| List of ongoing works on the road ( R547 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Revenue |
OTM 07-NRD/2012-2013 (Package-03) |
18-Jun-2013 |
90 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
2752 |
2.752 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
OTM 05-NRD/2009-2010 (Lot 05/03) |
18-Mar-2010 |
30 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
800 |
0.8 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2012-2013 (Package-02) |
25-Apr-2013 |
45 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
1280 |
1.28 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2009-2010 (Lot 12/04) |
25-Feb-2010 |
7 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
33000 |
33 |
Naogaon, (Division Office) |
| Revenue |
06-NRD/2009-2010(Lot No.02) |
22-Feb-2010 |
14 Days |
Road Rehablitation |
LRPS |
0 |
0 |
LRP078 |
0 |
76.948 |
Naogaon, (Division Office) |
| Deposit Works |
Quotation 34-NRD/2005-2006 (Lot No. 34/02) |
28-Jul-2006 |
15 Days |
Pavement |
LRPS |
200 |
0.2 |
LRPS |
500 |
0.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 10-NRD/2004-2005 (Lot No. 10/02) |
7-May-2006 |
15 Days |
Pavement |
LRPS |
200 |
0.2 |
LRPS |
700 |
0.7 |
Naogaon, (Division Office) |
| Revenue Others |
Tender 27-NRD/2005-2006 (Lot No. 27/09) |
31-Aug-2006 |
20 Days |
Carpeting |
LRPS |
640 |
0.64 |
LRP001 |
50 |
1.05 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 44-NRD/2005-2006 (Lot No. 44/11) |
14-Dec-2006 |
25 Days |
Pavement |
LRP001 |
0 |
1 |
LRP001 |
1000 |
2 |
Naogaon, (Division Office) |
| Revenue Others |
RTM 11-NRD/2007-2008 (Lot No. 11/02) |
13-May-2008 |
171 Days |
Pavement |
LRP001 |
|
1 |
LRP001 |
500 |
1.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 16-NRD/2005-2006 (Lot No. 16/06) |
15-Jun-2006 |
15 Days |
Carpeting |
LRP001 |
100 |
1.1 |
LRP001 |
200 |
1.2 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 18-NRD/2005-2006 (Lot No. 18/04) |
12-Mar-2006 |
15 Days |
Pavement |
LRP001 |
200 |
1.2 |
LRP001 |
500 |
1.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 23-NRD/2005-2006(Lot No. 23/8) |
28-Apr-2006 |
10 Days |
Road Embankment |
LRP001 |
250 |
1.25 |
LRP001 |
500 |
1.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
41-NRD/2005-2006 (Lot No. 41/11) |
8-Oct-2006 |
15 Days |
Pavement |
LRP001 |
400 |
1.4 |
LRP001 |
800 |
1.8 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 13-NRD/2004-2005 (Lot No. 13/06) |
25-May-2005 |
15 Days |
Pavement |
LRP001 |
400 |
1.4 |
LRP001 |
700 |
1.7 |
Naogaon, (Division Office) |
| Revenue Others |
Tender 27-NRD/2005-2006 (Lot No 27/08) |
31-Aug-2006 |
20 Days |
Carpeting |
LRP001 |
470 |
1.47 |
LRP001 |
892 |
1.892 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2009-2010 (Lot 12/03) |
25-Feb-2010 |
7 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
1900 |
1.9 |
Naogaon, (Division Office) |
| Revenue Others |
Tender 37-NRD/2005-2006 (Lot No. 37/6) |
13-Jul-2006 |
15 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
1900 |
1.9 |
Naogaon, (Division Office) |
| Development |
e-GP/RAZ/ADP/07/2014-2015 |
8-Jul-2015 |
324 Days |
Overlay |
LRPS |
1500 |
1.5 |
LRPS |
4000 |
4 |
Naogaon, (Division Office) |
| Revenue |
Quotation 23-NRD/2009-2010 (Lot 23/01) |
1-Jun-2010 |
7 Days |
Carpeting |
LRPS |
2000 |
2 |
LRPS |
3900 |
3.9 |
Naogaon, (Division Office) |
| Revenue Others |
Quotation-A-37-NRD/2005-2006 (Lot No. 37/02) |
6-Dec-2006 |
15 Days |
Carpeting |
LRP002 |
13 |
2 |
LRP002 |
363 |
2.35 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2011-2012 (P-04) |
25-Nov-2011 |
90 Days |
Carpeting |
LRPS |
2100 |
2.1 |
LRPS |
2500 |
2.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 06-NRD/2006-2007 (Lot No. 06/10) |
28-Jan-2007 |
25 Days |
Road Embankment |
LRP002 |
200 |
2.187 |
LRP002 |
400 |
2.387 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 37-NRD/2005-2006 (Lot No. 37/01) |
6-Dec-2006 |
15 Days |
Road Embankment |
LRP002 |
200 |
2.187 |
LRP002 |
500 |
2.487 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 44-NRD/2005-2006 (Lot No. 44/11) |
14-Dec-2006 |
25 Days |
Pavement |
LRP002 |
200 |
2.187 |
LRP002 |
500 |
2.487 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/06) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
2300 |
2.3 |
LRPS |
3000 |
3 |
Naogaon, (Division Office) |
| Revenue |
OTM 15-NRD/2009-2010 (Lot 15/03) |
1-Aug-2010 |
15 Days |
Carpeting |
LRPS |
2300 |
2.3 |
LRPS |
23500 |
23.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 15-NRD/2009-2010 (Lot 15/03) |
1-Aug-2010 |
15 Days |
Carpeting |
LRPS |
2300 |
2.3 |
LRPS |
27500 |
27.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2005-2006 (Lot No. 12/11) |
18-Jan-2006 |
15 Days |
Pavement |
LRP002 |
350 |
2.337 |
LRP002 |
550 |
2.537 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2005-2006 (Lot No. 12/10) |
18-Jan-2006 |
15 Days |
Pavement |
LRP002 |
400 |
2.387 |
LRP002 |
600 |
2.587 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 37-NRD/2005-2006 (Lot No. 37/02) |
6-Dec-2006 |
15 Days |
Pavement |
LRP002 |
600 |
2.587 |
LRP002 |
900 |
2.887 |
Naogaon, (Division Office) |
| Revenue Others |
08-NRD/2006-2007 (Lot No. 08/11(a) |
25-Jan-2007 |
25 Days |
Carpeting |
LRPS |
3085 |
3.085 |
LRPS |
3200 |
3.2 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 23-NRD/2005-2006 (Lot No. 23/07) |
28-Apr-2006 |
15 Days |
Road Embankment |
LRP003 |
150 |
3.135 |
LRP003 |
450 |
3.435 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Quotation 09-NRD/2005-2006 (Lot No. 09/01) |
28-Feb-2006 |
15 Days |
Pavement |
LRP003 |
200 |
3.185 |
LRP003 |
400 |
3.385 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 13-NRD/2004-2005 (Lot No. 13/07) |
25-May-2005 |
15 Days |
Pavement |
LRP003 |
200 |
3.185 |
LRP003 |
500 |
3.485 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-04) |
8-Sep-2011 |
7 Days |
Carpeting |
LRPS |
3200 |
3.2 |
LRPS |
3800 |
3.8 |
Naogaon, (Division Office) |
| Revenue Others |
08-NRD/2006-2007 (Lot No. 08/11(a) |
25-Jan-2007 |
25 Days |
Carpeting |
LRPS |
3218 |
3.218 |
LRPS |
3293 |
3.293 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2005-2006 (Lot No. 12/10) |
18-Jan-2006 |
15 Days |
Pavement |
LRP003 |
300 |
3.285 |
LRP003 |
600 |
3.585 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 06-NRD/2006-2007 (Lot No. 06/10) |
28-Jan-2007 |
25 Days |
Road Embankment |
LRP003 |
300 |
3.285 |
LRP003 |
500 |
3.485 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2005-2006 (Lot No. 12/09) |
16-Jan-2006 |
15 Days |
Pavement |
LRP003 |
600 |
3.585 |
LRP003 |
800 |
3.785 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/06) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
4000 |
4 |
LRPS |
5000 |
5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 22-NRD/2009-2010 (Lot 22/01) |
27-May-2010 |
7 Days |
Carpeting |
LRPS |
4000 |
4 |
LRPS |
5800 |
5.8 |
Naogaon, (Division Office) |
| Revenue Others |
Tender-A 24-NRD/2005-2006 (Lot No. 24/06) |
4-Jul-2006 |
15 Days |
Carpeting |
LRP004 |
100 |
4.1 |
LRP004 |
300 |
4.3 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 08-NRD/2004-2005 (Lot No. 08/01) |
7-Jun-2005 |
15 Days |
Pavement |
LRP004 |
200 |
4.2 |
LRP004 |
400 |
4.4 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 06-NRD/2006-2007 (Lot No. 06/02) |
17-Jan-2007 |
15 Days |
Road Embankment |
LRP004 |
200 |
4.2 |
LRP004 |
600 |
4.6 |
Naogaon, (Division Office) |
| Deposit Works |
Restricted 7-NRD/2004-2005(Lot No. 07/07) |
31-May-2005 |
15 Days |
Pavement |
LRP004 |
200 |
4.2 |
LRP004 |
300 |
4.3 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 24-NRD/2005-2006 (Lot No. 24/06) |
4-Jul-2006 |
15 Days |
Pavement |
LRP004 |
400 |
4.4 |
LRP004 |
800 |
4.8 |
Naogaon, (Division Office) |
| Development |
e-GP/RAZ/ADP/07/2014-2015 |
8-Jul-2015 |
324 Days |
Overlay |
LRPS |
4400 |
4.4 |
LRPS |
6400 |
6.4 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 16-NRD/2005-2006 (Lot No. 16/06) |
15-Jun-2006 |
15 Days |
Carpeting |
LRP004 |
500 |
4.5 |
LRP004 |
700 |
4.7 |
Naogaon, (Division Office) |
| Deposit Works |
Restricted 7-NRD/2004-2005(Lot No. 07/07) |
31-May-2005 |
15 Days |
Pavement |
LRP005 |
100 |
5.097 |
LRP005 |
200 |
5.197 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 08-NRD/2004-2005 (Lot No. 08/01) |
7-Jun-2005 |
15 Days |
Pavement |
LRP005 |
400 |
5.397 |
LRP005 |
700 |
5.697 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2006-2007 (Lot No. 11/03) |
15-Feb-2007 |
351 Days |
Carpeting |
LRPS |
5400 |
5.4 |
LRPS |
5500 |
5.5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2006-2007 (Lot 12/15) |
15-Feb-2007 |
15 Days |
Carpeting |
LRPS |
5600 |
5.6 |
LRPS |
5900 |
5.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation 23-NRD/2009-2010 (Lot 23/02) |
1-Jun-2010 |
7 Days |
Carpeting |
LRPS |
6000 |
6 |
LRPS |
7600 |
7.6 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/04) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
6000 |
6 |
LRPS |
6800 |
6.8 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Quotation 09-NRD/2005-2006 (Lot No. 09/01) |
28-Feb-2006 |
15 Days |
Pavement |
LRP006 |
100 |
6.091 |
LRP006 |
300 |
6.291 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 19-NRD/2005-2006 (Lot No. 19/07) |
3-Apr-2006 |
15 Days |
Pavement |
LRP006 |
200 |
6.191 |
LRP006 |
700 |
6.691 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 24-NRD/2005-2006 (Lot No. 24/03) |
12-Jun-2006 |
25 Days |
Pavement |
LRP003 |
3400 |
6.385 |
LRP003 |
3700 |
6.685 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 08-NRD/2004-2005 (Lot No. 08/01) |
7-Jun-2005 |
15 Days |
Pavement |
LRP006 |
700 |
6.691 |
LRP006 |
900 |
6.891 |
Naogaon, (Division Office) |
| Development |
e-GP/RAZ/ADP/07/2014-2015 |
8-Jul-2015 |
324 Days |
Overlay |
LRPS |
6725 |
6.725 |
LRPS |
12000 |
12 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/4) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
6900 |
6.9 |
LRPS |
7100 |
7.1 |
Naogaon, (Division Office) |
| Development |
01-RRC/2010-2011 (Package-CW-P-04/06 |
15-May-2011 |
351 Days |
Carpeting |
LRPS |
12000 |
12 |
LRPS |
14000 |
14 |
Naogaon, (Division Office) |
| Revenue |
Tender 10-NRD/2006-2007 (Lot 10/01) |
7-Feb-2007 |
35 Days |
Carpeting |
LRP012 |
19 |
12 |
LRP012 |
605 |
12.586 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/4) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
12800 |
12.8 |
LRPS |
13050 |
13.05 |
Naogaon, (Division Office) |
| Revenue |
OTM 03-NRD/2008-2009 |
|
50 Days |
Surfacing |
LRP014 |
527 |
14.5 |
LRP016 |
41 |
16 |
Naogaon, (Division Office) |
| Revenue |
OTM 06-NRD/2008-2009 |
19-Mar-2009 |
60 Days |
Carpeting |
LRP014 |
527 |
14.5 |
LRP016 |
41 |
16 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2012-2013 (Package-02) |
25-Apr-2013 |
45 Days |
Carpeting |
LRPS |
15000 |
15 |
LRPS |
16000 |
16 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 10-NRD/2005-2006 (Lot No. 10/11) |
16-Jan-2006 |
15 Days |
Pavement |
LRP015 |
100 |
15.069 |
LRP015 |
500 |
15.469 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 31-NRD/2005-2006 (Lot No. 31/02) |
3-Jul-2006 |
40 Days |
Road Embankment |
LRP015 |
150 |
15.119 |
LRP015 |
500 |
15.469 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 33-NRD/2005-2006 (Lot No. 33/01) |
18-Jul-2006 |
25 Days |
Pavement |
LRP015 |
700 |
15.669 |
LRP015 |
825 |
15.794 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 33-NRD/2005-2006 (Lot No. 33/02) |
29-Jun-2006 |
25 Days |
Pavement |
LRP016 |
30 |
15.989 |
LRP016 |
155 |
16.114 |
Naogaon, (Division Office) |
| Revenue |
OTM 04-NRD/2011-2012 (Package-01) |
18-Jun-2012 |
60 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
16130 |
16.13 |
Naogaon, (Division Office) |
| Revenue |
LTM 03-NRD/2012-2013 (Package-01) |
22-Oct-2012 |
30 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
24000 |
24 |
Naogaon, (Division Office) |
| Revenue |
OTM 04-NRD/2011-2012 (Package-01) |
18-Jun-2012 |
60 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
16130 |
16.13 |
Naogaon, (Division Office) |
| Deposit Works |
Restricted 16-NRD/2005-2006 (Lot 16/06) |
25-May-2005 |
7 Days |
Pavement |
LRP016 |
50 |
16.009 |
LRP016 |
90 |
16.049 |
Naogaon, (Division Office) |
| Development |
e-GP/RAZ/ADP/07/2014-2015 |
8-Jul-2015 |
324 Days |
Overlay |
LRPS |
16100 |
16.1 |
LRPS |
32300 |
32.3 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 33-NRD/2005-2006 (Lot No. 33/03) |
13-Jul-2006 |
25 Days |
Pavement |
LRP016 |
200 |
16.159 |
LRP016 |
700 |
16.659 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 02-NRD/2006-2007 (Lot No. 02/06) |
6-Dec-2006 |
15 Days |
Pavement |
LRP016 |
200 |
16.159 |
LRP016 |
800 |
16.759 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 31-NRD/2005-2006 (Lot No. 31/06) |
29-Jun-2006 |
35 Days |
Pavement |
LRP016 |
300 |
16.259 |
LRP016 |
600 |
16.559 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 16-NRD/2004-2005 (Lot No. 16/05) |
25-May-2005 |
7 Days |
Pavement |
LRP016 |
600 |
16.559 |
LRP016 |
900 |
16.859 |
Naogaon, (Division Office) |
| Development |
Tender 34-NRD/2005-2006 (Lot 34/01) |
|
60 Days |
Carpeting |
LRPS |
17100 |
17.1 |
LRPS |
17900 |
17.9 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Tender 16-NRD/2004-2005 (Lot No. 16/06) |
25-May-2005 |
7 Days |
Pavement |
LRP016 |
1200 |
17.159 |
LRP016 |
1600 |
17.559 |
Naogaon, (Division Office) |
| Deposit Works |
Restricted 16-NRD/2005-2006 (Lot 16/06) |
25-May-2005 |
7 Days |
Pavement |
LRP016 |
1250 |
17.209 |
LRP016 |
1400 |
17.359 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Tender 33-NRD/2005-2006 (Lot No. 33/03) |
13-Jul-2006 |
25 Days |
Pavement |
LRP016 |
1300 |
17.259 |
LRP016 |
1700 |
17.659 |
Naogaon, (Division Office) |
| Revenue |
Quotation 38-NRD/2005-2006 (Lot 38/06) |
7-Aug-2006 |
15 Days |
Carpeting |
LRPS |
17400 |
17.4 |
LRPS |
17900 |
17.9 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 38-NRD/2005-2006 (Lot No. 38/12) |
5-Oct-2006 |
15 Days |
Road Embankment |
LRP016 |
2100 |
18.059 |
LRP016 |
2500 |
18.459 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Tender 16-NRD/2004-2005 (Lot No. 16/06) |
25-May-2005 |
7 Days |
Pavement |
LRP016 |
2400 |
18.359 |
LRP016 |
2800 |
18.759 |
Naogaon, (Division Office) |
| Revenue |
Tender 37-NRD/2005-2006 (Lot 37/09) |
1-Jul-2008 |
15 Days |
Road Embankment |
LRPS |
18500 |
18.5 |
LRPS |
18900 |
18.9 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 05-NRD/2005-2006 (Lot No. 05/11) |
13-Nov-2005 |
15 Days |
Pavement |
LRP019 |
100 |
19.058 |
LRP019 |
200 |
19.158 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2011-2012 (Package-05) |
24-Apr-2012 |
40 Days |
Carpeting |
LRP019 |
200 |
19.158 |
LRP019 |
700 |
19.658 |
Naogaon, (Division Office) |
| Revenue |
LTM 06-NRD/2011-2012 (Package-04) |
20-May-2012 |
40 Days |
Carpeting |
LRP019 |
1100 |
20.058 |
LRP019 |
1500 |
20.458 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 07-NRD/2006-2007 (Lot No. 07/01) |
18-Jan-2007 |
15 Days |
Pavement |
LRP019 |
1200 |
20.158 |
LRP019 |
1600 |
20.558 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2006-2007 (Lot 12/01) |
7-Feb-2007 |
1239 Days |
Carpeting |
LRPS |
20600 |
20.6 |
LRPS |
20900 |
20.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-01) |
12-Dec-2010 |
7 Days |
Carpeting |
LRPS |
21000 |
21 |
LRPS |
23000 |
23 |
Naogaon, (Division Office) |
| Revenue |
Quotation 08-NRD/2010-2011 (Package-01) |
26-Jan-2011 |
7 Days |
Carpeting |
LRP022 |
50 |
21.994 |
LRP022 |
500 |
22.444 |
Naogaon, (Division Office) |
| Revenue |
Quotation 06-NRD/2010-2011 (Package-01) |
20-Jan-2011 |
7 Days |
Carpeting |
LRPS |
22000 |
22 |
LRPS |
24000 |
24 |
Naogaon, (Division Office) |
| Revenue |
LTM 06-NRD/2011-2012 (Package-06) |
21-May-2012 |
40 Days |
Road Embankment |
LRP022 |
300 |
22.244 |
LRP022 |
550 |
22.494 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 17-NRD/2005-2006 (Lot No. 17/01) |
5-Mar-2006 |
20 Days |
Pavement |
LRP022 |
500 |
22.444 |
LRP022 |
800 |
22.744 |
Naogaon, (Division Office) |
| Revenue |
LTM 06-NRD/2011-2012 (Package-06) |
21-May-2012 |
40 Days |
Road Embankment |
LRP023 |
180 |
23.115 |
LRP023 |
430 |
23.365 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 31 NRD/2005-2006(Lot No. 31/08) |
3-Jul-2006 |
25 Days |
Pavement |
LRP023 |
350 |
23.285 |
LRP023 |
500 |
23.435 |
Naogaon, (Division Office) |
| Revenue |
LTM 02-NRD/2012-2013 (Package-03) |
15-Oct-2012 |
30 Days |
Carpeting |
LRPS |
24000 |
24 |
LRPS |
30857 |
30.857 |
Naogaon, (Division Office) |
| Revenue |
Tender 31-NRD/2005-2006 (Lot 31/08) |
1-Jul-2008 |
25 Days |
Carpeting |
LRPS |
24100 |
24.1 |
LRPS |
24500 |
24.5 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 31 NRD/2005-2006(Lot No. 31/08) |
3-Jul-2006 |
25 Days |
Pavement |
LRP023 |
1600 |
24.535 |
LRP023 |
1850 |
24.785 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 03-NRD/2012-2013 (Package-01) |
16-Oct-2012 |
7 Days |
Carpeting |
LRPS |
25100 |
25.1 |
LRPS |
25300 |
25.3 |
Naogaon, (Division Office) |
| Revenue |
Tender 31-NRD/2005-2006 (Lot 31/08) |
1-Jul-2008 |
25 Days |
Carpeting |
LRPS |
25300 |
25.3 |
LRPS |
25700 |
25.7 |
Naogaon, (Division Office) |
| Revenue |
DPM 04-NRD/2011-2012 (Package-02) |
21-Nov-2011 |
7 Days |
Carpeting |
LRPS |
27100 |
27.1 |
LRPS |
27500 |
27.5 |
Naogaon, (Division Office) |
| Revenue |
DPM 04-NRD/2011-2012 (Package-03) |
21-Nov-2011 |
7 Days |
Carpeting |
LRPS |
28100 |
28.1 |
LRPS |
28400 |
28.4 |
Naogaon, (Division Office) |
| Revenue |
LTM 08-NRD/2011-2012 (Package-03) |
3-Jun-2012 |
40 Days |
Carpeting |
LRP028 |
300 |
28.247 |
LRP028 |
650 |
28.597 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2005-2006 (Lot No. 12/09) |
16-Jan-2006 |
15 Days |
Pavement |
LRP028 |
400 |
28.347 |
LRP028 |
700 |
28.647 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 07-NRD/2006-2007 (Lot No. 07/01) |
18-Jan-2007 |
15 Days |
Pavement |
LRP028 |
400 |
28.347 |
LRP028 |
700 |
28.647 |
Naogaon, (Division Office) |
| Revenue |
DPM 04-NRD/2011-2012 (Package-01) |
21-Nov-2011 |
7 Days |
Carpeting |
LRPS |
29100 |
29.1 |
LRPS |
29500 |
29.5 |
Naogaon, (Division Office) |
| Revenue |
LTM 08-NRD/2011-2012 (Package-01) |
3-Jun-2012 |
40 Days |
Carpeting |
LRP028 |
1400 |
29.347 |
LRP028 |
1900 |
29.847 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
OTM 20-NRD/2007-2008 (Lot No. 20/02) |
18-Jun-2008 |
20 Days |
Carpeting |
LRPS |
29650 |
29.65 |
LRPS |
30000 |
30 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/11) |
25-Jan-2007 |
244 Days |
Carpeting |
LRPS |
30085 |
30.085 |
LRPS |
30200 |
30.2 |
Naogaon, (Division Office) |
| Revenue |
Quotation 07-NRD/2010-2011 (Package-01) |
24-Jan-2011 |
7 Days |
Carpeting |
LRPS |
30100 |
30.1 |
LRPS |
30600 |
30.6 |
Naogaon, (Division Office) |
| Revenue |
Quotation 03-NRD/2011-2012 (Package-05) |
9-Jan-2012 |
7 Days |
Carpeting |
LRP028 |
2200 |
30.147 |
LRP028 |
2400 |
30.347 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/11) |
25-Jan-2007 |
244 Days |
Carpeting |
LRPS |
30218 |
30.218 |
LRPS |
30293 |
30.293 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
OTM 20-NRD/2007-2008 (Lot No. 20/02) |
18-Jun-2008 |
20 Days |
Carpeting |
LRPS |
30750 |
30.75 |
LRPS |
31000 |
31 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (Package-01) |
14-Oct-2010 |
15 Days |
Carpeting |
LRPS |
30900 |
30.9 |
LRPS |
31500 |
31.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
OTM 20-NRD/2007-2008 (Lot No. 20/02) |
18-Jun-2008 |
20 Days |
Carpeting |
LRPS |
31000 |
31 |
LRPS |
31700 |
31.7 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-06) |
12-Sep-2011 |
7 Days |
Carpeting |
LRPS |
31100 |
31.1 |
LRPS |
31500 |
31.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 10-NRD/2008-2009 (Lot 10/02) |
10-May-2009 |
15 Days |
Carpeting |
LRP028 |
3953 |
31.9 |
LRP028 |
4200 |
32.147 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (Package-02) |
14-Oct-2010 |
15 Days |
Carpeting |
LRPS |
32000 |
32 |
LRPS |
32200 |
32.2 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 05-NRD/2005-2006(Lot No. 5/5) |
2-Jan-2006 |
15 Days |
Pavement |
LRP028 |
4100 |
32.047 |
LRP028 |
4250 |
32.197 |
Naogaon, (Division Office) |
| Revenue |
Quotation 07-NRD/2010-2011 (Package-02) |
24-Jan-2011 |
7 Days |
Carpeting |
LRPS |
32140 |
32.14 |
LRPS |
32490 |
32.49 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 23-NRD/2004-2005 (Lot No. 23/04) |
17-Jan-2006 |
45 Days |
Pavement |
LRP016 |
16600 |
32.559 |
LRP016 |
16900 |
32.859 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 05-NRD/2005-2006 (Lot No. 05/04) |
2-Jan-2006 |
15 Days |
Pavement |
LRP033 |
0 |
32.947 |
LRP033 |
1000 |
33.947 |
Naogaon, (Division Office) |
| Revenue |
Quotation 02-NRD/2011-2012 (Package-02) |
19-Sep-2011 |
7 Days |
Carpeting |
LRP033 |
100 |
33.047 |
LRP033 |
350 |
33.297 |
Naogaon, (Division Office) |
| Development |
07/e-GP/ADP/SE/Raj/2015-16 (02/e-GP/ADP/SE/Raj/2015-16) |
11-Nov-2015 |
180 Days |
Pavement |
LRPS |
33070 |
33.07 |
LRPS |
41000 |
41 |
Naogaon, (Division Office) |
| Revenue |
Quotation 07-NRD/2010-2011 (Package-03) |
24-Jan-2011 |
7 Days |
Carpeting |
LRP033 |
230 |
33.177 |
LRP033 |
560 |
33.507 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 05-NRD/2005-2006(Lot No. 5/5) |
2-Jan-2006 |
15 Days |
Pavement |
LRP033 |
250 |
33.197 |
LRP033 |
400 |
33.347 |
Naogaon, (Division Office) |
| Revenue |
Quotation 02-NRD/2012-2013 (Package-04) |
14-Nov-2012 |
7 Days |
Carpeting |
LRPS |
33250 |
33.25 |
LRPS |
33600 |
33.6 |
Naogaon, (Division Office) |
| Development |
Quotation 10-NRD/2006-2007 (Lot No. 10/10) |
31-Jan-2007 |
319 Days |
Carpeting |
LRPS |
33300 |
33.3 |
LRPS |
33630 |
33.63 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 05-NRD/2005-2006 (Lot No. 05/04) |
2-Jan-2006 |
15 Days |
Pavement |
LRP034 |
400 |
33.478 |
LRP034 |
900 |
33.978 |
Naogaon, (Division Office) |
| Development |
01-RRC/2010-2011 (Package CW-P-01/04) |
16-May-2011 |
345 Days |
Carpeting |
LRP033 |
653 |
33.6 |
LRP034 |
1922 |
35 |
Naogaon, (Division Office) |
| Revenue Others |
Quotation 12-NRD/2006-2007 (Lot 12/22) |
14-Feb-2007 |
15 Days |
Pavement |
LRP034 |
1222 |
34.3 |
LRP036 |
169 |
35.3 |
Naogaon, (Division Office) |
| Development |
Quotation 12-NRD/2006-2007 (Lot No. 12/22) |
14-Feb-2007 |
291 Days |
Carpeting |
LRPS |
34300 |
34.3 |
LRPS |
35300 |
35.3 |
Naogaon, (Division Office) |
| Revenue Others |
Quotation-A 12-NRD/2006-2007 (Lot No. 12/22) |
14-Feb-2007 |
291 Days |
Carpeting |
LRP034 |
1222 |
34.3 |
LRP036 |
169 |
35.3 |
Naogaon, (Division Office) |
| Development |
Quotation 13-NRD/2009-2010 (Lot 13/01) |
1-Mar-2010 |
7 Days |
Carpeting |
LRPS |
34600 |
34.6 |
LRPS |
34800 |
34.8 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2006-2007 (Lot No. 11/11) |
6-Feb-2007 |
15 Days |
Carpeting |
LRP034 |
1840 |
34.918 |
LRP036 |
107 |
35.238 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/01) |
6-Feb-2007 |
30 Days |
Carpeting |
LRP036 |
107 |
35.238 |
LRP037 |
585 |
36.715 |
Naogaon, (Division Office) |
| Development |
Tender (A) 08-NRD/2006-2007 (Lot No. 08/01) |
6-Feb-2007 |
450 Days |
Carpeting |
LRP036 |
107 |
35.238 |
LRP037 |
585 |
36.715 |
Naogaon, (Division Office) |
| Development |
Quotation 08-NRD/2009-2010 (Lot 08/01) |
11-Feb-2010 |
7 Days |
Carpeting |
LRPS |
35600 |
35.6 |
LRPS |
35800 |
35.8 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/05) |
24-Nov-2009 |
150 Days |
Carpeting |
LRPS |
36720 |
36.72 |
LRPS |
36970 |
36.97 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/05) |
24-Nov-2009 |
150 Days |
Carpeting |
LRPS |
36970 |
36.97 |
LRPS |
37052 |
37.052 |
Naogaon, (Division Office) |
| Development |
Tender 10-NRD/2006-2007 (Lot No. 10/03) |
4-Feb-2007 |
331 Days |
Pavement |
LRPS |
37044 |
37.044 |
LRPS |
37374 |
37.374 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2010-2011 (Package-02) |
17-Feb-2011 |
7 Days |
Carpeting |
LRPS |
37050 |
37.05 |
LRPS |
37400 |
37.4 |
Naogaon, (Division Office) |
| Development |
Quotation 21-NRD/2009-2010 (Lot 21/06) |
16-May-2010 |
7 Days |
Carpeting |
LRPS |
37050 |
37.05 |
LRPS |
37450 |
37.45 |
Naogaon, (Division Office) |
| Development |
Tender(p) 10-NRD/2004-2005 (Lot No. 10/05) |
27-Apr-2005 |
60 Days |
Pavement |
LRP038 |
0 |
37.127 |
LRP039 |
1000 |
39.125 |
Naogaon, (Division Office) |
| Development |
OTM 08-NRD/2010-2011 (Package-03) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
37200 |
37.2 |
LRPS |
53100 |
53.1 |
Naogaon, (Division Office) |
| Revenue |
OTM 13-NRD/2008-2009 (Lot No. 13/01) |
20-May-2009 |
40 Days |
Surfacing |
LRP038 |
253 |
37.38 |
LRP039 |
35 |
38.16 |
Naogaon, (Division Office) |
| Revenue |
Quotation 11-NRD/2010-2011 (Package-05) |
17-Feb-2011 |
7 Days |
Carpeting |
LRPS |
37500 |
37.5 |
LRPS |
37850 |
37.85 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (package-07) |
18-Oct-2010 |
15 Days |
Carpeting |
LRPS |
37600 |
37.6 |
LRPS |
38200 |
38.2 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (Package-08) |
18-Oct-2010 |
15 Days |
Carpeting |
LRPS |
37770 |
37.77 |
LRPS |
38170 |
38.17 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2012-2013 (Package-04) |
24-May-2013 |
45 Days |
Carpeting |
LRPS |
38000 |
38 |
LRPS |
40150 |
40.15 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-03) |
12-Dec-2010 |
7 Days |
Carpeting |
LRPS |
38200 |
38.2 |
LRPS |
38600 |
38.6 |
Naogaon, (Division Office) |
| Development |
Quotation 21-NRD/2009-2010 (Lot 21/04) |
16-May-2010 |
7 Days |
Carpeting |
LRPS |
38500 |
38.5 |
LRPS |
39000 |
39 |
Naogaon, (Division Office) |
| Development |
Tender(p) 10-NRD/2004-2005 (Lot No. 10/05) |
27-Apr-2005 |
60 Days |
Pavement |
LRP039 |
500 |
38.625 |
LRP039 |
900 |
39.025 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/05) |
29-Jan-2007 |
30 Days |
Pavement |
LRPS |
38850 |
38.85 |
LRPS |
39140 |
39.14 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/04) |
5-Feb-2007 |
273 Days |
Carpeting |
LRPS |
38870 |
38.87 |
LRPS |
39160 |
39.16 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/05) |
30-Nov-2006 |
577 Days |
Pavement |
LRP041 |
39 |
40.16 |
LRP041 |
569 |
40.69 |
Naogaon, (Division Office) |
| Development |
Tender-A 03-NRD/2006-2007 (Lot No. 03/05) |
30-Nov-2006 |
577 Days |
Pavement |
LRP041 |
39 |
40.16 |
LRP041 |
569 |
40.69 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2007-2008 (Lot No. 04/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
40200 |
40.2 |
LRPS |
42000 |
42 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 37-NRD/2005-2006 (Lot No. 37/06) |
13-Jul-2006 |
15 Days |
Pavement |
LRP041 |
100 |
40.221 |
LRP041 |
300 |
40.421 |
Naogaon, (Division Office) |
| Development |
OTM 13-NRD/2008-2009 (Lot No. 13/02) |
18-May-2009 |
30 Days |
Surfacing |
LRP041 |
279 |
40.4 |
LRP042 |
712 |
41.8 |
Naogaon, (Division Office) |
| Revenue |
OTM 16-NRD/2009-2010 (Package-01) |
4-Aug-2010 |
15 Days |
Carpeting |
LRPS |
40500 |
40.5 |
LRPS |
40900 |
40.9 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/02) |
30-Nov-2006 |
577 Days |
Pavement |
LRP041 |
569 |
40.69 |
LRP042 |
132 |
41.22 |
Naogaon, (Division Office) |
| Development |
e-GP/RAZ/ADP/04/2015-2016 |
24-Dec-2015 |
180 Days |
Carpeting |
LRPS |
41000 |
41 |
LRPS |
51000 |
51 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP042 |
112 |
41.2 |
LRP042 |
612 |
41.7 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 37-NRD/2005-2006 (Lot No. 37/06) |
13-Jul-2006 |
15 Days |
Pavement |
LRP042 |
400 |
41.488 |
LRP042 |
700 |
41.788 |
Naogaon, (Division Office) |
| Revenue |
Quotation 21-NRD/2009-2010 (Lot 21/05) |
16-May-2010 |
7 Days |
Carpeting |
LRPS |
41800 |
41.8 |
LRPS |
42275 |
42.275 |
Naogaon, (Division Office) |
| Revenue |
Quotation 24-NRD/2009-2010 (Lot 24/02) |
9-Jun-2010 |
7 Days |
Carpeting |
LRPS |
41800 |
41.8 |
LRPS |
42000 |
42 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2011-2012 (Package-04) |
26-Dec-2011 |
90 Days |
Carpeting |
LRPS |
41810 |
41.81 |
LRPS |
43370 |
43.37 |
Naogaon, (Division Office) |
| Revenue |
LTM 03-NRD/2011-2012 (Package-02) |
23-Feb-2012 |
40 Days |
Carpeting |
LRPS |
42000 |
42 |
LRPS |
42300 |
42.3 |
Naogaon, (Division Office) |
| Revenue |
e-GP/04/NRD/2013-2014 |
24-Feb-2014 |
45 Days |
Carpeting |
LRPS |
42500 |
42.5 |
LRPS |
42900 |
42.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 02-NRD/2012-2013 (Package-03) |
9-Oct-2012 |
7 Days |
Carpeting |
LRPS |
43120 |
43.12 |
LRPS |
43480 |
43.48 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 9-NRD/2005-2006(Lot No. 9/2) |
9-May-2006 |
25 Days |
Road Embankment |
LRP044 |
100 |
43.186 |
LRP044 |
300 |
43.386 |
Naogaon, (Division Office) |
| Revenue Others |
Quotation-14 NRD/2006-2007 (Lot No. 14/01) |
19-Aug-2007 |
15 Days |
Carpeting |
LRP044 |
200 |
43.286 |
LRP044 |
600 |
43.686 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2007-2008 (Lot No. 04/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
43300 |
43.3 |
LRPS |
43600 |
43.6 |
Naogaon, (Division Office) |
| Development |
Quotation 12NRD/2006-07 (Lot No. 12/23) |
14-Feb-2007 |
291 Days |
Carpeting |
LRPS |
43346 |
43.346 |
LRPS |
44415 |
44.415 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/05) |
24-Nov-2009 |
150 Days |
Carpeting |
LRPS |
43370 |
43.37 |
LRPS |
45910 |
45.91 |
Naogaon, (Division Office) |
| Development |
Tender 10-NRD/2006-2007 (Lot No. 10/02) |
8-Feb-2007 |
386 Days |
Pavement |
LRP044 |
529 |
43.615 |
LRP044 |
914 |
44 |
Naogaon, (Division Office) |
| Development |
Tender 10-NRD/2006-2007 (Lot No. 10/04) |
8-Feb-2007 |
386 Days |
Pavement |
LRPS |
43615 |
43.615 |
LRPS |
44000 |
44 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 01-NRD/2012-2013 (Package-02) |
27-Aug-2012 |
7 Days |
Carpeting |
LRPS |
43900 |
43.9 |
LRPS |
44500 |
44.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 05-NRD/2005-2006 (Lot No. 05/11) |
13-Nov-2005 |
15 Days |
Pavement |
LRP022 |
22000 |
43.944 |
LRP022 |
23000 |
44.944 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-02) |
12-Dec-2010 |
7 Days |
Road Embankment |
LRPS |
44000 |
44 |
LRPS |
45000 |
45 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/03) |
16-May-2007 |
30 Days |
Pavement |
LRP045 |
200 |
44.306 |
LRP045 |
700 |
44.806 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 09-NRD/2005-2006(Lot No. 09/03) |
9-May-2006 |
25 Days |
Pavement |
LRP045 |
200 |
44.306 |
LRP045 |
500 |
44.606 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 9-NRD/2005-2006(Lot No. 9/2) |
9-May-2006 |
25 Days |
Pavement |
LRP045 |
250 |
44.356 |
LRP045 |
550 |
44.656 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-02) |
12-Dec-2010 |
7 Days |
Road Embankment |
LRPS |
44400 |
44.4 |
LRPS |
44600 |
44.6 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2007-2008 (Lot No. 04/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
44800 |
44.8 |
LRPS |
44900 |
44.9 |
Naogaon, (Division Office) |
| Revenue |
Tender 10-NRD/2006-2007 (Lot 10/05) |
6-Feb-2007 |
35 Days |
Carpeting |
LRPS |
45100 |
45.1 |
LRPS |
45800 |
45.8 |
Naogaon, (Division Office) |
| Revenue |
Tender-A 10-NRD/2006-2007 (Lot 10/05) |
1-Jul-2008 |
35 Days |
Carpeting |
LRPS |
45100 |
45.1 |
LRPS |
45800 |
45.8 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 16-NRD/2005-2006 (Lot No. 16/06) |
15-Jun-2006 |
15 Days |
Carpeting |
LRP046 |
200 |
45.285 |
LRP046 |
500 |
45.585 |
Naogaon, (Division Office) |
| Revenue |
OTM 02-NRD/2012-2013 (Package-02) |
6-Dec-2012 |
30 Days |
Carpeting |
LRPS |
45310 |
45.31 |
LRPS |
45910 |
45.91 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 09-NRD/2005-2006(Lot No. 09/03) |
9-May-2006 |
25 Days |
Pavement |
LRP046 |
250 |
45.335 |
LRP046 |
600 |
45.685 |
Naogaon, (Division Office) |
| Development |
Quotation 10-NRD/2006-2007 (Lot No. 10/07) |
31-Jan-2007 |
15 Days |
Pavement |
LRPS |
45885 |
45.885 |
LRPS |
46395 |
46.395 |
Naogaon, (Division Office) |
| Development |
Quotation 12-NRD/2006-2007 (Lot No. 12/04) |
6-Feb-2007 |
15 Days |
Carpeting |
LRP046 |
800 |
45.885 |
LRP047 |
311 |
46.395 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 07-NRD/2007-2008 (Lot No. 07/04) |
11-Mar-2008 |
30 Days |
Carpeting |
LRP023 |
23000 |
45.935 |
LRP023 |
24000 |
46.935 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 05-NRD/2005-2006 (Lot No. 05/11) |
13-Nov-2005 |
15 Days |
Pavement |
LRP023 |
23200 |
46.135 |
LRP023 |
23500 |
46.435 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP047 |
100 |
46.184 |
LRP047 |
300 |
46.384 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2006-2007 (Lot No. 09/08) |
11-Feb-2007 |
15 Days |
Carpeting |
LRP047 |
200 |
46.284 |
LRP048 |
500 |
47.582 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 37-NRD/2005-2006 (Lot No. 37/05) |
3-Aug-2006 |
15 Days |
Pavement |
LRP047 |
200 |
46.284 |
LRP047 |
400 |
46.484 |
Naogaon, (Division Office) |
| Development |
OTM 10-NRD/2009-2010 |
2-Aug-2010 |
120 Days |
Carpeting |
LRPS |
46290 |
46.29 |
LRPS |
48790 |
48.79 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-02) |
12-Dec-2010 |
7 Days |
Road Embankment |
LRPS |
46300 |
46.3 |
LRPS |
46800 |
46.8 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP048 |
200 |
47.282 |
LRP048 |
300 |
47.382 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 09-NRD/2005-2006 (Lot No. 09/04) |
6-Apr-2006 |
25 Days |
Pavement |
LRP048 |
200 |
47.282 |
LRP048 |
400 |
47.482 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 37-NRD/2005-2006 (Lot No. 37/05) |
3-Aug-2006 |
15 Days |
Pavement |
LRP048 |
400 |
47.482 |
LRP048 |
700 |
47.782 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 09-NRD/2005-2006 (Lot No. 09/04) |
6-Apr-2006 |
25 Days |
Pavement |
LRP049 |
100 |
48.18 |
LRP049 |
300 |
48.38 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/06) |
30-Nov-2006 |
45 Days |
Pavement |
LRP049 |
100 |
48.18 |
LRP049 |
900 |
48.98 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP049 |
150 |
48.23 |
LRP049 |
350 |
48.43 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/08) |
30-Nov-2006 |
45 Days |
Pavement |
LRP049 |
200 |
48.28 |
LRP049 |
800 |
48.88 |
Naogaon, (Division Office) |
| Development |
Quotation 07-NRD/2005-2006 (Lot No. 07/05) |
3-Jan-2006 |
15 Days |
Pavement |
LRP049 |
200 |
48.28 |
LRP049 |
500 |
48.58 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP049 |
250 |
48.33 |
LRP049 |
400 |
48.48 |
Naogaon, (Division Office) |
| Development |
Quotation 10-NRD/2006-2007 (Lot No. 10/03) |
11-Feb-2007 |
15 Days |
Carpeting |
LRP049 |
420 |
48.5 |
LRP049 |
920 |
49 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2012-2013 (Package-01) |
4-Jun-2013 |
30 Days |
Carpeting |
LRPS |
48700 |
48.7 |
LRPS |
49100 |
49.1 |
Naogaon, (Division Office) |
| Revenue |
Quotation 24-NRD/2009-2010 (Lot 24/03) |
10-Jun-2010 |
7 Days |
Carpeting |
LRPS |
48800 |
48.8 |
LRPS |
49000 |
49 |
Naogaon, (Division Office) |
| Revenue |
Quotation 03-NRD/2011-2012 (Package-04) |
9-Jan-2012 |
7 Days |
Carpeting |
LRP049 |
820 |
48.9 |
LRP049 |
1020 |
49.1 |
Naogaon, (Division Office) |
| Development |
OTM 10-NRD/2009-2010 |
2-Aug-2010 |
120 Days |
Carpeting |
LRPS |
49100 |
49.1 |
LRPS |
50100 |
50.1 |
Naogaon, (Division Office) |
| Development |
Quotation 05-NRD/2006-2007 (Lot No. 05/02) |
11-Dec-2006 |
15 Days |
Pavement |
LRP050 |
100 |
49.177 |
LRP050 |
400 |
49.477 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP050 |
123 |
49.2 |
LRP050 |
523 |
49.6 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 37-NRD/2005-2006 (Lot No. 37/03) |
18-Jul-2006 |
15 Days |
Pavement |
LRP050 |
300 |
49.377 |
LRP050 |
500 |
49.577 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/08) |
30-Nov-2006 |
45 Days |
Pavement |
LRP050 |
300 |
49.377 |
LRP050 |
900 |
49.977 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP050 |
350 |
49.427 |
LRP050 |
500 |
49.577 |
Naogaon, (Division Office) |
| Development |
Quotation 07-NRD/2005-2006 (Lot No. 07/05) |
3-Jan-2006 |
15 Days |
Pavement |
LRP050 |
400 |
49.477 |
LRP050 |
700 |
49.777 |
Naogaon, (Division Office) |
| Development |
01-RRC/2010-2011 (Package CW-P-01/04) |
16-May-2011 |
345 Days |
Carpeting |
LRP050 |
1023 |
50.1 |
LRP052 |
928 |
52 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP051 |
100 |
50.175 |
LRP051 |
400 |
50.475 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Tender 37-NRD/2005-2006 (Lot No. 37/03) |
18-Jul-2006 |
15 Days |
Pavement |
LRP051 |
100 |
50.175 |
LRP051 |
600 |
50.675 |
Naogaon, (Division Office) |
| Development |
Quotation 07-NRD/2006-2007 (Lot No. 07/06) |
17-Jan-2007 |
15 Days |
Pavement |
LRP051 |
200 |
50.275 |
LRP051 |
600 |
50.675 |
Naogaon, (Division Office) |
| Development |
Tender 16-NRD/2005-2006 (Lot No. 16/01) |
5-Apr-2006 |
60 Days |
Pavement |
LRP051 |
200 |
50.275 |
LRP051 |
400 |
50.475 |
Naogaon, (Division Office) |
| Development |
Quotation 05-NRD/2006-2007 (Lot No. 05/02) |
11-Dec-2006 |
15 Days |
Pavement |
LRP051 |
300 |
50.375 |
LRP051 |
700 |
50.775 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 37-NRD/2005-2006 (Lot No. 37/03) |
18-Jul-2006 |
15 Days |
Pavement |
LRP051 |
400 |
50.475 |
LRP051 |
600 |
50.675 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2006-2007 (Lot No. 09/05) |
15-Feb-2007 |
15 Days |
Pavement |
LRPS |
50600 |
50.6 |
LRPS |
51200 |
51.2 |
Naogaon, (Division Office) |
| Development |
OTM 08-NRD/2010-2011 (Package-4) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
51000 |
51 |
LRPS |
52000 |
52 |
Naogaon, (Division Office) |
| Development |
e-GP/RJZ/ADP/08/2015-2016 |
14-Feb-2016 |
365 Days |
Carpeting |
LRPS |
51000 |
51 |
LRPS |
59050 |
59.05 |
Naogaon, (Division Office) |
| Revenue |
OTM 08-NRD/2010-2011 (Package-04) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
51000 |
51 |
LRPS |
52000 |
52 |
Naogaon, (Division Office) |
| Development |
Quotation 07-NRD/2006-2007 (Lot No. 07/06) |
17-Jan-2007 |
15 Days |
Pavement |
LRP052 |
100 |
51.172 |
LRP052 |
500 |
51.572 |
Naogaon, (Division Office) |
| Development |
Tender 16-NRD/2005-2006 (Lot No. 16/01) |
5-Apr-2006 |
60 Days |
Pavement |
LRP052 |
300 |
51.372 |
LRP052 |
700 |
51.772 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
D-Tender 37-NRD/2005-2006 (Lot No. 37/03) |
18-Jul-2006 |
15 Days |
Pavement |
LRP052 |
400 |
51.472 |
LRP052 |
900 |
51.972 |
Naogaon, (Division Office) |
| Revenue |
Quotation 09-NRD/2006-2007 (Lot 09/07) |
|
15 Days |
Carpeting |
LRPS |
52100 |
52.1 |
LRPS |
52700 |
52.7 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-7-NRD/2004-2005 |
27-Dec-2004 |
10 Days |
Pavement |
LRP053 |
200 |
52.27 |
LRP053 |
400 |
52.47 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-08) |
14-Sep-2011 |
7 Days |
Carpeting |
LRPS |
52400 |
52.4 |
LRPS |
52800 |
52.8 |
Naogaon, (Division Office) |
| Development |
Tender 16-NRD/2005-2006 (Lot No. 16/01) |
5-Apr-2006 |
60 Days |
Pavement |
LRP053 |
400 |
52.47 |
LRP053 |
600 |
52.67 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2007-2008 (Lot No. 04/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
52600 |
52.6 |
LRPS |
53000 |
53 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/05) |
24-Nov-2009 |
150 Days |
Carpeting |
LRPS |
52850 |
52.85 |
LRPS |
55750 |
55.75 |
Naogaon, (Division Office) |
| Development |
Tender 16-NRD/2005-2006 (Lot No. 16/01) |
5-Apr-2006 |
60 Days |
Pavement |
LRP054 |
400 |
53.469 |
LRP054 |
700 |
53.769 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2007-2008 (Lot No. 04/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
54000 |
54 |
LRPS |
56200 |
56.2 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 02-NRD/2012-2013 (Package-02) |
9-Oct-2012 |
7 Days |
Carpeting |
LRPS |
54000 |
54 |
LRPS |
54300 |
54.3 |
Naogaon, (Division Office) |
| Development |
Quotation 12-NRD/2006-2007 (Lot No. 12/10) |
15-Feb-2007 |
15 Days |
Road Embankment |
LRPS |
54000 |
54 |
LRPS |
55000 |
55 |
Naogaon, (Division Office) |
| Development |
Tender 16-NRD/2005-2006 (Lot No. 16/01) |
5-Apr-2006 |
60 Days |
Pavement |
LRP055 |
500 |
54.551 |
LRP055 |
800 |
54.851 |
Naogaon, (Division Office) |
| Development |
Tender 16-NRD/2005-2006 (Lot No. 16/01) |
5-Apr-2006 |
60 Days |
Pavement |
LRP056 |
600 |
55.657 |
LRP056 |
800 |
55.857 |
Naogaon, (Division Office) |
| Revenue |
OTM 08-NRD/2010-2011 (Package-04) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
55750 |
55.75 |
LRPS |
58500 |
58.5 |
Naogaon, (Division Office) |
| Development |
OTM 08-NRD/2010-2011 (Package-4) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
55750 |
55.75 |
LRPS |
58500 |
58.5 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2006-2007 (Lot No. 09/07) |
7-Feb-2007 |
511 Days |
Carpeting |
LRP057 |
867 |
56.922 |
LRP058 |
447 |
57.5 |
Naogaon, (Division Office) |
| Development |
RFQ 13-NRD/2014-2015 (Package-03) |
17-Jun-2015 |
7 Days |
Carpeting |
LRPS |
57000 |
57 |
LRPS |
57300 |
57.3 |
Naogaon, (Division Office) |
| Revenue |
Quotation 09-NRD/2010-2011 (Package-02) |
13-Feb-2011 |
7 Days |
Carpeting |
LRPS |
57000 |
57 |
LRPS |
58100 |
58.1 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2006-2007 (Lot 12/21) |
14-Feb-2007 |
15 Days |
Road Embankment |
LRP057 |
945 |
57 |
LRP058 |
540 |
57.593 |
Naogaon, (Division Office) |
| Revenue |
Quotation 11-NRD/2006-2007 (Lot 11/18) |
14-Feb-2007 |
15 Days |
Road Embankment |
LRPS |
57170 |
57.17 |
LRPS |
57781 |
57.781 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2006-2007 (Lot No. 11/01) |
5-Feb-2007 |
299 Days |
Pavement |
LRP058 |
447 |
57.5 |
LRP058 |
947 |
58 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 07-NRD/2005-2006 (Lot No. 07/02) |
14-Feb-2006 |
10 Days |
Pavement |
LRP058 |
500 |
57.553 |
LRP058 |
700 |
57.753 |
Naogaon, (Division Office) |
| Development |
Restricted 02-NRD/2006-2007 (Lot 02/03) |
14-Feb-2007 |
30 Days |
Road Embankment |
LRP058 |
697 |
57.75 |
LRP060 |
45 |
59.25 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 07-NRD/2007-2008 (Lot No. 07/04) |
11-Mar-2008 |
30 Days |
Carpeting |
LRP028 |
30000 |
57.947 |
LRP028 |
30750 |
58.697 |
Naogaon, (Division Office) |
| Development |
RFQ 13-NRD/2014-2015 (Package-04) |
17-Jun-2015 |
7 Days |
Carpeting |
LRPS |
58200 |
58.2 |
LRPS |
58500 |
58.5 |
Naogaon, (Division Office) |
| Revenue |
LTM 07-NRD/2011-2012 (Package-02) |
27-May-2012 |
40 Days |
Carpeting |
LRP059 |
79 |
58.3 |
LRP059 |
479 |
58.7 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2006-2007 (Lot 12/11) |
15-Feb-2007 |
15 Days |
Road Embankment |
LRPS |
58500 |
58.5 |
LRPS |
58700 |
58.7 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2006-2007 (Lot No. 11/02) |
5-Feb-2007 |
347 Days |
Carpeting |
LRPS |
58500 |
58.5 |
LRPS |
59000 |
59 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/05) |
24-Nov-2009 |
150 Days |
Carpeting |
LRPS |
59000 |
59 |
LRPS |
59500 |
59.5 |
Naogaon, (Division Office) |
| Development |
e-GP/RJZ/ADP/06/2013-2014 |
14-May-2014 |
411 Days |
Carpeting |
LRPS |
59050 |
59.05 |
LRPS |
66550 |
66.55 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2006-2007 (Lot 12/11) |
15-Feb-2007 |
15 Days |
Road Embankment |
LRPS |
59600 |
59.6 |
LRPS |
59700 |
59.7 |
Naogaon, (Division Office) |
| Development |
Restricted 02-NRD/2006-2007 (Lot No. 02/01) |
13-Feb-2007 |
45 Days |
Road Embankment |
LRPS |
60000 |
60 |
LRPS |
63000 |
63 |
Naogaon, (Division Office) |
| Development |
OTM 10-NRD/2009-2010 |
2-Aug-2010 |
120 Days |
Carpeting |
LRPS |
60000 |
60 |
LRPS |
61500 |
61.5 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 01-NRD/2005-2006 (Lot No. 01/02) |
13-Aug-2005 |
15 Days |
Pavement |
LRP061 |
1000 |
61.426 |
LRP061 |
2000 |
62.426 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2012-2013 (Package-01) |
4-Jun-2013 |
30 Days |
Carpeting |
LRPS |
61500 |
61.5 |
LRPS |
64100 |
64.1 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 12-NRD/2006-2007 (Lot 12/13) |
15-Feb-2007 |
15 Days |
Road Embankment |
LRPS |
62000 |
62 |
LRPS |
62500 |
62.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP063 |
87 |
62.15 |
LRP063 |
437 |
62.5 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2011-2012 (Package-04) |
24-Apr-2012 |
40 Days |
Road Embankment |
LRP061 |
1734 |
62.16 |
LRP065 |
1573 |
65.61 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 01-NRD/2005-2006 (Lot No. 01/02) |
13-Aug-2005 |
15 Days |
Pavement |
LRP063 |
200 |
62.263 |
LRP063 |
400 |
62.463 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 37-NRD/2005-2006 (Lot No. 37/07) |
11-Jul-2006 |
15 Days |
Pavement |
LRP063 |
200 |
62.263 |
LRP063 |
300 |
62.363 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2006-2007 (Lot No. 11/15) |
7-Feb-2007 |
283 Days |
Road Embankment |
LRPS |
62289 |
62.289 |
LRPS |
62960 |
62.96 |
Naogaon, (Division Office) |
| Development |
Restricted 02-NRD/2006-2007 (Lot No. 02/02) |
13-Feb-2007 |
45 Days |
Road Embankment |
LRP063 |
937 |
63 |
LRP066 |
965 |
66 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 09-NRD/2005-2006 (Lot No. 09/02) |
2-Jan-2006 |
15 Days |
Pavement |
LRP064 |
150 |
63.191 |
LRP064 |
200 |
63.241 |
Naogaon, (Division Office) |
| Revenue |
Quotation 11-NRD/2006-2007 (Lot 11/15) |
1-Jul-2008 |
15 Days |
Carpeting |
LRPS |
63200 |
63.2 |
LRPS |
63800 |
63.8 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Tender 37-NRD/2005-2006 (Lot No. 37/07) |
11-Jul-2006 |
15 Days |
Pavement |
LRP064 |
300 |
63.341 |
LRP064 |
500 |
63.541 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 09-NRD/2005-2006 (Lot No. 09/02) |
2-Jan-2006 |
15 Days |
Pavement |
LRP065 |
200 |
64.237 |
LRP065 |
400 |
64.437 |
Naogaon, (Division Office) |
| Revenue |
LTM 03-NRD/2012-2013 (Package-03) |
22-Oct-2012 |
30 Days |
Carpeting |
LRPS |
65000 |
65 |
LRPS |
65800 |
65.8 |
Naogaon, (Division Office) |
| Development |
D-Tender 30-NRD/2005-2006 (Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP066 |
0 |
65.035 |
LRP066 |
1000 |
66.035 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Quotation 09-NRD/2005-2006 (Lot No. 09/02) |
2-Jan-2006 |
15 Days |
Pavement |
LRP066 |
300 |
65.335 |
LRP066 |
600 |
65.635 |
Naogaon, (Division Office) |
| Revenue |
e-GP/05/NRD/2013-2014 |
24-Feb-2014 |
45 Days |
Carpeting |
LRPS |
65500 |
65.5 |
LRPS |
68000 |
68 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2010-2011 (Package-01) |
20-Mar-2011 |
30 Days |
Carpeting |
LRP066 |
965 |
66 |
LRP066 |
2465 |
67.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP066 |
965 |
66 |
LRP066 |
1315 |
66.35 |
Naogaon, (Division Office) |
| Deposit Works |
Tender 30-NRD/2005-2006(Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP066 |
1000 |
66.035 |
LRP071 |
3000 |
72.959 |
Naogaon, (Division Office) |
| Revenue |
LTM 02-NRD/2012-2013 (Package-02) |
15-Oct-2012 |
30 Days |
Carpeting |
LRPS |
66100 |
66.1 |
LRPS |
67000 |
67 |
Naogaon, (Division Office) |
| Development |
e-GP/RJZ/ADP/08/2015-2016 |
14-Feb-2016 |
365 Days |
Carpeting |
LRPS |
66550 |
66.55 |
LRPS |
71009 |
71.009 |
Naogaon, (Division Office) |
| Development |
01-RRC/2010-2011 (Package CW-P-01/04) |
16-May-2011 |
345 Days |
Carpeting |
LRP066 |
1765 |
66.8 |
LRP080 |
991 |
80 |
Naogaon, (Division Office) |
| Development |
D-Tender 30-NRD/2005-2006 (Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP068 |
0 |
67.005 |
LRP068 |
1000 |
68.005 |
Naogaon, (Division Office) |
| Revenue Others |
Quotation-14 NRD/2006-2007 (Lot No. 14/01) |
19-Aug-2007 |
15 Days |
Carpeting |
LRP034 |
34000 |
67.078 |
LRP034 |
35000 |
68.078 |
Naogaon, (Division Office) |
| Revenue Others |
Quotation-14 NRD/2006-2007 (Lot No. 14/01) |
19-Aug-2007 |
15 Days |
Carpeting |
LRP034 |
34000 |
67.078 |
LRP036 |
36000 |
71.131 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP068 |
295 |
67.3 |
LRP068 |
545 |
67.55 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-10) |
15-Sep-2011 |
7 Days |
Carpeting |
LRPS |
67500 |
67.5 |
LRPS |
67800 |
67.8 |
Naogaon, (Division Office) |
| Development |
D-Tender 30-NRD/2005-2006 (Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP069 |
0 |
68.002 |
LRP069 |
1000 |
69.002 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2010-2011 (Package-01) |
20-Mar-2011 |
30 Days |
Carpeting |
LRP068 |
1095 |
68.1 |
LRP069 |
398 |
68.4 |
Naogaon, (Division Office) |
| Development |
D-Tender 30-NRD/2005-2006 (Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP070 |
0 |
68.964 |
LRP070 |
1000 |
69.964 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
69100 |
69.1 |
LRPS |
69350 |
69.35 |
Naogaon, (Division Office) |
| Development |
D-Tender 30-NRD/2005-2006 (Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP071 |
0 |
69.959 |
LRP071 |
1000 |
70.959 |
Naogaon, (Division Office) |
| Development |
D-Tender 30-NRD/2005-2006 (Lot No. 30/03) |
29-Jun-2006 |
60 Days |
Pavement |
LRP072 |
0 |
70.956 |
LRP072 |
1000 |
71.956 |
Naogaon, (Division Office) |
| Development |
Tender 32-NRD/2005-2006 (Lot No. 32/01) |
29-Jun-2006 |
60 Days |
Pavement |
LRP072 |
0 |
70.956 |
LRP072 |
1000 |
71.956 |
Naogaon, (Division Office) |
| Development |
e-GP/RJZ/ADP/01/2015-2016 |
4-Jan-2016 |
365 Days |
Overlay |
LRP002 |
69079 |
71.009 |
LRP002 |
77079 |
79.009 |
Nawabganj, (Division Office) |
| Revenue Others |
Quotation-14 NRD/2006-2007 (Lot No. 14/01) |
19-Aug-2007 |
15 Days |
Carpeting |
LRP036 |
36000 |
71.131 |
LRP036 |
37000 |
72.131 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
71150 |
71.15 |
LRPS |
71300 |
71.3 |
Naogaon, (Division Office) |
| Development |
Tender 32-NRD/2005-2006 (Lot No. 32/01) |
29-Jun-2006 |
60 Days |
Pavement |
LRP073 |
0 |
71.955 |
LRP073 |
1000 |
72.955 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
72350 |
72.35 |
LRPS |
72450 |
72.45 |
Naogaon, (Division Office) |
| Development |
Tender 32-NRD/2005-2006 (Lot No. 32/01) |
29-Jun-2006 |
60 Days |
Pavement |
LRP074 |
0 |
72.952 |
LRP074 |
1000 |
73.952 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
73400 |
73.4 |
LRPS |
73550 |
73.55 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
74100 |
74.1 |
LRPS |
74350 |
74.35 |
Naogaon, (Division Office) |
| Development |
Tender 32-NRD/2005-2006 (Lot No. 32/01) |
29-Jun-2006 |
60 Days |
Pavement |
LRP075 |
200 |
74.15 |
LRP075 |
800 |
74.75 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
75200 |
75.2 |
LRPS |
75500 |
75.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
76050 |
76.05 |
LRPS |
76450 |
76.45 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 16-NRD/2004-2005 (Lot No. 16/03) |
22-Nov-2005 |
7 Days |
Road Embankment |
LRP077 |
200 |
76.153 |
LRP077 |
300 |
76.253 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2006-2007 (Lot No. 04/04) |
6-Dec-2006 |
45 Days |
Carpeting |
LRPS |
76734 |
76.734 |
LRPS |
79734 |
79.734 |
Naogaon, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/01) |
3-Dec-2006 |
1305 Days |
Carpeting |
LRPS |
77000 |
77 |
LRPS |
78000 |
78 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 16-NRD/2004-2005 (Lot No. 16/03) |
22-Nov-2005 |
7 Days |
Road Embankment |
LRP078 |
100 |
77.048 |
LRP078 |
300 |
77.248 |
Naogaon, (Division Office) |
| Revenue |
Quotation 25-NRD/2009-2010 (Lot 25/01) |
20-Jun-2010 |
7 Days |
Carpeting |
LRPS |
77800 |
77.8 |
LRPS |
78200 |
78.2 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
Restricted 16-NRD/2004-2005 (Lot No. 16/03) |
22-Nov-2005 |
7 Days |
Road Embankment |
LRP079 |
300 |
78.319 |
LRP079 |
500 |
78.519 |
Naogaon, (Division Office) |
| Revenue |
Quotation 25-NRD/2009-2010 (Lot 25/02) |
20-Jun-2010 |
7 Days |
Carpeting |
LRPS |
78600 |
78.6 |
LRPS |
79100 |
79.1 |
Naogaon, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/02) |
6-Dec-2006 |
1302 Days |
Carpeting |
LRPS |
79000 |
79 |
LRPS |
80000 |
80 |
Naogaon, (Division Office) |
| Revenue |
07-NJRD/2013-2014, Lot No. 07/04 |
30-Dec-2013 |
20 Days |
Surfacing |
LRP002 |
77013 |
79 |
LRP002 |
78013 |
80 |
Nawabganj, (Division Office) |
| Revenue Periodic Roads |
Tender (p) 11-NRD/2004-2005 (Lot No. 11/03) |
8-Jun-2005 |
60 Days |
Pavement |
LRP080 |
0 |
79.009 |
LRP080 |
7000 |
86.009 |
Naogaon, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Surfacing |
LRP080 |
0 |
79.009 |
LRP080 |
245 |
79.254 |
Nawabganj, (Division Office) |
| Development |
e-GP/RJZ/ADP/01/2015-2016 |
4-Jan-2016 |
365 Days |
Overlay |
LRP002 |
77079 |
79.009 |
LRP092 |
651 |
93.056 |
Nawabganj, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Pavement |
LRP080 |
400 |
79.409 |
LRP080 |
600 |
79.609 |
Nawabganj, (Division Office) |
| Revenue Periodic Roads |
Restricted 16-NRD/2004-2005 (Lot No. 16/03) |
22-Nov-2005 |
7 Days |
Road Embankment |
LRP080 |
500 |
79.509 |
LRP080 |
700 |
79.709 |
Naogaon, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Pavement |
LRP080 |
800 |
79.809 |
LRP080 |
834 |
79.843 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP002 |
77848 |
79.835 |
LRP081 |
360 |
80.363 |
Nawabganj, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Pavement |
LRP080 |
944 |
79.953 |
LRP081 |
44 |
80.047 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP002 |
78013 |
80 |
LRP082 |
6 |
81 |
Nawabganj, (Division Office) |
| Revenue |
02-NJRD/2010-2011, Lot No. 02/05 |
24-Feb-2011 |
28 Days |
Surfacing |
LRP002 |
78013 |
80 |
LRP084 |
17 |
83 |
Nawabganj, (Division Office) |
| Revenue Others |
08-NJRD/2007-2008, Lot No. 08/03. |
6-May-2008 |
30 Days |
Pavement |
LRP081 |
627 |
80.63 |
LRP081 |
797 |
80.8 |
Nawabganj, (Division Office) |
| Revenue Others |
08-NJRD/2007-2008, Lot No. 08/03. |
6-May-2008 |
30 Days |
Pavement |
LRP081 |
831 |
80.834 |
LRP081 |
941 |
80.944 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013, Lot No. 03/02 |
18-Dec-2012 |
28 Days |
Surfacing |
LRP082 |
6 |
81 |
LRP084 |
17 |
83 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013, Lot No. 03/02 |
18-Dec-2012 |
28 Days |
Surfacing |
LRP081 |
997 |
81 |
LRP083 |
1012 |
83 |
Nawabganj, (Division Office) |
| Revenue Others |
08-NJRD/2007-2008, Lot No. 08/03. |
6-May-2008 |
30 Days |
Pavement |
LRP082 |
50 |
81.044 |
LRP082 |
156 |
81.15 |
Nawabganj, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/03) |
6-Dec-2006 |
1305 Days |
Carpeting |
LRPS |
81100 |
81.1 |
LRPS |
81500 |
81.5 |
Naogaon, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP083 |
188 |
82.176 |
LRP084 |
147 |
83.13 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP084 |
147 |
83.13 |
LRP084 |
391 |
83.374 |
Nawabganj, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Pavement |
LRP084 |
300 |
83.283 |
LRP084 |
500 |
83.483 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP084 |
391 |
83.374 |
LRP085 |
348 |
84.324 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2011-2012, Lot No. 09/05 |
29-May-2012 |
21 Days |
Surfacing |
LRP083 |
1812 |
83.8 |
LRP085 |
324 |
84.3 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP085 |
24 |
84 |
LRP086 |
43 |
85 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013(LTM), Lot No. 03/02 |
11-Feb-2013 |
10 Days |
Carpeting |
LRP085 |
24 |
84 |
LRP085 |
524 |
84.5 |
Nawabganj, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/04) |
6-Dec-2006 |
1302 Days |
Carpeting |
LRPS |
84000 |
84 |
LRPS |
86000 |
86 |
Naogaon, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Pavement |
LRP085 |
300 |
84.276 |
LRP085 |
600 |
84.576 |
Nawabganj, (Division Office) |
| Revenue Periodic Roads |
Tender 19-NRD/2005-2006 (Lot No. 19/11) |
15-Jun-2006 |
15 Days |
Pavement |
LRP042 |
43200 |
84.288 |
LRP042 |
43500 |
84.588 |
Naogaon, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP086 |
43 |
85 |
LRP087 |
46 |
86 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2011-2012, Lot No. 09/05 |
29-May-2012 |
21 Days |
Surfacing |
LRP086 |
113 |
85.07 |
LRP086 |
613 |
85.57 |
Nawabganj, (Division Office) |
| Development |
Package No. CW-P-02/08 |
12-May-2011 |
75 Days |
Surfacing |
LRP087 |
46 |
86 |
LRP101 |
910 |
101 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013(LTM), Lot No. 03/02 |
11-Feb-2013 |
10 Days |
Carpeting |
LRP087 |
46 |
86 |
LRP087 |
746 |
86.7 |
Nawabganj, (Division Office) |
| Development |
CW-P-02/08 |
12-May-2011 |
90 Days |
Surfacing |
LRP087 |
46 |
86 |
LRP101 |
910 |
101 |
Nawabganj, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Pavement |
LRP087 |
400 |
86.354 |
LRP087 |
600 |
86.554 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP088 |
381 |
87.383 |
LRP088 |
516 |
87.518 |
Nawabganj, (Division Office) |
| Revenue |
11-NJRD/2007-2008, Lot No. 11/02 (D to R) |
1-Jul-2008 |
10 Days |
Surfacing |
LRP088 |
398 |
87.4 |
LRP088 |
598 |
87.6 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Pavement |
LRP088 |
1100 |
88.102 |
LRP088 |
1310 |
88.312 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Pavement |
LRP088 |
1370 |
88.372 |
LRP088 |
1416 |
88.418 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Pavement |
LRP088 |
1416 |
88.418 |
LRP088 |
1450 |
88.452 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Pavement |
LRP088 |
1450 |
88.452 |
LRP088 |
1705 |
88.707 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP088 |
1626 |
88.628 |
LRP093 |
377 |
92.392 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP090 |
191 |
89.205 |
LRP090 |
686 |
89.7 |
Nawabganj, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Surfacing |
LRP090 |
310 |
89.324 |
LRP090 |
500 |
89.514 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP090 |
486 |
89.5 |
LRP090 |
986 |
90 |
Nawabganj, (Division Office) |
| Development |
11-NJRD/2007-2008, Lot No. 11/02 |
30-Apr-2008 |
60 Days |
Surfacing |
LRP090 |
580 |
89.594 |
LRP091 |
696 |
90.702 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP090 |
686 |
89.7 |
LRP090 |
986 |
90 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP090 |
986 |
90 |
LRP091 |
994 |
91 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP090 |
986 |
90 |
LRP091 |
794 |
90.8 |
Nawabganj, (Division Office) |
| Revenue |
11-NJRD/2007-2008, Lot No. 11/02 (D to R) |
1-Jul-2008 |
10 Days |
Surfacing |
LRP091 |
304 |
90.31 |
LRP091 |
494 |
90.5 |
Nawabganj, (Division Office) |
| Revenue |
11-NJRD/2007-2008, Lot No. 11/02 (D to R) |
1-Jul-2008 |
10 Days |
Surfacing |
LRP091 |
574 |
90.58 |
LRP092 |
677 |
91.696 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP092 |
568 |
91.587 |
LRP092 |
981 |
92 |
Nawabganj, (Division Office) |
| Revenue |
05-NJRD/2012-2013, Lot No. 05/01 |
8-Jan-2013 |
42 Days |
Pavement |
LRP092 |
881 |
91.9 |
LRP092 |
961 |
91.98 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP092 |
981 |
92 |
LRP093 |
473 |
92.488 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Surfacing |
LRP093 |
|
92.015 |
LRP093 |
66 |
92.081 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Surfacing |
LRP093 |
152 |
92.167 |
LRP094 |
|
93.016 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP093 |
985 |
93 |
LRP094 |
343 |
93.359 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2012-2013 (LTM), Lot No. 04/01 |
17-Jun-2013 |
15 Days |
Pavement |
LRP093 |
985 |
93 |
LRP094 |
1184 |
94.2 |
Nawabganj, (Division Office) |
| Development |
e-GP/RJZ/ADP/07/2013-2014 |
21-May-2014 |
216 Days |
Pavement |
LRP094 |
40 |
93.056 |
LRP101 |
366 |
100.456 |
Nawabganj, (Division Office) |
| Revenue Others |
08-NJRD/2007-2008, Lot No. 08/03. |
6-May-2008 |
30 Days |
Pavement |
LRP094 |
50 |
93.066 |
LRP094 |
136 |
93.152 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Surfacing |
LRP094 |
800 |
93.816 |
LRP095 |
776 |
94.793 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP094 |
877 |
93.893 |
LRP096 |
0 |
95.027 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Pavement |
LRP095 |
900 |
94.917 |
LRP096 |
|
95.027 |
Nawabganj, (Division Office) |
| Development |
10-NJRD/2007-2008, Lot No. 10/02. |
5-May-2008 |
90 Days |
Surfacing |
LRP096 |
12 |
95.039 |
LRP097 |
821 |
96.858 |
Nawabganj, (Division Office) |
| Revenue Periodic Roads |
Restricted 06-NRD/2004-2005 (Lot No. 06/06) |
24-Apr-2005 |
15 Days |
Pavement |
LRP048 |
48200 |
95.282 |
LRP048 |
48600 |
95.682 |
Naogaon, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP096 |
294 |
95.321 |
LRP096 |
912 |
95.939 |
Nawabganj, (Division Office) |
| Revenue Others |
08-NJRD/2007-2008, Lot No. 08/03. |
6-May-2008 |
30 Days |
Pavement |
LRP096 |
749 |
95.776 |
LRP096 |
985 |
96.012 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2012-2013 (LTM), Lot No. 04/01 |
17-Jun-2013 |
15 Days |
Pavement |
LRP096 |
973 |
96 |
LRP097 |
463 |
96.5 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP096 |
973 |
96 |
LRP097 |
640 |
96.677 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP098 |
0 |
97.048 |
LRP098 |
700 |
97.748 |
Nawabganj, (Division Office) |
| Revenue |
01-NJRD/2008-2009, Lot No. 01/04 |
2-Feb-2009 |
21 Days |
Surfacing |
LRP098 |
492 |
97.54 |
LRP099 |
494 |
98.54 |
Nawabganj, (Division Office) |
| Revenue |
05-NJRD/2012-2013, Lot No. 05/01 |
8-Jan-2013 |
42 Days |
Pavement |
LRP098 |
602 |
97.65 |
LRP098 |
682 |
97.73 |
Nawabganj, (Division Office) |
| Revenue |
05-NJRD/2012-2013, Lot No. 05/01 |
8-Jan-2013 |
42 Days |
Pavement |
LRP099 |
474 |
98.52 |
LRP099 |
564 |
98.61 |
Nawabganj, (Division Office) |
| Revenue |
01-NJRD/2008-2009, Lot No. 01/04 |
2-Feb-2009 |
21 Days |
Surfacing |
LRP099 |
494 |
98.54 |
LRP101 |
250 |
100.34 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2012-2013 (LTM), Lot No. 04/01 |
17-Jun-2013 |
15 Days |
Pavement |
LRP099 |
954 |
99 |
LRP101 |
410 |
100.5 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP100 |
569 |
99.65 |
LRP101 |
310 |
100.4 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP101 |
310 |
100.4 |
LRP101 |
566 |
100.656 |
Nawabganj, (Division Office) |
| Development |
e-GP/RJZ/ADP/01/2015-2016 |
4-Jan-2016 |
365 Days |
Overlay |
LRP099 |
1066 |
100.456 |
LRP099 |
1266 |
100.656 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2011-2012, Lot No. 09/06 |
29-May-2012 |
21 Days |
Surfacing |
LRP101 |
935 |
101.025 |
LRP101 |
1566 |
101.656 |
Nawabganj, (Division Office) |
| Revenue Periodic Roads |
Quotation 09-NRD/2005-2006 (Lot No. 09/02) |
2-Jan-2006 |
15 Days |
Pavement |
LRP063 |
63100 |
125.163 |
LRP063 |
63200 |
125.263 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-16-NRD/2004-2005 |
12-Sep-2004 |
10 Days |
Pavement |
LRP064 |
64100 |
127.141 |
LRP064 |
64300 |
127.341 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-16-NRD/2004-2005 |
12-Sep-2004 |
10 Days |
Pavement |
LRP065 |
65150 |
129.187 |
LRP065 |
65350 |
129.387 |
Naogaon, (Division Office) |
| Revenue Periodic Roads |
SQ-06-NRD/2004-2005 |
1-Dec-2004 |
10 Days |
Pavement |
LRP075 |
75200 |
149.15 |
LRP075 |
75500 |
149.45 |
Naogaon, (Division Office) |