List of ongoing works on the road ( R280 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Revenue  146/EE, RHD/Sylhet/2010-2011  5-Jan-2011  7 Days  Pavement  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Revenue  120/EE, RHD/Sylhet/2009-2010  24-Dec-2009  7 Days  Pavement  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Revenue  64t/EE, RHD/Sylhet/2013-2014  12-Jan-2014  60 Days  Pavement  LRPS  0 0     LRP010  0 9.749     Sylhet, (Division Office) 
 Revenue  156/EE/SRD/2008-2009  30-Mar-2009  7 Days  Pavement  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  450/EE/SRD/2007-2008  4-May-2008  7 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Revenue  PMP 2009-2010/25/DBST & Overlay  18-Aug-2010  591 Days  Overlay  LRPS   0     LRP006  386 6.256     Sylhet, (Division Office) 
 Development  02(Two)/ACE/SZ/2012-2013  25-Jul-2013  797 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  521/EE/SRD/2007-2008  18-May-2008  7 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  424/EE/SRD/2007-2008  4-Jun-2008  30 Days  Surfacing  LRPS  0 0     LRP003  0 2.956     Sylhet, (Division Office) 
 Development  449/EE/SRD/2007-2008  4-May-2008  7 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Revenue  WD 37(Thirty Seven)/2018-2019/EE, RHD/Sylhet/312790  23-May-2019  30 Days  Pavement  LRPS  0 0     LRP004  0 3.92     Sylhet, (Division Office) 
 Development  403/EE/SRD/2007-2008  15-May-2008  60 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  279/EE/SRD/2007-2008  27-Nov-2007  5 Days  Surfacing  LRPS  0 0     LRPS  500 0.5     Sylhet, (Division Office) 
 Revenue  e-GP/22(Twenty two)/ACE/SZ/2015-2016/33178  7-Jan-2016  180 Days  Pavement  LRPS  0 0     LRP020  0 19.47     Sylhet, (Division Office) 
 Development  520/EE/SRD/2007-2008  10-May-2008  7 Days  Pavement  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  247/EE/SRD/2007-2008  22-Jan-2008  120 Days  Pavement  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  421/EE/SRD/2007-2008  18-May-2008  60 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  447/EE/SRD/2007-2008  4-May-2008  7 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Development  54/EE/SRD/2008-2009  30-Sep-2008  5 Days  Surfacing  LRPS  0 0     LRP001  0 0.936     Sylhet, (Division Office) 
 Revenue  e-GP 15/EE, RHD/Sylhet/2014-2015  9-Feb-2015  30 Days  Pavement  LRP001  0 0.936     LRP014  0 13.707     Sylhet, (Division Office) 
 Development  232/EE/SRD/2007-2008  26-Nov-2007  5 Days  Surfacing  LRP001  0 0.936     LRP008  0 7.815     Sylhet, (Division Office) 
 Development  236/EE/SRD/2007-2008  26-Nov-2007  10 Days  Surfacing  LRP001  0 0.936     LRP002  0 1.96     Sylhet, (Division Office) 
 Revenue  48t/EE, RHD/Sylhet/2012-2013  23-Jun-2013  7 Days  Surfacing  LRP001   0.936     LRP002   1.96     Sylhet, (Division Office) 
 Development  80/EE/SRD/2006-2007  24-Sep-2006  10 Days  Road Rehablitation  LRPS  1000 1     LRPS  2000 2     Sylhet, (Division Office) 
 Revenue  45l/EE, RHD/Sylhet/2012-2013  20-Jun-2013  10 Days  Surfacing  LRPS  1000 1     LRP020  0 19.47     Sylhet, (Division Office) 
 Development  14(Fourteen)/2005-2006/SE/SRC  13-Apr-2006  627 Days  Pavement  LRP001  64 1     LRP005  88 5     Sylhet, (Division Office) 
 Revenue  e-GP/09/ACE/SZ/2014-2015/16344  22-Mar-2015  180 Days  Overlay  LRP001  596 1.532     LRP005  88 5     Sylhet, (Division Office) 
 Revenue  114/EE/SRD/2008-2009  11-Mar-2009  60 Days  Carpeting  LRP002  0 1.96     LRP004  0 3.92     Sylhet, (Division Office) 
 Revenue  31l/EE, RHD/Sylhet/2012-2013  24-Feb-2013  20 Days  Surfacing  LRP002  0 1.96     LRP003  0 2.956     Sylhet, (Division Office) 
 Development  235/EE/SRD/2007-2008  4-Dec-2007  5 Days  Surfacing  LRP002  0 1.96     LRP005  0 4.912     Sylhet, (Division Office) 
 Revenue  47t/EE, RHD/Sylhet/2012-2013  23-Jun-2013  7 Days  Surfacing  LRP002  0 1.96     LRP003  0 2.956     Sylhet, (Division Office) 
 Development  233/EE/SRD/2007-2008  26-Nov-2007  10 Days  Surfacing  LRP002  0 1.96     LRP003  0 2.956     Sylhet, (Division Office) 
 Revenue  WD 34(Thirty Four)/2019-2020/EE, RHD/Sylhet/426238  25-Mar-2020  30 Days  Pavement  LRPS  2000 2     LRPS  5000 5     Sylhet, (Division Office) 
 Revenue  18l/EE, RHD/Sylhet/2013-2014  23-Sep-2013  30 Days  Pavement  LRP002  40 2     LRP005  88 5     Sylhet, (Division Office) 
 Revenue  WD 02(Two)/2019-2020/EE, RHD/Sylhet/355759  14-Nov-2019  30 Days  Pavement  LRP003  0 2.956     LRP005  0 4.912     Sylhet, (Division Office) 
 Revenue  113/EE/SRD/2008-2009  11-Mar-2009  60 Days  Carpeting  LRP003  0 2.956     LRP004  0 3.92     Sylhet, (Division Office) 
 Revenue  136/EE, RHD/Sylhet/2009-2010  5-Oct-2009  5 Days  Pavement  LRP003  0 2.956     LRP004  0 3.92     Sylhet, (Division Office) 
 Revenue  13(Thirteen)/SE, RHD/Sylhet/2014-2015  14-May-2015  30 Days  Pavement  LRP003  0 2.956     LRP016  0 15.59     Sylhet, (Division Office) 
 Development  233/EE/SRD/2007-2008  26-Nov-2007  10 Days  Surfacing  LRP003  0 2.956     LRP004  0 3.92     Sylhet, (Division Office) 
 Revenue  97/EE, RHD/Sylhet/2009-2010  30-Dec-2009  7 Days  Pavement  LRP004   3.92     LRP005   4.912     Sylhet, (Division Office) 
 Development  530/EE/SRD/2007-2008  28-May-2008  7 Days  Surfacing  LRP004  0 3.92     LRP005  0 4.912     Sylhet, (Division Office) 
 Revenue Others  401/EE/SRD/2007-2008  7-May-2008  30 Days  Surfacing  LRP004  0 3.92     LRP008  0 7.815     Sylhet, (Division Office) 
 Revenue  135/EE, RHD/Sylhet/2009-2010  5-Oct-2009  5 Days  Pavement  LRP004  0 3.92     LRP005  0 4.912     Sylhet, (Division Office) 
 Revenue  e-GP/05(Five)/2012-2013  17-Jun-2013  244 Days  Pavement  LRP004  80 4     LRP007  139 7     Sylhet, (Division Office) 
 Revenue  WD 26(Twenty Six)/2019-2020/EE, RHD/Sylhet/405750  4-Mar-2020  30 Days  Pavement  LRPS  4000 4     LRPS  5000 5     Sylhet, (Division Office) 
 Development  15(Fifteen)/2005-2006/SE/SRC  7-May-2006  270 Days  Pavement  LRP004  880 4.8     LRP007  239 7.1     Sylhet, (Division Office) 
 Development  e-GP/01(One)/SE/SRC/2017-2018/ID 166180/03  2-Jul-2018  1008 Days  Pavement  LRP004  985 4.905     LRP020  65 19.535     Sylhet, (Division Office) 
 Revenue  210/EE, RHD/Sylhet/2008-2009  4-Jun-2009  59 Days  Carpeting  LRP005  0 4.912     LRP007  0 6.861     Sylhet, (Division Office) 
 Development  341/EE/SRD/2007-2008  4-Dec-2007  5 Days  Surfacing  LRP005  0 4.912     LRP008  0 7.815     Sylhet, (Division Office) 
 Revenue  192/EE, RHD/Sylhet/2009-2010  1-Oct-2009  5 Days  Pavement  LRP005  0 4.912     LRP006  0 5.87     Sylhet, (Division Office) 
 Development  204/EE/SRD/2007-2008  21-Jan-2008  60 Days  Surfacing  LRP005  632 5.544     LRP006  540 6.41     Sylhet, (Division Office) 
 Development  19(Nineteen)/SE, RHD/Sylhet/2010-2011  27-Jun-2011  360 Days  Road Rehablitation  LRP006  0 5.87     LRP012  0 11.714     Sylhet, (Division Office) 
 Revenue  137/EE, RHD/Sylhet/2009-2010  28-Sep-2009  5 Days  Pavement  LRP006  0 5.87     LRP008  0 7.815     Sylhet, (Division Office) 
 Revenue PMP  PMP 2006-07/15/ DBST & Overlay  7-Jun-2007  150 Days  DBST  LRP006  0 5.87     LRP014  0 13.707     Sylhet, (Division Office) 
 Revenue  26d/EE, RHD/Sylhet/2014-2015  14-Jul-2014  7 Days  Pavement  LRP007  0 6.861     LRP008  0 7.815     Sylhet, (Division Office) 
 Revenue  206/EE/SRD/2008-2009  31-May-2009  3 Days  Pavement  LRP007  139 7     LRP007  899 7.76     Sylhet, (Division Office) 
 Development  16(Sixteen)/2005-2006/SE/SRC  13-Apr-2006  543 Days  Pavement  LRP007  139 7     LRP008  2185 10     Sylhet, (Division Office) 
 Development  274/EE/SRD/2007-2008  4-Dec-2007  5 Days  Surfacing  LRP008  0 7.815     LRP010  0 9.749     Sylhet, (Division Office) 
 Development  124/EE/SRD/2004-2005  31-Oct-2004  90 Days  Road Embankment  LRP008  0 7.815     LRP008  1000 8.815     Sylhet, (Division Office) 
 Revenue  281d/EE, RHD/Sylhet/2013-2014  24-Jun-2014  3 Days  Carpeting  LRP008  0 7.815     LRP010  0 9.749     Sylhet, (Division Office) 
 Revenue  86/EE, RHD/Sylhet/2010-2011  3-Oct-2010  7 Days  Pavement  LRP008  0 7.815     LRP010  0 9.749     Sylhet, (Division Office) 
 Revenue  168d/EE, RHD/Sylhet/2014-2015  8-Oct-2014  3 Days  Surfacing  LRP008  0 7.815     LRP010  0 9.749     Sylhet, (Division Office) 
 Revenue Others  68/EE/SRD/2007-2008  16-Jul-2007  5 Days  Pavement  LRP008  185 8     LRP008  1185 9     Sylhet, (Division Office) 
 Revenue Periodic Roads  239/EE/SRD/2005-2006  16-Mar-2006  60 Days  SBST  LRP008  185 8     LRP020  2530 22     Sylhet, (Division Office) 
 Revenue  104d/EE, RHD/Sylhet/2013-2014  28-Nov-2013  7 Days  Pavement  LRP008  185 8     LRP008  1185 9     Sylhet, (Division Office) 
 Revenue  50/EE, RHD/Sylhet/2011-2012  13-Sep-2011  7 Days  Pavement  LRP008  185 8     LRP008  1185 9     Sylhet, (Division Office) 
 Revenue Others  95/EE/SRD/2007-2008  4-Nov-2007  45 Days  Carpeting  LRP008  574 8.389     LRP008  760 8.575     Sylhet, (Division Office) 
 Revenue  PMP 2009-2010/25/DBST & Overlay  18-Aug-2010  591 Days  Overlay  LRP008  915 8.73     LRP008  1069 8.884     Sylhet, (Division Office) 
 Revenue  55/EE, RHD/Sylhet/2011-2012  13-Sep-2011  7 Days  Pavement  LRP008  1185 9     LRP010  251 10     Sylhet, (Division Office) 
 Revenue  84/EE, RHD/Sylhet/2010-2011  23-Sep-2010  7 Days  Pavement  LRP010  0 9.749     LRP011  0 10.745     Sylhet, (Division Office) 
 Revenue  63t/EE, RHD/Sylhet/2013-2014  8-Jan-2014  90 Days  Pavement  LRP010  0 9.749     LRP017  0 16.586     Sylhet, (Division Office) 
 Revenue  28d/EE, RHD/Sylhet/2014-2015  8-Jul-2014  7 Days  Pavement  LRP011  0 10.745     LRP013  0 12.71     Sylhet, (Division Office) 
 Revenue  199/EE, RHD/Sylhet/2010-2011  16-Sep-2010  7 Days  Pavement  LRP011  0 10.745     LRP012  0 11.714     Sylhet, (Division Office) 
 Revenue  WD 10(Ten)/2018-2019/EE, RHD/Sylhet/260128  28-Jan-2019  30 Days  Pavement  LRP011  0 10.745     LRP014  0 13.707     Sylhet, (Division Office) 
 Revenue  121d/EE, RHD/Sylhet/2012-2013  23-Apr-2013  7 Days  Pavement  LRP011  255 11     LRP012  286 12     Sylhet, (Division Office) 
 Revenue  122d/EE, RHD/Sylhet/2013-2014  3-Dec-2013  7 Days  Pavement  LRP011  255 11     LRP012  286 12     Sylhet, (Division Office) 
 Revenue  123/EE, RHD/Sylhet/2011-2012  10-Oct-2011  7 Days  Pavement  LRP012  0 11.714     LRP013  0 12.71     Sylhet, (Division Office) 
 Revenue  e-GP 05(Five)/2020-2021/EE, RHD/Sylhet/512685  27-Dec-2020  30 Days  Pavement  LRP012  0 11.755     LRP013  0 12.755     Sylhet, (Division Office) 
 Revenue  WD 56(Fifty Six)/2019-2020/EE, RHD/Sylhet/460562  7-Jun-2020  15 Days  Pavement  LRP012  0 11.755     LRP013  0 12.755     Sylhet, (Division Office) 
 Revenue  80d/EE, RHD/Sylhet/2013-2014  19-Nov-2013  7 Days  Pavement  LRP012  286 12     LRP013  290 13     Sylhet, (Division Office) 
 Revenue  123d/EE, RHD/Sylhet/2012-2013  23-Apr-2013  7 Days  Pavement  LRP012  286 12     LRP013  290 13     Sylhet, (Division Office) 
 Revenue  167d/EE, RHD/Sylhet/2014-2015  12-Oct-2014  3 Days  Surfacing  LRP013  0 12.71     LRP014  0 13.707     Sylhet, (Division Office) 
 Revenue  WD 38(Thirty Eight)/2017-2018/EE, RHD/Sylhet/170890  6-Jun-2018  20 Days  Pavement  LRP013  0 12.755     LRP016  0 15.645     Sylhet, (Division Office) 
 Revenue  WD 16(Sixteen)/2019-2020/EE, RHD/Sylhet/398807  16-Jan-2020  30 Days  Pavement  LRP013  0 12.755     LRP018  0 17.58     Sylhet, (Division Office) 
 Revenue  93/EE, RHD/Sylhet/2011-2012  15-Sep-2011  30 Days  Pavement  LRP014  0 13.707     LRP019  0 18.482     Sylhet, (Division Office) 
 Revenue  328d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Pavement  LRP014  0 13.707     LRP016  0 15.59     Sylhet, (Division Office) 
 Revenue  25d/EE, RHD/Sylhet/2014-2015  8-Jul-2014  7 Days  Pavement  LRP014  0 13.707     LRP016  0 15.59     Sylhet, (Division Office) 
 Revenue  124d/EE, RHD/Sylhet/2012-2013  23-Apr-2013  7 Days  Pavement  LRP013  1290 14     LRP014  1293 15     Sylhet, (Division Office) 
 Revenue  81d/EE, RHD/Sylhet/2013-2014  5-Nov-2013  7 Days  Pavement  LRP014  293 14     LRP014  1293 15     Sylhet, (Division Office) 
 Revenue  121d/EE, RHD/Sylhet/2013-2014  3-Dec-2013  7 Days  Pavement  LRP014  293 14     LRP014  1293 15     Sylhet, (Division Office) 
 Revenue  320/EE, RHD/Sylhet/2008-2009  16-Jun-2009  488 Days  Pavement  LRP014  874 14.581     LRP014  1199 14.906     Sylhet, (Division Office) 
 Revenue PMP  PMP 2007-08/13/ DBST  27-Mar-2008  734 Days  DBST  LRP014  874 14.581     LRP016  173 15.763     Sylhet, (Division Office) 
 Revenue  157/EE/SRD/2008-2009  21-Apr-2009  5 Days  Pavement  LRP014  1758 15.465     LRP016  0 15.59     Sylhet, (Division Office) 
 Revenue  329d/EE, RHD/Sylhet/2012-2013  20-Jun-2013  7 Days  Pavement  LRP016   15.59     LRP017   16.586     Sylhet, (Division Office) 
 Revenue  269d/EE, RHD/Sylhet/2013-2014  24-Jun-2014  3 Days  Carpeting  LRP016  0 15.59     LRP017  0 16.586     Sylhet, (Division Office) 
 Revenue  e-GP 28(Twenty Eight)/2020-2021/EE, RHD/Sylhet/553688  15-Apr-2021  30 Days  Pavement  LRP016  0 15.645     LRP017  0 16.645     Sylhet, (Division Office) 
 Revenue  PMP 2009-2010/25/DBST & Overlay  18-Aug-2010  591 Days  Overlay  LRP016  173 15.763     LRP017   16.586     Sylhet, (Division Office) 
 Revenue Others  36/EE/SRD/2007-2008  11-Sep-2007  5 Days  Pavement  LRP016  410 16     LRP017  414 17     Sylhet, (Division Office) 
 Revenue  18l/EE, RHD/Sylhet/2012-2013  6-Jan-2013  30 Days  Road Embankment  LRP017  0 16.586     LRP019  0 18.482     Sylhet, (Division Office) 
 Revenue  62t/EE, RHD/Sylhet/2013-2014  8-Jan-2014  75 Days  Pavement  LRP017  0 16.586     LRP019  0 18.482     Sylhet, (Division Office) 
 Revenue PMP  PMP 2007-08/13/ DBST  27-Mar-2008  734 Days  DBST  LRP017   16.586     LRP018   17.514     Sylhet, (Division Office) 
 Revenue  198d/EE, RHD/Sylhet/2013-2014  17-Apr-2014  3 Days  Pavement  LRP017  0 16.586     LRP018  0 17.514     Sylhet, (Division Office) 
 Revenue  e-GP 07(Seven)/2020-2021/EE, RHD/Sylhet/512687  27-Dec-2020  30 Days  Pavement  LRP017  0 16.645     LRP018  0 17.58     Sylhet, (Division Office) 
 Revenue Others  95/EE/SRD/2007-2008  4-Nov-2007  45 Days  Carpeting  LRP017  414 17     LRP017  714 17.3     Sylhet, (Division Office) 
 Revenue  82d/EE, RHD/Sylhet/2013-2014  5-Nov-2013  7 Days  Pavement  LRP017  414 17     LRP018  486 18     Sylhet, (Division Office) 
 Revenue  07/EE, RHD/Sylhet/2009-2010  19-Jul-2009  7 Days  Road Embankment  LRP018  0 17.514     LRP019  0 18.482     Sylhet, (Division Office) 
 Revenue Others  515/EE/SRD/2007-2008  19-Jun-2008  3 Days  Surfacing  LRP018  0 17.514     LRP019  0 18.482     Sylhet, (Division Office) 
 Revenue  PMP 2009-2010/25/DBST & Overlay  18-Aug-2010  591 Days  Overlay  LRP018   17.514     LRP020   19.47     Sylhet, (Division Office) 
 Revenue  100d/EE, RHD/Sylhet/2012-2013  19-Dec-2012  5 Days  Pavement  LRP018  486 18     LRP019  518 19     Sylhet, (Division Office) 
 Revenue  325/EE, RHD/Sylhet/2009-2010  12-May-2010  7 Days  Pavement  LRP019  0 18.482     LRP020  0 19.47     Sylhet, (Division Office) 
 Revenue  13/EE, RHD/Sylhet/2010-2011  21-Jul-2010  7 Days  Surfacing  LRP019  0 18.482     LRP020  0 19.47     Sylhet, (Division Office) 
 Revenue  08/EE, RHD/Sylhet/2009-2010  19-Jul-2009  7 Days  Road Embankment  LRP019  0 18.482     LRP020  0 19.47     Sylhet, (Division Office) 
 Revenue  14/EE, RHD/Sylhet/2010-2011  21-Jul-2010  7 Days  Surfacing  LRP019  0 18.482     LRP020  0 19.47     Sylhet, (Division Office) 
 Revenue  25/EE, RHD/Sylhet/2009-2010  26-Aug-2009  7 Days  Road Embankment  LRP019  0 18.482     LRP020  0 19.47     Sylhet, (Division Office) 
 Revenue  12/EE, RHD/Sylhet/2010-2011  21-Jul-2010  7 Days  Surfacing  LRP019  0 18.482     LRP020  0 19.47     Sylhet, (Division Office) 
 Revenue Periodic Roads  Quotation No. 07/SDE.RHD/CRSD/2006-2007  28-Jun-2006  7 Days  Road Rehablitation  LRP020  0 19.47     LRP062  0 61.67     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 13/EE/Sunam/2006-2007  31-Aug-2006  5 Days  Road Embankment  LRP020  0 19.47     LRP062  0 61.67     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 14/EE/Sunam/2006-2007  31-Aug-2006  7 Days  Road Embankment  LRP020  0 19.47     LRP062  0 61.67     Sunamganj, (Division Office) 
 Revenue PMP  PMP 2007-08/13/ DBST  27-Mar-2008  734 Days  DBST  LRP020   19.47     LRP020  1000 20.47     Sylhet, (Division Office) 
 Revenue  201/EE, RHD/Sylhet/2011-2012  30-Apr-2012  5 Days  Pavement  LRP020  530 20     LRP020  1530 21     Sylhet, (Division Office) 
 Revenue Others  95/EE/SRD/2007-2008  4-Nov-2007  45 Days  Carpeting  LRP020  630 20.1     LRP020  1430 20.9     Sylhet, (Division Office) 
 Revenue Periodic Roads  Quotation No. 05/SDE.RHD/CRSD/2006-2007  28-Aug-2006  7 Days  Road Embankment  LRP022  535 22     LRP023  540 23     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 04/SDE.RHD/CRSD/2006-2007  28-Aug-2006  7 Days  Road Embankment  LRP022  535 22     LRP023  540 23     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 10/EE.RHD/SUNAM/2005-2006. (Md. Nader Ahmed)  30-Apr-2006  7 Days  Road Embankment  LRP027  140 26.6     LRP030  946 30.4     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 27/SDE.RHD/CRSD/2005-2006 (M/S. J. H. Enterprise)  20-Nov-2005  7 Days  Pavement  LRP027  440 26.9     LRP027  467 26.927     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 28/SDE.RHD/CRSD/2005-2006 (M/S. J. H. Enterprise)  24-Nov-2005  7 Days  Pavement  LRP028  261 27.7     LRP028  287 27.726     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 38/SDE.RHD/CRSD/2005-2006.  16-Apr-2006  7 Days  Pavement  LRP030  546 30     LRP031  550 31     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 39/SDE.RHD/CRSD/2005-2006.  16-Apr-2006  7 Days  Carpeting  LRP031  0 30.45     LRP032  0 31.188     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 11/EE.RHD/SUNAM/2005-2006. (Md. Nader Ahmed)  30-Apr-2006  7 Days  Road Embankment  LRP031  550 31     LRP035  160 34.6     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 29/SDE.RHD/CRSD/2005-2006. (M/S. J. H. Enterprise)  20-Nov-2005  7 Days  Road Embankment  LRP033  545 33     LRP033  571 33.026     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 37/SDE.RHD/CRSD/2005-2006.  17-Apr-2006  7 Days  Pavement  LRP034  0 33.455     LRP035  0 34.44     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 40/SDE.RHD/CRSD/2005-2006.  16-Apr-2006  7 Days  Pavement  LRP034  0 33.455     LRP035  0 34.44     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 30/SDE.RHD/CRSD/2005-2006 (M/S. J. H. Enterprise)  20-Nov-2005  7 Days  Pavement  LRP034  545 34     LRP035  560 35     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 15/EE/Sunam/2006-2007  31-Aug-2006  7 Days  Road Embankment  LRP035  560 35     LRP037  560 37     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 16/EE/Sunam/2006-2007  31-Aug-2006  7 Days  Road Embankment  LRP035  560 35     LRP037  560 37     Sunamganj, (Division Office) 
 Revenue Periodic Roads  02/EE.RHD/SUNAM/2006-2007  29-May-2007  7 Days  Road Embankment  LRP037  10 36.45     LRP037  560 37     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 04/SDE.RHD/CRSD/2004-2005.  27-Jul-2005  7 Days  Road Embankment  LRP038  0 37.43     LRP039  0 38.44     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP041  615 41.03     LRP042  774 42.189     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP042  968 42.383     LRP044  270 43.64     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP044  270 43.64     LRP045  900 45.27     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP045  932 45.302     LRP048  10 47.38     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 41/SDE.RHD/CRSD/2005-2006.  16-Apr-2006  7 Days  Pavement  LRP048  0 47.37     LRP050  0 49.495     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP048  42 47.412     LRP050  1430 50.925     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 03/SDE.RHD/CRSD/2006-2007  28-Jun-2006  7 Days  Road Embankment  LRP048  1630 49     LRP050  505 50     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP050  1466 50.961     LRP052  1131 52.681     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP052  1281 52.831     LRP058  755 58.435     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 22/EE/Sunam/2006-2007.  4-Jan-2007  7 Days  Road Embankment  LRP056  320 56     LRP058  0 57.68     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 23/EE/Sunam/2006-2007.  6-Dec-2006  7 Days  Road Embankment  LRP056  1320 57     LRP058  320 58     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 21/EE/Sunam/2006-2007.  4-Jan-2007  7 Days  Road Embankment  LRP056  1320 57     LRP058  320 58     Sunamganj, (Division Office) 
 Revenue Periodic Roads  Quotation No. 24/EE.RHD/Sunam/2006-2007  6-Dec-2006  7 Days  Road Rehablitation  LRP056  1320 57     LRP058  320 58     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP058  799 58.479     LRP060  1708 61.382     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP060  1796 61.47     LRP062  3008 64.678     Sunamganj, (Division Office) 
 Revenue PMP  PMP : 2009-10/24/Overlay  19-Aug-2010  360 Days  Overlay  LRP062  3045 64.715     LRP062  4778 66.448     Sunamganj, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division