List of ongoing works on the road ( R547 )
Fund Source   Contract no.   St. Date   Duration   Type of work  Start location End location  Res.Division 
           LRP   Offset  Chainage      LRP   Offset  Chainage      
 Development  e-GP/RAZ/ADP/07/2014-2015  8-Jul-2015  324 Days  Overlay  LRPS  1500 1.5     LRPS  4000 4     Naogaon, (Division Office) 
 Development  e-GP/RAZ/ADP/07/2014-2015  8-Jul-2015  324 Days  Overlay  LRPS  4400 4.4     LRPS  6400 6.4     Naogaon, (Division Office) 
 Development  Quotation 11-NRD/2006-2007 (Lot No. 11/03)  15-Feb-2007  351 Days  Carpeting  LRPS  5400 5.4     LRPS  5500 5.5     Naogaon, (Division Office) 
 Development  e-GP/RAZ/ADP/07/2014-2015  8-Jul-2015  324 Days  Overlay  LRPS  6725 6.725     LRPS  12000 12     Naogaon, (Division Office) 
 Development  01-RRC/2010-2011 (Package-CW-P-04/06  15-May-2011  351 Days  Carpeting  LRPS  12000 12     LRPS  14000 14     Naogaon, (Division Office) 
 Development  e-GP/RAZ/ADP/07/2014-2015  8-Jul-2015  324 Days  Overlay  LRPS  16100 16.1     LRPS  32300 32.3     Naogaon, (Division Office) 
 Development  Tender 34-NRD/2005-2006 (Lot 34/01)    60 Days  Carpeting  LRPS  17100 17.1     LRPS  17900 17.9     Naogaon, (Division Office) 
 Development  Tender 08-NRD/2006-2007 (Lot No. 08/11)  25-Jan-2007  244 Days  Carpeting  LRPS  30085 30.085     LRPS  30200 30.2     Naogaon, (Division Office) 
 Development  Tender 08-NRD/2006-2007 (Lot No. 08/11)  25-Jan-2007  244 Days  Carpeting  LRPS  30218 30.218     LRPS  30293 30.293     Naogaon, (Division Office) 
 Development  07/e-GP/ADP/SE/Raj/2015-16 (02/e-GP/ADP/SE/Raj/2015-16)  11-Nov-2015  180 Days  Pavement  LRPS  33070 33.07     LRPS  41000 41     Naogaon, (Division Office) 
 Development  Quotation 10-NRD/2006-2007 (Lot No. 10/10)  31-Jan-2007  319 Days  Carpeting  LRPS  33300 33.3     LRPS  33630 33.63     Naogaon, (Division Office) 
 Development  01-RRC/2010-2011 (Package CW-P-01/04)  16-May-2011  345 Days  Carpeting  LRP033  653 33.6     LRP034  1922 35     Naogaon, (Division Office) 
 Development  Quotation 12-NRD/2006-2007 (Lot No. 12/22)  14-Feb-2007  291 Days  Carpeting  LRPS  34300 34.3     LRPS  35300 35.3     Naogaon, (Division Office) 
 Development  Quotation 13-NRD/2009-2010 (Lot 13/01)  1-Mar-2010  7 Days  Carpeting  LRPS  34600 34.6     LRPS  34800 34.8     Naogaon, (Division Office) 
 Development  Quotation 11-NRD/2006-2007 (Lot No. 11/11)  6-Feb-2007  15 Days  Carpeting  LRP034  1840 34.918     LRP036  107 35.238     Naogaon, (Division Office) 
 Development  Tender 08-NRD/2006-2007 (Lot No. 08/01)  6-Feb-2007  30 Days  Carpeting  LRP036  107 35.238     LRP037  585 36.715     Naogaon, (Division Office) 
 Development  Tender (A) 08-NRD/2006-2007 (Lot No. 08/01)  6-Feb-2007  450 Days  Carpeting  LRP036  107 35.238     LRP037  585 36.715     Naogaon, (Division Office) 
 Development  Quotation 08-NRD/2009-2010 (Lot 08/01)  11-Feb-2010  7 Days  Carpeting  LRPS  35600 35.6     LRPS  35800 35.8     Naogaon, (Division Office) 
 Development  OTM 01-NRD/2009-2010 (Lot 01/05)  24-Nov-2009  150 Days  Carpeting  LRPS  36720 36.72     LRPS  36970 36.97     Naogaon, (Division Office) 
 Development  OTM 01-NRD/2009-2010 (Lot 01/05)  24-Nov-2009  150 Days  Carpeting  LRPS  36970 36.97     LRPS  37052 37.052     Naogaon, (Division Office) 
 Development  Tender 10-NRD/2006-2007 (Lot No. 10/03)  4-Feb-2007  331 Days  Pavement  LRPS  37044 37.044     LRPS  37374 37.374     Naogaon, (Division Office) 
 Development  Quotation 11-NRD/2010-2011 (Package-02)  17-Feb-2011  7 Days  Carpeting  LRPS  37050 37.05     LRPS  37400 37.4     Naogaon, (Division Office) 
 Development  Quotation 21-NRD/2009-2010 (Lot 21/06)  16-May-2010  7 Days  Carpeting  LRPS  37050 37.05     LRPS  37450 37.45     Naogaon, (Division Office) 
 Development  Tender(p) 10-NRD/2004-2005 (Lot No. 10/05)  27-Apr-2005  60 Days  Pavement  LRP038  0 37.127     LRP039  1000 39.125     Naogaon, (Division Office) 
 Development  OTM 08-NRD/2010-2011 (Package-03)  25-Aug-2011  300 Days  Carpeting  LRPS  37200 37.2     LRPS  53100 53.1     Naogaon, (Division Office) 
 Development  Quotation 21-NRD/2009-2010 (Lot 21/04)  16-May-2010  7 Days  Carpeting  LRPS  38500 38.5     LRPS  39000 39     Naogaon, (Division Office) 
 Development  Tender(p) 10-NRD/2004-2005 (Lot No. 10/05)  27-Apr-2005  60 Days  Pavement  LRP039  500 38.625     LRP039  900 39.025     Naogaon, (Division Office) 
 Development  Tender 08-NRD/2006-2007 (Lot No. 08/05)  29-Jan-2007  30 Days  Pavement  LRPS  38850 38.85     LRPS  39140 39.14     Naogaon, (Division Office) 
 Development  Tender 08-NRD/2006-2007 (Lot No. 08/04)  5-Feb-2007  273 Days  Carpeting  LRPS  38870 38.87     LRPS  39160 39.16     Naogaon, (Division Office) 
 Development  Tender-A 03-NRD/2006-2007 (Lot No. 03/05)  30-Nov-2006  577 Days  Pavement  LRP041  39 40.16     LRP041  569 40.69     Naogaon, (Division Office) 
 Development  Tender 03-NRD/2006-2007 (Lot No. 03/05)  30-Nov-2006  577 Days  Pavement  LRP041  39 40.16     LRP041  569 40.69     Naogaon, (Division Office) 
 Development  Tender 04-NRD/2007-2008 (Lot No. 04/01)  10-Feb-2008  45 Days  Carpeting  LRPS  40200 40.2     LRPS  42000 42     Naogaon, (Division Office) 
 Development  OTM 13-NRD/2008-2009 (Lot No. 13/02)  18-May-2009  30 Days  Surfacing  LRP041  279 40.4     LRP042  712 41.8     Naogaon, (Division Office) 
 Development  Tender 03-NRD/2006-2007 (Lot No. 03/02)  30-Nov-2006  577 Days  Pavement  LRP041  569 40.69     LRP042  132 41.22     Naogaon, (Division Office) 
 Development  e-GP/RAZ/ADP/04/2015-2016  24-Dec-2015  180 Days  Carpeting  LRPS  41000 41     LRPS  51000 51     Naogaon, (Division Office) 
 Development  Tender 04-NRD/2007-2008 (Lot No. 04/01)  10-Feb-2008  45 Days  Carpeting  LRPS  43300 43.3     LRPS  43600 43.6     Naogaon, (Division Office) 
 Development  Quotation 12NRD/2006-07 (Lot No. 12/23)  14-Feb-2007  291 Days  Carpeting  LRPS  43346 43.346     LRPS  44415 44.415     Naogaon, (Division Office) 
 Development  OTM 01-NRD/2009-2010 (Lot 01/05)  24-Nov-2009  150 Days  Carpeting  LRPS  43370 43.37     LRPS  45910 45.91     Naogaon, (Division Office) 
 Development  Tender 10-NRD/2006-2007 (Lot No. 10/02)  8-Feb-2007  386 Days  Pavement  LRP044  529 43.615     LRP044  914 44     Naogaon, (Division Office) 
 Development  Tender 10-NRD/2006-2007 (Lot No. 10/04)  8-Feb-2007  386 Days  Pavement  LRPS  43615 43.615     LRPS  44000 44     Naogaon, (Division Office) 
 Development  Tender 08-NRD/2006-2007 (Lot No. 08/03)  16-May-2007  30 Days  Pavement  LRP045  200 44.306     LRP045  700 44.806     Naogaon, (Division Office) 
 Development  Tender 04-NRD/2007-2008 (Lot No. 04/01)  10-Feb-2008  45 Days  Carpeting  LRPS  44800 44.8     LRPS  44900 44.9     Naogaon, (Division Office) 
 Development  Quotation 10-NRD/2006-2007 (Lot No. 10/07)  31-Jan-2007  15 Days  Pavement  LRPS  45885 45.885     LRPS  46395 46.395     Naogaon, (Division Office) 
 Development  Quotation 12-NRD/2006-2007 (Lot No. 12/04)  6-Feb-2007  15 Days  Carpeting  LRP046  800 45.885     LRP047  311 46.395     Naogaon, (Division Office) 
 Development  Quotation 09-NRD/2006-2007 (Lot No. 09/08)  11-Feb-2007  15 Days  Carpeting  LRP047  200 46.284     LRP048  500 47.582     Naogaon, (Division Office) 
 Development  OTM 10-NRD/2009-2010  2-Aug-2010  120 Days  Carpeting  LRPS  46290 46.29     LRPS  48790 48.79     Naogaon, (Division Office) 
 Development  Tender 03-NRD/2006-2007 (Lot No. 03/06)  30-Nov-2006  45 Days  Pavement  LRP049  100 48.18     LRP049  900 48.98     Naogaon, (Division Office) 
 Development  Quotation 07-NRD/2005-2006 (Lot No. 07/05)  3-Jan-2006  15 Days  Pavement  LRP049  200 48.28     LRP049  500 48.58     Naogaon, (Division Office) 
 Development  Tender 03-NRD/2006-2007 (Lot No. 03/08)  30-Nov-2006  45 Days  Pavement  LRP049  200 48.28     LRP049  800 48.88     Naogaon, (Division Office) 
 Development  Quotation 10-NRD/2006-2007 (Lot No. 10/03)  11-Feb-2007  15 Days  Carpeting  LRP049  420 48.5     LRP049  920 49     Naogaon, (Division Office) 
 Development  OTM 10-NRD/2009-2010  2-Aug-2010  120 Days  Carpeting  LRPS  49100 49.1     LRPS  50100 50.1     Naogaon, (Division Office) 
 Development  Quotation 05-NRD/2006-2007 (Lot No. 05/02)  11-Dec-2006  15 Days  Pavement  LRP050  100 49.177     LRP050  400 49.477     Naogaon, (Division Office) 
 Development  Tender 03-NRD/2006-2007 (Lot No. 03/08)  30-Nov-2006  45 Days  Pavement  LRP050  300 49.377     LRP050  900 49.977     Naogaon, (Division Office) 
 Development  Quotation 07-NRD/2005-2006 (Lot No. 07/05)  3-Jan-2006  15 Days  Pavement  LRP050  400 49.477     LRP050  700 49.777     Naogaon, (Division Office) 
 Development  01-RRC/2010-2011 (Package CW-P-01/04)  16-May-2011  345 Days  Carpeting  LRP050  1023 50.1     LRP052  928 52     Naogaon, (Division Office) 
 Development  Tender 16-NRD/2005-2006 (Lot No. 16/01)  5-Apr-2006  60 Days  Pavement  LRP051  200 50.275     LRP051  400 50.475     Naogaon, (Division Office) 
 Development  Quotation 07-NRD/2006-2007 (Lot No. 07/06)  17-Jan-2007  15 Days  Pavement  LRP051  200 50.275     LRP051  600 50.675     Naogaon, (Division Office) 
 Development  Quotation 05-NRD/2006-2007 (Lot No. 05/02)  11-Dec-2006  15 Days  Pavement  LRP051  300 50.375     LRP051  700 50.775     Naogaon, (Division Office) 
 Development  Quotation 09-NRD/2006-2007 (Lot No. 09/05)  15-Feb-2007  15 Days  Pavement  LRPS  50600 50.6     LRPS  51200 51.2     Naogaon, (Division Office) 
 Development  e-GP/RJZ/ADP/08/2015-2016  14-Feb-2016  365 Days  Carpeting  LRPS  51000 51     LRPS  59050 59.05     Naogaon, (Division Office) 
 Development  OTM 08-NRD/2010-2011 (Package-4)  25-Aug-2011  300 Days  Carpeting  LRPS  51000 51     LRPS  52000 52     Naogaon, (Division Office) 
 Development  Quotation 07-NRD/2006-2007 (Lot No. 07/06)  17-Jan-2007  15 Days  Pavement  LRP052  100 51.172     LRP052  500 51.572     Naogaon, (Division Office) 
 Development  Tender 16-NRD/2005-2006 (Lot No. 16/01)  5-Apr-2006  60 Days  Pavement  LRP052  300 51.372     LRP052  700 51.772     Naogaon, (Division Office) 
 Development  Tender 16-NRD/2005-2006 (Lot No. 16/01)  5-Apr-2006  60 Days  Pavement  LRP053  400 52.47     LRP053  600 52.67     Naogaon, (Division Office) 
 Development  Tender 04-NRD/2007-2008 (Lot No. 04/01)  10-Feb-2008  45 Days  Carpeting  LRPS  52600 52.6     LRPS  53000 53     Naogaon, (Division Office) 
 Development  OTM 01-NRD/2009-2010 (Lot 01/05)  24-Nov-2009  150 Days  Carpeting  LRPS  52850 52.85     LRPS  55750 55.75     Naogaon, (Division Office) 
 Development  Tender 16-NRD/2005-2006 (Lot No. 16/01)  5-Apr-2006  60 Days  Pavement  LRP054  400 53.469     LRP054  700 53.769     Naogaon, (Division Office) 
 Development  Tender 04-NRD/2007-2008 (Lot No. 04/01)  10-Feb-2008  45 Days  Carpeting  LRPS  54000 54     LRPS  56200 56.2     Naogaon, (Division Office) 
 Development  Quotation 12-NRD/2006-2007 (Lot No. 12/10)  15-Feb-2007  15 Days  Road Embankment  LRPS  54000 54     LRPS  55000 55     Naogaon, (Division Office) 
 Development  Tender 16-NRD/2005-2006 (Lot No. 16/01)  5-Apr-2006  60 Days  Pavement  LRP055  500 54.551     LRP055  800 54.851     Naogaon, (Division Office) 
 Development  Tender 16-NRD/2005-2006 (Lot No. 16/01)  5-Apr-2006  60 Days  Pavement  LRP056  600 55.657     LRP056  800 55.857     Naogaon, (Division Office) 
 Development  OTM 08-NRD/2010-2011 (Package-4)  25-Aug-2011  300 Days  Carpeting  LRPS  55750 55.75     LRPS  58500 58.5     Naogaon, (Division Office) 
 Development  Quotation 09-NRD/2006-2007 (Lot No. 09/07)  7-Feb-2007  511 Days  Carpeting  LRP057  867 56.922     LRP058  447 57.5     Naogaon, (Division Office) 
 Development  RFQ 13-NRD/2014-2015 (Package-03)  17-Jun-2015  7 Days  Carpeting  LRPS  57000 57     LRPS  57300 57.3     Naogaon, (Division Office) 
 Development  Quotation 11-NRD/2006-2007 (Lot No. 11/01)  5-Feb-2007  299 Days  Pavement  LRP058  447 57.5     LRP058  947 58     Naogaon, (Division Office) 
 Development  Restricted 02-NRD/2006-2007 (Lot 02/03)  14-Feb-2007  30 Days  Road Embankment  LRP058  697 57.75     LRP060  45 59.25     Naogaon, (Division Office) 
 Development  RFQ 13-NRD/2014-2015 (Package-04)  17-Jun-2015  7 Days  Carpeting  LRPS  58200 58.2     LRPS  58500 58.5     Naogaon, (Division Office) 
 Development  Quotation 11-NRD/2006-2007 (Lot No. 11/02)  5-Feb-2007  347 Days  Carpeting  LRPS  58500 58.5     LRPS  59000 59     Naogaon, (Division Office) 
 Development  OTM 01-NRD/2009-2010 (Lot 01/05)  24-Nov-2009  150 Days  Carpeting  LRPS  59000 59     LRPS  59500 59.5     Naogaon, (Division Office) 
 Development  e-GP/RJZ/ADP/06/2013-2014  14-May-2014  411 Days  Carpeting  LRPS  59050 59.05     LRPS  66550 66.55     Naogaon, (Division Office) 
 Development  Restricted 02-NRD/2006-2007 (Lot No. 02/01)  13-Feb-2007  45 Days  Road Embankment  LRPS  60000 60     LRPS  63000 63     Naogaon, (Division Office) 
 Development  OTM 10-NRD/2009-2010  2-Aug-2010  120 Days  Carpeting  LRPS  60000 60     LRPS  61500 61.5     Naogaon, (Division Office) 
 Development  Quotation 11-NRD/2006-2007 (Lot No. 11/15)  7-Feb-2007  283 Days  Road Embankment  LRPS  62289 62.289     LRPS  62960 62.96     Naogaon, (Division Office) 
 Development  Restricted 02-NRD/2006-2007 (Lot No. 02/02)  13-Feb-2007  45 Days  Road Embankment  LRP063  937 63     LRP066  965 66     Naogaon, (Division Office) 
 Development  D-Tender 30-NRD/2005-2006 (Lot No. 30/03)  29-Jun-2006  60 Days  Pavement  LRP066  0 65.035     LRP066  1000 66.035     Naogaon, (Division Office) 
 Development  e-GP/RJZ/ADP/08/2015-2016  14-Feb-2016  365 Days  Carpeting  LRPS  66550 66.55     LRPS  71009 71.009     Naogaon, (Division Office) 
 Development  01-RRC/2010-2011 (Package CW-P-01/04)  16-May-2011  345 Days  Carpeting  LRP066  1765 66.8     LRP080  991 80     Naogaon, (Division Office) 
 Development  D-Tender 30-NRD/2005-2006 (Lot No. 30/03)  29-Jun-2006  60 Days  Pavement  LRP068  0 67.005     LRP068  1000 68.005     Naogaon, (Division Office) 
 Development  D-Tender 30-NRD/2005-2006 (Lot No. 30/03)  29-Jun-2006  60 Days  Pavement  LRP069  0 68.002     LRP069  1000 69.002     Naogaon, (Division Office) 
 Development  D-Tender 30-NRD/2005-2006 (Lot No. 30/03)  29-Jun-2006  60 Days  Pavement  LRP070  0 68.964     LRP070  1000 69.964     Naogaon, (Division Office) 
 Development  D-Tender 30-NRD/2005-2006 (Lot No. 30/03)  29-Jun-2006  60 Days  Pavement  LRP071  0 69.959     LRP071  1000 70.959     Naogaon, (Division Office) 
 Development  D-Tender 30-NRD/2005-2006 (Lot No. 30/03)  29-Jun-2006  60 Days  Pavement  LRP072  0 70.956     LRP072  1000 71.956     Naogaon, (Division Office) 
 Development  Tender 32-NRD/2005-2006 (Lot No. 32/01)  29-Jun-2006  60 Days  Pavement  LRP072  0 70.956     LRP072  1000 71.956     Naogaon, (Division Office) 
 Development  e-GP/RJZ/ADP/01/2015-2016  4-Jan-2016  365 Days  Overlay  LRP002  69079 71.009     LRP002  77079 79.009     Nawabganj, (Division Office) 
 Development  Tender 32-NRD/2005-2006 (Lot No. 32/01)  29-Jun-2006  60 Days  Pavement  LRP073  0 71.955     LRP073  1000 72.955     Naogaon, (Division Office) 
 Development  Tender 32-NRD/2005-2006 (Lot No. 32/01)  29-Jun-2006  60 Days  Pavement  LRP074  0 72.952     LRP074  1000 73.952     Naogaon, (Division Office) 
 Development  Tender 32-NRD/2005-2006 (Lot No. 32/01)  29-Jun-2006  60 Days  Pavement  LRP075  200 74.15     LRP075  800 74.75     Naogaon, (Division Office) 
 Development  Tender 04-NRD/2006-2007 (Lot No. 04/04)  6-Dec-2006  45 Days  Carpeting  LRPS  76734 76.734     LRPS  79734 79.734     Naogaon, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Surfacing  LRP080  0 79.009     LRP080  245 79.254     Nawabganj, (Division Office) 
 Development  e-GP/RJZ/ADP/01/2015-2016  4-Jan-2016  365 Days  Overlay  LRP002  77079 79.009     LRP092  651 93.056     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Pavement  LRP080  400 79.409     LRP080  600 79.609     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Pavement  LRP080  800 79.809     LRP080  834 79.843     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Pavement  LRP080  944 79.953     LRP081  44 80.047     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Pavement  LRP084  300 83.283     LRP084  500 83.483     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Pavement  LRP085  300 84.276     LRP085  600 84.576     Nawabganj, (Division Office) 
 Development  CW-P-02/08  12-May-2011  90 Days  Surfacing  LRP087  46 86     LRP101  910 101     Nawabganj, (Division Office) 
 Development  Package No. CW-P-02/08  12-May-2011  75 Days  Surfacing  LRP087  46 86     LRP101  910 101     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Pavement  LRP087  400 86.354     LRP087  600 86.554     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Pavement  LRP088  1100 88.102     LRP088  1310 88.312     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Pavement  LRP088  1370 88.372     LRP088  1416 88.418     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Pavement  LRP088  1416 88.418     LRP088  1450 88.452     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Pavement  LRP088  1450 88.452     LRP088  1705 88.707     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Surfacing  LRP090  310 89.324     LRP090  500 89.514     Nawabganj, (Division Office) 
 Development  11-NJRD/2007-2008, Lot No. 11/02  30-Apr-2008  60 Days  Surfacing  LRP090  580 89.594     LRP091  696 90.702     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Surfacing  LRP093   92.015     LRP093  66 92.081     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Surfacing  LRP093  152 92.167     LRP094   93.016     Nawabganj, (Division Office) 
 Development  e-GP/RJZ/ADP/07/2013-2014  21-May-2014  216 Days  Pavement  LRP094  40 93.056     LRP101  366 100.456     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Surfacing  LRP094  800 93.816     LRP095  776 94.793     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Pavement  LRP095  900 94.917     LRP096   95.027     Nawabganj, (Division Office) 
 Development  10-NJRD/2007-2008, Lot No. 10/02.  5-May-2008  90 Days  Surfacing  LRP096  12 95.039     LRP097  821 96.858     Nawabganj, (Division Office) 
 Development  e-GP/RJZ/ADP/01/2015-2016  4-Jan-2016  365 Days  Overlay  LRP099  1066 100.456     LRP099  1266 100.656     Nawabganj, (Division Office) 
 
 Note: The on going work list is gathered from Central Management System (CMS) running in the field divisions and the information is updated once in a month at RHD head office. This information is largely depended on how the work is defined in CMS and will not include any contract that is not properly defined by field division