List of ongoing works on the road ( N208 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
|
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
Development |
14/2005-2006/EE/MRD |
7-Dec-2005 |
10 Days |
Road Embankment |
LRPS |
|
0 |
LRP035 |
|
33.939 |
Moulvi Bazar, (Division Office) |
Revenue |
07/2008-2009/E.E/M.R.D/T-03/2 |
1-Apr-2009 |
30 Days |
Pavement |
LRPS |
0 |
0 |
LRPS |
20 |
0.02 |
Moulvi Bazar, (Division Office) |
Development |
Lot 01 of Tender No. 07 (Seven)/2006-2007/EE/MRD |
|
60 Days |
Road Embankment |
LRPS |
|
0 |
LRP035 |
|
33.939 |
Moulvi Bazar, (Division Office) |
Development |
Lot 02 of 08/SDE/RSDM/2005-2006 |
30-Mar-2006 |
10 Days |
Carpeting |
LRPS |
0 |
0 |
LRP035 |
0 |
33.939 |
Moulvi Bazar, (Division Office) |
Revenue |
04/LTM/EE/MRD/2009-2010/T-03/1 |
14-Mar-2010 |
20 Days |
Carpeting |
LRPS |
0 |
0 |
LRP035 |
0 |
33.939 |
Moulvi Bazar, (Division Office) |
Development |
64/2005-2006/EE.RHD/MRD |
30-Mar-2006 |
10 Days |
Road Embankment |
LRPS |
|
0 |
LRP035 |
|
33.939 |
Moulvi Bazar, (Division Office) |
Revenue |
56/EE/MRD/2018-2019/ TID: 315282 |
30-May-2019 |
15 Days |
Surfacing |
LRPS |
0 |
0 |
LRP014 |
0 |
13.404 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/01/PMP- Road Mejor/ACE/SZ/Moul/2020-2021/490505 |
27-Dec-2020 |
181 Days |
Overlay |
LRPS |
0 |
0 |
LRP030 |
1473 |
30.6 |
Moulvi Bazar, (Division Office) |
Revenue |
26/LTM/EE/MRD/2012-2013/T-02/2 |
10-Feb-2013 |
30 Days |
Pavement |
LRPS |
0 |
0 |
LRPS |
100 |
0.1 |
Moulvi Bazar, (Division Office) |
Revenue |
27/LTM/EE/MRD/2010-2011/T-13/4 (2009-10) |
28-Dec-2010 |
25 Days |
Road Embankment |
LRPS |
0 |
0 |
LRP012 |
0 |
11.745 |
Moulvi Bazar, (Division Office) |
Revenue |
03/EE/MRD/2013-2014/T-06/4(2012-13) |
23-Sep-2013 |
30 Days |
Road Embankment |
LRPS |
0 |
0 |
LRP030 |
1473 |
30.6 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/11/EE/MRD/2014-15/14992 |
12-Feb-2015 |
30 Days |
Surfacing |
LRPS |
0 |
0 |
LRP030 |
0 |
29.127 |
Moulvi Bazar, (Division Office) |
Development |
12/2005-2006/SE.RHD/SRC |
17-Apr-2006 |
60 Days |
Road Embankment |
LRPS |
|
0 |
LRP010 |
|
9.795 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/01/EE/MRD/2016-2017/72068 |
26-Dec-2016 |
30 Days |
Surfacing |
LRPS |
0 |
0 |
LRPS |
2580 |
2.58 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/07/EE/MRD/2015-2016/33565 |
7-Jan-2016 |
30 Days |
Surfacing |
LRPS |
0 |
0 |
LRP005 |
0 |
5 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2014-15/19472 |
12-Apr-2015 |
30 Days |
Road Embankment |
LRPS |
0 |
0 |
LRP015 |
0 |
14.4 |
Moulvi Bazar, (Division Office) |
Development |
28/2005-2006/EE.RHD/MRD |
1-Mar-2006 |
10 Days |
Road Embankment |
LRPS |
|
0 |
LRP035 |
|
33.939 |
Moulvi Bazar, (Division Office) |
Revenue PMP |
PMP-07/2010-11/22/Overlay |
23-Nov-2011 |
180 Days |
Overlay |
LRPS |
0 |
0 |
LRP018 |
830 |
18.2 |
Moulvi Bazar, (Division Office) |
Revenue |
09/2008-2009/E.E/M.R.D/T-03/1 |
1-Apr-2009 |
25 Days |
Pavement |
LRPS |
340 |
0.34 |
LRPS |
400 |
0.4 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/29/EE/MRD/2015-2016/57411 |
20-Jun-2016 |
10 Days |
Road Embankment |
LRPS |
1770 |
1.77 |
LRPS |
1800 |
1.8 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Carpeting |
LRPS |
2090 |
2.09 |
LRPS |
2105 |
2.105 |
Moulvi Bazar, (Division Office) |
Revenue |
01/S.E/R.C.M/2006-2007 (D to R) |
17-May-2009 |
30 Days |
Pavement |
LRPS |
2120 |
2.12 |
LRPS |
3253 |
3.253 |
Moulvi Bazar, (Division Office) |
Development |
01/SE/RCM/2006-2007 |
6-Sep-2006 |
90 Days |
Pavement |
LRPS |
2120 |
2.12 |
LRPS |
3253 |
3.253 |
Moulvi Bazar, (Division Office) |
Revenue |
05/EE/MRD/2013-2014/T-07/6(2012-13) |
24-Sep-2013 |
30 Days |
Carpeting |
LRPS |
2250 |
2.25 |
LRPS |
2305 |
2.305 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRPS |
2250 |
2.25 |
LRPS |
2265 |
2.265 |
Moulvi Bazar, (Division Office) |
Revenue |
18/EE/MRD/2018-2019/TID:240708 |
2-Dec-2018 |
30 Days |
Surfacing |
LRPS |
2400 |
2.4 |
LRPS |
2812 |
2.812 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2015-2016/42111 |
29-Feb-2016 |
45 Days |
Surfacing |
LRPS |
2800 |
2.8 |
LRP025 |
0 |
24.31 |
Moulvi Bazar, (Division Office) |
Revenue |
MRD/RFQ/03/2017-2018 |
5-Feb-2018 |
7 Days |
Surfacing |
LRPS |
3000 |
3 |
LRPS |
4000 |
4 |
Moulvi Bazar, (Division Office) |
Revenue |
18/EE/MRD/2018-2019/TID:240708 |
2-Dec-2018 |
30 Days |
Surfacing |
LRPS |
3017 |
3.017 |
LRPS |
3431 |
3.431 |
Moulvi Bazar, (Division Office) |
Revenue |
11/EE/MRD/2009-2010/T-04/2 |
1-Jun-2010 |
45 Days |
Pavement |
LRPS |
3180 |
3.18 |
LRPS |
3380 |
3.38 |
Moulvi Bazar, (Division Office) |
Revenue |
05/EE/MRD/2013-2014/T-07/6(2012-13) |
24-Sep-2013 |
30 Days |
Carpeting |
LRPS |
3500 |
3.5 |
LRPS |
3584 |
3.584 |
Moulvi Bazar, (Division Office) |
Revenue |
29/EE/MRD/2018-2019/ TID: 259979 |
3-Feb-2019 |
30 Days |
Surfacing |
LRPS |
4800 |
4.8 |
LRP010 |
55 |
9.85 |
Moulvi Bazar, (Division Office) |
Revenue Periodic Roads |
28/2007-2008/EE/MRD |
4-Mar-2008 |
10 Days |
Carpeting |
LRP005 |
0 |
5 |
LRP014 |
0 |
13.404 |
Moulvi Bazar, (Division Office) |
Revenue |
MRD/RFQ/03/2017-2018 |
5-Feb-2018 |
7 Days |
Surfacing |
LRP005 |
0 |
5 |
LRP006 |
1153 |
7 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/04/EE/MRD/2014-15/14536 |
10-Feb-2015 |
45 Days |
Carpeting |
LRP005 |
0 |
5 |
LRP024 |
0 |
23.33 |
Moulvi Bazar, (Division Office) |
Revenue |
06/RFQ-06/MRD/2011-12 |
4-Dec-2011 |
10 Days |
Carpeting |
LRP005 |
300 |
5.3 |
LRP005 |
830 |
5.83 |
Moulvi Bazar, (Division Office) |
Revenue |
06/RFQ-06/MRD/2011-12 |
4-Dec-2011 |
10 Days |
Carpeting |
LRP006 |
503 |
6.35 |
LRP006 |
1003 |
6.85 |
Moulvi Bazar, (Division Office) |
Revenue |
06/RFQ-06/MRD/2011-12 |
4-Dec-2011 |
10 Days |
Carpeting |
LRP006 |
1653 |
7.5 |
LRP006 |
1953 |
7.8 |
Moulvi Bazar, (Division Office) |
Revenue Periodic Roads |
31/2007-2008/EE/MRD |
24-Apr-2008 |
10 Days |
Pavement |
LRP008 |
-269 |
7.525 |
LRP008 |
58 |
7.852 |
Moulvi Bazar, (Division Office) |
Revenue |
PMP-Minor-Works-45/2019-20/455402 |
4-Jun-2020 |
15 Days |
Surfacing |
LRP008 |
206 |
8 |
LRP008 |
356 |
8.15 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/24/EE/MRD/2016-2017/96333 |
18-May-2017 |
30 Days |
Carpeting |
LRP008 |
306 |
8.1 |
LRP008 |
706 |
8.5 |
Moulvi Bazar, (Division Office) |
Revenue |
14/LTM/EE/MRD/2010-2011/T-13/2(2009-10) |
24-Oct-2010 |
30 Days |
Carpeting |
LRP008 |
306 |
8.1 |
LRP008 |
1606 |
9.4 |
Moulvi Bazar, (Division Office) |
Revenue |
28/LTM/EE/MRD/2009-2010/T-11/4 |
27-Jun-2010 |
30 Days |
Carpeting |
LRP010 |
-365 |
9.43 |
LRP010 |
635 |
10.43 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Carpeting |
LRP010 |
155 |
9.95 |
LRP010 |
175 |
9.97 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Carpeting |
LRP010 |
205 |
10 |
LRP010 |
240 |
10.035 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Carpeting |
LRP010 |
235 |
10.03 |
LRP010 |
255 |
10.05 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Carpeting |
LRP010 |
295 |
10.13 |
LRP010 |
385 |
10.22 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Carpeting |
LRP010 |
435 |
10.23 |
LRP010 |
465 |
10.26 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP010 |
705 |
10.5 |
LRP010 |
737 |
10.532 |
Moulvi Bazar, (Division Office) |
Revenue |
14/LTM/EE/MRD/2010-2011/T-13/2(2009-10) |
24-Oct-2010 |
30 Days |
Carpeting |
LRP010 |
705 |
10.5 |
LRP010 |
1205 |
11 |
Moulvi Bazar, (Division Office) |
Revenue |
MRD/RFQ/03/2017-2018 |
5-Feb-2018 |
7 Days |
Surfacing |
LRP010 |
1205 |
11 |
LRP012 |
255 |
12 |
Moulvi Bazar, (Division Office) |
Revenue |
16/LTM/EE/MRD/2010-2011/T-13/6(2009-10) |
24-Oct-2010 |
20 Days |
Carpeting |
LRP010 |
1380 |
11.175 |
LRP010 |
1705 |
11.5 |
Moulvi Bazar, (Division Office) |
Revenue |
37/LTM/EE/MRD/2010-2011/T-02/4 |
14-Jun-2011 |
30 Days |
Carpeting |
LRP010 |
1705 |
11.5 |
LRP012 |
1595 |
13.34 |
Moulvi Bazar, (Division Office) |
Revenue |
11/LTM/EE/MRD/2010-2011/T-11/6(2009-10) |
10-Oct-2010 |
30 Days |
Road Embankment |
LRP012 |
0 |
11.745 |
LRP035 |
0 |
33.939 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP012 |
245 |
11.99 |
LRP012 |
260 |
12.005 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP012 |
285 |
12.03 |
LRP012 |
307 |
12.052 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP012 |
315 |
12.06 |
LRP012 |
325 |
12.07 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/02/PMP Road/MRC/2018-19/219741 |
31-Jan-2019 |
318 Days |
Overlay |
LRP014 |
146 |
13.55 |
LRP014 |
596 |
14 |
Moulvi Bazar, (Division Office) |
Development |
33/2007-2008/EE/MRD |
12-May-2008 |
30 Days |
Road Embankment |
LRP015 |
-400 |
14 |
LRP017 |
-180 |
16.2 |
Moulvi Bazar, (Division Office) |
Revenue |
24/EE/MRD/2018-2019/ TID: 259028 |
3-Feb-2019 |
30 Days |
Surfacing |
LRP015 |
0 |
14.4 |
LRP025 |
0 |
24.31 |
Moulvi Bazar, (Division Office) |
Revenue Periodic Roads |
29/2007-2008/EE/MRD |
4-Mar-2008 |
10 Days |
Carpeting |
LRP015 |
0 |
14.4 |
LRP032 |
0 |
31.043 |
Moulvi Bazar, (Division Office) |
Revenue |
16/LTM/EE/MRD/2012-2013/T-01/2 |
30-Oct-2012 |
30 Days |
Surfacing |
LRP015 |
600 |
15 |
LRP030 |
1473 |
30.6 |
Moulvi Bazar, (Division Office) |
Revenue |
32/EE/MRD/2018-2019/ TID: 268463 |
5-Feb-2019 |
30 Days |
Surfacing |
LRP016 |
0 |
15.39 |
LRP019 |
0 |
18.354 |
Moulvi Bazar, (Division Office) |
Development |
71/2005-2006/EE.RHD/MRD |
23-Apr-2006 |
10 Days |
Carpeting |
LRP016 |
0 |
15.39 |
LRP017 |
0 |
16.38 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/11/ACE/SZ/2013-2014/6410 |
8-May-2014 |
180 Days |
Overlay |
LRP016 |
110 |
15.5 |
LRP018 |
590 |
17.96 |
Moulvi Bazar, (Division Office) |
Revenue |
09/EE/MRD/2018-2019 / TID:234231 |
2-Dec-2018 |
30 Days |
Surfacing |
LRP016 |
730 |
16.12 |
LRP017 |
920 |
17.3 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Surfacing |
LRP016 |
856 |
16.246 |
LRP017 |
70 |
16.45 |
Moulvi Bazar, (Division Office) |
Revenue |
25/LTM/EE/MRD/2010-2011/T-11/7 |
26-Oct-2010 |
30 Days |
Pavement |
LRP017 |
-66 |
16.314 |
LRP017 |
300 |
16.68 |
Moulvi Bazar, (Division Office) |
Revenue |
36/EE/MRD/2018-2019/ TID: 281967 |
7-Mar-2019 |
30 Days |
Surfacing |
LRP017 |
0 |
16.38 |
LRP030 |
0 |
29.127 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP017 |
90 |
16.47 |
LRP017 |
120 |
16.5 |
Moulvi Bazar, (Division Office) |
Revenue |
07/LTM/EE/MRD/2011-2012/T-05/5 (10-11) |
4-Sep-2011 |
25 Days |
Pavement |
LRP017 |
300 |
16.68 |
LRP017 |
450 |
16.83 |
Moulvi Bazar, (Division Office) |
Revenue |
MRD/RFQ/08/2017-2018 |
18-Jun-2018 |
7 Days |
Pavement |
LRP018 |
0 |
17.37 |
LRP030 |
0 |
29.127 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/02/PMP Road/MRC/2018-19/219741 |
31-Jan-2019 |
318 Days |
Overlay |
LRP018 |
590 |
17.96 |
LRP019 |
46 |
18.4 |
Moulvi Bazar, (Division Office) |
Revenue |
12/LTM/EE/MRD/2010-2011/T-11/5(2009-10) |
10-Oct-2010 |
30 Days |
Pavement |
LRP019 |
321 |
18.675 |
LRP019 |
571 |
18.925 |
Moulvi Bazar, (Division Office) |
Revenue |
08/LTM/EE/MRD/2011-2012/T-05/7 (10-11) |
5-Sep-2011 |
25 Days |
Pavement |
LRP019 |
571 |
18.925 |
LRP019 |
746 |
19.1 |
Moulvi Bazar, (Division Office) |
Revenue |
30/EE/MRD/2012-2013/T-02/5 |
31-Jan-2013 |
30 Days |
Carpeting |
LRP019 |
646 |
19 |
LRP020 |
1240 |
20.6 |
Moulvi Bazar, (Division Office) |
Revenue Others |
10/2007-2008/EE/MRD |
31-Dec-2007 |
10 Days |
Carpeting |
LRP020 |
0 |
19.36 |
LRP023 |
0 |
22.33 |
Moulvi Bazar, (Division Office) |
Development |
21/2007-2008/EE/MRD |
16-Mar-2008 |
75 Days |
Road Embankment |
LRP020 |
|
19.36 |
LRP024 |
|
23.33 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/02/PMP Road/MRC/2018-19/219741 |
31-Jan-2019 |
318 Days |
Overlay |
LRP020 |
740 |
20.1 |
LRP020 |
2550 |
21.91 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2016-2017/82360 |
2-Apr-2017 |
30 Days |
Surfacing |
LRP020 |
1840 |
21.2 |
LRP020 |
1880 |
21.24 |
Moulvi Bazar, (Division Office) |
Revenue |
05/LTM/EE/MRD/2011-2012/T-05//6 (10-11) |
21-Aug-2011 |
25 Days |
Pavement |
LRP020 |
2475 |
21.835 |
LRP020 |
2625 |
21.985 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/02/PMP Road/MRC/2018-19/219741 |
31-Jan-2019 |
318 Days |
Overlay |
LRP020 |
2640 |
22 |
LRP024 |
920 |
24.25 |
Moulvi Bazar, (Division Office) |
Revenue |
208d/EE, RHD/Sylhet/2012-2013 |
5-Feb-2013 |
7 Days |
Pavement |
LRPS |
22000 |
22 |
LRPS |
23000 |
23 |
Sylhet, (Division Office) |
Revenue |
05/LTM/EE/MRD/2011-2012/T-05//6 (10-11) |
21-Aug-2011 |
25 Days |
Pavement |
LRP020 |
2840 |
22.2 |
LRP023 |
-5 |
22.325 |
Moulvi Bazar, (Division Office) |
Revenue |
03/RFQ-02/MRD/2009-10 |
15-Dec-2009 |
10 Days |
Carpeting |
LRP023 |
185 |
22.515 |
LRP023 |
270 |
22.6 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2016-2017/82360 |
2-Apr-2017 |
30 Days |
Surfacing |
LRP022 |
1135 |
22.6 |
LRP022 |
1235 |
22.7 |
Moulvi Bazar, (Division Office) |
Revenue |
22/2008-2009/E.E/M.R.D/T-12/1 |
31-May-2009 |
40 Days |
Carpeting |
LRP023 |
370 |
22.7 |
LRP024 |
470 |
23.8 |
Moulvi Bazar, (Division Office) |
Revenue |
01/LTM/2008-2009/E.E/M.R.D/T-01/1 |
18-Jun-2009 |
15 Days |
Road Embankment |
LRP023 |
370 |
22.7 |
LRP027 |
367 |
26.6 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2016-2017/82360 |
2-Apr-2017 |
30 Days |
Surfacing |
LRP023 |
820 |
23.15 |
LRP023 |
970 |
23.3 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2016-2017/82360 |
2-Apr-2017 |
30 Days |
Surfacing |
LRP024 |
120 |
23.45 |
LRP024 |
170 |
23.5 |
Moulvi Bazar, (Division Office) |
Development |
41/2007-2008/E.E/M.R.D |
2-Jun-2008 |
29 Days |
Pavement |
LRP024 |
270 |
23.6 |
LRP028 |
317 |
27.5 |
Moulvi Bazar, (Division Office) |
Development |
41/2007-2008/E.E/M.R.D. (Full New) |
2-Jun-2008 |
28 Days |
Pavement |
LRP024 |
270 |
23.6 |
LRP028 |
317 |
27.5 |
Moulvi Bazar, (Division Office) |
Development |
41/2007-2008/E.E/M.R.D (New) |
2-Jun-2008 |
29 Days |
Pavement |
LRP024 |
270 |
23.6 |
LRP028 |
317 |
27.5 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP024 |
370 |
23.7 |
LRP024 |
470 |
23.8 |
Moulvi Bazar, (Division Office) |
Revenue |
18/2008-2009/E.E/M.R.D/T-07 |
8-Apr-2009 |
45 Days |
Carpeting |
LRP024 |
470 |
23.8 |
LRP027 |
367 |
26.6 |
Moulvi Bazar, (Division Office) |
Revenue |
PMP-Minor-Works-08/EE/MRD/2019-2020/373404 |
12-Dec-2019 |
30 Days |
Carpeting |
LRP025 |
0 |
24.31 |
LRP030 |
0 |
29.127 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/11/ACE/SZ/2013-2014/6410 |
8-May-2014 |
180 Days |
Overlay |
LRP025 |
190 |
24.5 |
LRP030 |
1473 |
30.6 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Surfacing |
LRP025 |
635 |
24.945 |
LRP025 |
690 |
25 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Surfacing |
LRP025 |
690 |
25 |
LRP026 |
72 |
25.37 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP025 |
690 |
25 |
LRP025 |
765 |
25.075 |
Moulvi Bazar, (Division Office) |
Revenue |
22/RFQ-25/MRD/2010-11 |
7-Jun-2011 |
7 Days |
Carpeting |
LRP025 |
690 |
25 |
LRP030 |
873 |
30 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/08/EE/MRD/2016-2017/82359 |
21-Mar-2017 |
30 Days |
Pavement |
LRP026 |
102 |
25.4 |
LRP027 |
267 |
26.5 |
Moulvi Bazar, (Division Office) |
Revenue |
09/EE/MRD/2018-2019 / TID:234231 |
2-Dec-2018 |
30 Days |
Surfacing |
LRP026 |
287 |
25.585 |
LRP028 |
1117 |
28.3 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2016-2017/82360 |
2-Apr-2017 |
30 Days |
Surfacing |
LRP027 |
67 |
26.3 |
LRP027 |
87 |
26.32 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/13/EE/MRD/2016-2017/82360 |
2-Apr-2017 |
30 Days |
Surfacing |
LRP027 |
267 |
26.5 |
LRP028 |
167 |
27.35 |
Moulvi Bazar, (Division Office) |
Revenue |
03/RFQ-02/MRD/2009-10 |
15-Dec-2009 |
10 Days |
Carpeting |
LRP027 |
367 |
26.6 |
LRP027 |
502 |
26.735 |
Moulvi Bazar, (Division Office) |
Revenue |
124d/EE, RHD/Sylhet/2013-2014 |
23-Dec-2013 |
3 Days |
Surfacing |
LRPS |
27000 |
27 |
LRPS |
28000 |
28 |
Sylhet, (Division Office) |
Revenue |
25/EE/MRD/2018-2019/ TID: 259029 |
3-Feb-2019 |
30 Days |
Surfacing |
LRP028 |
0 |
27.183 |
LRP030 |
0 |
29.127 |
Moulvi Bazar, (Division Office) |
Development |
01/2006-2007/EE/MRD |
4-Oct-2006 |
3 Days |
Road Embankment |
LRP028 |
0 |
27.183 |
LRP030 |
0 |
29.127 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Surfacing |
LRP028 |
177 |
27.36 |
LRP028 |
457 |
27.64 |
Moulvi Bazar, (Division Office) |
Development |
21/2007-2008/EE/MRD |
16-Mar-2008 |
75 Days |
Road Embankment |
LRP028 |
317 |
27.5 |
LRP035 |
561 |
34.5 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Surfacing |
LRP028 |
1217 |
28.4 |
LRP028 |
1397 |
28.58 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/15/EE/MRD/2017-2018/125963 |
22-Jan-2018 |
30 Days |
Surfacing |
LRP028 |
1517 |
28.7 |
LRP028 |
1617 |
28.8 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/09/EE/MRD/2016-2017/82361 |
23-Mar-2017 |
30 Days |
Carpeting |
LRP028 |
1617 |
28.8 |
LRP030 |
723 |
29.85 |
Moulvi Bazar, (Division Office) |
Revenue Periodic Roads |
31/2007-2008/EE/MRD |
24-Apr-2008 |
10 Days |
Pavement |
LRP030 |
473 |
29.6 |
LRP033 |
-8 |
32 |
Moulvi Bazar, (Division Office) |
Revenue |
e-GP/07(Seven)/ACE/SZ/2015-2016/28103 |
23-Dec-2015 |
180 Days |
DBST |
LRPS |
30600 |
30.6 |
LRP052 |
665 |
51.9 |
Sylhet, (Division Office) |
Revenue |
172/EE, RHD/Sylhet/2010-2011 |
27-Mar-2011 |
7 Days |
Surfacing |
LRP032 |
0 |
31.043 |
LRP033 |
0 |
32.008 |
Sylhet, (Division Office) |
Revenue |
e-GP 04/EE, RHD/Sylhet/2014-2015 |
20-Jul-2014 |
36 Days |
Surfacing |
LRP032 |
0 |
31.043 |
LRP033 |
0 |
32.008 |
Sylhet, (Division Office) |
Revenue |
63/EE, RHD/Sylhet/2011-2012 |
27-Nov-2011 |
3 Days |
Surfacing |
LRP032 |
|
31.043 |
LRP033 |
|
32.008 |
Sylhet, (Division Office) |
Revenue |
244/EE, RHD/Sylhet/2011-2012 |
14-May-2012 |
7 Days |
Pavement |
LRP032 |
0 |
31.043 |
LRP058 |
0 |
58.19 |
Sylhet, (Division Office) |
Revenue |
84d/EE, RHD/Sylhet/2012-2013 |
28-Jan-2013 |
7 Days |
Surfacing |
LRP032 |
0 |
31.043 |
LRP033 |
0 |
32.008 |
Sylhet, (Division Office) |
Revenue |
102/EE, RHD/Sylhet/2011-2012 |
9-Oct-2011 |
7 Days |
Surfacing |
LRP032 |
0 |
31.043 |
LRP034 |
0 |
32.979 |
Sylhet, (Division Office) |
Revenue |
145d/EE, RHD/Sylhet/2012-2013 |
16-Apr-2013 |
7 Days |
Pavement |
LRP032 |
0 |
31.043 |
LRP037 |
0 |
36.28 |
Sylhet, (Division Office) |
Revenue |
18/EE, RHD/Sylhet/2011-2012 |
12-Jul-2011 |
7 Days |
Road Embankment |
LRP033 |
0 |
32.008 |
LRP034 |
0 |
32.979 |
Sylhet, (Division Office) |
Revenue |
17/EE, RHD/Sylhet/2011-2012 |
12-Jul-2011 |
7 Days |
Road Embankment |
LRP033 |
0 |
32.008 |
LRP034 |
0 |
32.979 |
Sylhet, (Division Office) |
Revenue |
152d/EE, RHD/Sylhet/2014-2015 |
6-Jul-2014 |
7 Days |
Surfacing |
LRP034 |
0 |
32.979 |
LRP035 |
0 |
33.939 |
Sylhet, (Division Office) |
Revenue |
215d/EE, RHD/Sylhet/2013-2014 |
11-May-2014 |
7 Days |
Surfacing |
LRP034 |
0 |
32.979 |
LRP035 |
0 |
33.939 |
Sylhet, (Division Office) |
Revenue |
DPM 19(Nineteen)/2016-2017/EE, RHD/Sylhet |
15-Jun-2017 |
3 Days |
Pavement |
LRP035 |
0 |
33.939 |
LRP037 |
0 |
36.28 |
Sylhet, (Division Office) |
Revenue |
216d/EE, RHD/Sylhet/2013-2014 |
11-May-2014 |
7 Days |
Surfacing |
LRP035 |
0 |
33.939 |
LRP037 |
0 |
36.28 |
Sylhet, (Division Office) |
Development |
08/EE/SRD/2007-2008 |
5-Aug-2007 |
30 Days |
Surfacing |
LRP035 |
0 |
33.939 |
LRP037 |
0 |
36.28 |
Sylhet, (Division Office) |
Development |
260/EE/SRD/2007-2008 |
22-Jan-2008 |
30 Days |
Surfacing |
LRP035 |
0 |
33.939 |
LRP037 |
0 |
36.28 |
Sylhet, (Division Office) |
Revenue |
WD 53(Fifty Three)/2019-2020/EE, RHD/Sylhet/460559 |
7-Jun-2020 |
20 Days |
Pavement |
LRP035 |
0 |
34.235 |
LRP044 |
0 |
42.675 |
Sylhet, (Division Office) |
Revenue |
103d/EE, RHD/Sylhet/2013-2014 |
2-Dec-2013 |
3 Days |
Surfacing |
LRP035 |
1061 |
35 |
LRP035 |
2061 |
36 |
Sylhet, (Division Office) |
Revenue |
230d/EE, RHD/Sylhet/2012-2013 |
18-Jun-2013 |
7 Days |
Surfacing |
LRP034 |
2021 |
35 |
LRP035 |
2061 |
36 |
Sylhet, (Division Office) |
Revenue |
57t/EE, RHD/Sylhet/2013-2014 |
3-Mar-2014 |
75 Days |
Pavement |
LRP035 |
1061 |
35 |
LRP039 |
700 |
39 |
Sylhet, (Division Office) |
Revenue |
38d/EE, RHD/Sylhet/2013-2014 |
7-Oct-2013 |
7 Days |
Surfacing |
LRP035 |
1061 |
35 |
LRP035 |
2061 |
36 |
Sylhet, (Division Office) |
Revenue |
229d/EE, RHD/Sylhet/2012-2013 |
18-Jun-2013 |
7 Days |
Surfacing |
LRP035 |
1061 |
35 |
LRP035 |
2061 |
36 |
Sylhet, (Division Office) |
Revenue Others |
260/2007-2008/EE/SRD |
22-Jan-2008 |
30 Days |
Surfacing |
LRP035 |
1125 |
35.064 |
LRP035 |
1652 |
35.591 |
Sylhet, (Division Office) |
Revenue |
PMP 2009-2010/25/DBST & Overlay |
18-Aug-2010 |
591 Days |
DBST |
LRPS |
35760 |
35.76 |
LRP054 |
930 |
54.15 |
Sylhet, (Division Office) |
Revenue |
158d/EE, RHD/Sylhet/2013-2014 |
6-Mar-2014 |
7 Days |
Surfacing |
LRP035 |
2261 |
36.2 |
LRP035 |
2281 |
36.22 |
Sylhet, (Division Office) |
Development |
14/EE/SRD/2007-2008 |
5-Aug-2007 |
30 Days |
Carpeting |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Development |
444/EE/SRD/2007-2008 |
24-Mar-2008 |
7 Days |
Surfacing |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
238/EE, RHD/Sylhet/2009-2010 |
2-Mar-2010 |
7 Days |
Pavement |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Development |
78/EE/SRD/2007-2008 |
4-Oct-2007 |
30 Days |
Pavement |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
184/EE/SRD/2008-2009 |
23-Apr-2009 |
5 Days |
Surfacing |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
79/EE, RHD/Sylhet/2009-2010 |
14-Jan-2010 |
3 Days |
Pavement |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
42/EE/SRD/2008-2009 |
3-Nov-2008 |
5 Days |
Pavement |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
52t/EE, RHD/Sylhet/2012-2013 |
25-Feb-2013 |
248 Days |
Pavement |
LRP037 |
|
36.28 |
LRP043 |
|
42.28 |
Sylhet, (Division Office) |
Revenue |
81/EE, RHD/Sylhet/2009-2010 |
12-Nov-2009 |
5 Days |
Surfacing |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
145/EE, RHD/Sylhet/2009-2010 |
9-Mar-2010 |
5 Days |
Pavement |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
97/EE, RHD/Sylhet/2010-2011 |
16-Sep-2010 |
5 Days |
Surfacing |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Revenue |
128/EE/SRD/2008-2009 |
18-Jan-2009 |
5 Days |
Carpeting |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Development |
443/EE/SRD/2007-2008 |
24-Mar-2008 |
7 Days |
Surfacing |
LRP037 |
0 |
36.28 |
LRP038 |
0 |
37.28 |
Sylhet, (Division Office) |
Development |
287/EE/SRD/2007-2008 |
4-Feb-2008 |
146 Days |
Carpeting |
LRP035 |
2461 |
36.4 |
LRP053 |
1442 |
53.665 |
Sylhet, (Division Office) |
Revenue |
246/EE, RHD/Sylhet/2009-2010 |
5-May-2010 |
7 Days |
Surfacing |
LRP038 |
0 |
37.28 |
LRP039 |
0 |
38.3 |
Sylhet, (Division Office) |
Revenue |
96/EE, RHD/Sylhet/2010-2011 |
5-Jul-2010 |
5 Days |
Pavement |
LRP038 |
0 |
37.28 |
LRP039 |
0 |
38.3 |
Sylhet, (Division Office) |
Development |
468/EE/SRD/2007-2008 |
13-May-2008 |
7 Days |
Pavement |
LRP038 |
0 |
37.28 |
LRP043 |
0 |
42.28 |
Sylhet, (Division Office) |
Revenue |
66/EE/SRD/2008-2009 |
22-Oct-2008 |
5 Days |
Pavement |
LRP038 |
0 |
37.28 |
LRP040 |
0 |
39.296 |
Sylhet, (Division Office) |
Revenue |
146/EE, RHD/Sylhet/2009-2010 |
9-Mar-2010 |
5 Days |
Surfacing |
LRP039 |
|
38.3 |
LRP040 |
|
39.296 |
Sylhet, (Division Office) |
Revenue |
DPM 20(Twenty)/2016-2017/EE, RHD/Sylhet |
15-Jun-2017 |
3 Days |
Pavement |
LRP039 |
0 |
38.3 |
LRP040 |
0 |
39.296 |
Sylhet, (Division Office) |
Revenue |
e-GP/10/ACE/SZ/2013-2014/6411 |
5-May-2014 |
299 Days |
Overlay |
LRP040 |
0 |
39.296 |
LRP048 |
0 |
47.256 |
Sylhet, (Division Office) |
Revenue |
247/EE, RHD/Sylhet/2009-2010 |
5-May-2010 |
7 Days |
Surfacing |
LRP040 |
0 |
39.296 |
LRP041 |
0 |
40.245 |
Sylhet, (Division Office) |
Revenue |
340/EE/SRD/2008-2009 |
25-Jun-2009 |
5 Days |
Surfacing |
LRP040 |
0 |
39.296 |
LRP041 |
0 |
40.245 |
Sylhet, (Division Office) |
Revenue |
351/EE/SRD/2008-2009 |
22-Jun-2009 |
3 Days |
Pavement |
LRP041 |
0 |
40.245 |
LRP042 |
0 |
41.28 |
Sylhet, (Division Office) |
Revenue |
DPM 02(Two)/Bishwanath/2016-2017/EE, RHD/Sylhet |
1-Feb-2017 |
3 Days |
Pavement |
LRP041 |
0 |
40.245 |
LRP042 |
0 |
41.28 |
Sylhet, (Division Office) |
Revenue |
95/EE, RHD/Sylhet/2010-2011 |
4-Sep-2010 |
5 Days |
Pavement |
LRP041 |
0 |
40.245 |
LRP042 |
0 |
41.28 |
Sylhet, (Division Office) |
Revenue |
171/EE, RHD/Sylhet/2010-2011 |
27-Mar-2011 |
7 Days |
Surfacing |
LRP042 |
0 |
41.28 |
LRP043 |
0 |
42.28 |
Sylhet, (Division Office) |
Revenue |
91/EE, RHD/Sylhet/2010-2011 |
4-Oct-2010 |
7 Days |
Pavement |
LRP042 |
0 |
41.28 |
LRP043 |
0 |
42.28 |
Sylhet, (Division Office) |
Revenue |
57/EE, RHD/Sylhet/2010-2011 |
15-Sep-2010 |
7 Days |
Pavement |
LRP042 |
0 |
41.28 |
LRP043 |
0 |
42.28 |
Sylhet, (Division Office) |
Revenue |
289/EE/SRD/2008-2009 |
13-May-2009 |
5 Days |
Surfacing |
LRP043 |
0 |
42.28 |
LRP044 |
0 |
43.278 |
Sylhet, (Division Office) |
Revenue |
160d/EE, RHD/Sylhet/2013-2014 |
9-Mar-2014 |
7 Days |
Surfacing |
LRP043 |
720 |
43 |
LRP044 |
722 |
44 |
Sylhet, (Division Office) |
Revenue |
WD 30(Thirty)/2019-2020/EE, RHD/Sylhet/405747 |
4-Mar-2020 |
30 Days |
Pavement |
LRP048 |
0 |
46.675 |
LRP052 |
0 |
50.665 |
Sylhet, (Division Office) |
Revenue |
DPM 01(One)/Bishwanath/2016-2017/EE, RHD/Sylhet |
26-Jan-2017 |
3 Days |
Pavement |
LRP048 |
0 |
47.256 |
LRP049 |
0 |
48.25 |
Sylhet, (Division Office) |
Revenue |
91/EE/SRD/2008-2009 |
25-Jan-2009 |
45 Days |
Carpeting |
LRP048 |
0 |
47.256 |
LRP050 |
0 |
49.244 |
Sylhet, (Division Office) |
Revenue |
106/EE/SRD/2008-2009 |
25-Jan-2009 |
60 Days |
Carpeting |
LRP047 |
1144 |
47.4 |
LRP048 |
1629 |
48.885 |
Sylhet, (Division Office) |
Revenue |
291/EE/SRD/2008-2009 |
12-May-2009 |
7 Days |
Surfacing |
LRP049 |
0 |
48.25 |
LRP050 |
0 |
49.244 |
Sylhet, (Division Office) |
Revenue |
141d/EE, RHD/Sylhet/2013-2014 |
30-Jan-2014 |
7 Days |
Road Embankment |
LRP049 |
750 |
49 |
LRP050 |
756 |
50 |
Sylhet, (Division Office) |
Revenue |
e-GP 17/EE, RHD/Sylhet/2014-2015 |
8-Feb-2015 |
30 Days |
Pavement |
LRP050 |
0 |
49.244 |
LRP054 |
0 |
53.22 |
Sylhet, (Division Office) |
Revenue |
e-GP/01(One)/ACE/SZ/2016-2017/79729 |
22-Mar-2017 |
274 Days |
Overlay |
LRP049 |
1315 |
49.565 |
LRP055 |
1003 |
55.218 |
Sylhet, (Division Office) |
Development |
483/EE/SRD/2007-2008 |
5-Jun-2008 |
90 Days |
Carpeting |
LRP050 |
556 |
49.8 |
LRP054 |
545 |
53.765 |
Sylhet, (Division Office) |
Development |
19(Nineteen)/SE, RHD/Sylhet/2010-2011 |
27-Jun-2011 |
360 Days |
Road Rehablitation |
LRP051 |
0 |
50.24 |
LRP055 |
0 |
54.215 |
Sylhet, (Division Office) |
Revenue |
WD 29(Twenty Nine)/2019-2020/EE, RHD/Sylhet/405746 |
4-Mar-2020 |
30 Days |
Pavement |
LRP052 |
|
50.665 |
LRP053 |
|
51.665 |
Sylhet, (Division Office) |
Development |
16/EE/SRD/2007-2008 |
6-Aug-2007 |
30 Days |
Pavement |
LRP053 |
0 |
52.223 |
LRPE |
0 |
59.19 |
Sylhet, (Division Office) |
Revenue |
243/EE, RHD/Sylhet/2011-2012 |
14-May-2012 |
7 Days |
Pavement |
LRP053 |
0 |
52.223 |
LRP058 |
0 |
58.19 |
Sylhet, (Division Office) |
Revenue |
107/EE/SRD/2008-2009 |
20-Jan-2009 |
5 Days |
Surfacing |
LRP053 |
0 |
52.223 |
LRP054 |
0 |
53.22 |
Sylhet, (Division Office) |
Revenue |
210/EE, RHD/Sylhet/2009-2010 |
27-Jan-2010 |
3 Days |
Pavement |
LRP054 |
0 |
53.22 |
LRP055 |
0 |
54.215 |
Sylhet, (Division Office) |
Revenue |
01d/EE, RHD/Sylhet/2012-2013 |
6-Aug-2012 |
3 Days |
Surfacing |
LRP054 |
0 |
53.22 |
LRP055 |
0 |
54.215 |
Sylhet, (Division Office) |
Revenue |
52t/EE, RHD/Sylhet/2013-2014 |
30-Jan-2014 |
120 Days |
Pavement |
LRP054 |
|
53.22 |
LRP055 |
|
54.215 |
Sylhet, (Division Office) |
Revenue |
277/EE, RHD/Sylhet/2011-2012 |
26-Jun-2012 |
3 Days |
Surfacing |
LRP054 |
0 |
53.22 |
LRP055 |
0 |
54.215 |
Sylhet, (Division Office) |
Revenue |
60/EE, RHD/Sylhet/2010-2011 |
15-Sep-2010 |
7 Days |
Surfacing |
LRP054 |
0 |
53.22 |
LRP056 |
0 |
55.208 |
Sylhet, (Division Office) |
Revenue |
286/EE/SRD/2008-2009 |
27-May-2009 |
3 Days |
Pavement |
LRP054 |
0 |
53.22 |
LRP055 |
0 |
54.215 |
Sylhet, (Division Office) |
Revenue |
WD 11(Eleven)/2019-2020/EE, RHD/Sylhet/396657 |
12-Jan-2020 |
20 Days |
Carpeting |
LRP055 |
|
53.585 |
LRP056 |
|
54.585 |
Sylhet, (Division Office) |
Revenue |
229/EE, RHD/Sylhet/2011-2012 |
3-May-2012 |
7 Days |
Surfacing |
LRP055 |
0 |
54.215 |
LRP058 |
0 |
58.19 |
Sylhet, (Division Office) |
Revenue |
266d/EE, RHD/Sylhet/2012-2013 |
18-Jun-2013 |
7 Days |
Surfacing |
LRP054 |
1780 |
55 |
LRP056 |
792 |
56 |
Sylhet, (Division Office) |
Revenue |
237/EE, RHD/Sylhet/2011-2012 |
18-Mar-2012 |
3 Days |
Pavement |
LRP057 |
0 |
56.203 |
LRP058 |
0 |
58.19 |
Sylhet, (Division Office) |
Revenue |
174/EE, RHD/Sylhet/2010-2011 |
27-Mar-2011 |
7 Days |
Surfacing |
LRP057 |
0 |
56.203 |
LRP058 |
0 |
58.19 |
Sylhet, (Division Office) |
Revenue Others |
92/EE/SRD/2007-2008 |
31-Oct-2007 |
21 Days |
Road Embankment |
LRP057 |
|
56.203 |
LRP058 |
|
58.19 |
Sylhet, (Division Office) |
Revenue |
265/EE/SRD/2008-2009 |
21-Jun-2009 |
7 Days |
Surfacing |
LRP057 |
0 |
56.203 |
LRP058 |
0 |
58.19 |
Sylhet, (Division Office) |
Development |
445/EE/SRD/2007-2008 |
15-Apr-2008 |
5 Days |
Surfacing |
LRP056 |
1792 |
57 |
LRP057 |
1797 |
58 |
Sylhet, (Division Office) |
Revenue |
PMP 2008-2009/26/Overlay |
15-Mar-2009 |
342 Days |
Overlay |
LRP057 |
817 |
57.02 |
LRP058 |
286 |
58.476 |
Sylhet, (Division Office) |
Development |
EDDRP/CIDA/SLZ/SYL/R-02 |
3-Sep-2008 |
557 Days |
Road Rehablitation |
LRP058 |
|
58.19 |
LRPE |
|
59.19 |
Sylhet, (Division Office) |