List of ongoing works on the road ( N208 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Development  14/2005-2006/EE/MRD  7-Dec-2005  10 Days  Road Embankment  LRPS   0     LRP035   33.939     Moulvi Bazar, (Division Office) 
 Revenue  07/2008-2009/E.E/M.R.D/T-03/2  1-Apr-2009  30 Days  Pavement  LRPS  0 0     LRPS  20 0.02     Moulvi Bazar, (Division Office) 
 Development  Lot 01 of Tender No. 07 (Seven)/2006-2007/EE/MRD    60 Days  Road Embankment  LRPS   0     LRP035   33.939     Moulvi Bazar, (Division Office) 
 Development  Lot 02 of 08/SDE/RSDM/2005-2006  30-Mar-2006  10 Days  Carpeting  LRPS  0 0     LRP035  0 33.939     Moulvi Bazar, (Division Office) 
 Revenue  04/LTM/EE/MRD/2009-2010/T-03/1  14-Mar-2010  20 Days  Carpeting  LRPS  0 0     LRP035  0 33.939     Moulvi Bazar, (Division Office) 
 Development  64/2005-2006/EE.RHD/MRD  30-Mar-2006  10 Days  Road Embankment  LRPS   0     LRP035   33.939     Moulvi Bazar, (Division Office) 
 Revenue  56/EE/MRD/2018-2019/ TID: 315282  30-May-2019  15 Days  Surfacing  LRPS  0 0     LRP014  0 13.404     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/01/PMP- Road Mejor/ACE/SZ/Moul/2020-2021/490505  27-Dec-2020  181 Days  Overlay  LRPS  0 0     LRP030  1473 30.6     Moulvi Bazar, (Division Office) 
 Revenue  26/LTM/EE/MRD/2012-2013/T-02/2  10-Feb-2013  30 Days  Pavement  LRPS  0 0     LRPS  100 0.1     Moulvi Bazar, (Division Office) 
 Revenue  27/LTM/EE/MRD/2010-2011/T-13/4 (2009-10)  28-Dec-2010  25 Days  Road Embankment  LRPS  0 0     LRP012  0 11.745     Moulvi Bazar, (Division Office) 
 Revenue  03/EE/MRD/2013-2014/T-06/4(2012-13)  23-Sep-2013  30 Days  Road Embankment  LRPS  0 0     LRP030  1473 30.6     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/11/EE/MRD/2014-15/14992  12-Feb-2015  30 Days  Surfacing  LRPS  0 0     LRP030  0 29.127     Moulvi Bazar, (Division Office) 
 Development  12/2005-2006/SE.RHD/SRC  17-Apr-2006  60 Days  Road Embankment  LRPS   0     LRP010   9.795     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/01/EE/MRD/2016-2017/72068  26-Dec-2016  30 Days  Surfacing  LRPS  0 0     LRPS  2580 2.58     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/07/EE/MRD/2015-2016/33565  7-Jan-2016  30 Days  Surfacing  LRPS  0 0     LRP005  0 5     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2014-15/19472  12-Apr-2015  30 Days  Road Embankment  LRPS  0 0     LRP015  0 14.4     Moulvi Bazar, (Division Office) 
 Development  28/2005-2006/EE.RHD/MRD  1-Mar-2006  10 Days  Road Embankment  LRPS   0     LRP035   33.939     Moulvi Bazar, (Division Office) 
 Revenue PMP  PMP-07/2010-11/22/Overlay  23-Nov-2011  180 Days  Overlay  LRPS  0 0     LRP018  830 18.2     Moulvi Bazar, (Division Office) 
 Revenue  09/2008-2009/E.E/M.R.D/T-03/1  1-Apr-2009  25 Days  Pavement  LRPS  340 0.34     LRPS  400 0.4     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/29/EE/MRD/2015-2016/57411  20-Jun-2016  10 Days  Road Embankment  LRPS  1770 1.77     LRPS  1800 1.8     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Carpeting  LRPS  2090 2.09     LRPS  2105 2.105     Moulvi Bazar, (Division Office) 
 Revenue  01/S.E/R.C.M/2006-2007 (D to R)  17-May-2009  30 Days  Pavement  LRPS  2120 2.12     LRPS  3253 3.253     Moulvi Bazar, (Division Office) 
 Development  01/SE/RCM/2006-2007  6-Sep-2006  90 Days  Pavement  LRPS  2120 2.12     LRPS  3253 3.253     Moulvi Bazar, (Division Office) 
 Revenue  05/EE/MRD/2013-2014/T-07/6(2012-13)  24-Sep-2013  30 Days  Carpeting  LRPS  2250 2.25     LRPS  2305 2.305     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRPS  2250 2.25     LRPS  2265 2.265     Moulvi Bazar, (Division Office) 
 Revenue  18/EE/MRD/2018-2019/TID:240708  2-Dec-2018  30 Days  Surfacing  LRPS  2400 2.4     LRPS  2812 2.812     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2015-2016/42111  29-Feb-2016  45 Days  Surfacing  LRPS  2800 2.8     LRP025  0 24.31     Moulvi Bazar, (Division Office) 
 Revenue  MRD/RFQ/03/2017-2018  5-Feb-2018  7 Days  Surfacing  LRPS  3000 3     LRPS  4000 4     Moulvi Bazar, (Division Office) 
 Revenue  18/EE/MRD/2018-2019/TID:240708  2-Dec-2018  30 Days  Surfacing  LRPS  3017 3.017     LRPS  3431 3.431     Moulvi Bazar, (Division Office) 
 Revenue  11/EE/MRD/2009-2010/T-04/2  1-Jun-2010  45 Days  Pavement  LRPS  3180 3.18     LRPS  3380 3.38     Moulvi Bazar, (Division Office) 
 Revenue  05/EE/MRD/2013-2014/T-07/6(2012-13)  24-Sep-2013  30 Days  Carpeting  LRPS  3500 3.5     LRPS  3584 3.584     Moulvi Bazar, (Division Office) 
 Revenue  29/EE/MRD/2018-2019/ TID: 259979  3-Feb-2019  30 Days  Surfacing  LRPS  4800 4.8     LRP010  55 9.85     Moulvi Bazar, (Division Office) 
 Revenue Periodic Roads  28/2007-2008/EE/MRD  4-Mar-2008  10 Days  Carpeting  LRP005  0 5     LRP014  0 13.404     Moulvi Bazar, (Division Office) 
 Revenue  MRD/RFQ/03/2017-2018  5-Feb-2018  7 Days  Surfacing  LRP005  0 5     LRP006  1153 7     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/04/EE/MRD/2014-15/14536  10-Feb-2015  45 Days  Carpeting  LRP005  0 5     LRP024  0 23.33     Moulvi Bazar, (Division Office) 
 Revenue  06/RFQ-06/MRD/2011-12  4-Dec-2011  10 Days  Carpeting  LRP005  300 5.3     LRP005  830 5.83     Moulvi Bazar, (Division Office) 
 Revenue  06/RFQ-06/MRD/2011-12  4-Dec-2011  10 Days  Carpeting  LRP006  503 6.35     LRP006  1003 6.85     Moulvi Bazar, (Division Office) 
 Revenue  06/RFQ-06/MRD/2011-12  4-Dec-2011  10 Days  Carpeting  LRP006  1653 7.5     LRP006  1953 7.8     Moulvi Bazar, (Division Office) 
 Revenue Periodic Roads  31/2007-2008/EE/MRD  24-Apr-2008  10 Days  Pavement  LRP008  -269 7.525     LRP008  58 7.852     Moulvi Bazar, (Division Office) 
 Revenue  PMP-Minor-Works-45/2019-20/455402  4-Jun-2020  15 Days  Surfacing  LRP008  206 8     LRP008  356 8.15     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/24/EE/MRD/2016-2017/96333  18-May-2017  30 Days  Carpeting  LRP008  306 8.1     LRP008  706 8.5     Moulvi Bazar, (Division Office) 
 Revenue  14/LTM/EE/MRD/2010-2011/T-13/2(2009-10)  24-Oct-2010  30 Days  Carpeting  LRP008  306 8.1     LRP008  1606 9.4     Moulvi Bazar, (Division Office) 
 Revenue  28/LTM/EE/MRD/2009-2010/T-11/4  27-Jun-2010  30 Days  Carpeting  LRP010  -365 9.43     LRP010  635 10.43     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Carpeting  LRP010  155 9.95     LRP010  175 9.97     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Carpeting  LRP010  205 10     LRP010  240 10.035     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Carpeting  LRP010  235 10.03     LRP010  255 10.05     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Carpeting  LRP010  295 10.13     LRP010  385 10.22     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Carpeting  LRP010  435 10.23     LRP010  465 10.26     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP010  705 10.5     LRP010  737 10.532     Moulvi Bazar, (Division Office) 
 Revenue  14/LTM/EE/MRD/2010-2011/T-13/2(2009-10)  24-Oct-2010  30 Days  Carpeting  LRP010  705 10.5     LRP010  1205 11     Moulvi Bazar, (Division Office) 
 Revenue  MRD/RFQ/03/2017-2018  5-Feb-2018  7 Days  Surfacing  LRP010  1205 11     LRP012  255 12     Moulvi Bazar, (Division Office) 
 Revenue  16/LTM/EE/MRD/2010-2011/T-13/6(2009-10)  24-Oct-2010  20 Days  Carpeting  LRP010  1380 11.175     LRP010  1705 11.5     Moulvi Bazar, (Division Office) 
 Revenue  37/LTM/EE/MRD/2010-2011/T-02/4  14-Jun-2011  30 Days  Carpeting  LRP010  1705 11.5     LRP012  1595 13.34     Moulvi Bazar, (Division Office) 
 Revenue  11/LTM/EE/MRD/2010-2011/T-11/6(2009-10)  10-Oct-2010  30 Days  Road Embankment  LRP012  0 11.745     LRP035  0 33.939     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP012  245 11.99     LRP012  260 12.005     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP012  285 12.03     LRP012  307 12.052     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP012  315 12.06     LRP012  325 12.07     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/02/PMP Road/MRC/2018-19/219741  31-Jan-2019  318 Days  Overlay  LRP014  146 13.55     LRP014  596 14     Moulvi Bazar, (Division Office) 
 Development  33/2007-2008/EE/MRD  12-May-2008  30 Days  Road Embankment  LRP015  -400 14     LRP017  -180 16.2     Moulvi Bazar, (Division Office) 
 Revenue  24/EE/MRD/2018-2019/ TID: 259028  3-Feb-2019  30 Days  Surfacing  LRP015  0 14.4     LRP025  0 24.31     Moulvi Bazar, (Division Office) 
 Revenue Periodic Roads  29/2007-2008/EE/MRD  4-Mar-2008  10 Days  Carpeting  LRP015  0 14.4     LRP032  0 31.043     Moulvi Bazar, (Division Office) 
 Revenue  16/LTM/EE/MRD/2012-2013/T-01/2  30-Oct-2012  30 Days  Surfacing  LRP015  600 15     LRP030  1473 30.6     Moulvi Bazar, (Division Office) 
 Revenue  32/EE/MRD/2018-2019/ TID: 268463  5-Feb-2019  30 Days  Surfacing  LRP016  0 15.39     LRP019  0 18.354     Moulvi Bazar, (Division Office) 
 Development  71/2005-2006/EE.RHD/MRD  23-Apr-2006  10 Days  Carpeting  LRP016  0 15.39     LRP017  0 16.38     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/11/ACE/SZ/2013-2014/6410  8-May-2014  180 Days  Overlay  LRP016  110 15.5     LRP018  590 17.96     Moulvi Bazar, (Division Office) 
 Revenue  09/EE/MRD/2018-2019 / TID:234231  2-Dec-2018  30 Days  Surfacing  LRP016  730 16.12     LRP017  920 17.3     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Surfacing  LRP016  856 16.246     LRP017  70 16.45     Moulvi Bazar, (Division Office) 
 Revenue  25/LTM/EE/MRD/2010-2011/T-11/7  26-Oct-2010  30 Days  Pavement  LRP017  -66 16.314     LRP017  300 16.68     Moulvi Bazar, (Division Office) 
 Revenue  36/EE/MRD/2018-2019/ TID: 281967  7-Mar-2019  30 Days  Surfacing  LRP017  0 16.38     LRP030  0 29.127     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP017  90 16.47     LRP017  120 16.5     Moulvi Bazar, (Division Office) 
 Revenue  07/LTM/EE/MRD/2011-2012/T-05/5 (10-11)  4-Sep-2011  25 Days  Pavement  LRP017  300 16.68     LRP017  450 16.83     Moulvi Bazar, (Division Office) 
 Revenue  MRD/RFQ/08/2017-2018  18-Jun-2018  7 Days  Pavement  LRP018  0 17.37     LRP030  0 29.127     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/02/PMP Road/MRC/2018-19/219741  31-Jan-2019  318 Days  Overlay  LRP018  590 17.96     LRP019  46 18.4     Moulvi Bazar, (Division Office) 
 Revenue  12/LTM/EE/MRD/2010-2011/T-11/5(2009-10)  10-Oct-2010  30 Days  Pavement  LRP019  321 18.675     LRP019  571 18.925     Moulvi Bazar, (Division Office) 
 Revenue  08/LTM/EE/MRD/2011-2012/T-05/7 (10-11)  5-Sep-2011  25 Days  Pavement  LRP019  571 18.925     LRP019  746 19.1     Moulvi Bazar, (Division Office) 
 Revenue  30/EE/MRD/2012-2013/T-02/5  31-Jan-2013  30 Days  Carpeting  LRP019  646 19     LRP020  1240 20.6     Moulvi Bazar, (Division Office) 
 Revenue Others  10/2007-2008/EE/MRD  31-Dec-2007  10 Days  Carpeting  LRP020  0 19.36     LRP023  0 22.33     Moulvi Bazar, (Division Office) 
 Development  21/2007-2008/EE/MRD  16-Mar-2008  75 Days  Road Embankment  LRP020   19.36     LRP024   23.33     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/02/PMP Road/MRC/2018-19/219741  31-Jan-2019  318 Days  Overlay  LRP020  740 20.1     LRP020  2550 21.91     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2016-2017/82360  2-Apr-2017  30 Days  Surfacing  LRP020  1840 21.2     LRP020  1880 21.24     Moulvi Bazar, (Division Office) 
 Revenue  05/LTM/EE/MRD/2011-2012/T-05//6 (10-11)  21-Aug-2011  25 Days  Pavement  LRP020  2475 21.835     LRP020  2625 21.985     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/02/PMP Road/MRC/2018-19/219741  31-Jan-2019  318 Days  Overlay  LRP020  2640 22     LRP024  920 24.25     Moulvi Bazar, (Division Office) 
 Revenue  208d/EE, RHD/Sylhet/2012-2013  5-Feb-2013  7 Days  Pavement  LRPS  22000 22     LRPS  23000 23     Sylhet, (Division Office) 
 Revenue  05/LTM/EE/MRD/2011-2012/T-05//6 (10-11)  21-Aug-2011  25 Days  Pavement  LRP020  2840 22.2     LRP023  -5 22.325     Moulvi Bazar, (Division Office) 
 Revenue  03/RFQ-02/MRD/2009-10  15-Dec-2009  10 Days  Carpeting  LRP023  185 22.515     LRP023  270 22.6     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2016-2017/82360  2-Apr-2017  30 Days  Surfacing  LRP022  1135 22.6     LRP022  1235 22.7     Moulvi Bazar, (Division Office) 
 Revenue  22/2008-2009/E.E/M.R.D/T-12/1  31-May-2009  40 Days  Carpeting  LRP023  370 22.7     LRP024  470 23.8     Moulvi Bazar, (Division Office) 
 Revenue  01/LTM/2008-2009/E.E/M.R.D/T-01/1  18-Jun-2009  15 Days  Road Embankment  LRP023  370 22.7     LRP027  367 26.6     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2016-2017/82360  2-Apr-2017  30 Days  Surfacing  LRP023  820 23.15     LRP023  970 23.3     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2016-2017/82360  2-Apr-2017  30 Days  Surfacing  LRP024  120 23.45     LRP024  170 23.5     Moulvi Bazar, (Division Office) 
 Development  41/2007-2008/E.E/M.R.D  2-Jun-2008  29 Days  Pavement  LRP024  270 23.6     LRP028  317 27.5     Moulvi Bazar, (Division Office) 
 Development  41/2007-2008/E.E/M.R.D. (Full New)  2-Jun-2008  28 Days  Pavement  LRP024  270 23.6     LRP028  317 27.5     Moulvi Bazar, (Division Office) 
 Development  41/2007-2008/E.E/M.R.D (New)  2-Jun-2008  29 Days  Pavement  LRP024  270 23.6     LRP028  317 27.5     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP024  370 23.7     LRP024  470 23.8     Moulvi Bazar, (Division Office) 
 Revenue  18/2008-2009/E.E/M.R.D/T-07  8-Apr-2009  45 Days  Carpeting  LRP024  470 23.8     LRP027  367 26.6     Moulvi Bazar, (Division Office) 
 Revenue  PMP-Minor-Works-08/EE/MRD/2019-2020/373404  12-Dec-2019  30 Days  Carpeting  LRP025  0 24.31     LRP030  0 29.127     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/11/ACE/SZ/2013-2014/6410  8-May-2014  180 Days  Overlay  LRP025  190 24.5     LRP030  1473 30.6     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Surfacing  LRP025  635 24.945     LRP025  690 25     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Surfacing  LRP025  690 25     LRP026  72 25.37     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP025  690 25     LRP025  765 25.075     Moulvi Bazar, (Division Office) 
 Revenue  22/RFQ-25/MRD/2010-11  7-Jun-2011  7 Days  Carpeting  LRP025  690 25     LRP030  873 30     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/08/EE/MRD/2016-2017/82359  21-Mar-2017  30 Days  Pavement  LRP026  102 25.4     LRP027  267 26.5     Moulvi Bazar, (Division Office) 
 Revenue  09/EE/MRD/2018-2019 / TID:234231  2-Dec-2018  30 Days  Surfacing  LRP026  287 25.585     LRP028  1117 28.3     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2016-2017/82360  2-Apr-2017  30 Days  Surfacing  LRP027  67 26.3     LRP027  87 26.32     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/13/EE/MRD/2016-2017/82360  2-Apr-2017  30 Days  Surfacing  LRP027  267 26.5     LRP028  167 27.35     Moulvi Bazar, (Division Office) 
 Revenue  03/RFQ-02/MRD/2009-10  15-Dec-2009  10 Days  Carpeting  LRP027  367 26.6     LRP027  502 26.735     Moulvi Bazar, (Division Office) 
 Revenue  124d/EE, RHD/Sylhet/2013-2014  23-Dec-2013  3 Days  Surfacing  LRPS  27000 27     LRPS  28000 28     Sylhet, (Division Office) 
 Revenue  25/EE/MRD/2018-2019/ TID: 259029  3-Feb-2019  30 Days  Surfacing  LRP028  0 27.183     LRP030  0 29.127     Moulvi Bazar, (Division Office) 
 Development  01/2006-2007/EE/MRD  4-Oct-2006  3 Days  Road Embankment  LRP028  0 27.183     LRP030  0 29.127     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Surfacing  LRP028  177 27.36     LRP028  457 27.64     Moulvi Bazar, (Division Office) 
 Development  21/2007-2008/EE/MRD  16-Mar-2008  75 Days  Road Embankment  LRP028  317 27.5     LRP035  561 34.5     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Surfacing  LRP028  1217 28.4     LRP028  1397 28.58     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/15/EE/MRD/2017-2018/125963  22-Jan-2018  30 Days  Surfacing  LRP028  1517 28.7     LRP028  1617 28.8     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/09/EE/MRD/2016-2017/82361  23-Mar-2017  30 Days  Carpeting  LRP028  1617 28.8     LRP030  723 29.85     Moulvi Bazar, (Division Office) 
 Revenue Periodic Roads  31/2007-2008/EE/MRD  24-Apr-2008  10 Days  Pavement  LRP030  473 29.6     LRP033  -8 32     Moulvi Bazar, (Division Office) 
 Revenue  e-GP/07(Seven)/ACE/SZ/2015-2016/28103  23-Dec-2015  180 Days  DBST  LRPS  30600 30.6     LRP052  665 51.9     Sylhet, (Division Office) 
 Revenue  172/EE, RHD/Sylhet/2010-2011  27-Mar-2011  7 Days  Surfacing  LRP032  0 31.043     LRP033  0 32.008     Sylhet, (Division Office) 
 Revenue  e-GP 04/EE, RHD/Sylhet/2014-2015  20-Jul-2014  36 Days  Surfacing  LRP032  0 31.043     LRP033  0 32.008     Sylhet, (Division Office) 
 Revenue  63/EE, RHD/Sylhet/2011-2012  27-Nov-2011  3 Days  Surfacing  LRP032   31.043     LRP033   32.008     Sylhet, (Division Office) 
 Revenue  244/EE, RHD/Sylhet/2011-2012  14-May-2012  7 Days  Pavement  LRP032  0 31.043     LRP058  0 58.19     Sylhet, (Division Office) 
 Revenue  84d/EE, RHD/Sylhet/2012-2013  28-Jan-2013  7 Days  Surfacing  LRP032  0 31.043     LRP033  0 32.008     Sylhet, (Division Office) 
 Revenue  102/EE, RHD/Sylhet/2011-2012  9-Oct-2011  7 Days  Surfacing  LRP032  0 31.043     LRP034  0 32.979     Sylhet, (Division Office) 
 Revenue  145d/EE, RHD/Sylhet/2012-2013  16-Apr-2013  7 Days  Pavement  LRP032  0 31.043     LRP037  0 36.28     Sylhet, (Division Office) 
 Revenue  18/EE, RHD/Sylhet/2011-2012  12-Jul-2011  7 Days  Road Embankment  LRP033  0 32.008     LRP034  0 32.979     Sylhet, (Division Office) 
 Revenue  17/EE, RHD/Sylhet/2011-2012  12-Jul-2011  7 Days  Road Embankment  LRP033  0 32.008     LRP034  0 32.979     Sylhet, (Division Office) 
 Revenue  152d/EE, RHD/Sylhet/2014-2015  6-Jul-2014  7 Days  Surfacing  LRP034  0 32.979     LRP035  0 33.939     Sylhet, (Division Office) 
 Revenue  215d/EE, RHD/Sylhet/2013-2014  11-May-2014  7 Days  Surfacing  LRP034  0 32.979     LRP035  0 33.939     Sylhet, (Division Office) 
 Revenue  DPM 19(Nineteen)/2016-2017/EE, RHD/Sylhet  15-Jun-2017  3 Days  Pavement  LRP035  0 33.939     LRP037  0 36.28     Sylhet, (Division Office) 
 Revenue  216d/EE, RHD/Sylhet/2013-2014  11-May-2014  7 Days  Surfacing  LRP035  0 33.939     LRP037  0 36.28     Sylhet, (Division Office) 
 Development  08/EE/SRD/2007-2008  5-Aug-2007  30 Days  Surfacing  LRP035  0 33.939     LRP037  0 36.28     Sylhet, (Division Office) 
 Development  260/EE/SRD/2007-2008  22-Jan-2008  30 Days  Surfacing  LRP035  0 33.939     LRP037  0 36.28     Sylhet, (Division Office) 
 Revenue  WD 53(Fifty Three)/2019-2020/EE, RHD/Sylhet/460559  7-Jun-2020  20 Days  Pavement  LRP035  0 34.235     LRP044  0 42.675     Sylhet, (Division Office) 
 Revenue  103d/EE, RHD/Sylhet/2013-2014  2-Dec-2013  3 Days  Surfacing  LRP035  1061 35     LRP035  2061 36     Sylhet, (Division Office) 
 Revenue  230d/EE, RHD/Sylhet/2012-2013  18-Jun-2013  7 Days  Surfacing  LRP034  2021 35     LRP035  2061 36     Sylhet, (Division Office) 
 Revenue  57t/EE, RHD/Sylhet/2013-2014  3-Mar-2014  75 Days  Pavement  LRP035  1061 35     LRP039  700 39     Sylhet, (Division Office) 
 Revenue  38d/EE, RHD/Sylhet/2013-2014  7-Oct-2013  7 Days  Surfacing  LRP035  1061 35     LRP035  2061 36     Sylhet, (Division Office) 
 Revenue  229d/EE, RHD/Sylhet/2012-2013  18-Jun-2013  7 Days  Surfacing  LRP035  1061 35     LRP035  2061 36     Sylhet, (Division Office) 
 Revenue Others  260/2007-2008/EE/SRD  22-Jan-2008  30 Days  Surfacing  LRP035  1125 35.064     LRP035  1652 35.591     Sylhet, (Division Office) 
 Revenue  PMP 2009-2010/25/DBST & Overlay  18-Aug-2010  591 Days  DBST  LRPS  35760 35.76     LRP054  930 54.15     Sylhet, (Division Office) 
 Revenue  158d/EE, RHD/Sylhet/2013-2014  6-Mar-2014  7 Days  Surfacing  LRP035  2261 36.2     LRP035  2281 36.22     Sylhet, (Division Office) 
 Development  14/EE/SRD/2007-2008  5-Aug-2007  30 Days  Carpeting  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Development  444/EE/SRD/2007-2008  24-Mar-2008  7 Days  Surfacing  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  238/EE, RHD/Sylhet/2009-2010  2-Mar-2010  7 Days  Pavement  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Development  78/EE/SRD/2007-2008  4-Oct-2007  30 Days  Pavement  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  184/EE/SRD/2008-2009  23-Apr-2009  5 Days  Surfacing  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  79/EE, RHD/Sylhet/2009-2010  14-Jan-2010  3 Days  Pavement  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  42/EE/SRD/2008-2009  3-Nov-2008  5 Days  Pavement  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  52t/EE, RHD/Sylhet/2012-2013  25-Feb-2013  248 Days  Pavement  LRP037   36.28     LRP043   42.28     Sylhet, (Division Office) 
 Revenue  81/EE, RHD/Sylhet/2009-2010  12-Nov-2009  5 Days  Surfacing  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  145/EE, RHD/Sylhet/2009-2010  9-Mar-2010  5 Days  Pavement  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  97/EE, RHD/Sylhet/2010-2011  16-Sep-2010  5 Days  Surfacing  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Revenue  128/EE/SRD/2008-2009  18-Jan-2009  5 Days  Carpeting  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Development  443/EE/SRD/2007-2008  24-Mar-2008  7 Days  Surfacing  LRP037  0 36.28     LRP038  0 37.28     Sylhet, (Division Office) 
 Development  287/EE/SRD/2007-2008  4-Feb-2008  146 Days  Carpeting  LRP035  2461 36.4     LRP053  1442 53.665     Sylhet, (Division Office) 
 Revenue  246/EE, RHD/Sylhet/2009-2010  5-May-2010  7 Days  Surfacing  LRP038  0 37.28     LRP039  0 38.3     Sylhet, (Division Office) 
 Revenue  96/EE, RHD/Sylhet/2010-2011  5-Jul-2010  5 Days  Pavement  LRP038  0 37.28     LRP039  0 38.3     Sylhet, (Division Office) 
 Development  468/EE/SRD/2007-2008  13-May-2008  7 Days  Pavement  LRP038  0 37.28     LRP043  0 42.28     Sylhet, (Division Office) 
 Revenue  66/EE/SRD/2008-2009  22-Oct-2008  5 Days  Pavement  LRP038  0 37.28     LRP040  0 39.296     Sylhet, (Division Office) 
 Revenue  146/EE, RHD/Sylhet/2009-2010  9-Mar-2010  5 Days  Surfacing  LRP039   38.3     LRP040   39.296     Sylhet, (Division Office) 
 Revenue  DPM 20(Twenty)/2016-2017/EE, RHD/Sylhet  15-Jun-2017  3 Days  Pavement  LRP039  0 38.3     LRP040  0 39.296     Sylhet, (Division Office) 
 Revenue  e-GP/10/ACE/SZ/2013-2014/6411  5-May-2014  299 Days  Overlay  LRP040  0 39.296     LRP048  0 47.256     Sylhet, (Division Office) 
 Revenue  247/EE, RHD/Sylhet/2009-2010  5-May-2010  7 Days  Surfacing  LRP040  0 39.296     LRP041  0 40.245     Sylhet, (Division Office) 
 Revenue  340/EE/SRD/2008-2009  25-Jun-2009  5 Days  Surfacing  LRP040  0 39.296     LRP041  0 40.245     Sylhet, (Division Office) 
 Revenue  351/EE/SRD/2008-2009  22-Jun-2009  3 Days  Pavement  LRP041  0 40.245     LRP042  0 41.28     Sylhet, (Division Office) 
 Revenue  DPM 02(Two)/Bishwanath/2016-2017/EE, RHD/Sylhet  1-Feb-2017  3 Days  Pavement  LRP041  0 40.245     LRP042  0 41.28     Sylhet, (Division Office) 
 Revenue  95/EE, RHD/Sylhet/2010-2011  4-Sep-2010  5 Days  Pavement  LRP041  0 40.245     LRP042  0 41.28     Sylhet, (Division Office) 
 Revenue  171/EE, RHD/Sylhet/2010-2011  27-Mar-2011  7 Days  Surfacing  LRP042  0 41.28     LRP043  0 42.28     Sylhet, (Division Office) 
 Revenue  91/EE, RHD/Sylhet/2010-2011  4-Oct-2010  7 Days  Pavement  LRP042  0 41.28     LRP043  0 42.28     Sylhet, (Division Office) 
 Revenue  57/EE, RHD/Sylhet/2010-2011  15-Sep-2010  7 Days  Pavement  LRP042  0 41.28     LRP043  0 42.28     Sylhet, (Division Office) 
 Revenue  289/EE/SRD/2008-2009  13-May-2009  5 Days  Surfacing  LRP043  0 42.28     LRP044  0 43.278     Sylhet, (Division Office) 
 Revenue  160d/EE, RHD/Sylhet/2013-2014  9-Mar-2014  7 Days  Surfacing  LRP043  720 43     LRP044  722 44     Sylhet, (Division Office) 
 Revenue  WD 30(Thirty)/2019-2020/EE, RHD/Sylhet/405747  4-Mar-2020  30 Days  Pavement  LRP048  0 46.675     LRP052  0 50.665     Sylhet, (Division Office) 
 Revenue  DPM 01(One)/Bishwanath/2016-2017/EE, RHD/Sylhet  26-Jan-2017  3 Days  Pavement  LRP048  0 47.256     LRP049  0 48.25     Sylhet, (Division Office) 
 Revenue  91/EE/SRD/2008-2009  25-Jan-2009  45 Days  Carpeting  LRP048  0 47.256     LRP050  0 49.244     Sylhet, (Division Office) 
 Revenue  106/EE/SRD/2008-2009  25-Jan-2009  60 Days  Carpeting  LRP047  1144 47.4     LRP048  1629 48.885     Sylhet, (Division Office) 
 Revenue  291/EE/SRD/2008-2009  12-May-2009  7 Days  Surfacing  LRP049  0 48.25     LRP050  0 49.244     Sylhet, (Division Office) 
 Revenue  141d/EE, RHD/Sylhet/2013-2014  30-Jan-2014  7 Days  Road Embankment  LRP049  750 49     LRP050  756 50     Sylhet, (Division Office) 
 Revenue  e-GP 17/EE, RHD/Sylhet/2014-2015  8-Feb-2015  30 Days  Pavement  LRP050  0 49.244     LRP054  0 53.22     Sylhet, (Division Office) 
 Revenue  e-GP/01(One)/ACE/SZ/2016-2017/79729  22-Mar-2017  274 Days  Overlay  LRP049  1315 49.565     LRP055  1003 55.218     Sylhet, (Division Office) 
 Development  483/EE/SRD/2007-2008  5-Jun-2008  90 Days  Carpeting  LRP050  556 49.8     LRP054  545 53.765     Sylhet, (Division Office) 
 Development  19(Nineteen)/SE, RHD/Sylhet/2010-2011  27-Jun-2011  360 Days  Road Rehablitation  LRP051  0 50.24     LRP055  0 54.215     Sylhet, (Division Office) 
 Revenue  WD 29(Twenty Nine)/2019-2020/EE, RHD/Sylhet/405746  4-Mar-2020  30 Days  Pavement  LRP052   50.665     LRP053   51.665     Sylhet, (Division Office) 
 Development  16/EE/SRD/2007-2008  6-Aug-2007  30 Days  Pavement  LRP053  0 52.223     LRPE  0 59.19     Sylhet, (Division Office) 
 Revenue  243/EE, RHD/Sylhet/2011-2012  14-May-2012  7 Days  Pavement  LRP053  0 52.223     LRP058  0 58.19     Sylhet, (Division Office) 
 Revenue  107/EE/SRD/2008-2009  20-Jan-2009  5 Days  Surfacing  LRP053  0 52.223     LRP054  0 53.22     Sylhet, (Division Office) 
 Revenue  210/EE, RHD/Sylhet/2009-2010  27-Jan-2010  3 Days  Pavement  LRP054  0 53.22     LRP055  0 54.215     Sylhet, (Division Office) 
 Revenue  01d/EE, RHD/Sylhet/2012-2013  6-Aug-2012  3 Days  Surfacing  LRP054  0 53.22     LRP055  0 54.215     Sylhet, (Division Office) 
 Revenue  52t/EE, RHD/Sylhet/2013-2014  30-Jan-2014  120 Days  Pavement  LRP054   53.22     LRP055   54.215     Sylhet, (Division Office) 
 Revenue  277/EE, RHD/Sylhet/2011-2012  26-Jun-2012  3 Days  Surfacing  LRP054  0 53.22     LRP055  0 54.215     Sylhet, (Division Office) 
 Revenue  60/EE, RHD/Sylhet/2010-2011  15-Sep-2010  7 Days  Surfacing  LRP054  0 53.22     LRP056  0 55.208     Sylhet, (Division Office) 
 Revenue  286/EE/SRD/2008-2009  27-May-2009  3 Days  Pavement  LRP054  0 53.22     LRP055  0 54.215     Sylhet, (Division Office) 
 Revenue  WD 11(Eleven)/2019-2020/EE, RHD/Sylhet/396657  12-Jan-2020  20 Days  Carpeting  LRP055   53.585     LRP056   54.585     Sylhet, (Division Office) 
 Revenue  229/EE, RHD/Sylhet/2011-2012  3-May-2012  7 Days  Surfacing  LRP055  0 54.215     LRP058  0 58.19     Sylhet, (Division Office) 
 Revenue  266d/EE, RHD/Sylhet/2012-2013  18-Jun-2013  7 Days  Surfacing  LRP054  1780 55     LRP056  792 56     Sylhet, (Division Office) 
 Revenue  237/EE, RHD/Sylhet/2011-2012  18-Mar-2012  3 Days  Pavement  LRP057  0 56.203     LRP058  0 58.19     Sylhet, (Division Office) 
 Revenue  174/EE, RHD/Sylhet/2010-2011  27-Mar-2011  7 Days  Surfacing  LRP057  0 56.203     LRP058  0 58.19     Sylhet, (Division Office) 
 Revenue Others  92/EE/SRD/2007-2008  31-Oct-2007  21 Days  Road Embankment  LRP057   56.203     LRP058   58.19     Sylhet, (Division Office) 
 Revenue  265/EE/SRD/2008-2009  21-Jun-2009  7 Days  Surfacing  LRP057  0 56.203     LRP058  0 58.19     Sylhet, (Division Office) 
 Development  445/EE/SRD/2007-2008  15-Apr-2008  5 Days  Surfacing  LRP056  1792 57     LRP057  1797 58     Sylhet, (Division Office) 
 Revenue  PMP 2008-2009/26/Overlay  15-Mar-2009  342 Days  Overlay  LRP057  817 57.02     LRP058  286 58.476     Sylhet, (Division Office) 
 Development  EDDRP/CIDA/SLZ/SYL/R-02  3-Sep-2008  557 Days  Road Rehablitation  LRP058   58.19     LRPE   59.19     Sylhet, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division