| List of ongoing works on the road ( Z5456 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Development |
OTM 01-NRD/2010-2011 (Package-01) |
11-Jan-2011 |
180 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
1300 |
1.3 |
Naogaon, (Division Office) |
| Development |
Tender 37-NRD/2005-2006 (Lot No. 37/01) |
24-Jul-2006 |
15 Days |
Pavement |
LRPS |
0 |
0 |
LRPS |
1000 |
1 |
Naogaon, (Division Office) |
| Development |
Quotation 33-NRD/2005-2006 (Lot No. 33/04) |
28-Jul-2006 |
15 Days |
Pavement |
LRPS |
0 |
0 |
LRPS |
200 |
0.2 |
Naogaon, (Division Office) |
| Development |
Quotation 18-NRD/2005-2006 (Lot No. 18/02) |
21-Mar-2006 |
15 Days |
Pavement |
LRPS |
0 |
0 |
LRPS |
1000 |
1 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 1/06) |
24-Nov-2009 |
120 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
2295 |
2.295 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 1/06) |
24-Nov-2009 |
120 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
680 |
0.68 |
Naogaon, (Division Office) |
| Development |
OTM 14-NRD/2008-2009 (Lot No. 14/01) |
4-Jun-2009 |
25 Days |
Carpeting |
LRPS |
0 |
0 |
LRPS |
350 |
0.35 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot No. 38/10) |
13-Jul-2006 |
15 Days |
Pavement |
LRPS |
0 |
0 |
LRPS |
100 |
0.1 |
Naogaon, (Division Office) |
| Development |
Tender 19-NRD/2005-2006 (Lot No. 19/12) |
18-May-2006 |
15 Days |
Road Embankment |
LRPS |
200 |
0.2 |
LRPS |
800 |
0.8 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot No. 38/10) |
13-Jul-2006 |
15 Days |
Pavement |
LRPS |
200 |
0.2 |
LRPS |
300 |
0.3 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot No. 38/10) |
13-Jul-2006 |
15 Days |
Pavement |
LRPS |
300 |
0.3 |
LRPS |
500 |
0.5 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/06) |
24-Nov-2009 |
120 Days |
Carpeting |
LRPS |
680 |
0.68 |
LRPS |
2295 |
2.295 |
Naogaon, (Division Office) |
| Development |
Quotation A-27-NRD/2005-2006 (Lot No. 27/2) |
12-Jul-2006 |
20 Days |
Pavement |
LRPS |
1100 |
1.1 |
LRPS |
1500 |
1.5 |
Naogaon, (Division Office) |
| Development |
Quotation 05-NRD/2006-2007 (Lot No. 05/05) |
18-Jan-2007 |
15 Days |
Pavement |
LRPS |
1200 |
1.2 |
LRPS |
1500 |
1.5 |
Naogaon, (Division Office) |
| Development |
Tender 10-NRD/2006-2007 (Lot No. 10/11) |
15-Feb-2007 |
287 Days |
Pavement |
LRPS |
1311 |
1.311 |
LRPS |
1466 |
1.466 |
Naogaon, (Division Office) |
| Development |
Quotation 33-NRD/2005-2006 (Lot No. 33/04) |
28-Jul-2006 |
15 Days |
Pavement |
LRPS |
1400 |
1.4 |
LRPS |
1600 |
1.6 |
Naogaon, (Division Office) |
| Development |
Tender 10-NRD/2006-2007 (Lot No. 10/12) |
15-Feb-2007 |
303 Days |
Pavement |
LRPS |
1483 |
1.483 |
LRPS |
1638 |
1.638 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2010-2011 (Package-01) |
11-Jan-2011 |
180 Days |
Carpeting |
LRPS |
1600 |
1.6 |
LRPS |
2350 |
2.35 |
Naogaon, (Division Office) |
| Development |
Tender (P) 20-NRD/2004-2005 (Lot No. 20/01) |
13-Jul-2005 |
75 Days |
Pavement |
LRPS |
2000 |
2 |
LRPS |
3000 |
3 |
Naogaon, (Division Office) |
| Development |
Quotation 05-NRD/2006-2007 (Lot No. 05/05) |
18-Jan-2007 |
15 Days |
Pavement |
LRPS |
2000 |
2 |
LRPS |
3000 |
3 |
Naogaon, (Division Office) |
| Development |
OTM 13-NRD/2009-2010 |
19-Aug-2010 |
120 Days |
Carpeting |
LRPS |
2100 |
2.1 |
LRPS |
2700 |
2.7 |
Naogaon, (Division Office) |
| Development |
Quotation 33-NRD/2005-2006 (Lot No. 33/03) |
30-Jul-2006 |
15 Days |
Pavement |
LRPS |
2400 |
2.4 |
LRPS |
2500 |
2.5 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2010-2011 (Package-01) |
11-Jan-2011 |
180 Days |
Carpeting |
LRPS |
2600 |
2.6 |
LRPS |
4300 |
4.3 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2007-2008 (Lot No. 02/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
3000 |
3 |
LRPS |
4000 |
4 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/08) |
15-Feb-2007 |
303 Days |
Pavement |
LRPS |
3238 |
3.238 |
LRPS |
3400 |
3.4 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/06) |
28-Jan-2007 |
321 Days |
Pavement |
LRPS |
3450 |
3.45 |
LRPS |
3716 |
3.716 |
Naogaon, (Division Office) |
| Development |
Quotation 33-NRD/2005-2006 (Lot No. 33/03) |
30-Jul-2006 |
15 Days |
Pavement |
LRPS |
3500 |
3.5 |
LRPS |
3700 |
3.7 |
Naogaon, (Division Office) |
| Development |
OTM 13-NRD/2009-2010 |
19-Aug-2010 |
120 Days |
Carpeting |
LRPS |
4000 |
4 |
LRPS |
6100 |
6.1 |
Naogaon, (Division Office) |
| Development |
Quotation 33-NRD/2005-2006 (Lot No. 33/03) |
30-Jul-2006 |
15 Days |
Pavement |
LRPS |
4300 |
4.3 |
LRPS |
4500 |
4.5 |
Naogaon, (Division Office) |
| Development |
Tender 04-NRD/2006-2007 (Lot No. 04/05) |
15-Feb-2007 |
389 Days |
Pavement |
LRPS |
4960 |
4.96 |
LRPS |
5218 |
5.218 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/14) |
15-Jan-2007 |
25 Days |
Carpeting |
LRPS |
5100 |
5.1 |
LRPS |
5400 |
5.4 |
Naogaon, (Division Office) |
| Development |
Quotation 05-NRD/2006-2007 (Lot No. 05/05) |
18-Jan-2007 |
15 Days |
Pavement |
LRPS |
5100 |
5.1 |
LRPS |
5600 |
5.6 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/09) |
10-Feb-2007 |
394 Days |
Pavement |
LRPS |
5220 |
5.22 |
LRPS |
5345 |
5.345 |
Naogaon, (Division Office) |
| Development |
Tender 01-NRD/2006-2007 (Lot No. 01/02) |
15-Feb-2007 |
45 Days |
Carpeting |
LRPS |
5390 |
5.39 |
LRPS |
5750 |
5.75 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/07) |
21-Jan-2007 |
30 Days |
Pavement |
LRPS |
5400 |
5.4 |
LRPS |
5900 |
5.9 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2010-2011 (Package-01) |
11-Jan-2011 |
180 Days |
Carpeting |
LRPS |
6000 |
6 |
LRPS |
8600 |
8.6 |
Naogaon, (Division Office) |
| Development |
Tender 44-NRD/2005-2006 (Lot No. 44/05) |
13-Dec-2006 |
505 Days |
Carpeting |
LRPS |
6100 |
6.1 |
LRPS |
6900 |
6.9 |
Naogaon, (Division Office) |
| Development |
D-Tender 01-NRD/2006-2007 (Lot No. 01/03) |
19-Oct-2006 |
45 Days |
Pavement |
LRPS |
6400 |
6.4 |
LRPS |
6800 |
6.8 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/14) |
15-Jan-2007 |
25 Days |
Carpeting |
LRPS |
6400 |
6.4 |
LRPS |
6700 |
6.7 |
Naogaon, (Division Office) |
| Development |
OTM 01-NRD/2009-2010 (Lot 01/06) |
24-Nov-2009 |
120 Days |
Carpeting |
LRPS |
7100 |
7.1 |
LRPS |
8600 |
8.6 |
Naogaon, (Division Office) |
| Development |
Tender 42-NRD/2005-2006 (Lot No. 42/02) |
17-Sep-2006 |
592 Days |
Pavement |
LRPS |
7100 |
7.1 |
LRPS |
7400 |
7.4 |
Naogaon, (Division Office) |
| Development |
D-Tender 44-NRD/2005-2006 (Lot No. 44/06) |
13-Dec-2006 |
45 Days |
Pavement |
LRPS |
7200 |
7.2 |
LRPS |
7900 |
7.9 |
Naogaon, (Division Office) |
| Development |
Tender 44-NRD/2005-2006 (Lot No. 44/06) |
13-Dec-2006 |
505 Days |
Pavement |
LRPS |
7200 |
7.2 |
LRPS |
7900 |
7.9 |
Naogaon, (Division Office) |
| Development |
Tender 37-NRD/2005-2006 (Lot No. 37/04) |
11-Jul-2006 |
15 Days |
Pavement |
LRPS |
7200 |
7.2 |
LRPS |
7500 |
7.5 |
Naogaon, (Division Office) |
| Development |
D-Tender 01-NRD/2006-2007 (Lot No. 01/03) |
19-Oct-2006 |
45 Days |
Pavement |
LRPS |
7300 |
7.3 |
LRPS |
7600 |
7.6 |
Naogaon, (Division Office) |
| Development |
Tender 42-NRD/2005-2006 (Lot No. 42/02) |
17-Sep-2006 |
592 Days |
Pavement |
LRPS |
8200 |
8.2 |
LRPS |
8600 |
8.6 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot No. 38/03) |
13-Nov-2006 |
25 Days |
Pavement |
LRPS |
8400 |
8.4 |
LRPS |
8700 |
8.7 |
Naogaon, (Division Office) |
| Development |
D-Tender 41-NRD/2005-2006 (Lot No. 41/01) |
17-Sep-2006 |
25 Days |
Pavement |
LRPS |
8400 |
8.4 |
LRPS |
8700 |
8.7 |
Naogaon, (Division Office) |
| Development |
Tender 37-NRD/2005-2006 (Lot No. 37/04) |
11-Jul-2006 |
15 Days |
Pavement |
LRPS |
8500 |
8.5 |
LRPS |
8600 |
8.6 |
Naogaon, (Division Office) |
| Development |
Quotation 11-NRD/2010-2011 (Package-01) |
17-Feb-2011 |
7 Days |
Carpeting |
LRPS |
8800 |
8.8 |
LRPS |
9150 |
9.15 |
Naogaon, (Division Office) |
| Development |
D-Tender 41-NRD/2005-2006 (Lot No. 41/01) |
17-Sep-2006 |
25 Days |
Pavement |
LRPS |
9100 |
9.1 |
LRPS |
9400 |
9.4 |
Naogaon, (Division Office) |
| Development |
Tender 17-NRD/2005-2006 (Lot No. 17/02) |
12-Jun-2006 |
15 Days |
Pavement |
LRPS |
9200 |
9.2 |
LRPS |
9400 |
9.4 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot No. 38/03) |
13-Nov-2006 |
25 Days |
Pavement |
LRPS |
9200 |
9.2 |
LRPS |
9400 |
9.4 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot 38/04) |
20-Aug-2006 |
25 Days |
Carpeting |
LRPS |
9500 |
9.5 |
LRPS |
9940 |
9.94 |
Naogaon, (Division Office) |
| Development |
Tender 41-NRD/2005-2006 (Lot No. 41/07) |
29-Aug-2006 |
611 Days |
Pavement |
LRPS |
10100 |
10.1 |
LRPS |
10600 |
10.6 |
Naogaon, (Division Office) |
| Development |
Restricted 08-NRD/2004-2005 (Lot No. 08/07) |
22-Nov-2005 |
15 Days |
Pavement |
LRPS |
10173 |
10.173 |
LRPS |
10598 |
10.598 |
Naogaon, (Division Office) |
| Development |
Tender 38-NRD/2005-2006 (Lot No. 38/06) |
29-Aug-2006 |
611 Days |
Pavement |
LRPS |
10200 |
10.2 |
LRPS |
10800 |
10.8 |
Naogaon, (Division Office) |
| Development |
Tender 41-NRD/2005-2006 (Lot No. 41/08) |
29-Aug-2006 |
611 Days |
Pavement |
LRPS |
10500 |
10.5 |
LRPS |
10900 |
10.9 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2009-2010 (Lot 09/02) |
18-Feb-2010 |
7 Days |
Carpeting |
LRPS |
11000 |
11 |
LRPS |
11500 |
11.5 |
Naogaon, (Division Office) |
| Development |
OTM 13-NRD/2009-2010 |
19-Aug-2010 |
120 Days |
Carpeting |
LRPS |
13000 |
13 |
LRPS |
15600 |
15.6 |
Naogaon, (Division Office) |
| Development |
Quotation 13-NRD/2009-2010 (Lot 13/02) |
1-Mar-2010 |
7 Days |
Carpeting |
LRPS |
15000 |
15 |
LRPS |
15400 |
15.4 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/01) |
28-Nov-2006 |
458 Days |
Carpeting |
LRPS |
15020 |
15.02 |
LRPS |
15430 |
15.43 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/03) |
30-Nov-2006 |
577 Days |
Pavement |
LRPS |
15215 |
15.215 |
LRPS |
15600 |
15.6 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2007-2008 (Lot No. 02/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
15600 |
15.6 |
LRPS |
15900 |
15.9 |
Naogaon, (Division Office) |
| Development |
Tender (P) 2-NRD/2005-2006(Lot No. 2/1) |
19-Oct-2005 |
15 Days |
Pavement |
LRPS |
19900 |
19.9 |
LRPS |
20200 |
20.2 |
Naogaon, (Division Office) |
| Development |
Tender (P) 02-NRD/2005-2006(Lot NO. 2/2) |
19-Oct-2005 |
15 Days |
Pavement |
LRPS |
20200 |
20.2 |
LRPS |
20500 |
20.5 |
Naogaon, (Division Office) |
| Development |
Tender (P) 2-NRD/2005-2006(Lot No. 2/1) |
19-Oct-2005 |
15 Days |
Pavement |
LRPS |
20500 |
20.5 |
LRPS |
20750 |
20.75 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2007-2008 (Lot No. 02/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
20750 |
20.75 |
LRPS |
21000 |
21 |
Naogaon, (Division Office) |
| Development |
Quotation 17-NRD/2009-2010 (Lot 17/01) |
21-Apr-2010 |
7 Days |
Carpeting |
LRPS |
21000 |
21 |
LRPS |
21400 |
21.4 |
Naogaon, (Division Office) |
| Development |
Tender 03-NRD/2006-2007 (Lot No. 03/01) |
28-Nov-2006 |
458 Days |
Carpeting |
LRPS |
21100 |
21.1 |
LRPS |
21400 |
21.4 |
Naogaon, (Division Office) |
| Development |
Tender (P) 02-NRD/2005-2006(Lot NO. 2/2) |
19-Oct-2005 |
15 Days |
Pavement |
LRPS |
21300 |
21.3 |
LRPS |
21550 |
21.55 |
Naogaon, (Division Office) |
| Development |
Quotation 17-NRD/2009-2010 (Lot 17/02) |
21-Apr-2010 |
7 Days |
Carpeting |
LRPS |
21400 |
21.4 |
LRPS |
21900 |
21.9 |
Naogaon, (Division Office) |
| Development |
Tender 36-NRD/2005-2006 (Lot No. 36/06) |
16-Jul-2006 |
15 Days |
Pavement |
LRPS |
21400 |
21.4 |
LRPS |
21700 |
21.7 |
Naogaon, (Division Office) |
| Development |
Tender 36-NRD/2005-2006 (Lot No. 36/06) |
16-Jul-2006 |
15 Days |
Pavement |
LRPS |
22500 |
22.5 |
LRPS |
22600 |
22.6 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2007-2008 (Lot No. 02/01) |
10-Feb-2008 |
45 Days |
Carpeting |
LRPS |
24500 |
24.5 |
LRPS |
26000 |
26 |
Naogaon, (Division Office) |
| Development |
D-Tender 05-NRD/2006-2007 (Lot No. 05/08) |
21-Dec-2006 |
25 Days |
Pavement |
LRPS |
24500 |
24.5 |
LRPS |
24900 |
24.9 |
Naogaon, (Division Office) |
| Development |
Tender 12-NRD/2005-2006 (Lot No. 12/02) |
11-Jul-2006 |
25 Days |
Pavement |
LRPS |
24500 |
24.5 |
LRPS |
24800 |
24.8 |
Naogaon, (Division Office) |
| Development |
Tender 10-NRD/2006-2007 (Lot No. 10/08) |
15-Feb-2007 |
25 Days |
Carpeting |
LRPS |
24650 |
24.65 |
LRPS |
25591 |
25.591 |
Naogaon, (Division Office) |
| Development |
D-Tender 05-NRD/2006-2007 (Lot No. 05/10) |
20-Dec-2006 |
25 Days |
Pavement |
LRPS |
25100 |
25.1 |
LRPS |
25600 |
25.6 |
Naogaon, (Division Office) |
| Development |
Tender 12-NRD/2005-2006 (Lot No. 12/02) |
11-Jul-2006 |
25 Days |
Pavement |
LRPS |
25600 |
25.6 |
LRPS |
25900 |
25.9 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2005-2006 (Lot No. 09/06) |
1-Feb-2006 |
15 Days |
Pavement |
LRPS |
26200 |
26.2 |
LRPS |
26500 |
26.5 |
Naogaon, (Division Office) |
| Development |
Quotation 06-NRD/2005-2006 (Lot No. 06/02) |
5-Dec-2005 |
10 Days |
Pavement |
LRPS |
27100 |
27.1 |
LRPS |
27200 |
27.2 |
Naogaon, (Division Office) |
| Development |
Quotation 06-NRD/2005-2006 (Lot No. 06/02) |
5-Dec-2005 |
10 Days |
Pavement |
LRPS |
28150 |
28.15 |
LRPS |
28230 |
28.23 |
Naogaon, (Division Office) |
| Development |
Tender 37-NRD/2005-2006 (Lot No. 37/08) |
12-Jul-2006 |
15 Days |
Pavement |
LRPS |
28400 |
28.4 |
LRPS |
28600 |
28.6 |
Naogaon, (Division Office) |
| Development |
Quotation 07-NRD/2005-2006 (Lot No. 07/01) |
27-Feb-2006 |
7 Days |
Pavement |
LRPS |
28400 |
28.4 |
LRPS |
28600 |
28.6 |
Naogaon, (Division Office) |
| Development |
Tender 37-NRD/2005-2006 (Lot No. 37/08) |
12-Jul-2006 |
15 Days |
Pavement |
LRPS |
29300 |
29.3 |
LRPS |
29700 |
29.7 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/10) |
28-Nov-2006 |
45 Days |
Pavement |
LRPS |
30000 |
30 |
LRPS |
30770 |
30.77 |
Naogaon, (Division Office) |
| Development |
Tender 36-NRD/2005-2006 (Lot No. 36/08) |
16-Jul-2006 |
15 Days |
Pavement |
LRPS |
30400 |
30.4 |
LRPS |
30700 |
30.7 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/08) |
14-Feb-2007 |
229 Days |
Pavement |
LRPS |
30450 |
30.45 |
LRPS |
30716 |
30.716 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/10) |
28-Nov-2006 |
45 Days |
Pavement |
LRPS |
31000 |
31 |
LRPS |
31120 |
31.12 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/09) |
27-Nov-2006 |
45 Days |
Pavement |
LRPS |
31000 |
31 |
LRPS |
31120 |
31.12 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/09) |
27-Nov-2006 |
45 Days |
Pavement |
LRPS |
31000 |
31 |
LRPS |
31420 |
31.42 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/08) |
27-Nov-2006 |
45 Days |
Pavement |
LRPS |
31000 |
31 |
LRPS |
31420 |
31.42 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/08) |
27-Nov-2006 |
45 Days |
Pavement |
LRPS |
31000 |
31 |
LRPS |
31720 |
31.72 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/03) |
19-Dec-2006 |
40 Days |
Pavement |
LRPS |
32100 |
32.1 |
LRPS |
32500 |
32.5 |
Naogaon, (Division Office) |
| Development |
D-Quotation 10-NRD/2005-2006 (Lot No. 10/09) |
5-Jul-2006 |
15 Days |
Pavement |
LRPS |
32500 |
32.5 |
LRPS |
32800 |
32.8 |
Naogaon, (Division Office) |
| Development |
Tender 01-NRD/2006-2007 (Lot No. 01/01) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
33000 |
33 |
LRPS |
34000 |
34 |
Naogaon, (Division Office) |
| Development |
LTM 07-NRD/2011-2012 (Package-01) |
27-May-2012 |
40 Days |
Road Embankment |
LRP032 |
1110 |
33 |
LRP036 |
670 |
36.45 |
Naogaon, (Division Office) |
| Development |
D-Quotation 10-NRD/2005-2006 (Lot No. 10/09) |
5-Jul-2006 |
15 Days |
Pavement |
LRPS |
33100 |
33.1 |
LRPS |
33400 |
33.4 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/03) |
19-Dec-2006 |
40 Days |
Pavement |
LRPS |
33200 |
33.2 |
LRPS |
33500 |
33.5 |
Naogaon, (Division Office) |
| Development |
Quotation 14-NRD/2005-2006 (Lot No 14/02) |
4-Feb-2006 |
15 Days |
Carpeting |
LRPS |
33200 |
33.2 |
LRPS |
33500 |
33.5 |
Naogaon, (Division Office) |
| Development |
Quotation 14-NRD/2005-2006 (Lot No. 14/01) |
1-Feb-2006 |
15 Days |
Pavement |
LRPS |
33400 |
33.4 |
LRPS |
33600 |
33.6 |
Naogaon, (Division Office) |
| Development |
Tender 01-NRD/2006-2007 (Lot No. 01/01) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
33500 |
33.5 |
LRPS |
33700 |
33.7 |
Naogaon, (Division Office) |
| Development |
Quotation 14-NRD/2005-2006 (Lot No 14/02) |
4-Feb-2006 |
15 Days |
Carpeting |
LRPS |
34100 |
34.1 |
LRPS |
34500 |
34.5 |
Naogaon, (Division Office) |
| Development |
Quotation 14-NRD/2005-2006 (Lot No. 14/01) |
1-Feb-2006 |
15 Days |
Pavement |
LRPS |
34400 |
34.4 |
LRPS |
34800 |
34.8 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/06) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
35000 |
35 |
LRPS |
36000 |
36 |
Naogaon, (Division Office) |
| Development |
Restricted Tender 16-NRD/2004-2005 (Lot No. 16/01) |
17-Jul-2005 |
7 Days |
Pavement |
LRPS |
35000 |
35 |
LRPS |
36000 |
36 |
Naogaon, (Division Office) |
| Development |
D-Quotation 17-NRD/2005-2006 (Lot No. 17/04) |
26-Jul-2006 |
15 Days |
Pavement |
LRPS |
35100 |
35.1 |
LRPS |
35400 |
35.4 |
Naogaon, (Division Office) |
| Development |
Tender 01-NRD/2006-2007 (Lot No. 01/01) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
35400 |
35.4 |
LRPS |
35800 |
35.8 |
Naogaon, (Division Office) |
| Development |
Quotation 13-NRD/2005-2006 (Lot No. 13/07) |
8-Jun-2006 |
15 Days |
Pavement |
LRPS |
35400 |
35.4 |
LRPS |
35900 |
35.9 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/06) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
35400 |
35.4 |
LRPS |
35700 |
35.7 |
Naogaon, (Division Office) |
| Development |
Tender 05-NRD/2005-2006 (Lot No. 05/07) |
31-May-2006 |
15 Days |
Pavement |
LRPS |
35400 |
35.4 |
LRPS |
35600 |
35.6 |
Naogaon, (Division Office) |
| Development |
Tender 01-NRD/2006-2007 (Lot No. 01/04) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
36000 |
36 |
LRPS |
37000 |
37 |
Naogaon, (Division Office) |
| Development |
Restricted Tender 16-NRD/2004-2005 (Lot No. 16/01) |
17-Jul-2005 |
7 Days |
Pavement |
LRPS |
36000 |
36 |
LRPS |
37000 |
37 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2005-2006 (Lot No. 09/08) |
18-Jan-2006 |
15 Days |
Pavement |
LRPS |
36350 |
36.35 |
LRPS |
36700 |
36.7 |
Naogaon, (Division Office) |
| Development |
D-Quotation 17-NRD/2005-2006 (Lot No. 17/04) |
26-Jul-2006 |
15 Days |
Pavement |
LRPS |
36400 |
36.4 |
LRPS |
36700 |
36.7 |
Naogaon, (Division Office) |
| Development |
Tender 05-NRD/2005-2006 (Lot No. 05/07) |
31-May-2006 |
15 Days |
Pavement |
LRPS |
36400 |
36.4 |
LRPS |
36700 |
36.7 |
Naogaon, (Division Office) |
| Development |
Tender 05-NRD/2005-2006 (Lot No. 05/07) |
31-May-2006 |
15 Days |
Pavement |
LRPS |
37300 |
37.3 |
LRPS |
37500 |
37.5 |
Naogaon, (Division Office) |
| Development |
Tender 01-NRD/2006-2007 (Lot No. 01/04) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
37400 |
37.4 |
LRPS |
37900 |
37.9 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/03) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
38000 |
38 |
LRPS |
39000 |
39 |
Naogaon, (Division Office) |
| Development |
Quotation 09-NRD/2005-2006 (Lot No. 09/07) |
13-Mar-2006 |
15 Days |
Pavement |
LRPS |
38100 |
38.1 |
LRPS |
38500 |
38.5 |
Naogaon, (Division Office) |
| Development |
Tender 02-NRD/2006-2007 (Lot No. 02/03) |
23-Nov-2006 |
45 Days |
Pavement |
LRPS |
38200 |
38.2 |
LRPS |
38700 |
38.7 |
Naogaon, (Division Office) |
| Development |
Tender 19-NRD/2005-2006 (Lot No. 19/08) |
15-Jun-2006 |
15 Days |
Pavement |
LRPS |
38400 |
38.4 |
LRPS |
38700 |
38.7 |
Naogaon, (Division Office) |
| Development |
Tender 05-NRD/2005-2006 (Lot No. 05/07) |
31-May-2006 |
15 Days |
Pavement |
LRPS |
38600 |
38.6 |
LRPS |
38700 |
38.7 |
Naogaon, (Division Office) |
| Development |
R-Quotation 03-NRD/2005-2006 (Lot No. 03/11) |
22-Nov-2005 |
15 Days |
Pavement |
LRPS |
39100 |
39.1 |
LRPS |
39600 |
39.6 |
Naogaon, (Division Office) |
| Development |
Tender 08-NRD/2006-2007 (Lot No. 08/02) |
15-Feb-2007 |
391 Days |
Carpeting |
LRPS |
40320 |
40.32 |
LRPS |
40585 |
40.585 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/02) |
19-Dec-2006 |
40 Days |
Pavement |
LRPS |
40500 |
40.5 |
LRPS |
40900 |
40.9 |
Naogaon, (Division Office) |
| Development |
Tender 06-NRD/2006-2007 (Lot No. 06/02) |
19-Dec-2006 |
40 Days |
Pavement |
LRPS |
41200 |
41.2 |
LRPS |
41700 |
41.7 |
Naogaon, (Division Office) |
| Development |
Quotation 10-NRD/2005-2006 (Lot No. 10/04) |
8-May-2006 |
15 Days |
Pavement |
LRPS |
47200 |
47.2 |
LRPS |
47500 |
47.5 |
Naogaon, (Division Office) |