| List of ongoing works on the road ( R280 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Revenue |
146/EE, RHD/Sylhet/2010-2011 |
5-Jan-2011 |
7 Days |
Pavement |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Revenue |
120/EE, RHD/Sylhet/2009-2010 |
24-Dec-2009 |
7 Days |
Pavement |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Revenue |
64t/EE, RHD/Sylhet/2013-2014 |
12-Jan-2014 |
60 Days |
Pavement |
LRPS |
0 |
0 |
LRP010 |
0 |
9.749 |
Sylhet, (Division Office) |
| Revenue |
156/EE/SRD/2008-2009 |
30-Mar-2009 |
7 Days |
Pavement |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
450/EE/SRD/2007-2008 |
4-May-2008 |
7 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Revenue |
PMP 2009-2010/25/DBST & Overlay |
18-Aug-2010 |
591 Days |
Overlay |
LRPS |
|
0 |
LRP006 |
386 |
6.256 |
Sylhet, (Division Office) |
| Development |
02(Two)/ACE/SZ/2012-2013 |
25-Jul-2013 |
797 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
521/EE/SRD/2007-2008 |
18-May-2008 |
7 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
424/EE/SRD/2007-2008 |
4-Jun-2008 |
30 Days |
Surfacing |
LRPS |
0 |
0 |
LRP003 |
0 |
2.956 |
Sylhet, (Division Office) |
| Development |
449/EE/SRD/2007-2008 |
4-May-2008 |
7 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Revenue |
WD 37(Thirty Seven)/2018-2019/EE, RHD/Sylhet/312790 |
23-May-2019 |
30 Days |
Pavement |
LRPS |
0 |
0 |
LRP004 |
0 |
3.92 |
Sylhet, (Division Office) |
| Development |
403/EE/SRD/2007-2008 |
15-May-2008 |
60 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
279/EE/SRD/2007-2008 |
27-Nov-2007 |
5 Days |
Surfacing |
LRPS |
0 |
0 |
LRPS |
500 |
0.5 |
Sylhet, (Division Office) |
| Revenue |
e-GP/22(Twenty two)/ACE/SZ/2015-2016/33178 |
7-Jan-2016 |
180 Days |
Pavement |
LRPS |
0 |
0 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Development |
520/EE/SRD/2007-2008 |
10-May-2008 |
7 Days |
Pavement |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
247/EE/SRD/2007-2008 |
22-Jan-2008 |
120 Days |
Pavement |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
421/EE/SRD/2007-2008 |
18-May-2008 |
60 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
447/EE/SRD/2007-2008 |
4-May-2008 |
7 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Development |
54/EE/SRD/2008-2009 |
30-Sep-2008 |
5 Days |
Surfacing |
LRPS |
0 |
0 |
LRP001 |
0 |
0.936 |
Sylhet, (Division Office) |
| Revenue |
e-GP 15/EE, RHD/Sylhet/2014-2015 |
9-Feb-2015 |
30 Days |
Pavement |
LRP001 |
0 |
0.936 |
LRP014 |
0 |
13.707 |
Sylhet, (Division Office) |
| Development |
232/EE/SRD/2007-2008 |
26-Nov-2007 |
5 Days |
Surfacing |
LRP001 |
0 |
0.936 |
LRP008 |
0 |
7.815 |
Sylhet, (Division Office) |
| Development |
236/EE/SRD/2007-2008 |
26-Nov-2007 |
10 Days |
Surfacing |
LRP001 |
0 |
0.936 |
LRP002 |
0 |
1.96 |
Sylhet, (Division Office) |
| Revenue |
48t/EE, RHD/Sylhet/2012-2013 |
23-Jun-2013 |
7 Days |
Surfacing |
LRP001 |
|
0.936 |
LRP002 |
|
1.96 |
Sylhet, (Division Office) |
| Development |
80/EE/SRD/2006-2007 |
24-Sep-2006 |
10 Days |
Road Rehablitation |
LRPS |
1000 |
1 |
LRPS |
2000 |
2 |
Sylhet, (Division Office) |
| Revenue |
45l/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
10 Days |
Surfacing |
LRPS |
1000 |
1 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Development |
14(Fourteen)/2005-2006/SE/SRC |
13-Apr-2006 |
627 Days |
Pavement |
LRP001 |
64 |
1 |
LRP005 |
88 |
5 |
Sylhet, (Division Office) |
| Revenue |
e-GP/09/ACE/SZ/2014-2015/16344 |
22-Mar-2015 |
180 Days |
Overlay |
LRP001 |
596 |
1.532 |
LRP005 |
88 |
5 |
Sylhet, (Division Office) |
| Revenue |
114/EE/SRD/2008-2009 |
11-Mar-2009 |
60 Days |
Carpeting |
LRP002 |
0 |
1.96 |
LRP004 |
0 |
3.92 |
Sylhet, (Division Office) |
| Revenue |
31l/EE, RHD/Sylhet/2012-2013 |
24-Feb-2013 |
20 Days |
Surfacing |
LRP002 |
0 |
1.96 |
LRP003 |
0 |
2.956 |
Sylhet, (Division Office) |
| Development |
235/EE/SRD/2007-2008 |
4-Dec-2007 |
5 Days |
Surfacing |
LRP002 |
0 |
1.96 |
LRP005 |
0 |
4.912 |
Sylhet, (Division Office) |
| Revenue |
47t/EE, RHD/Sylhet/2012-2013 |
23-Jun-2013 |
7 Days |
Surfacing |
LRP002 |
0 |
1.96 |
LRP003 |
0 |
2.956 |
Sylhet, (Division Office) |
| Development |
233/EE/SRD/2007-2008 |
26-Nov-2007 |
10 Days |
Surfacing |
LRP002 |
0 |
1.96 |
LRP003 |
0 |
2.956 |
Sylhet, (Division Office) |
| Revenue |
WD 34(Thirty Four)/2019-2020/EE, RHD/Sylhet/426238 |
25-Mar-2020 |
30 Days |
Pavement |
LRPS |
2000 |
2 |
LRPS |
5000 |
5 |
Sylhet, (Division Office) |
| Revenue |
18l/EE, RHD/Sylhet/2013-2014 |
23-Sep-2013 |
30 Days |
Pavement |
LRP002 |
40 |
2 |
LRP005 |
88 |
5 |
Sylhet, (Division Office) |
| Revenue |
WD 02(Two)/2019-2020/EE, RHD/Sylhet/355759 |
14-Nov-2019 |
30 Days |
Pavement |
LRP003 |
0 |
2.956 |
LRP005 |
0 |
4.912 |
Sylhet, (Division Office) |
| Revenue |
113/EE/SRD/2008-2009 |
11-Mar-2009 |
60 Days |
Carpeting |
LRP003 |
0 |
2.956 |
LRP004 |
0 |
3.92 |
Sylhet, (Division Office) |
| Revenue |
136/EE, RHD/Sylhet/2009-2010 |
5-Oct-2009 |
5 Days |
Pavement |
LRP003 |
0 |
2.956 |
LRP004 |
0 |
3.92 |
Sylhet, (Division Office) |
| Revenue |
13(Thirteen)/SE, RHD/Sylhet/2014-2015 |
14-May-2015 |
30 Days |
Pavement |
LRP003 |
0 |
2.956 |
LRP016 |
0 |
15.59 |
Sylhet, (Division Office) |
| Development |
233/EE/SRD/2007-2008 |
26-Nov-2007 |
10 Days |
Surfacing |
LRP003 |
0 |
2.956 |
LRP004 |
0 |
3.92 |
Sylhet, (Division Office) |
| Revenue |
97/EE, RHD/Sylhet/2009-2010 |
30-Dec-2009 |
7 Days |
Pavement |
LRP004 |
|
3.92 |
LRP005 |
|
4.912 |
Sylhet, (Division Office) |
| Development |
530/EE/SRD/2007-2008 |
28-May-2008 |
7 Days |
Surfacing |
LRP004 |
0 |
3.92 |
LRP005 |
0 |
4.912 |
Sylhet, (Division Office) |
| Revenue Others |
401/EE/SRD/2007-2008 |
7-May-2008 |
30 Days |
Surfacing |
LRP004 |
0 |
3.92 |
LRP008 |
0 |
7.815 |
Sylhet, (Division Office) |
| Revenue |
135/EE, RHD/Sylhet/2009-2010 |
5-Oct-2009 |
5 Days |
Pavement |
LRP004 |
0 |
3.92 |
LRP005 |
0 |
4.912 |
Sylhet, (Division Office) |
| Revenue |
e-GP/05(Five)/2012-2013 |
17-Jun-2013 |
244 Days |
Pavement |
LRP004 |
80 |
4 |
LRP007 |
139 |
7 |
Sylhet, (Division Office) |
| Revenue |
WD 26(Twenty Six)/2019-2020/EE, RHD/Sylhet/405750 |
4-Mar-2020 |
30 Days |
Pavement |
LRPS |
4000 |
4 |
LRPS |
5000 |
5 |
Sylhet, (Division Office) |
| Development |
15(Fifteen)/2005-2006/SE/SRC |
7-May-2006 |
270 Days |
Pavement |
LRP004 |
880 |
4.8 |
LRP007 |
239 |
7.1 |
Sylhet, (Division Office) |
| Development |
e-GP/01(One)/SE/SRC/2017-2018/ID 166180/03 |
2-Jul-2018 |
1008 Days |
Pavement |
LRP004 |
985 |
4.905 |
LRP020 |
65 |
19.535 |
Sylhet, (Division Office) |
| Revenue |
210/EE, RHD/Sylhet/2008-2009 |
4-Jun-2009 |
59 Days |
Carpeting |
LRP005 |
0 |
4.912 |
LRP007 |
0 |
6.861 |
Sylhet, (Division Office) |
| Development |
341/EE/SRD/2007-2008 |
4-Dec-2007 |
5 Days |
Surfacing |
LRP005 |
0 |
4.912 |
LRP008 |
0 |
7.815 |
Sylhet, (Division Office) |
| Revenue |
192/EE, RHD/Sylhet/2009-2010 |
1-Oct-2009 |
5 Days |
Pavement |
LRP005 |
0 |
4.912 |
LRP006 |
0 |
5.87 |
Sylhet, (Division Office) |
| Development |
204/EE/SRD/2007-2008 |
21-Jan-2008 |
60 Days |
Surfacing |
LRP005 |
632 |
5.544 |
LRP006 |
540 |
6.41 |
Sylhet, (Division Office) |
| Development |
19(Nineteen)/SE, RHD/Sylhet/2010-2011 |
27-Jun-2011 |
360 Days |
Road Rehablitation |
LRP006 |
0 |
5.87 |
LRP012 |
0 |
11.714 |
Sylhet, (Division Office) |
| Revenue |
137/EE, RHD/Sylhet/2009-2010 |
28-Sep-2009 |
5 Days |
Pavement |
LRP006 |
0 |
5.87 |
LRP008 |
0 |
7.815 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2006-07/15/ DBST & Overlay |
7-Jun-2007 |
150 Days |
DBST |
LRP006 |
0 |
5.87 |
LRP014 |
0 |
13.707 |
Sylhet, (Division Office) |
| Revenue |
26d/EE, RHD/Sylhet/2014-2015 |
14-Jul-2014 |
7 Days |
Pavement |
LRP007 |
0 |
6.861 |
LRP008 |
0 |
7.815 |
Sylhet, (Division Office) |
| Revenue |
206/EE/SRD/2008-2009 |
31-May-2009 |
3 Days |
Pavement |
LRP007 |
139 |
7 |
LRP007 |
899 |
7.76 |
Sylhet, (Division Office) |
| Development |
16(Sixteen)/2005-2006/SE/SRC |
13-Apr-2006 |
543 Days |
Pavement |
LRP007 |
139 |
7 |
LRP008 |
2185 |
10 |
Sylhet, (Division Office) |
| Development |
274/EE/SRD/2007-2008 |
4-Dec-2007 |
5 Days |
Surfacing |
LRP008 |
0 |
7.815 |
LRP010 |
0 |
9.749 |
Sylhet, (Division Office) |
| Development |
124/EE/SRD/2004-2005 |
31-Oct-2004 |
90 Days |
Road Embankment |
LRP008 |
0 |
7.815 |
LRP008 |
1000 |
8.815 |
Sylhet, (Division Office) |
| Revenue |
281d/EE, RHD/Sylhet/2013-2014 |
24-Jun-2014 |
3 Days |
Carpeting |
LRP008 |
0 |
7.815 |
LRP010 |
0 |
9.749 |
Sylhet, (Division Office) |
| Revenue |
86/EE, RHD/Sylhet/2010-2011 |
3-Oct-2010 |
7 Days |
Pavement |
LRP008 |
0 |
7.815 |
LRP010 |
0 |
9.749 |
Sylhet, (Division Office) |
| Revenue |
168d/EE, RHD/Sylhet/2014-2015 |
8-Oct-2014 |
3 Days |
Surfacing |
LRP008 |
0 |
7.815 |
LRP010 |
0 |
9.749 |
Sylhet, (Division Office) |
| Revenue Others |
68/EE/SRD/2007-2008 |
16-Jul-2007 |
5 Days |
Pavement |
LRP008 |
185 |
8 |
LRP008 |
1185 |
9 |
Sylhet, (Division Office) |
| Revenue Periodic Roads |
239/EE/SRD/2005-2006 |
16-Mar-2006 |
60 Days |
SBST |
LRP008 |
185 |
8 |
LRP020 |
2530 |
22 |
Sylhet, (Division Office) |
| Revenue |
104d/EE, RHD/Sylhet/2013-2014 |
28-Nov-2013 |
7 Days |
Pavement |
LRP008 |
185 |
8 |
LRP008 |
1185 |
9 |
Sylhet, (Division Office) |
| Revenue |
50/EE, RHD/Sylhet/2011-2012 |
13-Sep-2011 |
7 Days |
Pavement |
LRP008 |
185 |
8 |
LRP008 |
1185 |
9 |
Sylhet, (Division Office) |
| Revenue Others |
95/EE/SRD/2007-2008 |
4-Nov-2007 |
45 Days |
Carpeting |
LRP008 |
574 |
8.389 |
LRP008 |
760 |
8.575 |
Sylhet, (Division Office) |
| Revenue |
PMP 2009-2010/25/DBST & Overlay |
18-Aug-2010 |
591 Days |
Overlay |
LRP008 |
915 |
8.73 |
LRP008 |
1069 |
8.884 |
Sylhet, (Division Office) |
| Revenue |
55/EE, RHD/Sylhet/2011-2012 |
13-Sep-2011 |
7 Days |
Pavement |
LRP008 |
1185 |
9 |
LRP010 |
251 |
10 |
Sylhet, (Division Office) |
| Revenue |
84/EE, RHD/Sylhet/2010-2011 |
23-Sep-2010 |
7 Days |
Pavement |
LRP010 |
0 |
9.749 |
LRP011 |
0 |
10.745 |
Sylhet, (Division Office) |
| Revenue |
63t/EE, RHD/Sylhet/2013-2014 |
8-Jan-2014 |
90 Days |
Pavement |
LRP010 |
0 |
9.749 |
LRP017 |
0 |
16.586 |
Sylhet, (Division Office) |
| Revenue |
28d/EE, RHD/Sylhet/2014-2015 |
8-Jul-2014 |
7 Days |
Pavement |
LRP011 |
0 |
10.745 |
LRP013 |
0 |
12.71 |
Sylhet, (Division Office) |
| Revenue |
199/EE, RHD/Sylhet/2010-2011 |
16-Sep-2010 |
7 Days |
Pavement |
LRP011 |
0 |
10.745 |
LRP012 |
0 |
11.714 |
Sylhet, (Division Office) |
| Revenue |
WD 10(Ten)/2018-2019/EE, RHD/Sylhet/260128 |
28-Jan-2019 |
30 Days |
Pavement |
LRP011 |
0 |
10.745 |
LRP014 |
0 |
13.707 |
Sylhet, (Division Office) |
| Revenue |
121d/EE, RHD/Sylhet/2012-2013 |
23-Apr-2013 |
7 Days |
Pavement |
LRP011 |
255 |
11 |
LRP012 |
286 |
12 |
Sylhet, (Division Office) |
| Revenue |
122d/EE, RHD/Sylhet/2013-2014 |
3-Dec-2013 |
7 Days |
Pavement |
LRP011 |
255 |
11 |
LRP012 |
286 |
12 |
Sylhet, (Division Office) |
| Revenue |
123/EE, RHD/Sylhet/2011-2012 |
10-Oct-2011 |
7 Days |
Pavement |
LRP012 |
0 |
11.714 |
LRP013 |
0 |
12.71 |
Sylhet, (Division Office) |
| Revenue |
e-GP 05(Five)/2020-2021/EE, RHD/Sylhet/512685 |
27-Dec-2020 |
30 Days |
Pavement |
LRP012 |
0 |
11.755 |
LRP013 |
0 |
12.755 |
Sylhet, (Division Office) |
| Revenue |
WD 56(Fifty Six)/2019-2020/EE, RHD/Sylhet/460562 |
7-Jun-2020 |
15 Days |
Pavement |
LRP012 |
0 |
11.755 |
LRP013 |
0 |
12.755 |
Sylhet, (Division Office) |
| Revenue |
80d/EE, RHD/Sylhet/2013-2014 |
19-Nov-2013 |
7 Days |
Pavement |
LRP012 |
286 |
12 |
LRP013 |
290 |
13 |
Sylhet, (Division Office) |
| Revenue |
123d/EE, RHD/Sylhet/2012-2013 |
23-Apr-2013 |
7 Days |
Pavement |
LRP012 |
286 |
12 |
LRP013 |
290 |
13 |
Sylhet, (Division Office) |
| Revenue |
167d/EE, RHD/Sylhet/2014-2015 |
12-Oct-2014 |
3 Days |
Surfacing |
LRP013 |
0 |
12.71 |
LRP014 |
0 |
13.707 |
Sylhet, (Division Office) |
| Revenue |
WD 38(Thirty Eight)/2017-2018/EE, RHD/Sylhet/170890 |
6-Jun-2018 |
20 Days |
Pavement |
LRP013 |
0 |
12.755 |
LRP016 |
0 |
15.645 |
Sylhet, (Division Office) |
| Revenue |
WD 16(Sixteen)/2019-2020/EE, RHD/Sylhet/398807 |
16-Jan-2020 |
30 Days |
Pavement |
LRP013 |
0 |
12.755 |
LRP018 |
0 |
17.58 |
Sylhet, (Division Office) |
| Revenue |
93/EE, RHD/Sylhet/2011-2012 |
15-Sep-2011 |
30 Days |
Pavement |
LRP014 |
0 |
13.707 |
LRP019 |
0 |
18.482 |
Sylhet, (Division Office) |
| Revenue |
328d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Pavement |
LRP014 |
0 |
13.707 |
LRP016 |
0 |
15.59 |
Sylhet, (Division Office) |
| Revenue |
25d/EE, RHD/Sylhet/2014-2015 |
8-Jul-2014 |
7 Days |
Pavement |
LRP014 |
0 |
13.707 |
LRP016 |
0 |
15.59 |
Sylhet, (Division Office) |
| Revenue |
124d/EE, RHD/Sylhet/2012-2013 |
23-Apr-2013 |
7 Days |
Pavement |
LRP013 |
1290 |
14 |
LRP014 |
1293 |
15 |
Sylhet, (Division Office) |
| Revenue |
81d/EE, RHD/Sylhet/2013-2014 |
5-Nov-2013 |
7 Days |
Pavement |
LRP014 |
293 |
14 |
LRP014 |
1293 |
15 |
Sylhet, (Division Office) |
| Revenue |
121d/EE, RHD/Sylhet/2013-2014 |
3-Dec-2013 |
7 Days |
Pavement |
LRP014 |
293 |
14 |
LRP014 |
1293 |
15 |
Sylhet, (Division Office) |
| Revenue |
320/EE, RHD/Sylhet/2008-2009 |
16-Jun-2009 |
488 Days |
Pavement |
LRP014 |
874 |
14.581 |
LRP014 |
1199 |
14.906 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2007-08/13/ DBST |
27-Mar-2008 |
734 Days |
DBST |
LRP014 |
874 |
14.581 |
LRP016 |
173 |
15.763 |
Sylhet, (Division Office) |
| Revenue |
157/EE/SRD/2008-2009 |
21-Apr-2009 |
5 Days |
Pavement |
LRP014 |
1758 |
15.465 |
LRP016 |
0 |
15.59 |
Sylhet, (Division Office) |
| Revenue |
329d/EE, RHD/Sylhet/2012-2013 |
20-Jun-2013 |
7 Days |
Pavement |
LRP016 |
|
15.59 |
LRP017 |
|
16.586 |
Sylhet, (Division Office) |
| Revenue |
269d/EE, RHD/Sylhet/2013-2014 |
24-Jun-2014 |
3 Days |
Carpeting |
LRP016 |
0 |
15.59 |
LRP017 |
0 |
16.586 |
Sylhet, (Division Office) |
| Revenue |
e-GP 28(Twenty Eight)/2020-2021/EE, RHD/Sylhet/553688 |
15-Apr-2021 |
30 Days |
Pavement |
LRP016 |
0 |
15.645 |
LRP017 |
0 |
16.645 |
Sylhet, (Division Office) |
| Revenue |
PMP 2009-2010/25/DBST & Overlay |
18-Aug-2010 |
591 Days |
Overlay |
LRP016 |
173 |
15.763 |
LRP017 |
|
16.586 |
Sylhet, (Division Office) |
| Revenue Others |
36/EE/SRD/2007-2008 |
11-Sep-2007 |
5 Days |
Pavement |
LRP016 |
410 |
16 |
LRP017 |
414 |
17 |
Sylhet, (Division Office) |
| Revenue |
18l/EE, RHD/Sylhet/2012-2013 |
6-Jan-2013 |
30 Days |
Road Embankment |
LRP017 |
0 |
16.586 |
LRP019 |
0 |
18.482 |
Sylhet, (Division Office) |
| Revenue |
62t/EE, RHD/Sylhet/2013-2014 |
8-Jan-2014 |
75 Days |
Pavement |
LRP017 |
0 |
16.586 |
LRP019 |
0 |
18.482 |
Sylhet, (Division Office) |
| Revenue PMP |
PMP 2007-08/13/ DBST |
27-Mar-2008 |
734 Days |
DBST |
LRP017 |
|
16.586 |
LRP018 |
|
17.514 |
Sylhet, (Division Office) |
| Revenue |
198d/EE, RHD/Sylhet/2013-2014 |
17-Apr-2014 |
3 Days |
Pavement |
LRP017 |
0 |
16.586 |
LRP018 |
0 |
17.514 |
Sylhet, (Division Office) |
| Revenue |
e-GP 07(Seven)/2020-2021/EE, RHD/Sylhet/512687 |
27-Dec-2020 |
30 Days |
Pavement |
LRP017 |
0 |
16.645 |
LRP018 |
0 |
17.58 |
Sylhet, (Division Office) |
| Revenue Others |
95/EE/SRD/2007-2008 |
4-Nov-2007 |
45 Days |
Carpeting |
LRP017 |
414 |
17 |
LRP017 |
714 |
17.3 |
Sylhet, (Division Office) |
| Revenue |
82d/EE, RHD/Sylhet/2013-2014 |
5-Nov-2013 |
7 Days |
Pavement |
LRP017 |
414 |
17 |
LRP018 |
486 |
18 |
Sylhet, (Division Office) |
| Revenue |
07/EE, RHD/Sylhet/2009-2010 |
19-Jul-2009 |
7 Days |
Road Embankment |
LRP018 |
0 |
17.514 |
LRP019 |
0 |
18.482 |
Sylhet, (Division Office) |
| Revenue Others |
515/EE/SRD/2007-2008 |
19-Jun-2008 |
3 Days |
Surfacing |
LRP018 |
0 |
17.514 |
LRP019 |
0 |
18.482 |
Sylhet, (Division Office) |
| Revenue |
PMP 2009-2010/25/DBST & Overlay |
18-Aug-2010 |
591 Days |
Overlay |
LRP018 |
|
17.514 |
LRP020 |
|
19.47 |
Sylhet, (Division Office) |
| Revenue |
100d/EE, RHD/Sylhet/2012-2013 |
19-Dec-2012 |
5 Days |
Pavement |
LRP018 |
486 |
18 |
LRP019 |
518 |
19 |
Sylhet, (Division Office) |
| Revenue |
325/EE, RHD/Sylhet/2009-2010 |
12-May-2010 |
7 Days |
Pavement |
LRP019 |
0 |
18.482 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Revenue |
13/EE, RHD/Sylhet/2010-2011 |
21-Jul-2010 |
7 Days |
Surfacing |
LRP019 |
0 |
18.482 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Revenue |
08/EE, RHD/Sylhet/2009-2010 |
19-Jul-2009 |
7 Days |
Road Embankment |
LRP019 |
0 |
18.482 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Revenue |
14/EE, RHD/Sylhet/2010-2011 |
21-Jul-2010 |
7 Days |
Surfacing |
LRP019 |
0 |
18.482 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Revenue |
25/EE, RHD/Sylhet/2009-2010 |
26-Aug-2009 |
7 Days |
Road Embankment |
LRP019 |
0 |
18.482 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Revenue |
12/EE, RHD/Sylhet/2010-2011 |
21-Jul-2010 |
7 Days |
Surfacing |
LRP019 |
0 |
18.482 |
LRP020 |
0 |
19.47 |
Sylhet, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 07/SDE.RHD/CRSD/2006-2007 |
28-Jun-2006 |
7 Days |
Road Rehablitation |
LRP020 |
0 |
19.47 |
LRP062 |
0 |
61.67 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 13/EE/Sunam/2006-2007 |
31-Aug-2006 |
5 Days |
Road Embankment |
LRP020 |
0 |
19.47 |
LRP062 |
0 |
61.67 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 14/EE/Sunam/2006-2007 |
31-Aug-2006 |
7 Days |
Road Embankment |
LRP020 |
0 |
19.47 |
LRP062 |
0 |
61.67 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP 2007-08/13/ DBST |
27-Mar-2008 |
734 Days |
DBST |
LRP020 |
|
19.47 |
LRP020 |
1000 |
20.47 |
Sylhet, (Division Office) |
| Revenue |
201/EE, RHD/Sylhet/2011-2012 |
30-Apr-2012 |
5 Days |
Pavement |
LRP020 |
530 |
20 |
LRP020 |
1530 |
21 |
Sylhet, (Division Office) |
| Revenue Others |
95/EE/SRD/2007-2008 |
4-Nov-2007 |
45 Days |
Carpeting |
LRP020 |
630 |
20.1 |
LRP020 |
1430 |
20.9 |
Sylhet, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 05/SDE.RHD/CRSD/2006-2007 |
28-Aug-2006 |
7 Days |
Road Embankment |
LRP022 |
535 |
22 |
LRP023 |
540 |
23 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 04/SDE.RHD/CRSD/2006-2007 |
28-Aug-2006 |
7 Days |
Road Embankment |
LRP022 |
535 |
22 |
LRP023 |
540 |
23 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 10/EE.RHD/SUNAM/2005-2006. (Md. Nader Ahmed) |
30-Apr-2006 |
7 Days |
Road Embankment |
LRP027 |
140 |
26.6 |
LRP030 |
946 |
30.4 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 27/SDE.RHD/CRSD/2005-2006 (M/S. J. H. Enterprise) |
20-Nov-2005 |
7 Days |
Pavement |
LRP027 |
440 |
26.9 |
LRP027 |
467 |
26.927 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 28/SDE.RHD/CRSD/2005-2006 (M/S. J. H. Enterprise) |
24-Nov-2005 |
7 Days |
Pavement |
LRP028 |
261 |
27.7 |
LRP028 |
287 |
27.726 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 38/SDE.RHD/CRSD/2005-2006. |
16-Apr-2006 |
7 Days |
Pavement |
LRP030 |
546 |
30 |
LRP031 |
550 |
31 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 39/SDE.RHD/CRSD/2005-2006. |
16-Apr-2006 |
7 Days |
Carpeting |
LRP031 |
0 |
30.45 |
LRP032 |
0 |
31.188 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 11/EE.RHD/SUNAM/2005-2006. (Md. Nader Ahmed) |
30-Apr-2006 |
7 Days |
Road Embankment |
LRP031 |
550 |
31 |
LRP035 |
160 |
34.6 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 29/SDE.RHD/CRSD/2005-2006. (M/S. J. H. Enterprise) |
20-Nov-2005 |
7 Days |
Road Embankment |
LRP033 |
545 |
33 |
LRP033 |
571 |
33.026 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 37/SDE.RHD/CRSD/2005-2006. |
17-Apr-2006 |
7 Days |
Pavement |
LRP034 |
0 |
33.455 |
LRP035 |
0 |
34.44 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 40/SDE.RHD/CRSD/2005-2006. |
16-Apr-2006 |
7 Days |
Pavement |
LRP034 |
0 |
33.455 |
LRP035 |
0 |
34.44 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 30/SDE.RHD/CRSD/2005-2006 (M/S. J. H. Enterprise) |
20-Nov-2005 |
7 Days |
Pavement |
LRP034 |
545 |
34 |
LRP035 |
560 |
35 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 15/EE/Sunam/2006-2007 |
31-Aug-2006 |
7 Days |
Road Embankment |
LRP035 |
560 |
35 |
LRP037 |
560 |
37 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 16/EE/Sunam/2006-2007 |
31-Aug-2006 |
7 Days |
Road Embankment |
LRP035 |
560 |
35 |
LRP037 |
560 |
37 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
02/EE.RHD/SUNAM/2006-2007 |
29-May-2007 |
7 Days |
Road Embankment |
LRP037 |
10 |
36.45 |
LRP037 |
560 |
37 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 04/SDE.RHD/CRSD/2004-2005. |
27-Jul-2005 |
7 Days |
Road Embankment |
LRP038 |
0 |
37.43 |
LRP039 |
0 |
38.44 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP041 |
615 |
41.03 |
LRP042 |
774 |
42.189 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP042 |
968 |
42.383 |
LRP044 |
270 |
43.64 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP044 |
270 |
43.64 |
LRP045 |
900 |
45.27 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP045 |
932 |
45.302 |
LRP048 |
10 |
47.38 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 41/SDE.RHD/CRSD/2005-2006. |
16-Apr-2006 |
7 Days |
Pavement |
LRP048 |
0 |
47.37 |
LRP050 |
0 |
49.495 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP048 |
42 |
47.412 |
LRP050 |
1430 |
50.925 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 03/SDE.RHD/CRSD/2006-2007 |
28-Jun-2006 |
7 Days |
Road Embankment |
LRP048 |
1630 |
49 |
LRP050 |
505 |
50 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP050 |
1466 |
50.961 |
LRP052 |
1131 |
52.681 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP052 |
1281 |
52.831 |
LRP058 |
755 |
58.435 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 22/EE/Sunam/2006-2007. |
4-Jan-2007 |
7 Days |
Road Embankment |
LRP056 |
320 |
56 |
LRP058 |
0 |
57.68 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 23/EE/Sunam/2006-2007. |
6-Dec-2006 |
7 Days |
Road Embankment |
LRP056 |
1320 |
57 |
LRP058 |
320 |
58 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 21/EE/Sunam/2006-2007. |
4-Jan-2007 |
7 Days |
Road Embankment |
LRP056 |
1320 |
57 |
LRP058 |
320 |
58 |
Sunamganj, (Division Office) |
| Revenue Periodic Roads |
Quotation No. 24/EE.RHD/Sunam/2006-2007 |
6-Dec-2006 |
7 Days |
Road Rehablitation |
LRP056 |
1320 |
57 |
LRP058 |
320 |
58 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP058 |
799 |
58.479 |
LRP060 |
1708 |
61.382 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP060 |
1796 |
61.47 |
LRP062 |
3008 |
64.678 |
Sunamganj, (Division Office) |
| Revenue PMP |
PMP : 2009-10/24/Overlay |
19-Aug-2010 |
360 Days |
Overlay |
LRP062 |
3045 |
64.715 |
LRP062 |
4778 |
66.448 |
Sunamganj, (Division Office) |