| List of ongoing works on the road ( R547 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Revenue |
OTM 07-NRD/2012-2013 (Package-03) |
18-Jun-2013 |
90 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
2752 |
2.752 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2009-2010 (Lot 12/04) |
25-Feb-2010 |
7 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
33000 |
33 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2012-2013 (Package-02) |
25-Apr-2013 |
45 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
1280 |
1.28 |
Naogaon, (Division Office) |
| Revenue |
06-NRD/2009-2010(Lot No.02) |
22-Feb-2010 |
14 Days |
Road Rehablitation |
LRPS |
0 |
0 |
LRP078 |
0 |
76.948 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2009-2010 (Lot 12/03) |
25-Feb-2010 |
7 Days |
Carpeting |
LRPS |
1500 |
1.5 |
LRPS |
1900 |
1.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation 23-NRD/2009-2010 (Lot 23/01) |
1-Jun-2010 |
7 Days |
Carpeting |
LRPS |
2000 |
2 |
LRPS |
3900 |
3.9 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2011-2012 (P-04) |
25-Nov-2011 |
90 Days |
Carpeting |
LRPS |
2100 |
2.1 |
LRPS |
2500 |
2.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 15-NRD/2009-2010 (Lot 15/03) |
1-Aug-2010 |
15 Days |
Carpeting |
LRPS |
2300 |
2.3 |
LRPS |
23500 |
23.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 15-NRD/2009-2010 (Lot 15/03) |
1-Aug-2010 |
15 Days |
Carpeting |
LRPS |
2300 |
2.3 |
LRPS |
27500 |
27.5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/06) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
2300 |
2.3 |
LRPS |
3000 |
3 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-04) |
8-Sep-2011 |
7 Days |
Carpeting |
LRPS |
3200 |
3.2 |
LRPS |
3800 |
3.8 |
Naogaon, (Division Office) |
| Revenue |
Quotation 22-NRD/2009-2010 (Lot 22/01) |
27-May-2010 |
7 Days |
Carpeting |
LRPS |
4000 |
4 |
LRPS |
5800 |
5.8 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/06) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
4000 |
4 |
LRPS |
5000 |
5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2006-2007 (Lot 12/15) |
15-Feb-2007 |
15 Days |
Carpeting |
LRPS |
5600 |
5.6 |
LRPS |
5900 |
5.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation 23-NRD/2009-2010 (Lot 23/02) |
1-Jun-2010 |
7 Days |
Carpeting |
LRPS |
6000 |
6 |
LRPS |
7600 |
7.6 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/04) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
6000 |
6 |
LRPS |
6800 |
6.8 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/4) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
6900 |
6.9 |
LRPS |
7100 |
7.1 |
Naogaon, (Division Office) |
| Revenue |
Tender 10-NRD/2006-2007 (Lot 10/01) |
7-Feb-2007 |
35 Days |
Carpeting |
LRP012 |
19 |
12 |
LRP012 |
605 |
12.586 |
Naogaon, (Division Office) |
| Revenue |
Quotation 15-NRD/2009-2010 (Lot 15/4) |
11-Apr-2010 |
7 Days |
Carpeting |
LRPS |
12800 |
12.8 |
LRPS |
13050 |
13.05 |
Naogaon, (Division Office) |
| Revenue |
OTM 03-NRD/2008-2009 |
|
50 Days |
Surfacing |
LRP014 |
527 |
14.5 |
LRP016 |
41 |
16 |
Naogaon, (Division Office) |
| Revenue |
OTM 06-NRD/2008-2009 |
19-Mar-2009 |
60 Days |
Carpeting |
LRP014 |
527 |
14.5 |
LRP016 |
41 |
16 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2012-2013 (Package-02) |
25-Apr-2013 |
45 Days |
Carpeting |
LRPS |
15000 |
15 |
LRPS |
16000 |
16 |
Naogaon, (Division Office) |
| Revenue |
LTM 03-NRD/2012-2013 (Package-01) |
22-Oct-2012 |
30 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
24000 |
24 |
Naogaon, (Division Office) |
| Revenue |
OTM 04-NRD/2011-2012 (Package-01) |
18-Jun-2012 |
60 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
16130 |
16.13 |
Naogaon, (Division Office) |
| Revenue |
OTM 04-NRD/2011-2012 (Package-01) |
18-Jun-2012 |
60 Days |
Carpeting |
LRPS |
16000 |
16 |
LRPS |
16130 |
16.13 |
Naogaon, (Division Office) |
| Revenue |
Quotation 38-NRD/2005-2006 (Lot 38/06) |
7-Aug-2006 |
15 Days |
Carpeting |
LRPS |
17400 |
17.4 |
LRPS |
17900 |
17.9 |
Naogaon, (Division Office) |
| Revenue |
Tender 37-NRD/2005-2006 (Lot 37/09) |
1-Jul-2008 |
15 Days |
Road Embankment |
LRPS |
18500 |
18.5 |
LRPS |
18900 |
18.9 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2011-2012 (Package-05) |
24-Apr-2012 |
40 Days |
Carpeting |
LRP019 |
200 |
19.158 |
LRP019 |
700 |
19.658 |
Naogaon, (Division Office) |
| Revenue |
LTM 06-NRD/2011-2012 (Package-04) |
20-May-2012 |
40 Days |
Carpeting |
LRP019 |
1100 |
20.058 |
LRP019 |
1500 |
20.458 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2006-2007 (Lot 12/01) |
7-Feb-2007 |
1239 Days |
Carpeting |
LRPS |
20600 |
20.6 |
LRPS |
20900 |
20.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-01) |
12-Dec-2010 |
7 Days |
Carpeting |
LRPS |
21000 |
21 |
LRPS |
23000 |
23 |
Naogaon, (Division Office) |
| Revenue |
Quotation 08-NRD/2010-2011 (Package-01) |
26-Jan-2011 |
7 Days |
Carpeting |
LRP022 |
50 |
21.994 |
LRP022 |
500 |
22.444 |
Naogaon, (Division Office) |
| Revenue |
Quotation 06-NRD/2010-2011 (Package-01) |
20-Jan-2011 |
7 Days |
Carpeting |
LRPS |
22000 |
22 |
LRPS |
24000 |
24 |
Naogaon, (Division Office) |
| Revenue |
LTM 06-NRD/2011-2012 (Package-06) |
21-May-2012 |
40 Days |
Road Embankment |
LRP022 |
300 |
22.244 |
LRP022 |
550 |
22.494 |
Naogaon, (Division Office) |
| Revenue |
LTM 06-NRD/2011-2012 (Package-06) |
21-May-2012 |
40 Days |
Road Embankment |
LRP023 |
180 |
23.115 |
LRP023 |
430 |
23.365 |
Naogaon, (Division Office) |
| Revenue |
LTM 02-NRD/2012-2013 (Package-03) |
15-Oct-2012 |
30 Days |
Carpeting |
LRPS |
24000 |
24 |
LRPS |
30857 |
30.857 |
Naogaon, (Division Office) |
| Revenue |
Tender 31-NRD/2005-2006 (Lot 31/08) |
1-Jul-2008 |
25 Days |
Carpeting |
LRPS |
24100 |
24.1 |
LRPS |
24500 |
24.5 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 03-NRD/2012-2013 (Package-01) |
16-Oct-2012 |
7 Days |
Carpeting |
LRPS |
25100 |
25.1 |
LRPS |
25300 |
25.3 |
Naogaon, (Division Office) |
| Revenue |
Tender 31-NRD/2005-2006 (Lot 31/08) |
1-Jul-2008 |
25 Days |
Carpeting |
LRPS |
25300 |
25.3 |
LRPS |
25700 |
25.7 |
Naogaon, (Division Office) |
| Revenue |
DPM 04-NRD/2011-2012 (Package-02) |
21-Nov-2011 |
7 Days |
Carpeting |
LRPS |
27100 |
27.1 |
LRPS |
27500 |
27.5 |
Naogaon, (Division Office) |
| Revenue |
DPM 04-NRD/2011-2012 (Package-03) |
21-Nov-2011 |
7 Days |
Carpeting |
LRPS |
28100 |
28.1 |
LRPS |
28400 |
28.4 |
Naogaon, (Division Office) |
| Revenue |
LTM 08-NRD/2011-2012 (Package-03) |
3-Jun-2012 |
40 Days |
Carpeting |
LRP028 |
300 |
28.247 |
LRP028 |
650 |
28.597 |
Naogaon, (Division Office) |
| Revenue |
DPM 04-NRD/2011-2012 (Package-01) |
21-Nov-2011 |
7 Days |
Carpeting |
LRPS |
29100 |
29.1 |
LRPS |
29500 |
29.5 |
Naogaon, (Division Office) |
| Revenue |
LTM 08-NRD/2011-2012 (Package-01) |
3-Jun-2012 |
40 Days |
Carpeting |
LRP028 |
1400 |
29.347 |
LRP028 |
1900 |
29.847 |
Naogaon, (Division Office) |
| Revenue |
Quotation 07-NRD/2010-2011 (Package-01) |
24-Jan-2011 |
7 Days |
Carpeting |
LRPS |
30100 |
30.1 |
LRPS |
30600 |
30.6 |
Naogaon, (Division Office) |
| Revenue |
Quotation 03-NRD/2011-2012 (Package-05) |
9-Jan-2012 |
7 Days |
Carpeting |
LRP028 |
2200 |
30.147 |
LRP028 |
2400 |
30.347 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (Package-01) |
14-Oct-2010 |
15 Days |
Carpeting |
LRPS |
30900 |
30.9 |
LRPS |
31500 |
31.5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-06) |
12-Sep-2011 |
7 Days |
Carpeting |
LRPS |
31100 |
31.1 |
LRPS |
31500 |
31.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 10-NRD/2008-2009 (Lot 10/02) |
10-May-2009 |
15 Days |
Carpeting |
LRP028 |
3953 |
31.9 |
LRP028 |
4200 |
32.147 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (Package-02) |
14-Oct-2010 |
15 Days |
Carpeting |
LRPS |
32000 |
32 |
LRPS |
32200 |
32.2 |
Naogaon, (Division Office) |
| Revenue |
Quotation 07-NRD/2010-2011 (Package-02) |
24-Jan-2011 |
7 Days |
Carpeting |
LRPS |
32140 |
32.14 |
LRPS |
32490 |
32.49 |
Naogaon, (Division Office) |
| Revenue |
Quotation 02-NRD/2011-2012 (Package-02) |
19-Sep-2011 |
7 Days |
Carpeting |
LRP033 |
100 |
33.047 |
LRP033 |
350 |
33.297 |
Naogaon, (Division Office) |
| Revenue |
Quotation 07-NRD/2010-2011 (Package-03) |
24-Jan-2011 |
7 Days |
Carpeting |
LRP033 |
230 |
33.177 |
LRP033 |
560 |
33.507 |
Naogaon, (Division Office) |
| Revenue |
Quotation 02-NRD/2012-2013 (Package-04) |
14-Nov-2012 |
7 Days |
Carpeting |
LRPS |
33250 |
33.25 |
LRPS |
33600 |
33.6 |
Naogaon, (Division Office) |
| Revenue |
OTM 13-NRD/2008-2009 (Lot No. 13/01) |
20-May-2009 |
40 Days |
Surfacing |
LRP038 |
253 |
37.38 |
LRP039 |
35 |
38.16 |
Naogaon, (Division Office) |
| Revenue |
Quotation 11-NRD/2010-2011 (Package-05) |
17-Feb-2011 |
7 Days |
Carpeting |
LRPS |
37500 |
37.5 |
LRPS |
37850 |
37.85 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (package-07) |
18-Oct-2010 |
15 Days |
Carpeting |
LRPS |
37600 |
37.6 |
LRPS |
38200 |
38.2 |
Naogaon, (Division Office) |
| Revenue |
LTM 01-NRD/2010-2011 (Package-08) |
18-Oct-2010 |
15 Days |
Carpeting |
LRPS |
37770 |
37.77 |
LRPS |
38170 |
38.17 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2012-2013 (Package-04) |
24-May-2013 |
45 Days |
Carpeting |
LRPS |
38000 |
38 |
LRPS |
40150 |
40.15 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-03) |
12-Dec-2010 |
7 Days |
Carpeting |
LRPS |
38200 |
38.2 |
LRPS |
38600 |
38.6 |
Naogaon, (Division Office) |
| Revenue |
OTM 16-NRD/2009-2010 (Package-01) |
4-Aug-2010 |
15 Days |
Carpeting |
LRPS |
40500 |
40.5 |
LRPS |
40900 |
40.9 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP042 |
112 |
41.2 |
LRP042 |
612 |
41.7 |
Naogaon, (Division Office) |
| Revenue |
Quotation 24-NRD/2009-2010 (Lot 24/02) |
9-Jun-2010 |
7 Days |
Carpeting |
LRPS |
41800 |
41.8 |
LRPS |
42000 |
42 |
Naogaon, (Division Office) |
| Revenue |
Quotation 21-NRD/2009-2010 (Lot 21/05) |
16-May-2010 |
7 Days |
Carpeting |
LRPS |
41800 |
41.8 |
LRPS |
42275 |
42.275 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2011-2012 (Package-04) |
26-Dec-2011 |
90 Days |
Carpeting |
LRPS |
41810 |
41.81 |
LRPS |
43370 |
43.37 |
Naogaon, (Division Office) |
| Revenue |
LTM 03-NRD/2011-2012 (Package-02) |
23-Feb-2012 |
40 Days |
Carpeting |
LRPS |
42000 |
42 |
LRPS |
42300 |
42.3 |
Naogaon, (Division Office) |
| Revenue |
e-GP/04/NRD/2013-2014 |
24-Feb-2014 |
45 Days |
Carpeting |
LRPS |
42500 |
42.5 |
LRPS |
42900 |
42.9 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 02-NRD/2012-2013 (Package-03) |
9-Oct-2012 |
7 Days |
Carpeting |
LRPS |
43120 |
43.12 |
LRPS |
43480 |
43.48 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 01-NRD/2012-2013 (Package-02) |
27-Aug-2012 |
7 Days |
Carpeting |
LRPS |
43900 |
43.9 |
LRPS |
44500 |
44.5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-02) |
12-Dec-2010 |
7 Days |
Road Embankment |
LRPS |
44000 |
44 |
LRPS |
45000 |
45 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-02) |
12-Dec-2010 |
7 Days |
Road Embankment |
LRPS |
44400 |
44.4 |
LRPS |
44600 |
44.6 |
Naogaon, (Division Office) |
| Revenue |
Tender 10-NRD/2006-2007 (Lot 10/05) |
6-Feb-2007 |
35 Days |
Carpeting |
LRPS |
45100 |
45.1 |
LRPS |
45800 |
45.8 |
Naogaon, (Division Office) |
| Revenue |
Tender-A 10-NRD/2006-2007 (Lot 10/05) |
1-Jul-2008 |
35 Days |
Carpeting |
LRPS |
45100 |
45.1 |
LRPS |
45800 |
45.8 |
Naogaon, (Division Office) |
| Revenue |
OTM 02-NRD/2012-2013 (Package-02) |
6-Dec-2012 |
30 Days |
Carpeting |
LRPS |
45310 |
45.31 |
LRPS |
45910 |
45.91 |
Naogaon, (Division Office) |
| Revenue |
Quotation 05-NRD/2010-2011 (Package-02) |
12-Dec-2010 |
7 Days |
Road Embankment |
LRPS |
46300 |
46.3 |
LRPS |
46800 |
46.8 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2012-2013 (Package-01) |
4-Jun-2013 |
30 Days |
Carpeting |
LRPS |
48700 |
48.7 |
LRPS |
49100 |
49.1 |
Naogaon, (Division Office) |
| Revenue |
Quotation 24-NRD/2009-2010 (Lot 24/03) |
10-Jun-2010 |
7 Days |
Carpeting |
LRPS |
48800 |
48.8 |
LRPS |
49000 |
49 |
Naogaon, (Division Office) |
| Revenue |
Quotation 03-NRD/2011-2012 (Package-04) |
9-Jan-2012 |
7 Days |
Carpeting |
LRP049 |
820 |
48.9 |
LRP049 |
1020 |
49.1 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP050 |
123 |
49.2 |
LRP050 |
523 |
49.6 |
Naogaon, (Division Office) |
| Revenue |
OTM 08-NRD/2010-2011 (Package-04) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
51000 |
51 |
LRPS |
52000 |
52 |
Naogaon, (Division Office) |
| Revenue |
Quotation 09-NRD/2006-2007 (Lot 09/07) |
|
15 Days |
Carpeting |
LRPS |
52100 |
52.1 |
LRPS |
52700 |
52.7 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-08) |
14-Sep-2011 |
7 Days |
Carpeting |
LRPS |
52400 |
52.4 |
LRPS |
52800 |
52.8 |
Naogaon, (Division Office) |
| Revenue |
Quotation-P 02-NRD/2012-2013 (Package-02) |
9-Oct-2012 |
7 Days |
Carpeting |
LRPS |
54000 |
54 |
LRPS |
54300 |
54.3 |
Naogaon, (Division Office) |
| Revenue |
OTM 08-NRD/2010-2011 (Package-04) |
25-Aug-2011 |
300 Days |
Carpeting |
LRPS |
55750 |
55.75 |
LRPS |
58500 |
58.5 |
Naogaon, (Division Office) |
| Revenue |
Quotation 09-NRD/2010-2011 (Package-02) |
13-Feb-2011 |
7 Days |
Carpeting |
LRPS |
57000 |
57 |
LRPS |
58100 |
58.1 |
Naogaon, (Division Office) |
| Revenue |
Quotation 12-NRD/2006-2007 (Lot 12/21) |
14-Feb-2007 |
15 Days |
Road Embankment |
LRP057 |
945 |
57 |
LRP058 |
540 |
57.593 |
Naogaon, (Division Office) |
| Revenue |
Quotation 11-NRD/2006-2007 (Lot 11/18) |
14-Feb-2007 |
15 Days |
Road Embankment |
LRPS |
57170 |
57.17 |
LRPS |
57781 |
57.781 |
Naogaon, (Division Office) |
| Revenue |
LTM 07-NRD/2011-2012 (Package-02) |
27-May-2012 |
40 Days |
Carpeting |
LRP059 |
79 |
58.3 |
LRP059 |
479 |
58.7 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2012-2013 (Package-01) |
4-Jun-2013 |
30 Days |
Carpeting |
LRPS |
61500 |
61.5 |
LRPS |
64100 |
64.1 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP063 |
87 |
62.15 |
LRP063 |
437 |
62.5 |
Naogaon, (Division Office) |
| Revenue |
LTM 04-NRD/2011-2012 (Package-04) |
24-Apr-2012 |
40 Days |
Road Embankment |
LRP061 |
1734 |
62.16 |
LRP065 |
1573 |
65.61 |
Naogaon, (Division Office) |
| Revenue |
Quotation 11-NRD/2006-2007 (Lot 11/15) |
1-Jul-2008 |
15 Days |
Carpeting |
LRPS |
63200 |
63.2 |
LRPS |
63800 |
63.8 |
Naogaon, (Division Office) |
| Revenue |
LTM 03-NRD/2012-2013 (Package-03) |
22-Oct-2012 |
30 Days |
Carpeting |
LRPS |
65000 |
65 |
LRPS |
65800 |
65.8 |
Naogaon, (Division Office) |
| Revenue |
e-GP/05/NRD/2013-2014 |
24-Feb-2014 |
45 Days |
Carpeting |
LRPS |
65500 |
65.5 |
LRPS |
68000 |
68 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP066 |
965 |
66 |
LRP066 |
1315 |
66.35 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2010-2011 (Package-01) |
20-Mar-2011 |
30 Days |
Carpeting |
LRP066 |
965 |
66 |
LRP066 |
2465 |
67.5 |
Naogaon, (Division Office) |
| Revenue |
LTM 02-NRD/2012-2013 (Package-02) |
15-Oct-2012 |
30 Days |
Carpeting |
LRPS |
66100 |
66.1 |
LRPS |
67000 |
67 |
Naogaon, (Division Office) |
| Revenue |
OTM 01-NRD/2008-2009 (Lot 01/02) |
22-Apr-2009 |
25 Days |
Carpeting |
LRP068 |
295 |
67.3 |
LRP068 |
545 |
67.55 |
Naogaon, (Division Office) |
| Revenue |
Quotation 01-NRD/2011-2012 (Package-10) |
15-Sep-2011 |
7 Days |
Carpeting |
LRPS |
67500 |
67.5 |
LRPS |
67800 |
67.8 |
Naogaon, (Division Office) |
| Revenue |
OTM 05-NRD/2010-2011 (Package-01) |
20-Mar-2011 |
30 Days |
Carpeting |
LRP068 |
1095 |
68.1 |
LRP069 |
398 |
68.4 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
69100 |
69.1 |
LRPS |
69350 |
69.35 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
71150 |
71.15 |
LRPS |
71300 |
71.3 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
72350 |
72.35 |
LRPS |
72450 |
72.45 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
73400 |
73.4 |
LRPS |
73550 |
73.55 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
74100 |
74.1 |
LRPS |
74350 |
74.35 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
75200 |
75.2 |
LRPS |
75500 |
75.5 |
Naogaon, (Division Office) |
| Revenue |
OTM 09-NRD/2008-2009 (Lot 09/05) |
10-May-2009 |
30 Days |
Carpeting |
LRPS |
76050 |
76.05 |
LRPS |
76450 |
76.45 |
Naogaon, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/01) |
3-Dec-2006 |
1305 Days |
Carpeting |
LRPS |
77000 |
77 |
LRPS |
78000 |
78 |
Naogaon, (Division Office) |
| Revenue |
Quotation 25-NRD/2009-2010 (Lot 25/01) |
20-Jun-2010 |
7 Days |
Carpeting |
LRPS |
77800 |
77.8 |
LRPS |
78200 |
78.2 |
Naogaon, (Division Office) |
| Revenue |
Quotation 25-NRD/2009-2010 (Lot 25/02) |
20-Jun-2010 |
7 Days |
Carpeting |
LRPS |
78600 |
78.6 |
LRPS |
79100 |
79.1 |
Naogaon, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/02) |
6-Dec-2006 |
1302 Days |
Carpeting |
LRPS |
79000 |
79 |
LRPS |
80000 |
80 |
Naogaon, (Division Office) |
| Revenue |
07-NJRD/2013-2014, Lot No. 07/04 |
30-Dec-2013 |
20 Days |
Surfacing |
LRP002 |
77013 |
79 |
LRP002 |
78013 |
80 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP002 |
77848 |
79.835 |
LRP081 |
360 |
80.363 |
Nawabganj, (Division Office) |
| Revenue |
02-NJRD/2010-2011, Lot No. 02/05 |
24-Feb-2011 |
28 Days |
Surfacing |
LRP002 |
78013 |
80 |
LRP084 |
17 |
83 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP002 |
78013 |
80 |
LRP082 |
6 |
81 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013, Lot No. 03/02 |
18-Dec-2012 |
28 Days |
Surfacing |
LRP082 |
6 |
81 |
LRP084 |
17 |
83 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013, Lot No. 03/02 |
18-Dec-2012 |
28 Days |
Surfacing |
LRP081 |
997 |
81 |
LRP083 |
1012 |
83 |
Nawabganj, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/03) |
6-Dec-2006 |
1305 Days |
Carpeting |
LRPS |
81100 |
81.1 |
LRPS |
81500 |
81.5 |
Naogaon, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP083 |
188 |
82.176 |
LRP084 |
147 |
83.13 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP084 |
147 |
83.13 |
LRP084 |
391 |
83.374 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP084 |
391 |
83.374 |
LRP085 |
348 |
84.324 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2011-2012, Lot No. 09/05 |
29-May-2012 |
21 Days |
Surfacing |
LRP083 |
1812 |
83.8 |
LRP085 |
324 |
84.3 |
Nawabganj, (Division Office) |
| Revenue |
Tender 04-NRD/2006-2007 (Lot 04/04) |
6-Dec-2006 |
1302 Days |
Carpeting |
LRPS |
84000 |
84 |
LRPS |
86000 |
86 |
Naogaon, (Division Office) |
| Revenue |
03-NJRD/2012-2013(LTM), Lot No. 03/02 |
11-Feb-2013 |
10 Days |
Carpeting |
LRP085 |
24 |
84 |
LRP085 |
524 |
84.5 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP085 |
24 |
84 |
LRP086 |
43 |
85 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP086 |
43 |
85 |
LRP087 |
46 |
86 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2011-2012, Lot No. 09/05 |
29-May-2012 |
21 Days |
Surfacing |
LRP086 |
113 |
85.07 |
LRP086 |
613 |
85.57 |
Nawabganj, (Division Office) |
| Revenue |
03-NJRD/2012-2013(LTM), Lot No. 03/02 |
11-Feb-2013 |
10 Days |
Carpeting |
LRP087 |
46 |
86 |
LRP087 |
746 |
86.7 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP088 |
381 |
87.383 |
LRP088 |
516 |
87.518 |
Nawabganj, (Division Office) |
| Revenue |
11-NJRD/2007-2008, Lot No. 11/02 (D to R) |
1-Jul-2008 |
10 Days |
Surfacing |
LRP088 |
398 |
87.4 |
LRP088 |
598 |
87.6 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP088 |
1626 |
88.628 |
LRP093 |
377 |
92.392 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP090 |
191 |
89.205 |
LRP090 |
686 |
89.7 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP090 |
486 |
89.5 |
LRP090 |
986 |
90 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP090 |
686 |
89.7 |
LRP090 |
986 |
90 |
Nawabganj, (Division Office) |
| Revenue |
06-NJRD/2012-2013(LTM), Lot No. 06/02 |
20-Jun-2013 |
10 Days |
Surfacing |
LRP090 |
986 |
90 |
LRP091 |
994 |
91 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP090 |
986 |
90 |
LRP091 |
794 |
90.8 |
Nawabganj, (Division Office) |
| Revenue |
11-NJRD/2007-2008, Lot No. 11/02 (D to R) |
1-Jul-2008 |
10 Days |
Surfacing |
LRP091 |
304 |
90.31 |
LRP091 |
494 |
90.5 |
Nawabganj, (Division Office) |
| Revenue |
11-NJRD/2007-2008, Lot No. 11/02 (D to R) |
1-Jul-2008 |
10 Days |
Surfacing |
LRP091 |
574 |
90.58 |
LRP092 |
677 |
91.696 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP092 |
568 |
91.587 |
LRP092 |
981 |
92 |
Nawabganj, (Division Office) |
| Revenue |
05-NJRD/2012-2013, Lot No. 05/01 |
8-Jan-2013 |
42 Days |
Pavement |
LRP092 |
881 |
91.9 |
LRP092 |
961 |
91.98 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP092 |
981 |
92 |
LRP093 |
473 |
92.488 |
Nawabganj, (Division Office) |
| Revenue |
10-NJRD/2007-2008, Lot No. 10/02(D to R) |
20-Jun-2009 |
15 Days |
Surfacing |
LRP093 |
985 |
93 |
LRP094 |
343 |
93.359 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2012-2013 (LTM), Lot No. 04/01 |
17-Jun-2013 |
15 Days |
Pavement |
LRP093 |
985 |
93 |
LRP094 |
1184 |
94.2 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP094 |
877 |
93.893 |
LRP096 |
0 |
95.027 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP096 |
294 |
95.321 |
LRP096 |
912 |
95.939 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP096 |
973 |
96 |
LRP097 |
640 |
96.677 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2012-2013 (LTM), Lot No. 04/01 |
17-Jun-2013 |
15 Days |
Pavement |
LRP096 |
973 |
96 |
LRP097 |
463 |
96.5 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2008-2009, Lot No. 09/01 |
10-Jun-2009 |
21 Days |
Surfacing |
LRP098 |
0 |
97.048 |
LRP098 |
700 |
97.748 |
Nawabganj, (Division Office) |
| Revenue |
01-NJRD/2008-2009, Lot No. 01/04 |
2-Feb-2009 |
21 Days |
Surfacing |
LRP098 |
492 |
97.54 |
LRP099 |
494 |
98.54 |
Nawabganj, (Division Office) |
| Revenue |
05-NJRD/2012-2013, Lot No. 05/01 |
8-Jan-2013 |
42 Days |
Pavement |
LRP098 |
602 |
97.65 |
LRP098 |
682 |
97.73 |
Nawabganj, (Division Office) |
| Revenue |
05-NJRD/2012-2013, Lot No. 05/01 |
8-Jan-2013 |
42 Days |
Pavement |
LRP099 |
474 |
98.52 |
LRP099 |
564 |
98.61 |
Nawabganj, (Division Office) |
| Revenue |
01-NJRD/2008-2009, Lot No. 01/04 |
2-Feb-2009 |
21 Days |
Surfacing |
LRP099 |
494 |
98.54 |
LRP101 |
250 |
100.34 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2012-2013 (LTM), Lot No. 04/01 |
17-Jun-2013 |
15 Days |
Pavement |
LRP099 |
954 |
99 |
LRP101 |
410 |
100.5 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP100 |
569 |
99.65 |
LRP101 |
310 |
100.4 |
Nawabganj, (Division Office) |
| Revenue |
04-NJRD/2009-2010, Lot No. 04/01 |
28-Feb-2010 |
30 Days |
Surfacing |
LRP101 |
310 |
100.4 |
LRP101 |
566 |
100.656 |
Nawabganj, (Division Office) |
| Revenue |
09-NJRD/2011-2012, Lot No. 09/06 |
29-May-2012 |
21 Days |
Surfacing |
LRP101 |
935 |
101.025 |
LRP101 |
1566 |
101.656 |
Nawabganj, (Division Office) |