRP141 |
2110 |
142.11 |
Habiganj, (Division Office) |
| Revenue |
39(Thirty Nine)/2012-2013/ E.E. RHD/ HRD |
23-Jun-2013 |
30 Days |
Pavement |
LRP141 |
2200 |
142.2 |
LRP141 |
2420 |
142.42 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP141 |
2230 |
142.23 |
LRP146 |
230 |
145.23 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM- 93(Ninety Three)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP144 |
0 |
143.031 |
LRP145 |
0 |
144.031 |
Habiganj, (Division Office) |
| Revenue |
39(Thirty Nine)/2012-2013/ E.E. RHD/ HRD |
23-Jun-2013 |
30 Days |
Pavement |
LRP141 |
3300 |
143.3 |
LRP141 |
3600 |
143.6 |
Habiganj, (Division Office) |
| Revenue |
27(Twenty Seven)/2012-2013/ E.E. RHD/ HRD |
18-Feb-2013 |
60 Days |
Carpeting |
LRP141 |
4115 |
144.115 |
LRP141 |
4165 |
144.165 |
Habiganj, (Division Office) |
| Revenue |
01(One)/2012-2013/ E.E. RHD/ HRD |
2-Jul-2012 |
30 Days |
Overlay |
LRP141 |
4150 |
144.15 |
LRP141 |
4350 |
144.35 |
Habiganj, (Division Office) |
| Revenue |
21(Twenty One)/2012-2013/ E.E. RHD/ HRD |
20-Jan-2013 |
30 Days |
Road Rehablitation |
LRP131 |
14200 |
144.2 |
LRP131 |
14500 |
144.5 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-35(Thirty Five) EE.RHD,HRD -2010-2011. |
7-Mar-2011 |
7 Days |
Carpeting |
LRP146 |
0 |
145 |
LRP146 |
145 |
145.145 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-44(Forty Four) EE.RHD,HRD -2010-2011. |
15-Mar-2011 |
7 Days |
Road Rehablitation |
LRP141 |
5000 |
145 |
LRP141 |
50030 |
190.03 |
Habiganj, (Division Office) |
| Revenue |
DPM- 94(Ninety Four)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP146 |
0 |
145.041 |
LRP147 |
0 |
146.046 |
Habiganj, (Division Office) |
| Revenue |
10(Ten)/2010-2011/ E.E. RHD/ HRD |
26-Dec-2010 |
644 Days |
Carpeting |
LRP146 |
77 |
145.077 |
LRP146 |
730 |
145.73 |
Habiganj, (Division Office) |
| Revenue |
09(Nine)/2010-2011/ E.E. RHD/ HRD |
21-Dec-2010 |
30 Days |
Pavement |
LRP146 |
360 |
145.36 |
LRP146 |
610 |
145.61 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP146 |
830 |
145.83 |
LRP146 |
2830 |
147.83 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM-14(Fourteen) 2020-2021 |
10-Feb-2021 |
7 Days |
Road Rehablitation |
LRP147 |
0 |
146.046 |
LRP147 |
555 |
146.601 |
Habiganj, (Division Office) |
| Revenue |
09-B(Nine-B)/2012-2013/ E.E. RHD/ HRD |
10-Sep-2012 |
30 Days |
Pavement |
LRP146 |
1650 |
146.65 |
LRP156 |
1230 |
156.23 |
Habiganj, (Division Office) |
| Revenue |
DPM- 05(Five)/HRD/2016-17 |
10-Aug-2016 |
3 Days |
Road Rehablitation |
LRP146 |
2000 |
147 |
LRP146 |
3000 |
148 |
Habiganj, (Division Office) |
| Revenue |
14-B(Fourteen-B)/2013-2014/ E.E. RHD/ HRD |
6-Oct-2013 |
30 Days |
Road Rehablitation |
LRP146 |
2000 |
147 |
LRP146 |
2100 |
147.1 |
Habiganj, (Division Office) |
| Revenue |
DPM- 92(Ninety Two)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Carpeting |
LRP149 |
0 |
147.991 |
LRP150 |
0 |
149.001 |
Habiganj, (Division Office) |
| Revenue |
DPM- 23(Twenty-Three)/HRD/2016-17 |
28-Aug-2016 |
3 Days |
Road Rehablitation |
LRP151 |
1000 |
151 |
LRP151 |
2000 |
152 |
Habiganj, (Division Office) |
| Revenue |
DPM- 18(Eighteen)-2017-18. |
6-Aug-2017 |
3 Days |
Pavement |
LRP153 |
0 |
152.031 |
LRP154 |
0 |
153.041 |
Habiganj, (Division Office) |
| Revenue |
DPM-15(Fifteen) 2020-2021 |
10-Feb-2021 |
7 Days |
Road Rehablitation |
LRP153 |
0 |
152.031 |
LRP153 |
400 |
152.431 |
Habiganj, (Division Office) |
| Revenue |
DPM- 18(Eighteen)-2017-2018. |
6-Aug-2017 |
3 Days |
Carpeting |
LRP153 |
0 |
152.031 |
LRP154 |
0 |
153.041 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-04(Four) EE.RHD,HRD -2012-2013 |
10-Jun-2013 |
7 Days |
Carpeting |
LRP151 |
4150 |
154.15 |
LRP151 |
4230 |
154.23 |
Habiganj, (Division Office) |
| Revenue |
37(Thirty Seven)/2012-2013/ E.E. RHD/ HRD |
20-Jun-2013 |
30 Days |
Road Rehablitation |
LRP151 |
4225 |
154.225 |
LRP171 |
4120 |
174.12 |
Habiganj, (Division Office) |
| Revenue |
38(Thirty Eight)/2012-2013/ E.E. RHD/ HRD |
23-Jun-2013 |
60 Days |
Carpeting |
LRP156 |
50 |
155.05 |
LRP156 |
620 |
155.62 |
Habiganj, (Division Office) |
| Revenue |
52/EE/KRD/2011-2012 |
14-Sep-2011 |
5 Days |
Carpeting |
LRP073 |
82500 |
155.5 |
LRP073 |
83000 |
156 |
Kishoreganj, (Division Office) |
| Revenue |
MRC/e-GP/06/PMP(Road)KRD/2018-2019,.. Tender ID No.- 292759 |
12-Jun-2019 |
90 Days |
Carpeting |
LRP073 |
83000 |
156 |
LRP073 |
85000 |
158 |
Kishoreganj, (Division Office) |
| Revenue |
DPM- 09(Nine)-2017-2018. |
19-Jul-2017 |
3 Days |
Carpeting |
LRP157 |
0 |
156.061 |
LRP158 |
0 |
157.061 |
Habiganj, (Division Office) |
| Revenue |
DPM- 09(Nine)-2017-18. |
19-Jul-2017 |
3 Days |
Road Rehablitation |
LRP157 |
0 |
156.061 |
LRP158 |
0 |
157.061 |
Habiganj, (Division Office) |
| Revenue |
41(Forty One)/2012-2013/ E.E. RHD/ HRD |
23-Jun-2013 |
60 Days |
Carpeting |
LRP156 |
1370 |
156.37 |
LRP156 |
3690 |
158.69 |
Habiganj, (Division Office) |
| Revenue |
54/EE/KRD/2011-2012 |
14-Sep-2011 |
5 Days |
Carpeting |
LRP073 |
83500 |
156.5 |
LRP073 |
84000 |
157 |
Kishoreganj, (Division Office) |
| Development |
e-GP/11(eleven)/ACE/SZ/2014-2015(Re-tender)/28664 |
21-Oct-2015 |
548 Days |
Carpeting |
LRP156 |
3000 |
158 |
LRP171 |
|
170 |
Habiganj, (Division Office) |
| Revenue |
DPM- 04(Four)-2017-18. |
9-Jul-2017 |
3 Days |
Road Rehablitation |
LRP160 |
0 |
159.086 |
LRP161 |
0 |
160.091 |
Habiganj, (Division Office) |
| Revenue |
DPM- 04(Four)-2017-2018. |
9-Jul-2017 |
3 Days |
Carpeting |
LRP160 |
0 |
159.086 |
LRP161 |
0 |
160.091 |
Habiganj, (Division Office) |
| Revenue |
13-D(Thirteen-D)/2013-2014/ E.E. RHD/ HRD |
5-Aug-2013 |
30 Days |
Pavement |
LRP156 |
5000 |
160 |
LRP156 |
5080 |
160.08 |
Habiganj, (Division Office) |
| Revenue |
DPM-05/HRD/2015-2016 |
21-Dec-2015 |
3 Days |
Road Rehablitation |
LRP156 |
5000 |
160 |
LRP161 |
1000 |
161 |
Habiganj, (Division Office) |
| Revenue |
30/PMP-Minor-DS/e-GP/HRD/2020-21 (563024) |
20-Apr-2021 |
102 Days |
Road Rehablitation |
LRP161 |
559 |
160.65 |
LRP161 |
759 |
160.85 |
Habiganj, (Division Office) |
| Revenue |
07/B(Seven/B)/2011-2012/ E.E. RHD/ HRD |
2-Nov-2011 |
60 Days |
Pavement |
LRP161 |
1000 |
161 |
LRP161 |
1178 |
161.178 |
Habiganj, (Division Office) |
| Revenue |
DPM-06/HRD/2015-2016 |
21-Dec-2015 |
3 Days |
Pavement |
LRP161 |
1000 |
161 |
LRP161 |
2000 |
162 |
Habiganj, (Division Office) |
| Revenue |
15-A(Fifteen-A)/2013-2014/ E.E. RHD/ HRD |
7-Oct-2013 |
30 Days |
Carpeting |
LRP161 |
2000 |
162 |
LRP176 |
0 |
175 |
Habiganj, (Division Office) |
| Revenue |
04/PMP-Minor/e-GP/HRD/2019-20 (389598) |
9-Jan-2020 |
30 Days |
Road Rehablitation |
LRP163 |
0 |
162.091 |
LRP189 |
0 |
188.21 |
Habiganj, (Division Office) |
| Revenue |
e-GP/03/PMP(Road-Major)/ACE/SZ/M.Bazar/2019-2020/350482 |
5-Mar-2020 |
274 Days |
Overlay |
LRP163 |
|
162.091 |
LRP180 |
360 |
179.455 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP161 |
3529 |
163.529 |
LRP161 |
5529 |
165.529 |
Moulvi Bazar, (Division Office) |
| Revenue |
E-gp-01(One)EE/RHD/HRD/2013-2014 |
7-May-2014 |
30 Days |
Road Rehablitation |
LRP161 |
4450 |
164.45 |
LRP166 |
3950 |
168.95 |
Habiganj, (Division Office) |
| Revenue |
e-GP-01/PMP Road/ACE/SZ/Sylhet/2018-2019/Re-Tendered/261516 |
14-May-2019 |
274 Days |
Overlay |
LRP164 |
1634 |
164.73 |
LRP180 |
105 |
179.2 |
Habiganj, (Division Office) |
| Revenue |
DPM-16(Sixteen) 2020-2021 |
10-Feb-2021 |
30 Days |
Road Rehablitation |
LRP167 |
0 |
166.121 |
LRP167 |
400 |
166.521 |
Habiganj, (Division Office) |
| Revenue |
11/PMP-Minor/e-GP/HRD/2020-21 (511724) |
26-Jan-2021 |
64 Days |
Pavement |
LRP167 |
879 |
167 |
LRP167 |
1004 |
167.125 |
Habiganj, (Division Office) |
| Revenue |
DPM-19(Nineteen)2020-2021 |
22-Jun-2021 |
7 Days |
Carpeting |
LRP168 |
0 |
167.316 |
LRP168 |
100 |
167.416 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP166 |
4929 |
169.929 |
LRP171 |
1129 |
171.129 |
Moulvi Bazar, (Division Office) |
| Revenue |
21/e-GP/EE/HRD/2014-2015 |
29-Mar-2015 |
30 Days |
Carpeting |
LRP166 |
5000 |
170 |
LRP176 |
1000 |
176 |
Habiganj, (Division Office) |
| Revenue |
e-GP09/RHD/HRD/2017-2018 (131435) |
7-Mar-2018 |
30 Days |
Carpeting |
LRP172 |
450 |
171.623 |
LRP176 |
350 |
175.618 |
Habiganj, (Division Office) |
| Revenue |
10/PMP-Minor/e-GP/HRD/2020-21 (511723) |
26-Jan-2021 |
79 Days |
Road Rehablitation |
LRP173 |
647 |
172.89 |
LRP186 |
850 |
186.02 |
Habiganj, (Division Office) |
| Revenue |
02(Two)/2012-2013/ E.E. RHD/ HRD |
2-Jul-2012 |
30 Days |
Road Rehablitation |
LRP176 |
0 |
175 |
LRP191 |
0 |
190 |
Habiganj, (Division Office) |
| Revenue |
DPM- 99(Ninety Nine)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP176 |
0 |
175.268 |
LRP189 |
0 |
188.21 |
Habiganj, (Division Office) |
| Revenue |
29/A(Twenty Nine/A)/2011-2012/ E.E. RHD/ HRD |
21-Jun-2012 |
30 Days |
Road Rehablitation |
LRP176 |
1000 |
176 |
LRP176 |
2000 |
177 |
Habiganj, (Division Office) |
| Revenue |
e-GP42/RHD/HRD/2017-2018 (194036) |
11-Jun-2018 |
17 Days |
Carpeting |
LRP176 |
987 |
176.255 |
LRP176 |
1392 |
176.66 |
Habiganj, (Division Office) |
| Revenue |
15(Fifteen)/2011-2012/ E.E. RHD/ HRD |
23-Jan-2012 |
90 Days |
Road Rehablitation |
LRP171 |
7000 |
177 |
LRP181 |
5000 |
185 |
Habiganj, (Division Office) |
| Revenue |
14-D(Fourteen-D)/2013-2014/ E.E. RHD/ HRD |
6-Oct-2013 |
30 Days |
Road Rehablitation |
LRP176 |
2000 |
177 |
LRP191 |
500 |
190.5 |
Habiganj, (Division Office) |
| Revenue |
19/A(Nineteen/A)/2011-2012/ E.E. RHD/ HRD |
7-Feb-2012 |
30 Days |
Road Rehablitation |
LRP171 |
7000 |
177 |
LRP191 |
50000 |
240 |
Habiganj, (Division Office) |
| Revenue |
05(Five)/2012-2013/ E.E. RHD/ HRD |
26-Jul-2012 |
30 Days |
Road Rehablitation |
LRP176 |
2000 |
177 |
LRP191 |
14000 |
204 |
Habiganj, (Division Office) |
| Revenue |
22/e-GP/EE/HRD/2016-2017/93229 |
11-May-2017 |
30 Days |
Carpeting |
LRP176 |
3000 |
178 |
LRP181 |
0 |
180 |
Habiganj, (Division Office) |
| Revenue |
e-GP42/RHD/HRD/2017-2018 (194036) |
11-Jun-2018 |
17 Days |
Carpeting |
LRP178 |
1115 |
178.19 |
LRP180 |
315 |
179.41 |
Habiganj, (Division Office) |
| Revenue |
16/e-GP/EE/HRD/2014-2015 |
9-Mar-2015 |
30 Days |
Road Rehablitation |
LRP176 |
4000 |
179 |
LRP186 |
3000 |
188 |
Habiganj, (Division Office) |
| Revenue |
DPM- 73(Seventy Three)/HRD/2016-17 |
14-Jun-2017 |
3 Days |
Road Rehablitation |
LRP180 |
0 |
179.095 |
LRP181 |
0 |
180.08 |
Habiganj, (Division Office) |
| Revenue |
35-C(Thirty Five-C)/2012-2013/ E.E. RHD/ HRD |
18-Jun-2013 |
60 Days |
Pavement |
LRP176 |
4200 |
179.2 |
LRP176 |
5000 |
180 |
Habiganj, (Division Office) |
| Revenue |
e-GP-07(Seven)/ACE/SZ/2016-2017/83421. |
24-Apr-2017 |
274 Days |
Overlay |
LRP178 |
2425 |
179.5 |
LRP185 |
385 |
184.57 |
Habiganj, (Division Office) |
| Revenue |
e-GP42/RHD/HRD/2017-2018 (194036) |
11-Jun-2018 |
17 Days |
Carpeting |
LRP180 |
575 |
179.67 |
LRP181 |
620 |
180.7 |
Habiganj, (Division Office) |
| Revenue |
DPM- 96(Ninety Six)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP181 |
0 |
180.08 |
LRP182 |
0 |
181.13 |
Habiganj, (Division Office) |
| Revenue |
DPM- 95(Ninety Five)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP181 |
0 |
180.08 |
LRP182 |
0 |
181.13 |
Habiganj, (Division Office) |
| Revenue Others |
36(Thirty-Six)/ 2007-2008/EE, RHD/HRD |
22-Jun-2008 |
7 Days |
Carpeting |
LRP181 |
500 |
180.5 |
LRP181 |
1000 |
181 |
Habiganj, (Division Office) |
| Revenue |
19-B(Nineteen-B)/2012-2013/ E.E. RHD/ HRD |
18-Dec-2012 |
90 Days |
Road Rehablitation |
LRP181 |
522 |
180.522 |
LRP181 |
612 |
180.612 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-81(Eighty One) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP181 |
1000 |
181 |
LRP181 |
1035 |
181.035 |
Habiganj, (Division Office) |
| Revenue |
DPM- 74(Seventy Four)/HRD/2016-17 |
14-Jun-2017 |
3 Days |
Road Rehablitation |
LRP182 |
0 |
181.13 |
LRP183 |
0 |
182.18 |
Habiganj, (Division Office) |
| Revenue |
DPM-11(Eleven) 2020-2021 |
31-Jan-2021 |
7 Days |
Road Rehablitation |
LRP182 |
200 |
181.33 |
LRP182 |
300 |
181.43 |
Habiganj, (Division Office) |
| Revenue |
42(Forty Two)/2008-2009/EE, RHD/HRD |
25-Jun-2009 |
30 Days |
Pavement |
LRP181 |
1600 |
181.6 |
LRP181 |
1900 |
181.9 |
Habiganj, (Division Office) |
| Revenue |
42(Forty Two)/2008-2009/EE, RHD/HRD |
25-Jun-2009 |
30 Days |
Pavement |
LRP181 |
2100 |
182.1 |
LRP181 |
2800 |
182.8 |
Habiganj, (Division Office) |
| Revenue |
DPM- 25(Twenty Five)-2017-18. |
8-Aug-2017 |
3 Days |
Pavement |
LRP183 |
0 |
182.18 |
LRP184 |
0 |
183.18 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-81(Eighty One) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP181 |
3000 |
183 |
LRP181 |
3028 |
183.028 |
Habiganj, (Division Office) |
| Revenue |
42(Forty Two)/2008-2009/EE, RHD/HRD |
25-Jun-2009 |
30 Days |
Pavement |
LRP181 |
3000 |
183 |
LRP181 |
3760 |
183.76 |
Habiganj, (Division Office) |
| Revenue |
19/e-GP/EE/HRD/2016-2017/ 93228 |
11-May-2017 |
30 Days |
Carpeting |
LRP181 |
3000 |
183 |
LRP186 |
4000 |
189 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP181 |
3129 |
183.129 |
LRP181 |
4570 |
184.57 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM- 75(Seventy Five)/HRD/2016-17 |
14-Jun-2017 |
3 Days |
Road Rehablitation |
LRP184 |
0 |
183.18 |
LRP185 |
0 |
184.185 |
Habiganj, (Division Office) |
| Revenue |
DPM-12(Twelve) 2020-2021 |
31-Jan-2021 |
7 Days |
Road Rehablitation |
LRP184 |
20 |
183.2 |
LRP185 |
600 |
184.785 |
Habiganj, (Division Office) |
| Revenue |
42(Forty Two)/2008-2009/EE, RHD/HRD |
25-Jun-2009 |
30 Days |
Pavement |
LRP181 |
3450 |
183.45 |
LRP181 |
4700 |
184.7 |
Habiganj, (Division Office) |
| Revenue |
2012-13/03/Overlay |
19-Feb-2013 |
365 Days |
Overlay |
LRP181 |
4000 |
184 |
LRP191 |
14000 |
204 |
Habiganj, (Division Office) |
| Revenue |
42(Forty Two)/2008-2009/EE, RHD/HRD |
25-Jun-2009 |
30 Days |
Pavement |
LRP181 |
4200 |
184.2 |
LRP181 |
4700 |
184.7 |
Habiganj, (Division Office) |
| Revenue |
DPM-13(Thirteen) 2020-2021 |
31-Jan-2021 |
7 Days |
Road Rehablitation |
LRP185 |
350 |
184.535 |
LRP185 |
500 |
184.685 |
Habiganj, (Division Office) |
| Revenue |
29/A(Twenty Nine/A)/2011-2012/ E.E. RHD/ HRD |
21-Jun-2012 |
30 Days |
Road Rehablitation |
LRP181 |
5000 |
185 |
LRP186 |
2800 |
187.8 |
Habiganj, (Division Office) |
| Revenue |
DPM. 01(One)/EE, HRD/HRD/2009-2010 |
5-Nov-2009 |
7 Days |
Road Embankment |
LRP186 |
1 |
185.001 |
LRP186 |
750 |
185.75 |
Habiganj, (Division Office) |
| Revenue |
e-GP-07(Seven)/ACE/SZ/2016-2017/83421. |
24-Apr-2017 |
274 Days |
Overlay |
LRP186 |
400 |
185.57 |
LRP190 |
0 |
189.21 |
Habiganj, (Division Office) |
| Revenue |
DPM-25/HRD/2015-2016 |
15-Jun-2016 |
3 Days |
Road Rehablitation |
LRP186 |
1085 |
186.085 |
LRP186 |
1091 |
186.091 |
Habiganj, (Division Office) |
| Revenue |
DPM-26/HRD/2015-2016 |
15-Jun-2016 |
3 Days |
Road Rehablitation |
LRP186 |
1091 |
186.091 |
LRP186 |
1097 |
186.097 |
Habiganj, (Division Office) |
| Revenue |
e-GP39/RHD/HRD/2017-2018 (184948) |
28-May-2018 |
30 Days |
Carpeting |
LRP186 |
930 |
186.1 |
LRP188 |
30 |
187.24 |
Habiganj, (Division Office) |
| Revenue |
e-GP39/RHD/HRD/2017-2018 (184948) |
28-May-2018 |
30 Days |
Carpeting |
LRP187 |
20 |
186.25 |
LRP187 |
55 |
186.285 |
Habiganj, (Division Office) |
| Revenue |
e-GP39/RHD/HRD/2017-2018 (184948) |
28-May-2018 |
30 Days |
Carpeting |
LRP187 |
200 |
186.43 |
LRP187 |
250 |
186.48 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-80(Eighty) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP186 |
2000 |
187 |
LRP186 |
2020 |
187.02 |
Habiganj, (Division Office) |
| Revenue |
PMP : 2009-10/23/DBST & Overlay |
19-Aug-2010 |
360 Days |
DBST |
LRP186 |
2005 |
187.005 |
LRP186 |
3329 |
188.329 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM- 99(Ninety Nine)/HRD/2016-2017 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP188 |
0 |
187.21 |
LRP189 |
0 |
188.21 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-80(Eighty) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP186 |
3000 |
188 |
LRP186 |
3028 |
188.028 |
Habiganj, (Division Office) |
| Revenue |
DPM- 100(One Hundred)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP189 |
0 |
188.21 |
LRP190 |
1197 |
190.407 |
Habiganj, (Division Office) |
| Revenue |
DPM- 76(Seventy Six)/HRD/2016-17 |
14-Jun-2017 |
3 Days |
Road Rehablitation |
LRP189 |
0 |
188.21 |
LRP190 |
0 |
189.21 |
Habiganj, (Division Office) |
| Revenue |
5/e-GP/EE/HRD/2015-2016 |
6-Jan-2016 |
30 Days |
Carpeting |
LRP186 |
4000 |
189 |
LRP186 |
5000 |
190 |
Habiganj, (Division Office) |
| Revenue |
06/EE/MRD/2018-2019 / TID: 234228 |
2-Dec-2018 |
30 Days |
Surfacing |
LRP190 |
0 |
189.21 |
LRP192 |
0 |
191.21 |
Moulvi Bazar, (Division Office) |
| Revenue |
55/EE/MRD/2018-2019/ TID: 315279 |
30-May-2019 |
15 Days |
Pavement |
LRP190 |
0 |
189.21 |
LRP192 |
0 |
191.21 |
Moulvi Bazar, (Division Office) |
| Revenue |
53/EE/MRD/2018-2019/ TID: 315277 |
30-May-2019 |
15 Days |
Surfacing |
LRP190 |
0 |
189.21 |
LRP191 |
0 |
190.22 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM- 100(One Hundred)/HRD/2016-2017 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP190 |
0 |
189.21 |
LRP190 |
1790 |
191 |
Habiganj, (Division Office) |
| Revenue Others |
79/EE/SRD/2007-2008 |
11-Sep-2007 |
5 Days |
Pavement |
LRP191 |
0 |
190 |
LRP192 |
0 |
191.174 |
Sylhet, (Division Office) |
| Revenue Others |
234/EE/SRD/2007-2008 |
6-Nov-2007 |
5 Days |
Carpeting |
LRP191 |
|
190 |
LRP192 |
|
191.174 |
Sylhet, (Division Office) |
| Revenue Others |
145/EE/SRD/2007-2008 |
27-Nov-2007 |
3 Days |
Surfacing |
LRP191 |
0 |
190 |
LRP192 |
0 |
191.174 |
Sylhet, (Division Office) |
| Revenue Others |
143/EE/SRD/2007-2008 |
20-Nov-2007 |
3 Days |
Pavement |
LRP191 |
0 |
190 |
LRP192 |
0 |
191.174 |
Sylhet, (Division Office) |
| Revenue Others |
147/EE/SRD/2007-2008 |
21-Nov-2007 |
3 Days |
Road Embankment |
LRP191 |
0 |
190 |
LRP192 |
0 |
191.174 |
Sylhet, (Division Office) |
| Revenue Others |
96/EE/SRD/2007-2008 |
31-Oct-2007 |
45 Days |
Carpeting |
LRP191 |
0 |
190 |
LRP192 |
0 |
191.174 |
Sylhet, (Division Office) |
| Revenue |
26/e-GP/EE/HRD/2014-2015 |
25-Mar-2015 |
30 Days |
Carpeting |
LRP191 |
0 |
190 |
LRP191 |
5000 |
195 |
Habiganj, (Division Office) |
| Revenue |
PMP-Minor-Works-28/EE/MRD/2019-2020/409634 |
4-Mar-2020 |
60 Days |
Road Embankment |
LRP191 |
0 |
190.22 |
LRP192 |
0 |
191.21 |
Moulvi Bazar, (Division Office) |
| Revenue |
DPM- 97(Ninety Seven)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP190 |
1825 |
191.035 |
LRP190 |
2590 |
191.8 |
Habiganj, (Division Office) |
| Revenue |
RFQ No. 07/2015-2016/EE, RHD/Sylhet, Lot No. 02 |
30-Sep-2015 |
7 Days |
Surfacing |
LRP192 |
0 |
191.174 |
LRP204 |
0 |
203 |
Sylhet, (Division Office) |
| Revenue |
WD 32(Thirty Two)/2018-2019/EE, RHD/Sylhet/274822 |
11-Apr-2019 |
30 Days |
Pavement |
LRP192 |
|
191.174 |
LRP231 |
|
230 |
Sylhet, (Division Office) |
| Development |
SYL/DW-P1/2010-2011/Sylhet Zone |
13-Jun-2011 |
365 Days |
Overlay |
LRP192 |
0 |
191.174 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Development |
15/EE/SRD/2008-2009 |
12-Aug-2008 |
5 Days |
Pavement |
LRP192 |
0 |
191.174 |
LRP197 |
0 |
196.174 |
Sylhet, (Division Office) |
| Revenue |
36t/EE, RHD/Sylhet/2013-2014 |
6-Feb-2014 |
60 Days |
Surfacing |
LRP192 |
0 |
191.174 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
WD 15(Fifteen)/2018-2019/EE, RHD/Sylhet/260131 |
27-Jan-2019 |
20 Days |
Pavement |
LRP192 |
0 |
191.174 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
e-GP/14/ACE/SZ/2013-2014/6730 |
12-May-2014 |
414 Days |
DBST |
LRP192 |
0 |
191.174 |
LRP215 |
3109 |
217.109 |
Sylhet, (Division Office) |
| Revenue |
01/2017-2018 |
4-Jan-2018 |
10 Days |
Carpeting |
LRP192 |
0 |
191.21 |
LRP193 |
0 |
192.22 |
Sylhet, (Division Office) |
| Revenue |
20/e-GP/PMP(Road)/ACE/RHD/Sylhet/2017-2018/153835 |
26-Apr-2018 |
272 Days |
Overlay |
LRP192 |
390 |
191.564 |
LRP215 |
1564 |
215.564 |
Sylhet, (Division Office) |
| Revenue |
e-GP/04(Four)/ACE/SZ/2016-2017/83096 |
9-May-2017 |
442 Days |
Overlay |
LRP192 |
756 |
191.93 |
LRP220 |
2968 |
221.968 |
Sylhet, (Division Office) |
| Revenue |
12(Twelve)/SE, RHD/Sylhet/2015-2016 |
25-Jan-2016 |
45 Days |
Pavement |
LRP192 |
826 |
192 |
LRP192 |
1826 |
193 |
Sylhet, (Division Office) |
| Revenue |
WD 23(Twenty three))/2015-2016/EE, RHD/Sylhet |
31-Mar-2016 |
60 Days |
Pavement |
LRP192 |
826 |
192 |
LRP192 |
1826 |
193 |
Sylhet, (Division Office) |
| Revenue |
RFQ No-80(Eighty) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP191 |
2000 |
192 |
LRP191 |
2029 |
192.029 |
Habiganj, (Division Office) |
| Revenue |
RFQ No. 04/2015-2016/EE, RHD/Sylhet, Lot No. 02 |
27-Aug-2015 |
7 Days |
Carpeting |
LRP192 |
838 |
192.012 |
LRP192 |
898 |
192.072 |
Sylhet, (Division Office) |
| Revenue |
e-GP/08(Eight)/ACE/SZ/2015-2016/28105 |
12-Jan-2016 |
354 Days |
Surfacing |
LRP192 |
1326 |
192.5 |
LRP209 |
3890 |
211.89 |
Sylhet, (Division Office) |
| Revenue |
30/e-GP/EE/HRD/2014-2015 |
5-May-2015 |
30 Days |
Road Rehablitation |
LRP191 |
2950 |
192.95 |
LRP191 |
3000 |
193 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-54(Fifty Four) EE.RHD,HRD -2010-2011. |
1-Jun-2011 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3380 |
193.38 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-57(Fifty Seven) EE.RHD,HRD -2010-2011. |
1-Jun-2011 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3071 |
193.071 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-55(Fifty Five) EE.RHD,HRD -2010-2011. |
1-Jun-2011 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3072 |
193.072 |
Habiganj, (Division Office) |
| Revenue |
04(Four)/2011-2012/ E.E. RHD/ HRD |
21-Jul-2011 |
30 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
12000 |
202 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-01(One) SDE.RHD,HRD -2011-2012 |
11-Jan-2012 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3057 |
193.057 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-02(Two) SDE.RHD,HRD -2011-2012 |
18-Mar-2012 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3057 |
193.057 |
Habiganj, (Division Office) |
| Revenue |
19/e-GP/EE/HRD/2015-2016 |
28-Feb-2016 |
30 Days |
Road Rehablitation |
LRP191 |
3000 |
193 |
LRP191 |
3500 |
193.5 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-03(Three) SDE.RHD,HRD -2011-2012 |
27-May-2012 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3057 |
193.057 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-56(Fifty Six) EE.RHD,HRD -2010-2011. |
1-Jun-2011 |
7 Days |
Carpeting |
LRP191 |
3000 |
193 |
LRP191 |
3267 |
193.267 |
Habiganj, (Division Office) |
| Revenue |
03(Three)/SE, RHD/Sylhet/2020-2021 |
8-Feb-2021 |
45 Days |
Pavement |
LRP194 |
0 |
193.123 |
LRP218 |
0 |
217.438 |
Sylhet, (Division Office) |
| Revenue |
DPM- 98(Ninety Eight)/HRD/2016-17 |
18-Jun-2017 |
3 Days |
Road Rehablitation |
LRP190 |
3945 |
193.155 |
LRP190 |
4674 |
193.884 |
Habiganj, (Division Office) |
| Revenue |
e-GP/01/PMP(Road-Major)/ACE/SZ/Sylhet/2019-2020/ID 350468 |
22-Jan-2020 |
242 Days |
Pavement |
LRP193 |
1346 |
193.566 |
LRP222 |
647 |
222.08 |
Sylhet, (Division Office) |
| Revenue |
13/e-GP/EE/HRD/2015-2016 |
11-Jan-2016 |
30 Days |
Carpeting |
LRP191 |
4000 |
194 |
LRP191 |
8000 |
198 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-79(Seventy Nine) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP191 |
4000 |
194 |
LRP191 |
4035 |
194.035 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-79(Seventy Nine) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP191 |
4000 |
194 |
LRP191 |
4028 |
194.028 |
Habiganj, (Division Office) |
| Revenue |
11/e-GP/EE/HRD/2014-2015 |
28-Feb-2015 |
30 Days |
Carpeting |
LRP191 |
5000 |
195 |
LRP191 |
5780 |
195.78 |
Habiganj, (Division Office) |
| Revenue |
6/e-GP/EE/HRD/2015-2016 |
6-Jan-2016 |
30 Days |
Carpeting |
LRP191 |
6000 |
196 |
LRP191 |
7000 |
197 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-77(Seventy Seven) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP191 |
6100 |
196.1 |
LRP191 |
6782 |
196.782 |
Habiganj, (Division Office) |
| Revenue |
WD 03(Three)/2017-2018/EE, RHD/Sylhet |
29-Oct-2017 |
30 Days |
Pavement |
LRP197 |
0 |
196.174 |
LRP197 |
1316 |
197.49 |
Sylhet, (Division Office) |
| Revenue |
WD 15(Fifteen)/2019-2020/EE, RHD/Sylhet/396661 |
16-Jan-2020 |
30 Days |
Pavement |
LRP197 |
|
196.298 |
LRP207 |
|
206.333 |
Sylhet, (Division Office) |
| Revenue |
e-GP/04/PMP(Road-Major)/ACE/SZ/Sylhet/2020-2021/ID 491059 |
27-Dec-2020 |
181 Days |
Pavement |
LRP197 |
0 |
196.298 |
LRP220 |
0 |
219.438 |
Sylhet, (Division Office) |
| Revenue |
44(Forty Four)/2012-2013/ E.E. RHD/ HRD |
28-Jun-2013 |
60 Days |
Pavement |
LRP191 |
8000 |
198 |
LRP191 |
9000 |
199 |
Habiganj, (Division Office) |
| Revenue |
DPM-15/HRD/2015-2016 |
15-May-2016 |
3 Days |
Pavement |
LRP110 |
89451 |
199 |
LRP191 |
10000 |
200 |
Habiganj, (Division Office) |
| Revenue |
WD 55(Fifty Five)/2019-2020/EE, RHD/Sylhet/460561 |
7-Jun-2020 |
15 Days |
Pavement |
LRP200 |
0 |
199.308 |
LRP202 |
0 |
201.333 |
Sylhet, (Division Office) |
| Revenue |
30/e-GP/EE/HRD/2015-2016 |
26-Jun-2016 |
4 Days |
Carpeting |
LRP191 |
10000 |
200 |
LRP191 |
11000 |
201 |
Habiganj, (Division Office) |
| Revenue |
RFQ No-78(Seventy Eight) EE.RHD,HRD -2010-2011. |
12-Jun-2011 |
7 Days |
Road Rehablitation |
LRP191 |
10700 |
200.7 |
LRP191 |
11380 |
201.38 |
Habiganj, (Division Office) |
| Revenue |
e-GP/09/EE/MRD/2017-2018/125162 |
17-Jan-2018 |
30 Days |
Carpeting |
LRP192 |
11090 |
202.3 |
LRP192 |
11540 |
202.75 |
Moulvi Bazar, (Division Office) |
| Revenue |
e-GP/04/EE/MRD/2015-2016/33459 |
7-Jan-2016 |
60 Days |
Surfacing |
LRP192 |
11190 |
202.4 |
LRP192 |
13160 |
204.37 |
Moulvi Bazar, (Division Office) |
| Revenue |
75d/EE, RHD/Sylhet/2013-2014 |
12-Nov-2013 |
3 Days |
Pavement |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
99/EE, RHD/Sylhet/2010-2011 |
2-Sep-2010 |
5 Days |
Surfacing |
LRP204 |
0 |
203 |
LRP209 |
0 |
208 |
Sylhet, (Division Office) |
| Revenue |
249d/EE, RHD/Sylhet/2013-2014 |
22-Jun-2014 |
3 Days |
Pavement |
LRP204 |
0 |
203 |
LRP204 |
500 |
203.5 |
Sylhet, (Division Office) |
| Revenue Others |
231/EE/SRD/2007-2008 |
25-Nov-2007 |
5 Days |
Carpeting |
LRP204 |
0 |
203 |
LRP209 |
0 |
208 |
Sylhet, (Division Office) |
| Revenue |
80/EE, RHD/Sylhet/2009-2010 |
24-Nov-2009 |
5 Days |
Surfacing |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
72/EE,RHD/Sylhet/2011-2012 |
21-Sep-2011 |
3 Days |
Surfacing |
LRP204 |
|
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
37/EE, RHD/Sylhet/2009-2010 |
20-Aug-2009 |
5 Days |
Surfacing |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue Others |
193/EE/SRD/2007-2008 |
1-Jan-2008 |
21 Days |
Surfacing |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
264d/EE, RHD/Sylhet/2013-2014 |
19-Jun-2014 |
3 Days |
Pavement |
LRP204 |
0 |
203 |
LRP204 |
500 |
203.5 |
Sylhet, (Division Office) |
| Revenue |
13d/EE, RHD/Sylhet/2012-2013 |
12-Jul-2012 |
3 Days |
Pavement |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
187/EE, RHD/Sylhet/2009-2010 |
17-Jan-2010 |
5 Days |
Surfacing |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
175d/EE, RHD/Sylhet/2013-2014 |
30-Mar-2014 |
3 Days |
Carpeting |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
282d/EE, RHD/Sylhet/2013-2014 |
25-Jun-2014 |
3 Days |
Surfacing |
LRP204 |
0 |
203 |
LRP204 |
1000 |
204 |
Sylhet, (Division Office) |
| Revenue |
e-GP/09/EE/MRD/2017-2018/125162 |
17-Jan-2018 |
30 Days |
Carpeting |
LRP192 |
11790 |
203 |
LRP192 |
12360 |
203.57 |
Moulvi Bazar, (Division Office) |
| Revenue Others |
99/EE/SRD/2007-2008 |
31-Oct-2007 |
45 Days |
Pavement |
LRP204 |
0 |
203 |
LRP226 |
0 |
225 |
Sylhet, (Division Office) |
| Revenue |
28t/EE, RHD/Sylhet/2013-2014 |
16-Jan-2014 |
65 Days |
Pavement |
LRP204 |
|
203 |
LRP226 |
3000 |
228 |
Sylhet, (Division Office) |
| Revenue |
RFQ No-22(Twenty Two) EE.RHD,HRD -2009-2010. |
24-Jun-2010 |
7 Days |
Road Rehablitation |
LRP186 |
18700 |
203.7 |
LRP186 |
18800 |
203.8 |
Habiganj, (Division Office) |
| Revenue |
44t/EE, RHD/Sylhet/2013-2014 |
25-Feb-2014 |
60 Days |
Surfacing |
LRP204 |
1000 |
204 |
LRP239 |
1098 |
239 |
Sylhet, (Division Office) |
| Revenue |
02r/EE, RHD/Sylhet/2014-2015 |
3-Feb-2015 |
7 Days |
Pavement |
LRP204 |
1000 |
204 |
LRP204 |
2000 |
205 |
Sylhet, (Division Office) |
| Revenue |
01r/EE, RHD/Sylhet/2014-2015 |
3-Feb-2015 |
7 Days |
Pavement |
LRP204 |
1000 |
204 |
LRP204 |
2000 |
205 |
Sylhet, (Division Office) |
| Revenue |
15l/EE, RHD/Sylhet/2012-2013 |
20-Dec-2012 |
30 Days |
Pavement |
LRP204 |
1000 |
204 |
LRP204 |
2000 |
205 |
Sylhet, (Division Office) |
| Revenue |
264d/EE, RHD/Sylhet/2014-2015 |
24-Sep-2014 |
7 Days |
Pavement |
LRP204 |
1800 |
204.8 |
LRP204 |
1950 |
204.95 |
Sylhet, (Division Office) |
| Revenue |
146/EE/SRD/2008-2009 |
7-May-2009 |
5 Days |
Surfacing |
LRP204 |
2000 |
205 |
LRP204 |
3000 |
206 |
Sylhet, (Division Office) |
| Revenue |
10l/EE, RHD/Sylhet/2013-2014 |
30-Jul-2013 |
30 Days |
Pavement |
LRP204 |
2000 |
205 |
LRP239 |
1098 |
239 |
Sylhet, (Division Office) |
| Revenue |
06t/EE, RHD/Sylhet/2013-2014 |
12-Nov-2013 |
30 Days |
Pavement |
LRP204 |
2000 |
205 |
LRP237 |
1098 |
237 |
Sylhet, (Division Office) |
| Revenue |
284d/EE, RHD/Sylhet/2013-2014 |
25-Jun-2014 |
3 Days |
Surfacing |
LRP204 |
2000 |
205 |
LRP204 |
3000 |
206 |
Sylhet, (Division Office) |
| Revenue |
101d/EE, RHD/Sylhet/2013-2014 |
2-Dec-2013 |
3 Days |
Surfacing |
LRP204 |
2000 |
205 |
LRP204 |
4000 |
207 |
Sylhet, (Division Office) |
| Revenue |
PMP 2008-2009/09/Overlay |
2-Apr-2009 |
727 Days |
Overlay |
LRP204 |
2070 |
205.07 |
LRP234 |
108 |
233 |
Sylhet, (Division Office) |
| Revenue |
WD 17(Seventeen)/2018-2019/EE, RHD/Sylhet/260133 |
30-Jan-2019 |
30 Days |
Pavement |
LRP204 |
2900 |
205.9 |
LRP215 |
5438 |
219.438 |
Sylhet, (Division Office) |
| Revenue |
210d/EE, RHD/Sylhet/2012-2013 |
11-Jun-2013 |
7 Days |
Surfacing |
LRP204 |
3000 |
206 |
LRP204 |
4000 |
207 |
Sylhet, (Division Office) |
| Revenue |
04t/EE, RHD/Sylhet/2013-2014 |
3-Jul-2013 |
7 Days |
Pavement |
LRP204 |
3000 |
206 |
LRP209 |
5000 |
213 |
Sylhet, (Division Office) |
| Revenue |
13l/EE, RHD/Sylhet/2013-2014 |
11-Aug-2013 |
30 Days |
Pavement |
LRP204 |
3000 |
206 |
LRP209 |
6000 |
214 |
Sylhet, (Division Office) |
| Revenue |
283d/EE, RHD/Sylhet/2013-2014 |
25-Jun-2014 |
3 Days |
Surfacing |
LRP209 |
0 |
208 |
LRP209 |
1000 |
209 |
Sylhet, (Division Office) |
| Revenue Others |
268/EE/SRD/2007-2008 |
8-Jan-2008 |
7 Days |
Surfacing |
LRP209 |
0 |
208 |
LRP215 |
0 |
214 |
Sylhet, (Division Office) |
| Revenue |
WD 04(Four)/2017-2018/EE, RHD/Sylhet |
29-Oct-2017 |
30 Days |
Pavement |
LRP209 |
0 |
208 |
LRP209 |
2597 |
210.597 |
Sylhet, (Division Office) |
| Revenue |
109d/EE, RHD/Sylhet/2013-2014 |
4-Dec-2013 |
3 Days |
Surfacing |
LRP204 |
5400 |
208.4 |
LRP220 |
1500 |
220.5 |
Sylhet, (Division Office) |
| Revenue |
220d/EE, RHD/Sylhet/2014-2015 |
14-Oct-2014 |
3 Days |
Surfacing |
LRP209 |
1000 |
209 |
LRP209 |
3000 |
211 |
Sylhet, (Division Office) |
| Revenue |
115d/EE, RHD/Sylhet/2013-2014 |
2-Dec-2013 |
3 Days |
Surfacing |
LRP209 |
1000 |
209 |
LRP209 |
4000 |
212 |
Sylhet, (Division Office) |
| Revenue |
188/EE, RHD/Sylhet/2011-2012 |
2-Apr-2012 |
3 Days |
Surfacing |
LRP209 |
1000 |
209 |
LRP209 |
2000 |
210 |
Sylhet, (Division Office) |
| Revenue |
71l/EE, RHD/Sylhet/2012-2013 |
18-Jun-2013 |
15 Days |
Pavement |
LRP209 |
1000 |
209 |
LRP226 |
3000 |
228 |
Sylhet, (Division Office) |
| Revenue |
261d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Surfacing |
LRP209 |
1000 |
209 |
LRP209 |
3000 |
211 |
Sylhet, (Division Office) |
| Revenue |
WD 06(Six)/2017-2018/EE, RHD/Sylhet/118192 |
9-Nov-2017 |
45 Days |
Pavement |
LRP209 |
3376 |
211.376 |
LRP215 |
1418 |
215.418 |
Sylhet, (Division Office) |
| Revenue |
e-GP/09(Nine)/ACE/SZ/2015-2016/28107 |
7-Jan-2016 |
180 Days |
DBST |
LRP209 |
4700 |
212.7 |
LRP220 |
6050 |
225.05 |
Sylhet, (Division Office) |
| Revenue |
05t/EE, RHD/Sylhet/2013-2014 |
4-Jul-2013 |
7 Days |
Pavement |
LRP209 |
5000 |
213 |
LRP215 |
4000 |
218 |
Sylhet, (Division Office) |
| Revenue |
19/EE, RHD/Sylhet/2010-2011 |
8-Sep-2010 |
7 Days |
Surfacing |
LRP215 |
0 |
214 |
LRP220 |
0 |
219 |
Sylhet, (Division Office) |
| Revenue |
27l/EE, RHD/Sylhet/2012-2013 |
12-Feb-2013 |
30 Days |
Pavement |
LRP215 |
0 |
214 |
LRP226 |
0 |
225 |
Sylhet, (Division Office) |
| Revenue |
14l/EE, RHD/Sylhet/2013-2014 |
11-Aug-2013 |
30 Days |
Pavement |
LRP215 |
1000 |
215 |
LRP226 |
2000 |
227 |
Sylhet, (Division Office) |
| Revenue |
79/EE, RHD/Sylhet/2010-2011 |
30-Sep-2010 |
7 Days |
Surfacing |
LRP204 |
12000 |
215 |
LRP215 |
2000 |
216 |
Sylhet, (Division Office) |
| Revenue |
169/EE, RHD/Sylhet/2011-2012 |
14-Mar-2012 |
3 Days |
Surfacing |
LRP215 |
2000 |
216 |
LRP215 |
3000 |
217 |
Sylhet, (Division Office) |
| Revenue |
WD 23(Twenty Three)/2019-2020/EE, RHD/Sylhet/403293 |
4-Mar-2020 |
30 Days |
Pavement |
LRP219 |
0 |
218.438 |
LRP229 |
0 |
227.793 |
Sylhet, (Division Office) |
| Revenue |
45t/EE, RHD/Sylhet/2012-2013 |
2-Jun-2013 |
7 Days |
Pavement |
LRP215 |
6000 |
220 |
LRP220 |
6000 |
225 |
Sylhet, (Division Office) |
| Revenue |
e-GP 09(Nine)/2020-2021/EE, RHD/Sylhet/515943 |
27-Dec-2020 |
30 Days |
Pavement |
LRP222 |
0 |
221.433 |
LRP225 |
0 |
224.473 |
Sylhet, (Division Office) |
| Revenue |
108d/EE, RHD/Sylhet/2013-2014 |
5-Dec-2013 |
3 Days |
Surfacing |
LRP197 |
26226 |
222.4 |
LRP238 |
2899 |
239.8 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 04/2015-2016/EE, RHD/Sylhet, Lot No. 01 |
27-Aug-2015 |
7 Days |
Surfacing |
LRP220 |
4000 |
223 |
LRP220 |
5000 |
224 |
Sylhet, (Division Office) |
| Revenue |
e-GP/06/PMP(Road-Major)/ACE/SZ/Sylhet/2019-2020/ID 401830 |
20-Apr-2020 |
274 Days |
Pavement |
LRP225 |
|
224.473 |
LRP269 |
|
268.008 |
Sylhet, (Division Office) |
| Revenue Others |
363/EE/SRD/2007-2008 |
22-Apr-2008 |
45 Days |
Surfacing |
LRP226 |
0 |
225 |
LRP226 |
1000 |
226 |
Sylhet, (Division Office) |
| Revenue |
e-GP/08/ACE/SZ/2014-2015/11863 |
28-Dec-2014 |
180 Days |
DBST |
LRP226 |
51 |
225.051 |
LRP233 |
1106 |
233.001 |
Sylhet, (Division Office) |
| Revenue |
WD 19(Nineteen)/2018-2019/EE, RHD/Sylhet/263565 |
11-Feb-2019 |
30 Days |
Overlay |
LRP226 |
373 |
225.373 |
LRP226 |
1373 |
226.373 |
Sylhet, (Division Office) |
| Revenue |
46t/EE, RHD/Sylhet/2012-2013 |
30-May-2013 |
7 Days |
Pavement |
LRP226 |
1000 |
226 |
LRP237 |
1098 |
237 |
Sylhet, (Division Office) |
| Revenue |
WD 20(Twenty)/2018-2019/EE, RHD/Sylhet/263566 |
11-Feb-2019 |
30 Days |
Pavement |
LRP226 |
1373 |
226.373 |
LRP226 |
2756 |
227.756 |
Sylhet, (Division Office) |
| Revenue |
159d/EE, RHD/Sylhet/2013-2014 |
9-Mar-2014 |
7 Days |
Surfacing |
LRP226 |
2000 |
227 |
LRP226 |
4000 |
229 |
Sylhet, (Division Office) |
| Revenue |
54t/EE, RHD/Sylhet/2013-2014 |
30-Jan-2014 |
90 Days |
Pavement |
LRP226 |
2000 |
227 |
LRP226 |
3000 |
228 |
Sylhet, (Division Office) |
| Revenue |
WD 22(Twenty Two)/2019-2020/EE, RHD/Sylhet/403292 |
4-Mar-2020 |
30 Days |
Pavement |
LRP229 |
0 |
227.793 |
LRP234 |
0 |
232.888 |
Sylhet, (Division Office) |
| Revenue |
268d/EE, RHD/Sylhet/2012-2013 |
17-Jun-2013 |
7 Days |
Surfacing |
LRP226 |
3000 |
228 |
LRP237 |
1098 |
237 |
Sylhet, (Division Office) |
| Revenue |
WD 06(Six)/2016-2017/EE, RHD/Sylhet |
8-Dec-2016 |
50 Days |
Pavement |
LRP226 |
3000 |
228 |
LRP231 |
0 |
230 |
Sylhet, (Division Office) |
| Revenue Others |
100/EE/SRD/2007-2008 |
6-Nov-2007 |
30 Days |
Pavement |
LRP226 |
3000 |
228 |
LRP226 |
4000 |
229 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2006-07/15/ DBST & Overlay |
7-Jun-2007 |
150 Days |
Overlay |
LRP226 |
3000 |
228 |
LRP231 |
1000 |
231 |
Sylhet, (Division Office) |
| Revenue |
WD 14(Fourteen)/2019-2020/EE, RHD/Sylhet/396660 |
16-Jan-2020 |
30 Days |
Pavement |
LRP229 |
255 |
228.048 |
LRP229 |
1395 |
229.188 |
Sylhet, (Division Office) |
| Revenue |
35t/EE, RHD/Sylhet/2013-2014 |
6-Feb-2014 |
60 Days |
Pavement |
LRP226 |
4000 |
229 |
LRP231 |
0 |
230 |
Sylhet, (Division Office) |
| Revenue |
WD 18(Eighteen)/2017-2018/EE, RHD/Sylhet/139869 |
22-Feb-2018 |
30 Days |
Pavement |
LRP226 |
4599 |
229.599 |
LRP226 |
4893 |
229.893 |
Sylhet, (Division Office) |
| Revenue |
PMP 2012-2013/01/Overlay |
19-Feb-2013 |
360 Days |
Overlay |
LRP226 |
4880 |
229.88 |
LRP283 |
2222 |
284.09 |
Sylhet, (Division Office) |
| Revenue |
WD 16(Sixteen)/2017-2018/EE, RHD/Sylhet/139867 |
22-Feb-2018 |
30 Days |
Pavement |
LRP226 |
4893 |
229.893 |
LRP226 |
4990 |
229.99 |
Sylhet, (Division Office) |
| Revenue |
126/EE, RHD/Sylhet/2009-2010 |
15-Dec-2009 |
7 Days |
Surfacing |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
WD 01(One)/2018-2019/EE, RHD/Sylhet/241120 |
22-Jan-2019 |
30 Days |
Pavement |
LRP231 |
0 |
230 |
LRP255 |
0 |
253.979 |
Sylhet, (Division Office) |
| Revenue |
312/EE/SRD/2008-2009 |
24-Jun-2009 |
3 Days |
Surfacing |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
309/EE/SRD/2008-2009 |
24-Jun-2009 |
5 Days |
Surfacing |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
WD 10(Ten)/2016-2017/EE, RHD/Sylhet |
28-Feb-2017 |
60 Days |
Carpeting |
LRP231 |
0 |
230 |
LRP260 |
0 |
258.985 |
Sylhet, (Division Office) |
| Development |
EDDRP/ADB/SLZ/SYL/N-01 |
3-Jun-2008 |
576 Days |
Road Rehablitation |
LRP231 |
0 |
230 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue Others |
351/EE/SRD/2007-2008 |
19-Mar-2008 |
3 Days |
Road Embankment |
LRP231 |
0 |
230 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Development |
14/EE/SRD/2008-2009 |
7-Aug-2008 |
5 Days |
Pavement |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
45/EE, RHD/Sylhet/2010-2011 |
12-Sep-2010 |
7 Days |
Pavement |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue Others |
505/EE/SRD/2007-2008 |
8-Jun-2008 |
5 Days |
Pavement |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
278/EE/SRD/2008-2009 |
7-Jun-2009 |
7 Days |
Pavement |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
12l/EE, RHD/Sylhet/2013-2014 |
7-Aug-2013 |
30 Days |
Pavement |
LRP231 |
0 |
230 |
LRP238 |
1099 |
238 |
Sylhet, (Division Office) |
| Revenue |
WD 12(Twelve)/2017-2018/EE, RHD/Sylhet/144697 |
20-Feb-2018 |
30 Days |
Pavement |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
281/EE/SRD/2008-2009 |
21-Jun-2009 |
7 Days |
Surfacing |
LRP231 |
0 |
230 |
LRP233 |
0 |
231.895 |
Sylhet, (Division Office) |
| Revenue |
15/EE,RHD/Sylhet/2011-2012 |
21-Aug-2011 |
7 Days |
Surfacing |
LRP231 |
95 |
230.095 |
LRP231 |
120 |
230.12 |
Sylhet, (Division Office) |
| Revenue |
16/EE,RHD/Sylhet/2011-2012 |
21-Aug-2011 |
7 Days |
Surfacing |
LRP231 |
120 |
230.12 |
LRP231 |
146 |
230.146 |
Sylhet, (Division Office) |
| Revenue |
07t/EE, RHD/Sylhet/2012-2013 |
24-Dec-2012 |
60 Days |
Pavement |
LRP231 |
1000 |
231 |
LRP233 |
1105 |
233 |
Sylhet, (Division Office) |
| Revenue |
235/EE/SRD/2008-2009 |
16-Jun-2009 |
5 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
479/EE/SRD/2007-2008 |
22-Apr-2008 |
5 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
279/EE/SRD/2008-2009 |
23-Jun-2009 |
5 Days |
Surfacing |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
72/EE/SRD/2008-2009 |
24-Nov-2008 |
5 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 09/2015-2016/EE, RHD/Sylhet, Lot No. 02 |
3-Nov-2015 |
7 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
489/EE/SRD/2007-2008 |
1-Jun-2008 |
3 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
319d/EE, RHD/Sylhet/2012-2013 |
27-Jun-2013 |
5 Days |
Pavement |
LRP233 |
|
231.895 |
LRP234 |
|
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
376/EE/SRD/2007-2008 |
28-Apr-2008 |
5 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
19/e-GP/PMP(Road)/ACE/RHD/Sylhet/2017-2018/151580 |
18-Mar-2018 |
274 Days |
Overlay |
LRP233 |
|
231.895 |
LRP269 |
|
267.985 |
Sylhet, (Division Office) |
| Revenue |
117/EE/SRD/2008-2009 |
22-Jan-2009 |
5 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
508/EE/SRD/2007-2008 |
9-Jun-2008 |
5 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
58/EE/SRD/2007-2008 |
5-Sep-2007 |
5 Days |
Surfacing |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
209/EE/SRD/2008-2009 |
26-Apr-2009 |
5 Days |
Surfacing |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
352/EE/SRD/2007-2008 |
9-Apr-2008 |
3 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
94/EE/SRD/2008-2009 |
17-Dec-2008 |
5 Days |
Surfacing |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue Others |
431/EE/SRD/2007-2008 |
26-May-2008 |
3 Days |
Surfacing |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
293/EE/SRD/2008-2009 |
26-May-2009 |
7 Days |
Pavement |
LRP233 |
0 |
231.895 |
LRP234 |
0 |
232.892 |
Sylhet, (Division Office) |
| Revenue |
65/EE/SRD/2008-2009 |
2-Dec-2008 |
150 Days |
Surfacing |
LRP233 |
15 |
231.91 |
LRP233 |
480 |
232.375 |
Sylhet, (Division Office) |
| Revenue Others |
100/EE/SRD/2007-2008 |
6-Nov-2007 |
30 Days |
Pavement |
LRP231 |
2000 |
232 |
LRP231 |
3000 |
233 |
Sylhet, (Division Office) |
| Revenue |
e-GP 21(Twenty One)/2020-2021/EE, RHD/Sylhet/552206 |
15-Apr-2021 |
30 Days |
Pavement |
LRP234 |
0 |
232.888 |
LRP260 |
0 |
258.993 |
Sylhet, (Division Office) |
| Revenue |
WD 38(Thirty Eight)/2019-2020/EE, RHD/Sylhet/441956 |
19-May-2020 |
30 Days |
Pavement |
LRP234 |
0 |
232.888 |
LRP263 |
0 |
261.993 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 09/2015-2016/EE, RHD/Sylhet, Lot No. 01 |
3-Nov-2015 |
7 Days |
Carpeting |
LRP234 |
0 |
232.892 |
LRP235 |
0 |
233.905 |
Sylhet, (Division Office) |
| Revenue Others |
374/EE/SRD/2007-2008 |
10-Apr-2008 |
3 Days |
Pavement |
LRP234 |
0 |
232.892 |
LRP235 |
0 |
233.905 |
Sylhet, (Division Office) |
| Development |
13/EE/SRD/2008-2009 |
10-Aug-2008 |
5 Days |
Pavement |
LRP234 |
0 |
232.892 |
LRP235 |
0 |
233.905 |
Sylhet, (Division Office) |
| Revenue |
331/EE/SRD/2008-2009 |
24-Jun-2009 |
5 Days |
Surfacing |
LRP234 |
0 |
232.892 |
LRP235 |
0 |
233.905 |
Sylhet, (Division Office) |
| Revenue |
22t/EE, RHD/Sylhet/2013-2014 |
9-Jan-2014 |
25 Days |
Pavement |
LRP233 |
1105 |
233 |
LRP238 |
1099 |
238 |
Sylhet, (Division Office) |
| Revenue |
PMP 2009-2010/25/DBST & Overlay |
18-Aug-2010 |
591 Days |
Overlay |
LRP234 |
108 |
233 |
LRP244 |
84 |
243 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2007-08/13/ DBST |
27-Mar-2008 |
734 Days |
DBST |
LRP234 |
108 |
233 |
LRP269 |
615 |
268.6 |
Sylhet, (Division Office) |
| Revenue |
115d/EE, RHD/Sylhet/2012-2013 |
25-Jan-2013 |
3 Days |
Road Embankment |
LRP234 |
108 |
233 |
LRP235 |
95 |
234 |
Sylhet, (Division Office) |
| Revenue |
e-GP/05/PMP(Major-Road)/SE/SRC/Sylhet/2019-2020/ID 351216 |
11-Feb-2020 |
344 Days |
Pavement |
LRP235 |
|
233.893 |
LRP270 |
|
269.078 |
Sylhet, (Division Office) |
| Revenue Others |
356/EE/SRD/2007-2008 |
6-Apr-2008 |
3 Days |
Pavement |
LRP235 |
0 |
233.905 |
LRP236 |
0 |
234.895 |
Sylhet, (Division Office) |
| Revenue |
WD 13(Thirteen)/2017-2018/EE, RHD/Sylhet/144698 |
6-Mar-2018 |
30 Days |
Pavement |
LRP235 |
0 |
233.905 |
LRP251 |
0 |
249.953 |
Sylhet, (Division Office) |
| Revenue |
PMP 2008-2009/09/Overlay |
2-Apr-2009 |
727 Days |
Overlay |
LRP235 |
0 |
233.905 |
LRP251 |
0 |
249.953 |
Sylhet, (Division Office) |
| Revenue |
350/EE/SRD/2008-2009 |
18-Jun-2009 |
3 Days |
Surfacing |
LRP235 |
0 |
233.905 |
LRP236 |
0 |
234.895 |
Sylhet, (Division Office) |
| Revenue Others |
321/EE/SRD/2007-2008 |
19-Feb-2008 |
3 Days |
Surfacing |
LRP235 |
0 |
233.905 |
LRP236 |
0 |
234.895 |
Sylhet, (Division Office) |
| Revenue |
200d/EE, RHD/Sylhet/2012-2013 |
17-Jun-2013 |
7 Days |
Pavement |
LRP234 |
1108 |
234 |
LRP235 |
1095 |
235 |
Sylhet, (Division Office) |
| Revenue |
262d/EE, RHD/Sylhet/2012-2013 |
19-Jun-2013 |
7 Days |
Surfacing |
LRP235 |
95 |
234 |
LRP236 |
105 |
235 |
Sylhet, (Division Office) |
| Revenue |
332d/EE, RHD/Sylhet/2012-2013 |
27-Jun-2013 |
5 Days |
Pavement |
LRP234 |
1108 |
234 |
LRP235 |
1095 |
235 |
Sylhet, (Division Office) |
| Revenue |
162/EE/SRD/2008-2009 |
10-May-2009 |
7 Days |
Surfacing |
LRP236 |
0 |
234.895 |
LRP237 |
0 |
235.902 |
Sylhet, (Division Office) |
| Revenue |
277/EE/SRD/2008-2009 |
25-Jun-2009 |
5 Days |
Surfacing |
LRP236 |
0 |
234.895 |
LRP237 |
0 |
235.902 |
Sylhet, (Division Office) |
| Revenue |
353d/EE, RHD/Sylhet/2014-2015 |
14-Oct-2014 |
3 Days |
Carpeting |
LRP236 |
0 |
234.895 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
271/EE/SRD/2008-2009 |
23-Jun-2009 |
5 Days |
Pavement |
LRP236 |
0 |
234.895 |
LRP237 |
0 |
235.902 |
Sylhet, (Division Office) |
| Revenue |
09l/EE, RHD/Sylhet/2012-2013 |
8-Nov-2012 |
30 Days |
Pavement |
LRP236 |
|
234.895 |
LRP280 |
|
278.874 |
Sylhet, (Division Office) |
| Revenue |
176/EE, RHD/Sylhet/2009-2010 |
30-Dec-2009 |
7 Days |
Surfacing |
LRP236 |
0 |
234.895 |
LRP237 |
0 |
235.902 |
Sylhet, (Division Office) |
| Revenue |
292d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Surfacing |
LRP235 |
1095 |
235 |
LRP236 |
1105 |
236 |
Sylhet, (Division Office) |
| Revenue |
47l/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
15 Days |
Pavement |
LRP235 |
1095 |
235 |
LRP237 |
1098 |
237 |
Sylhet, (Division Office) |
| Revenue |
79d/EE, RHD/Sylhet/2013-2014 |
19-Nov-2013 |
7 Days |
Pavement |
LRP235 |
1095 |
235 |
LRP236 |
1105 |
236 |
Sylhet, (Division Office) |
| Revenue |
236/EE, RHD/Sylhet/2009-2010 |
24-Feb-2010 |
7 Days |
Surfacing |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
187/EE, RHD/Sylhet/2011-2012 |
2-Apr-2012 |
3 Days |
Surfacing |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
310/EE/SRD/2008-2009 |
24-Jun-2009 |
5 Days |
Surfacing |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
27d/EE, RHD/Sylhet/2014-2015 |
14-Jul-2014 |
7 Days |
Pavement |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
267/EE/SRD/2008-2009 |
25-May-2009 |
5 Days |
Surfacing |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
252d/EE, RHD/Sylhet/2014-2015 |
14-Oct-2014 |
3 Days |
Pavement |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
75d/EE, RHD/Sylhet/2012-2013 |
1-Jan-2013 |
5 Days |
Surfacing |
LRP237 |
0 |
235.902 |
LRP238 |
0 |
236.901 |
Sylhet, (Division Office) |
| Revenue |
290d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Pavement |
LRP235 |
2095 |
236 |
LRP237 |
1098 |
237 |
Sylhet, (Division Office) |
| Revenue Others |
100/EE/SRD/2007-2008 |
6-Nov-2007 |
30 Days |
Pavement |
LRP237 |
98 |
236 |
LRP238 |
99 |
237 |
Sylhet, (Division Office) |
| Revenue |
229/EE/SRD/2008-2009 |
2-Jun-2009 |
5 Days |
Pavement |
LRP238 |
0 |
236.901 |
LRP241 |
0 |
239.908 |
Sylhet, (Division Office) |
| Revenue |
345/EE/SRD/2008-2009 |
23-Jun-2009 |
3 Days |
Pavement |
LRP238 |
0 |
236.901 |
LRP239 |
0 |
237.902 |
Sylhet, (Division Office) |
| Revenue |
327d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Surfacing |
LRP237 |
1098 |
237 |
LRP238 |
1099 |
238 |
Sylhet, (Division Office) |
| Revenue |
326d/EE, RHD/Sylhet/2012-2013 |
17-Jun-2013 |
7 Days |
Surfacing |
LRP237 |
1098 |
237 |
LRP238 |
1099 |
238 |
Sylhet, (Division Office) |
| Revenue |
69d/EE, RHD/Sylhet/2013-2014 |
18-Nov-2013 |
7 Days |
Surfacing |
LRP237 |
1098 |
237 |
LRP238 |
1099 |
238 |
Sylhet, (Division Office) |
| Revenue |
319/EE, RHD/Sylhet/2008-2009 |
7-Jul-2009 |
542 Days |
Pavement |
LRP238 |
767 |
237.668 |
LRP239 |
14 |
237.916 |
Sylhet, (Division Office) |
| Revenue |
321/EE/SRD/2008-2009 |
21-Jun-2009 |
3 Days |
Surfacing |
LRP239 |
0 |
237.902 |
LRP240 |
0 |
238.907 |
Sylhet, (Division Office) |
| Revenue |
08/e-GP/PMP(Road)/ACE/RHD/Sylhet/2017-2018/126270 |
4-Feb-2018 |
272 Days |
Overlay |
LRP238 |
1099 |
238 |
LRP244 |
1384 |
244.3 |
Sylhet, (Division Office) |
| Revenue |
238/EE, RHD/Sylhet/2011-2012 |
10-Apr-2012 |
3 Days |
Surfacing |
LRP240 |
0 |
238.907 |
LRP241 |
0 |
239.908 |
Sylhet, (Division Office) |
| Revenue |
37l/EE, RHD/Sylhet/2012-2013 |
22-May-2013 |
10 Days |
Pavement |
LRP240 |
0 |
238.907 |
LRP241 |
0 |
239.908 |
Sylhet, (Division Office) |
| Revenue |
239/EE, RHD/Sylhet/2011-2012 |
10-Apr-2012 |
3 Days |
Surfacing |
LRP240 |
0 |
238.907 |
LRP241 |
0 |
239.908 |
Sylhet, (Division Office) |
| Revenue |
23/EE, RHD/Sylhet/2009-2010 |
18-Aug-2009 |
5 Days |
Pavement |
LRP240 |
|
238.907 |
LRP241 |
|
239.908 |
Sylhet, (Division Office) |
| Revenue |
83/EE, RHD/Sylhet/2010-2011 |
3-Oct-2010 |
7 Days |
Pavement |
LRP240 |
0 |
238.907 |
LRP241 |
0 |
239.908 |
Sylhet, (Division Office) |
| Revenue Others |
100/EE/SRD/2007-2008 |
6-Nov-2007 |
30 Days |
Pavement |
LRP240 |
93 |
239 |
LRP241 |
92 |
240 |
Sylhet, (Division Office) |
| Revenue |
17l/EE, RHD/Sylhet/2013-2014 |
19-Sep-2013 |
30 Days |
Pavement |
LRP239 |
1098 |
239 |
LRP240 |
1093 |
240 |
Sylhet, (Division Office) |
| Revenue |
92d/EE, RHD/Sylhet/2013-2014 |
27-Nov-2013 |
3 Days |
Surfacing |
LRP240 |
1093 |
240 |
LRP241 |
1092 |
241 |
Sylhet, (Division Office) |
| Revenue |
49/EE, RHD/Sylhet/2010-2011 |
28-Sep-2010 |
7 Days |
Pavement |
LRP243 |
0 |
241.915 |
LRP245 |
0 |
243.916 |
Sylhet, (Division Office) |
| Revenue |
252/EE/SRD/2008-2009 |
20-May-2009 |
30 Days |
Pavement |
LRP243 |
0 |
241.915 |
LRP244 |
0 |
242.916 |
Sylhet, (Division Office) |
| Revenue |
61t/EE, RHD/Sylhet/2013-2014 |
7-Jan-2014 |
60 Days |
Pavement |
LRP243 |
0 |
241.915 |
LRP267 |
0 |
265.986 |
Sylhet, (Division Office) |
| Revenue |
50/EE, RHD/Sylhet/2010-2011 |
28-Sep-2010 |
7 Days |
Pavement |
LRP243 |
|
241.915 |
LRP245 |
|
243.916 |
Sylhet, (Division Office) |
| Revenue |
10t/EE, RHD/Sylhet/2012-2013 |
31-Jan-2013 |
60 Days |
Pavement |
LRP242 |
1088 |
242 |
LRP243 |
1085 |
243 |
Sylhet, (Division Office) |
| Revenue |
105d/EE, RHD/Sylhet/2013-2014 |
28-Nov-2013 |
7 Days |
Pavement |
LRP242 |
1088 |
242 |
LRP243 |
1085 |
243 |
Sylhet, (Division Office) |
| Development |
21/OTM/DEV/ACE/RHD/Sylhet/2017-2018 |
3-Oct-2018 |
1001 Days |
Pavement |
LRP244 |
0 |
242.916 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue Others |
251/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Pavement |
LRP244 |
0 |
242.916 |
LRP245 |
0 |
243.916 |
Sylhet, (Division Office) |
| Revenue Others |
467/EE/SRD/2007-2008 |
3-Mar-2008 |
5 Days |
Carpeting |
LRP244 |
0 |
242.916 |
LRP246 |
0 |
244.943 |
Sylhet, (Division Office) |
| Revenue |
51/EE, RHD/Sylhet/2010-2011 |
28-Sep-2010 |
7 Days |
Pavement |
LRP244 |
0 |
242.916 |
LRP245 |
0 |
243.916 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. R 01/2018-2019/EE, RHD/Sylhet |
4-Sep-2018 |
7 Days |
Pavement |
LRP245 |
0 |
243.916 |
LRP253 |
0 |
251.973 |
Sylhet, (Division Office) |
| Revenue |
e-GP 08/EE, RHD/Sylhet/2014-2015 |
19-Jan-2015 |
30 Days |
Pavement |
LRP244 |
1380 |
244.296 |
LRP245 |
400 |
244.316 |
Sylhet, (Division Office) |
| Revenue |
22l/EE, RHD/Sylhet/2012-2013 |
29-Jan-2013 |
30 Days |
Pavement |
LRP246 |
0 |
244.943 |
LRP263 |
0 |
261.987 |
Sylhet, (Division Office) |
| Revenue Others |
354/EE/SRD/2007-2008 |
13-Mar-2008 |
3 Days |
Pavement |
LRP246 |
0 |
244.943 |
LRP247 |
0 |
245.944 |
Sylhet, (Division Office) |
| Development |
74/EE/SRD/2006-2007 |
13-Dec-2006 |
10 Days |
Road Rehablitation |
LRP247 |
0 |
245.944 |
LRP249 |
0 |
247.95 |
Sylhet, (Division Office) |
| Revenue |
106d/EE, RHD/Sylhet/2013-2014 |
2-Dec-2013 |
7 Days |
Pavement |
LRP246 |
1057 |
246 |
LRP237 |
11098 |
247 |
Sylhet, (Division Office) |
| Revenue |
136/EE,RHD/Sylhet/2011-2012 |
3-Oct-2011 |
7 Days |
Pavement |
LRP248 |
0 |
246.949 |
LRP249 |
0 |
247.95 |
Sylhet, (Division Office) |
| Revenue Others |
251/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Pavement |
LRP248 |
0 |
246.949 |
LRP249 |
0 |
247.95 |
Sylhet, (Division Office) |
| Revenue Others |
251/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Pavement |
LRP249 |
0 |
247.95 |
LRP250 |
0 |
248.952 |
Sylhet, (Division Office) |
| Revenue |
129/EE, RHD/Sylhet/2010-2011 |
9-Feb-2011 |
30 Days |
Pavement |
LRP249 |
0 |
247.95 |
LRP250 |
0 |
248.952 |
Sylhet, (Division Office) |
| Revenue |
e-GP/15/ACE/SZ/2013-2014/6746 |
6-May-2014 |
240 Days |
Pavement |
LRP248 |
1051 |
248 |
LRP260 |
1051 |
260.036 |
Sylhet, (Division Office) |
| Revenue |
51l/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
10 Days |
Pavement |
LRP250 |
0 |
248.952 |
LRP251 |
0 |
249.953 |
Sylhet, (Division Office) |
| Revenue |
46/EE, RHD/Sylhet/2010-2011 |
19-Sep-2010 |
7 Days |
Pavement |
LRP251 |
0 |
249.953 |
LRP258 |
0 |
256.983 |
Sylhet, (Division Office) |
| Revenue |
137/EE,RHD/Sylhet/2011-2012 |
3-Oct-2011 |
7 Days |
Pavement |
LRP251 |
0 |
249.953 |
LRP253 |
0 |
251.973 |
Sylhet, (Division Office) |
| Revenue Others |
251/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Pavement |
LRP251 |
0 |
249.953 |
LRP253 |
0 |
251.973 |
Sylhet, (Division Office) |
| Revenue |
101d/EE, RHD/Sylhet/2012-2013 |
30-Dec-2012 |
5 Days |
Surfacing |
LRP250 |
1048 |
250 |
LRP261 |
1008 |
261 |
Sylhet, (Division Office) |
| Revenue |
WD 44(Forty Four)/2018-2019/EE, RHD/Sylhet/323075 |
16-Jun-2019 |
10 Days |
Pavement |
LRP253 |
0 |
251.973 |
LRP256 |
0 |
254.98 |
Sylhet, (Division Office) |
| Revenue |
23/EE,RHD/Sylhet/2011-2012 |
27-Jul-2011 |
5 Days |
Pavement |
LRP253 |
0 |
251.973 |
LRP253 |
27 |
252 |
Sylhet, (Division Office) |
| Revenue |
131d/EE, RHD/Sylhet/2012-2013 |
2-May-2013 |
7 Days |
Pavement |
LRP253 |
27 |
252 |
LRP253 |
1027 |
253 |
Sylhet, (Division Office) |
| Revenue |
125d/EE, RHD/Sylhet/2012-2013 |
23-Apr-2013 |
7 Days |
Pavement |
LRP253 |
27 |
252 |
LRP253 |
1027 |
253 |
Sylhet, (Division Office) |
| Revenue |
99d/EE, RHD/Sylhet/2013-2014 |
2-Dec-2013 |
7 Days |
Pavement |
LRP251 |
2047 |
252 |
LRP253 |
1027 |
253 |
Sylhet, (Division Office) |
| Revenue |
171/EE, RHD/Sylhet/2011-2012 |
3-Oct-2011 |
7 Days |
Surfacing |
LRP253 |
27 |
252 |
LRP253 |
1027 |
253 |
Sylhet, (Division Office) |
| Revenue |
60t/EE, RHD/Sylhet/2013-2014 |
6-Jan-2014 |
90 Days |
Pavement |
LRP254 |
0 |
252.976 |
LRP257 |
0 |
255.981 |
Sylhet, (Division Office) |
| Revenue |
110/EE, RHD/Sylhet/2011-2012 |
28-Dec-2011 |
30 Days |
Carpeting |
LRP251 |
3023 |
252.976 |
LRP255 |
1521 |
255.5 |
Sylhet, (Division Office) |
| Revenue |
WD 02(Two)/2018-2019/EE, RHD/Sylhet/241119 |
22-Jan-2019 |
30 Days |
Pavement |
LRP256 |
0 |
254.98 |
LRP269 |
0 |
267.985 |
Sylhet, (Division Office) |
| Revenue |
133/EE, RHD/Sylhet/2011-2012 |
28-Dec-2011 |
30 Days |
Pavement |
LRP255 |
1521 |
255.5 |
LRP258 |
1017 |
258 |
Sylhet, (Division Office) |
| Revenue |
116d/EE, RHD/Sylhet/2013-2014 |
2-Dec-2013 |
7 Days |
Pavement |
LRP256 |
1020 |
256 |
LRP257 |
1019 |
257 |
Sylhet, (Division Office) |
| Revenue |
48l/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
15 Days |
Road Embankment |
LRP257 |
1019 |
257 |
LRP258 |
1017 |
258 |
Sylhet, (Division Office) |
| Revenue |
122d/EE, RHD/Sylhet/2012-2013 |
23-Apr-2013 |
7 Days |
Pavement |
LRP257 |
1019 |
257 |
LRP258 |
1017 |
258 |
Sylhet, (Division Office) |
| Revenue |
175/EE, RHD/Sylhet/2011-2012 |
14-Feb-2012 |
30 Days |
Carpeting |
LRP258 |
1017 |
258 |
LRP261 |
1988 |
261.98 |
Sylhet, (Division Office) |
| Revenue |
291d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Pavement |
LRP248 |
11051 |
258 |
LRP259 |
977 |
259 |
Sylhet, (Division Office) |
| Revenue Others |
251/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Pavement |
LRP260 |
0 |
258.985 |
LRP261 |
0 |
259.992 |
Sylhet, (Division Office) |
| Revenue |
e-GP/05(Five)/ACE/SZ/2015-2016/28101 |
5-Jan-2016 |
180 Days |
DBST |
LRP261 |
0 |
259.992 |
LRP267 |
0 |
265.986 |
Sylhet, (Division Office) |
| Revenue Others |
251/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Pavement |
LRP262 |
0 |
260.99 |
LRP263 |
0 |
261.987 |
Sylhet, (Division Office) |
| Revenue |
272/EE, RHD/Sylhet/2011-2012 |
22-Mar-2012 |
30 Days |
Pavement |
LRP262 |
0 |
260.99 |
LRP266 |
0 |
264.977 |
Sylhet, (Division Office) |
| Revenue |
289d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Pavement |
LRP261 |
1008 |
261 |
LRP262 |
1010 |
262 |
Sylhet, (Division Office) |
| Revenue |
85/EE, RHD/Sylhet/2010-2011 |
3-Oct-2010 |
7 Days |
Pavement |
LRP263 |
0 |
261.987 |
LRP264 |
0 |
262.985 |
Sylhet, (Division Office) |
| Revenue |
WD 21(Twenty One)/2019-2020/EE, RHD/Sylhet/403290 |
4-Mar-2020 |
30 Days |
Pavement |
LRP263 |
0 |
261.993 |
LRP267 |
0 |
265.993 |
Sylhet, (Division Office) |
| Revenue |
23l/EE, RHD/Sylhet/2012-2013 |
31-Jan-2013 |
30 Days |
Pavement |
LRP263 |
1013 |
263 |
LRP266 |
1023 |
266 |
Sylhet, (Division Office) |
| Revenue |
135/EE,RHD/Sylhet/2011-2012 |
3-Oct-2011 |
7 Days |
Pavement |
LRP263 |
1913 |
263.9 |
LRP264 |
1515 |
264.5 |
Sylhet, (Division Office) |
| Revenue |
30l/EE, RHD/Sylhet/2012-2013 |
22-Jan-2013 |
20 Days |
Pavement |
LRP265 |
0 |
263.984 |
LRP277 |
0 |
275.878 |
Sylhet, (Division Office) |
| Revenue |
87/EE, RHD/Sylhet/2010-2011 |
3-Oct-2010 |
7 Days |
Pavement |
LRP265 |
|
263.984 |
LRPE |
|
286.409 |
Sylhet, (Division Office) |
| Revenue |
e-GP 09/EE, RHD/Sylhet/2014-2015 |
8-Feb-2015 |
30 Days |
Pavement |
LRP265 |
0 |
263.984 |
LRP277 |
0 |
275.878 |
Sylhet, (Division Office) |
| Revenue |
e-GP 20(Twenty)/2020-2021/EE, RHD/Sylhet/526233 |
28-Jan-2021 |
30 Days |
Pavement |
LRP265 |
0 |
263.998 |
LRP269 |
0 |
268.008 |
Sylhet, (Division Office) |
| Revenue |
162d/EE, RHD/Sylhet/2014-2015 |
12-Oct-2014 |
3 Days |
Carpeting |
LRP266 |
0 |
264.977 |
LRP267 |
0 |
265.986 |
Sylhet, (Division Office) |
| Revenue |
29l/EE, RHD/Sylhet/2012-2013 |
22-Jan-2013 |
10 Days |
Pavement |
LRP266 |
0 |
264.977 |
LRP268 |
0 |
266.985 |
Sylhet, (Division Office) |
| Revenue |
WD 05(Five)/2019-2020/EE, RHD/Sylhet/359362 |
25-Nov-2019 |
20 Days |
Pavement |
LRP266 |
0 |
264.993 |
LRP267 |
0 |
265.993 |
Sylhet, (Division Office) |
| Revenue |
100/EE,RHD/Sylhet/2011-2012 |
18-Aug-2011 |
7 Days |
Pavement |
LRP265 |
1566 |
265.55 |
LRP266 |
1023 |
266 |
Sylhet, (Division Office) |
| Revenue |
163d/EE, RHD/Sylhet/2014-2015 |
8-Oct-2014 |
3 Days |
Surfacing |
LRP267 |
0 |
265.986 |
LRP268 |
0 |
266.985 |
Sylhet, (Division Office) |
| Revenue Others |
213/EE/SRD/2007-2008 |
22-Jan-2008 |
21 Days |
Carpeting |
LRP267 |
0 |
265.986 |
LRP268 |
0 |
266.985 |
Sylhet, (Division Office) |
| Revenue |
WD 20(Twenty)/2019-2020/EE, RHD/Sylhet/402939 |
4-Mar-2020 |
30 Days |
Pavement |
LRP267 |
0 |
265.993 |
LRP269 |
0 |
268.008 |
Sylhet, (Division Office) |
| Revenue |
113d/EE, RHD/Sylhet/2012-2013 |
4-Apr-2013 |
3 Days |
Pavement |
LRP268 |
15 |
267 |
LRP269 |
15 |
268 |
Sylhet, (Division Office) |
| Revenue |
142d/EE, RHD/Sylhet/2013-2014 |
5-Feb-2014 |
3 Days |
Pavement |
LRP269 |
0 |
267.985 |
LRP270 |
0 |
269.047 |
Sylhet, (Division Office) |
| Revenue |
24l/EE, RHD/Sylhet/2012-2013 |
31-Jan-2013 |
30 Days |
Pavement |
LRP270 |
0 |
269.047 |
LRP278 |
0 |
276.876 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. R 02/2018-2019/EE, RHD/Sylhet |
4-Sep-2018 |
7 Days |
Pavement |
LRP270 |
0 |
269.047 |
LRP278 |
0 |
276.876 |
Sylhet, (Division Office) |
| Revenue |
DPM 18(Eighteen)/2018-2019/SDE, RHD/Sylhet |
6-Aug-2018 |
5 Days |
Pavement |
LRP270 |
0 |
269.047 |
LRP271 |
0 |
269.925 |
Sylhet, (Division Office) |
| Revenue |
58/EE,RHD/Sylhet/2011-2012 |
18-Sep-2011 |
7 Days |
Pavement |
LRP269 |
1465 |
269.45 |
LRP270 |
953 |
270 |
Sylhet, (Division Office) |
| Revenue |
WD 30(Thirty)/2017-2018/EE, RHD/Sylhet/162155 |
15-May-2018 |
40 Days |
Pavement |
LRP271 |
0 |
269.925 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
202/EE, RHD/Sylhet/2011-2012 |
14-Feb-2012 |
30 Days |
Pavement |
LRP271 |
0 |
269.925 |
LRP273 |
0 |
271.881 |
Sylhet, (Division Office) |
| Revenue |
09(Nine)/SE, RHD/Sylhet/2015-2016 |
7-Jan-2016 |
60 Days |
Pavement |
LRP271 |
0 |
269.925 |
LRP280 |
0 |
278.874 |
Sylhet, (Division Office) |
| Revenue |
DPM 19(Nineteen)/2018-2019/SDE, RHD/Sylhet |
9-Aug-2018 |
5 Days |
Pavement |
LRP271 |
0 |
269.925 |
LRP272 |
0 |
270.882 |
Sylhet, (Division Office) |
| Revenue |
131/EE, RHD/Sylhet/2010-2011 |
7-Feb-2011 |
30 Days |
Pavement |
LRP270 |
998 |
270.045 |
LRP270 |
1498 |
270.545 |
Sylhet, (Division Office) |
| Revenue |
12(Twelve)/SE, RHD/Sylhet/2014-2015 |
21-Apr-2015 |
45 Days |
Pavement |
LRP270 |
1155 |
270.202 |
LRP270 |
1555 |
270.602 |
Sylhet, (Division Office) |
| Revenue |
WD 20(Twenty)/2015-2016/EE, RHD/Sylhet |
31-Mar-2016 |
60 Days |
Pavement |
LRP272 |
0 |
270.882 |
LRP281 |
0 |
279.869 |
Sylhet, (Division Office) |
| Revenue |
DPM 14(Fourteen)/2016-2017/EE, RHD/Sylhet |
4-Jun-2017 |
5 Days |
Pavement |
LRP272 |
0 |
270.882 |
LRP273 |
0 |
271.881 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2007-08/13/ DBST |
27-Mar-2008 |
734 Days |
DBST |
LRP272 |
318 |
271.2 |
LRP281 |
131 |
280 |
Sylhet, (Division Office) |
| Revenue Others |
213/EE/SRD/2007-2008 |
22-Jan-2008 |
21 Days |
Carpeting |
LRP273 |
0 |
271.881 |
LRP274 |
0 |
272.877 |
Sylhet, (Division Office) |
| Revenue |
S 01(One)/2017-2018/EE, RHD/Sylhet |
6-Feb-2018 |
7 Days |
Pavement |
LRP273 |
0 |
271.881 |
LRP274 |
0 |
272.877 |
Sylhet, (Division Office) |
| Revenue |
42l/EE, RHD/Sylhet/2012-2013 |
26-May-2013 |
10 Days |
Pavement |
LRP272 |
1118 |
272 |
LRP274 |
1123 |
274 |
Sylhet, (Division Office) |
| Revenue |
301d/EE, RHD/Sylhet/2014-2015 |
14-Oct-2014 |
3 Days |
Pavement |
LRP274 |
0 |
272.877 |
LRP275 |
0 |
273.879 |
Sylhet, (Division Office) |
| Revenue |
143d/EE, RHD/Sylhet/2013-2014 |
5-Feb-2014 |
3 Days |
Pavement |
LRP274 |
0 |
272.877 |
LRP275 |
0 |
273.879 |
Sylhet, (Division Office) |
| Revenue |
DPM 21(Twenty One)/2018-2019/SDE, RHD/Sylhet |
14-Aug-2018 |
5 Days |
Pavement |
LRP274 |
0 |
272.877 |
LRP275 |
0 |
273.879 |
Sylhet, (Division Office) |
| Revenue |
300d/EE, RHD/Sylhet/2014-2015 |
14-Oct-2014 |
3 Days |
Pavement |
LRP275 |
0 |
273.879 |
LRP276 |
0 |
274.859 |
Sylhet, (Division Office) |
| Revenue |
18/EE, RHD/Sylhet/2010-2011 |
3-Oct-2010 |
7 Days |
Pavement |
LRP275 |
0 |
273.879 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
DPM 20(Twenty)/2018-2019/SDE, RHD/Sylhet |
14-Aug-2018 |
5 Days |
Pavement |
LRP275 |
0 |
273.879 |
LRP276 |
0 |
274.859 |
Sylhet, (Division Office) |
| Revenue |
138/EE, RHD/Sylhet/2011-2012 |
18-Aug-2011 |
7 Days |
Pavement |
LRP274 |
1333 |
274.21 |
LRP274 |
1378 |
274.255 |
Sylhet, (Division Office) |
| Revenue Others |
347/EE/SRD/2007-2008 |
12-Sep-2007 |
5 Days |
Surfacing |
LRP276 |
0 |
274.859 |
LRP277 |
0 |
275.878 |
Sylhet, (Division Office) |
| Revenue |
06/EE, RHD/Sylhet/2011-2012 |
14-Jul-2011 |
7 Days |
Pavement |
LRP276 |
719 |
275.578 |
LRP276 |
1021 |
275.88 |
Sylhet, (Division Office) |
| Revenue |
321d/EE, RHD/Sylhet/2013-2014 |
26-Jun-2014 |
3 Days |
Pavement |
LRP277 |
0 |
275.878 |
LRP278 |
0 |
276.876 |
Sylhet, (Division Office) |
| Revenue Others |
213/EE/SRD/2007-2008 |
22-Jan-2008 |
21 Days |
Carpeting |
LRP277 |
0 |
275.878 |
LRP281 |
0 |
279.869 |
Sylhet, (Division Office) |
| Revenue |
32l/EE, RHD/Sylhet/2012-2013 |
20-Feb-2013 |
30 Days |
Pavement |
LRP277 |
0 |
275.878 |
LRP282 |
0 |
280.87 |
Sylhet, (Division Office) |
| Revenue |
273/EE, RHD/Sylhet/2010-2011 |
26-May-2011 |
7 Days |
Pavement |
LRP275 |
2089 |
275.968 |
LRP276 |
1291 |
276.15 |
Sylhet, (Division Office) |
| Revenue |
WD 01(One)/2016-2017/EE, RHD/Sylhet |
20-Dec-2016 |
60 Days |
Pavement |
LRP278 |
0 |
276.876 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
DPM 22(Twenty Two)/2018-2019/SDE, RHD/Sylhet |
28-Aug-2018 |
5 Days |
Pavement |
LRP279 |
0 |
277.874 |
LRP280 |
0 |
278.874 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 05/2015-2016/EE, RHD/Sylhet, Lot No. 03 |
13-Sep-2015 |
7 Days |
Pavement |
LRP279 |
0 |
277.874 |
LRP281 |
0 |
279.869 |
Sylhet, (Division Office) |
| Revenue |
DPM 15(Fifteen)/2016-2017/EE, RHD/Sylhet |
15-Jun-2017 |
5 Days |
Pavement |
LRP279 |
0 |
277.874 |
LRP280 |
0 |
278.874 |
Sylhet, (Division Office) |
| Revenue |
e-GP 11/EE, RHD/Sylhet/2014-2015 |
8-Feb-2015 |
45 Days |
Pavement |
LRP279 |
0 |
277.874 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
WD 02(Two)/2017-2018/EE, RHD/Sylhet |
10-Oct-2017 |
60 Days |
Pavement |
LRP279 |
0 |
277.874 |
LRP281 |
0 |
279.869 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 09A/2015-2016/EE, RHD/Sylhet |
11-Nov-2015 |
7 Days |
Pavement |
LRP279 |
0 |
277.874 |
LRP282 |
0 |
280.87 |
Sylhet, (Division Office) |
| Development |
214/EE/SRD/2007-2008 |
3-Dec-2007 |
5 Days |
Pavement |
LRP279 |
|
277.874 |
LRP280 |
|
278.874 |
Sylhet, (Division Office) |
| Revenue |
WD 01(One)/2017-2018/EE, RHD/Sylhet |
8-Oct-2017 |
60 Days |
Pavement |
LRP281 |
0 |
279.869 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. S 02/2016-2017/EE, RHD/Sylhet |
21-Jul-2016 |
7 Days |
Pavement |
LRP281 |
0 |
279.869 |
LRP282 |
0 |
280.87 |
Sylhet, (Division Office) |
| Revenue Others |
106/EE/SRD/2007-2008 |
6-Nov-2007 |
30 Days |
Pavement |
LRP281 |
0 |
279.869 |
LRP282 |
0 |
280.87 |
Sylhet, (Division Office) |
| Revenue Others |
213/EE/SRD/2007-2008 |
22-Jan-2008 |
21 Days |
Carpeting |
LRP281 |
0 |
279.869 |
LRP282 |
0 |
280.87 |
Sylhet, (Division Office) |
| Revenue |
WD 21(Twenty one))/2015-2016/EE, RHD/Sylhet |
18-Apr-2016 |
60 Days |
Pavement |
LRP281 |
0 |
279.869 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
08(Eight)/SE, RHD/Sylhet/2015-2016 |
4-Jan-2016 |
45 Days |
Pavement |
LRP281 |
0 |
279.869 |
LRP282 |
0 |
280.87 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 08/2015-2016/EE, RHD/Sylhet, Lot No. 02 |
6-Oct-2015 |
7 Days |
Pavement |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue Others |
105/EE/SRD/2007-2008 |
6-Nov-2007 |
45 Days |
Pavement |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
26/EE, RHD/Sylhet/2009-2010 |
5-Oct-2009 |
5 Days |
Surfacing |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
54/EE, RHD/Sylhet/2009-2010 |
22-Nov-2009 |
5 Days |
Pavement |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
264/EE, RHD/Sylhet/2009-2010 |
2-Feb-2010 |
3 Days |
Surfacing |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
260/EE, RHD/Sylhet/2009-2010 |
13-Jun-2010 |
3 Days |
Surfacing |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue Others |
190/EE/SRD/2007-2008 |
13-Dec-2007 |
5 Days |
Pavement |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
13(Thirteen)/SE, RHD/Sylhet/2015-2016 |
31-Jan-2016 |
60 Days |
Pavement |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2006-07/15/ DBST & Overlay |
7-Jun-2007 |
150 Days |
Overlay |
LRP282 |
|
280.87 |
LRP283 |
2000 |
283.868 |
Sylhet, (Division Office) |
| Revenue Others |
213/EE/SRD/2007-2008 |
22-Jan-2008 |
21 Days |
Carpeting |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
214/EE/SRD/2008-2009 |
9-Jun-2009 |
3 Days |
Pavement |
LRP282 |
0 |
280.87 |
LRP283 |
0 |
281.868 |
Sylhet, (Division Office) |
| Revenue |
287/EE/SRD/2008-2009 |
4-Jun-2009 |
3 Days |
Pavement |
LRP283 |
0 |
281.868 |
LRP285c |
0 |
284.64 |
Sylhet, (Division Office) |
| Revenue |
48/EE, RHD/Sylhet/2010-2011 |
3-Oct-2010 |
7 Days |
Pavement |
LRP283 |
0 |
281.868 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue |
RFQ No. 06/2015-2016/EE, RHD/Sylhet, Lot No. 02 |
30-Sep-2015 |
10 Days |
Pavement |
LRP283 |
0 |
281.868 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue |
33l/EE, RHD/Sylhet/2012-2013 |
17-Feb-2013 |
30 Days |
Pavement |
LRP283 |
0 |
281.868 |
LRP283 |
1000 |
282.868 |
Sylhet, (Division Office) |
| Revenue |
WD 02(Two)/2016-2017/EE, RHD/Sylhet |
20-Dec-2016 |
60 Days |
Pavement |
LRP283 |
1132 |
283 |
LRP283 |
2132 |
284 |
Sylhet, (Division Office) |
| Revenue |
WD 03(Three)/2016-2017/EE, RHD/Sylhet |
20-Dec-2016 |
60 Days |
Pavement |
LRP283 |
2132 |
284 |
LRP283 |
3132 |
285 |
Sylhet, (Division Office) |
| Revenue |
236d/EE, RHD/Sylhet/2012-2013 |
19-Jun-2013 |
7 Days |
Pavement |
LRP283 |
2132 |
284 |
LRP283 |
3132 |
285 |
Sylhet, (Division Office) |
| Revenue |
DPM 16(Sixteen)/2016-2017/EE, RHD/Sylhet |
13-Jun-2017 |
5 Days |
Pavement |
LRP283 |
2132 |
284 |
LRP283 |
3132 |
285 |
Sylhet, (Division Office) |
| Revenue |
07(Seven)/SE, RHD/Sylhet/2012-2013 |
11-Mar-2013 |
270 Days |
Pavement |
LRP283 |
2222 |
284.09 |
LRP283 |
2652 |
284.52 |
Sylhet, (Division Office) |
| Revenue |
334/EE, RHD/Sylhet/2010-2011 |
31-May-2011 |
7 Days |
Pavement |
LRP283 |
2532 |
284.4 |
LRP283 |
2802 |
284.67 |
Sylhet, (Division Office) |
| Revenue |
270/EE, RHD/Sylhet/2011-2012 |
18-Jun-2012 |
7 Days |
Pavement |
LRP283 |
2652 |
284.52 |
LRP283 |
2808 |
284.676 |
Sylhet, (Division Office) |
| Revenue |
47/EE, RHD/Sylhet/2009-2010 |
14-Oct-2009 |
5 Days |
Pavement |
LRP285c |
|
284.64 |
LRPE |
|
286.409 |
Sylhet, (Division Office) |
| Revenue |
112/EE, RHD/Sylhet/2009-2010 |
15-Dec-2009 |
5 Days |
Pavement |
LRP285c |
0 |
284.64 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2007-08/13/ DBST |
27-Mar-2008 |
734 Days |
DBST |
LRP285c |
228 |
284.868 |
LRP285c |
1360 |
286 |
Sylhet, (Division Office) |
| Revenue |
253/EE, RHD/Sylhet/2010-2011 |
23-May-2011 |
7 Days |
Pavement |
LRP282 |
4030 |
284.9 |
LRP283 |
3520 |
285.388 |
Sylhet, (Division Office) |
| Revenue |
259d/EE, RHD/Sylhet/2012-2013 |
24-Jun-2013 |
7 Days |
Pavement |
LRP283 |
3132 |
285 |
LRP283 |
4132 |
286 |
Sylhet, (Division Office) |
| Revenue |
18(Eighteen)/SE, RHD/Sylhet/2015-2016 |
1-Mar-2016 |
60 Days |
Pavement |
LRP283 |
4000 |
285.868 |
LRPE |
0 |
286.409 |
Sylhet, (Division Office) |