List of ongoing works on the road ( R143 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Revenue PMP  PMP 2006-07/01/Overlay  7-Jun-2007  389 Days  Overlay  LRPS   0     LRP007   7.001     Noakhali, (Division Office) 
 Revenue  NRD/04/2017-2018.  13-Jul-2017  7 Days  Pavement  LRPS  0 0     LRP001  0 1.059     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/13/2015-2016.  28-Dec-2015  30 Days  Surfacing  LRPS  0 0     LRP003  2000 5.082     Noakhali, (Division Office) 
 Development  ADP/SE/Noa/04/2018-2019/MRCB/PW-01 (Tender ID No.307377)  12-Jun-2019  1022 Days  Pavement  LRPS   0     LRP009  3897 12.909     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/06/2017-2018.  12-Nov-2017  45 Days  Surfacing  LRPS  0 0     LRP003  2000 5.082     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/200 of 2005-2006.  3-May-2006  3 Days  Pavement  LRPS  0 0     LRPS  380 0.38     Noakhali, (Division Office) 
 Revenue  E/N/42/2012-2013.  31-Jan-2013  45 Days  Road Embankment  LRPS  800 0.8     LRPS  860 0.86     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP001  0 1.059     LRP001  80 1.139     Noakhali, (Division Office) 
 Revenue  E/N/26/2011-2012.  9-May-2012  90 Days  Road Embankment  LRP001  400 1.459     LRP001  450 1.509     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP001  450 1.509     LRP001  470 1.529     Noakhali, (Division Office) 
 Revenue  SDE/Noa-17/2015-2016.  14-Dec-2015  3 Days  Carpeting  LRP001  500 1.559     LRP002  0 2.025     Noakhali, (Division Office) 
 Revenue  SDE/Noa-20/2017-2018.  31-Aug-2017  3 Days  Road Embankment  LRP002  0 2.025     LRP003  0 3.082     Noakhali, (Division Office) 
 Revenue  SDE/Noa-22/2015-2016.  16-Feb-2016  3 Days  Road Embankment  LRP002  0 2.025     LRP002  925 2.95     Noakhali, (Division Office) 
 Revenue  SDE/Noa-08/2016-2017.  12-Jan-2017  3 Days  Road Embankment  LRP002  200 2.225     LRP002  700 2.725     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP002  370 2.395     LRP002  410 2.435     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/104 of 2006-2007.  24-Jun-2007  3 Days  Road Embankment  LRP002  650 2.675     LRP002  870 2.895     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP002  760 2.785     LRP002  820 2.845     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/177 of 2005-2006.  9-May-2006  3 Days  Road Embankment  LRP002  857 2.882     LRP002  1032 3.057     Noakhali, (Division Office) 
 Revenue  SDE/Noa-19/2017-2018.  31-Aug-2017  3 Days  Road Embankment  LRP003  0 3.082     LRP003  1000 4.082     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/142 of 2005-2006.  4-Apr-2006  3 Days  Road Embankment  LRP003  160 3.242     LRP003  310 3.392     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  250 3.332     LRP003  330 3.412     Noakhali, (Division Office) 
 Revenue  E/N/81/2012-2013  11-Jun-2013  7 Days  Road Embankment  LRP003  300 3.382     LRP003  323 3.405     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/145 of 2005-2006.  6-Apr-2006  3 Days  Road Embankment  LRP003  310 3.392     LRP003  460 3.542     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/144 of 2005-2006.  6-Apr-2006  3 Days  Road Embankment  LRP003  460 3.542     LRP003  579 3.661     Noakhali, (Division Office) 
 Revenue  SDE/Noa-09/2016-2017.  12-Jan-2017  3 Days  Road Embankment  LRP003  500 3.56     LRP003  900 3.96     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/140 of 2005-2006.  4-Apr-2006  3 Days  Road Embankment  LRP003  590 3.672     LRP003  710 3.792     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/141 of 2005-2006.  5-Apr-2006  3 Days  Road Embankment  LRP003  710 3.792     LRP003  840 3.922     Noakhali, (Division Office) 
 Revenue  E/N/81/2012-2013  11-Jun-2013  7 Days  Road Embankment  LRP003  800 3.882     LRP003  820 3.902     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/143 of 2005-2006.  5-Apr-2006  3 Days  Road Embankment  LRP003  840 3.922     LRP003  980 4.062     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/176 of 2005-2006.  8-May-2006  3 Days  Road Embankment  LRP003  980 4.062     LRP003  1150 4.232     Noakhali, (Division Office) 
 Revenue  NRD/03/2017-2018.  13-Jul-2017  7 Days  Pavement  LRP003  1000 4.082     LRP003  2000 5.082     Noakhali, (Division Office) 
 Development  NRC/OTM/02 of 2010-2011. Package No.03: DW-P2 of 2010-2011.  12-Jun-2011  90 Days  DBST  LRP003  1000 4.082     LRP013   12.926     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/25/2013-2014.  17-Jul-2014  28 Days  Surfacing  LRP003  1000 4.082     LRP006  0 5.969     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/242 of 2005-2006.  12-May-2006  3 Days  Pavement  LRP003  1200 4.282     LRP003  1400 4.482     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  1200 4.282     LRP003  1230 4.312     Noakhali, (Division Office) 
 Revenue  SDE/Noa-10/2016-2017.  1-Feb-2017  3 Days  Road Embankment  LRP003  1300 4.382     LRP003  1800 4.882     Noakhali, (Division Office) 
 Revenue  SDE/Noa-26/2016-2017.  29-May-2017  3 Days  Road Embankment  LRP003  1400 4.46     LRP003  1900 4.96     Noakhali, (Division Office) 
 Revenue  SDE/Noa-23/2015-2016.  3-Mar-2016  3 Days  Road Embankment  LRP003  1400 4.482     LRP003  1900 4.982     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/175 of 2005-2006.  8-May-2006  3 Days  Road Embankment  LRP003  1410 4.492     LRP003  1520 4.602     Noakhali, (Division Office) 
 Revenue  E/N/21 of 2008-2009.  16-Jun-2009  30 Days  Carpeting  LRP003  1450 4.532     LRP003  1500 4.582     Noakhali, (Division Office) 
 Revenue  E/N/81/2012-2013  11-Jun-2013  7 Days  Road Embankment  LRP003  1500 4.582     LRP003  1510 4.592     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/182 of 2005-2006.  9-May-2006  3 Days  Road Embankment  LRP003  1520 4.602     LRP003  1646 4.728     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  1600 4.682     LRP003  1615 4.697     Noakhali, (Division Office) 
 Revenue  E/N/83/2012-2013.  11-Jun-2013  7 Days  Road Embankment  LRP003  1650 4.732     LRP003  1660 4.742     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/183 of 2005-2006.  10-May-2006  3 Days  Road Embankment  LRP003  1652 4.734     LRP003  1785 4.867     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/181 of 2005-2006.  10-May-2006  3 Days  Road Embankment  LRP003  1785 4.867     LRP003  1910 4.992     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/230 of 2005-2006.  14-May-2006  3 Days  Road Embankment  LRP003  1910 4.992     LRP003  2040 5.122     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  1950 5.032     LRP003  1970 5.052     Noakhali, (Division Office) 
 Revenue  Contract no. LRD-41 of 2012-2013.  18-Mar-2013  30 Days  Carpeting  LRP001  4000 5.059     LRP001  5000 6.059     Laxmipur, (Division Office) 
 Revenue  SDE/Noa-29/2016-2017.  29-May-2017  3 Days  Road Embankment  LRP003  2000 5.082     LRP003  2500 5.582     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/229 of 2005-2006.  14-May-2006  3 Days  Road Embankment  LRP003  2040 5.122     LRP003  2165 5.247     Noakhali, (Division Office) 
 Revenue  E/N/16 of 2009-2010.  4-Feb-2010  45 Days  Road Embankment  LRP003  2050 5.132     LRP003  2090 5.172     Noakhali, (Division Office) 
 Revenue  E/N/21 of 2008-2009.  16-Jun-2009  30 Days  Carpeting  LRP003  2070 5.152     LRP003  2370 5.452     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  2100 5.182     LRP003  2120 5.202     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/227 of 2005-2006.  12-May-2006  3 Days  Road Embankment  LRP003  2165 5.247     LRP003  2300 5.382     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  2200 5.282     LRP003  2215 5.297     Noakhali, (Division Office) 
 Revenue  NRD/RFQ/06/2013-2014. Package No.03(Three)  21-Nov-2013  7 Days  Road Embankment  LRP003  2250 5.332     LRP003  2263 5.345     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP003  2260 5.342     LRP003  2287 5.369     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/228 of 2005-2006.  12-May-2006  3 Days  Road Embankment  LRP003  2300 5.382     LRP003  2440 5.522     Noakhali, (Division Office) 
 Revenue  E/N/16 of 2009-2010.  4-Feb-2010  45 Days  Surfacing  LRP003  2370 5.452     LRP007  0 7.001     Noakhali, (Division Office) 
 Revenue  SDE/Noa-24/2015-2016.  3-Mar-2016  3 Days  Road Embankment  LRP003  2400 5.482     LRP006  0 5.969     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/244 of 2005-2006.  15-May-2006  3 Days  Road Embankment  LRP003  2440 5.522     LRP003  2575 5.657     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/245 of 2005-2006.  17-May-2006  3 Days  Road Embankment  LRP003  2575 5.657     LRP003  2715 5.797     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/248 of 2005-2006.  16-May-2006  3 Days  Road Embankment  LRP003  2715 5.797     LRP003  2887 5.969     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/102 of 2005-2006.  27-Mar-2006  4 Days  Road Embankment  LRP003  2763 5.845     LRP003  2913 5.995     Noakhali, (Division Office) 
 Revenue  NRD/03/2017-2018.  13-Jul-2017  7 Days  Pavement  LRP006  0 5.969     LRP007  0 7.001     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/246 of 2005-2006.  17-May-2006  3 Days  Road Embankment  LRP006  0 5.969     LRP006  175 6.144     Noakhali, (Division Office) 
 Revenue  SDE/Noa-27/2016-2017.  29-May-2017  3 Days  Road Embankment  LRP006  100 6.069     LRP006  600 6.569     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRD/DPM/247 of 2005-2006.  18-May-2006  3 Days  Road Embankment  LRP006  175 6.144     LRP006  330 6.299     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP006  300 6.269     LRP006  315 6.284     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP006  950 6.919     LRP006  970 6.939     Noakhali, (Division Office) 
 Revenue  E/N/21 of 2008-2009.  16-Jun-2009  30 Days  Carpeting  LRP007  0 7.001     LRP007  100 7.101     Noakhali, (Division Office) 
 Revenue Periodic Roads  E/N/18 of 2006-2007.  8-Feb-2007  30 Days  Pavement  LRP007  0 7.001     LRP008  105 8.073     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP007  50 7.051     LRP007  85 7.086     Noakhali, (Division Office) 
 Revenue  E/N/21 of 2008-2009.  16-Jun-2009  30 Days  Carpeting  LRP008  800 8.768     LRP009  140 9.152     Noakhali, (Division Office) 
 Revenue  E/N/83/2012-2013.  11-Jun-2013  7 Days  Road Embankment  LRP008  900 8.868     LRP008  919 8.887     Noakhali, (Division Office) 
 Revenue  E/N/16 of 2009-2010.  4-Feb-2010  45 Days  Surfacing  LRP009  140 9.152     LRP009  610 9.622     Noakhali, (Division Office) 
 Revenue  NRD/14/2015-2016.  23-Nov-2015  7 Days  Surfacing  LRP009  500 9.512     LRP009  800 9.812     Noakhali, (Division Office) 
 Revenue Periodic Roads  NRC/OTM/02 of 2005-2006.  2-May-2006  120 Days  Pavement  LRP009  665 9.677     LRP009  4000 13.012     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/48/2017-2018.  31-May-2018  21 Days  Pavement  LRP009  750 9.762     LRP009  3640 12.652     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP009  850 9.862     LRP009  926 9.938     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/48/2017-2018.  31-May-2018  21 Days  Road Embankment  LRP009  870 9.882     LRP009  2785 11.797     Noakhali, (Division Office) 
 Revenue  E/N/83/2012-2013.  11-Jun-2013  7 Days  Road Embankment  LRP009  900 9.912     LRP009  926 9.938     Noakhali, (Division Office) 
 Revenue  E/N/82/2012-2013  11-Jun-2013  7 Days  Road Embankment  LRP009  926 9.938     LRP009  953 9.965     Noakhali, (Division Office) 
 Revenue  E/N/49/2011-2012.  25-Jun-2012  4 Days  Road Embankment  LRP009  1100 10.112     LRP009  1115 10.127     Noakhali, (Division Office) 
 Revenue  E/N/47/2013-2014.  6-Jan-2014  7 Days  Surfacing  LRP009  1200 10.212     LRP009  1220 10.232     Noakhali, (Division Office) 
 Revenue  E/N/12 of 2008-2009.  29-Mar-2009  60 Days  Pavement  LRP009  1270 10.282     LRP009  2435 11.447     Noakhali, (Division Office) 
 Revenue  E/N/50/2011-2012.  25-Jun-2012  4 Days  Road Embankment  LRP009  1400 10.412     LRP009  1433 10.445     Noakhali, (Division Office) 
 Revenue  E/N/49/2011-2012.  25-Jun-2012  4 Days  Road Embankment  LRP009  1440 10.452     LRP009  1456 10.468     Noakhali, (Division Office) 
 Revenue  E/N/82/2012-2013  11-Jun-2013  7 Days  Road Embankment  LRP009  1460 10.472     LRP009  1473 10.485     Noakhali, (Division Office) 
 Revenue  E/N/49/2011-2012.  25-Jun-2012  4 Days  Road Embankment  LRP009  1730 10.742     LRP009  1746 10.758     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/29/2017-2018.  22-Mar-2018  30 Days  Surfacing  LRP009  2000 11.012     LRP009  3500 12.512     Noakhali, (Division Office) 
 Revenue  E/N/47/2013-2014.  6-Jan-2014  7 Days  Surfacing  LRP009  2280 11.292     LRP009  2305 11.317     Noakhali, (Division Office) 
 Revenue  E/N/16 of 2009-2010.  4-Feb-2010  45 Days  Pavement  LRP009  2435 11.447     LRP009  2635 11.647     Noakhali, (Division Office) 
 Revenue  Contract no. 40 of 2010-2011.  5-Jun-2011  30 Days  Carpeting  LRP014  -1733 12.16     LRP014  -983 12.91     Laxmipur, (Division Office) 
 Revenue  E/N/47/2013-2014.  6-Jan-2014  7 Days  Surfacing  LRP009  3355 12.367     LRP009  3396 12.408     Noakhali, (Division Office) 
 Revenue  NRD/e-GP/15/2014-2015.  29-Jan-2015  30 Days  Surfacing  LRP009  3460 12.472     LRP009  3480 12.492     Noakhali, (Division Office) 
 Revenue  e-GP/LRD/020/2016-2017  18-May-2017  25 Days  Carpeting  LRP001  12000 13.059     LRP001  18000 19.059     Laxmipur, (Division Office) 
 Revenue  e-GP/LxRD/018/2014-15  24-Dec-2014  30 Days  Carpeting  LRP001  12000 13.059     LRP001  14000 15.059     Laxmipur, (Division Office) 
 Development  e-GP/ADP/SE/Noa/05/2018-2019/MRCB/PW-02 [TI-307378]  19-Aug-2019  545 Days  Carpeting  LRP001  12897 13.956     LRP001  20200 21.259     Laxmipur, (Division Office) 
 Revenue  e-GP/LRD/59/2017-2018 [TI-192881]  14-Jun-2018  15 Days  Carpeting  LRP015  0 14.9     LRP016  0 15.507     Laxmipur, (Division Office) 
 Revenue  e-GP/LRD/006/2016-2017  20-Mar-2017  20 Days  Carpeting  LRP015  0 14.9     LRP016  0 15.507     Laxmipur, (Division Office) 
 Revenue  LRD/RFQ/06/2014-2015  21-Jan-2015  15 Days  Road Rehablitation  LRP016  0 15.445     LRP018  0 17.445     Laxmipur, (Division Office) 
 Revenue Periodic Roads  LRD-03 of 2006-2007.  3-Aug-2006  10 Days  Carpeting  LRP016  650 16.157     LRP016  1000 16.507     Laxmipur, (Division Office) 
 Revenue PMP  PMP 2006-07/01/Overlay  7-Jun-2007  389 Days  Overlay  LRP009  7300 16.312     LRP009  12000 21.012     Noakhali, (Division Office) 
 Revenue  e-GP/LXRD/004/2015-2016  14-Dec-2015  30 Days  Carpeting  LRP017  0 16.445     LRP018  0 17.445     Laxmipur, (Division Office) 
 Revenue  Contract no. 40 of 2010-2011.  5-Jun-2011  30 Days  Carpeting  LRP016  1188 16.695     LRP016  1338 16.845     Laxmipur, (Division Office) 
 Revenue  e-GP/LRD/27/2017-2018 [TI-147299]  11-Mar-2018  20 Days  Carpeting  LRP001  19800 20.859     LRP001  20000 21.059     Laxmipur, (Division Office) 
 Revenue  e-GP/LRD/58/2017-2018 [TI-192882]  14-Jun-2018  15 Days  Carpeting  LRP014  13000 26.893     LRP014  14000 27.893     Laxmipur, (Division Office) 
 Revenue  e-GP/LXRD/004/2015-2016  14-Dec-2015  30 Days  Carpeting  LRP015  14000 28.9     LRP015  15000 29.9     Laxmipur, (Division Office) 
 Revenue  e-GP/LRD/19/2016-2017  18-May-2017  25 Days  Carpeting  LRP015  14200 29.035     LRP015  14500 29.335     Laxmipur, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division