| List of ongoing works on the road ( Z8033 ) |
Fund Source  |
Contract no.  |
St. Date  |
Duration  |
Type of work  |
Start location |
End location |
Res.Division  |
| |
|
|
|
|
LRP  |
Offset  |
Chainage |
LRP  |
Offset  |
Chainage |
|
| Revenue |
03/PRD/2008-09.(Lot No.1) |
5-Nov-2008 |
10 Days |
Road Embankment |
LRP001 |
-4000 |
-2.995 |
LRP001 |
-3000 |
-1.995 |
Pirojpur, (Division Office) |
| Development |
68/2009-2010/PRD (Lot No.-04) |
20-May-2010 |
30 Days |
Pavement |
LRP001 |
-750 |
0.255 |
LRP001 |
0 |
1.005 |
Pirojpur, (Division Office) |
| Revenue |
55/PRD/2012-2013 (01) |
12-May-2013 |
20 Days |
Road Embankment |
LRP001 |
0 |
1.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Revenue |
11/PRD/2013-2014 |
6-Feb-2014 |
25 Days |
Road Embankment |
LRP001 |
0 |
1.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/02/PMP(Roads)/BZ/2014-2015 |
4-Dec-2014 |
376 Days |
Pavement |
LRP001 |
|
1.005 |
LRPE |
|
47.86 |
Pirojpur, (Division Office) |
| Revenue |
55/2011-2012/PRD(11) |
7-Jun-2012 |
30 Days |
Road Embankment |
LRP001 |
|
1.005 |
LRP001 |
51 |
1.056 |
Pirojpur, (Division Office) |
| Development |
69/2009-2010/PRD(Lot No.-12) |
20-May-2010 |
15 Days |
Road Embankment |
LRP001 |
0 |
1.005 |
LRP001 |
5000 |
6.005 |
Pirojpur, (Division Office) |
| Revenue |
09/PRD/2013-2014 |
11-Feb-2014 |
20 Days |
Road Embankment |
LRP001 |
0 |
1.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Revenue |
60/PRD/2012-2013 (05) |
2-May-2013 |
30 Days |
Pavement |
LRP001 |
0 |
1.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Development |
59/PRD/2010-2011 (Lot No.-01) |
24-Mar-2011 |
90 Days |
Pavement |
LRP001 |
0 |
1.005 |
LRP001 |
8500 |
9.505 |
Pirojpur, (Division Office) |
| Revenue |
10/PRD/2013-2014 |
6-Feb-2014 |
15 Days |
Road Embankment |
LRP001 |
0 |
1.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Revenue |
PMP(Roads)-01/ACE/BZ/2013-2014 (Packeg No.03) |
4-Mar-2014 |
667 Days |
Pavement |
LRP001 |
|
1.005 |
LRPE |
|
47.86 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
82/PRD/2009-2010 (Lot No.-11) |
10-Jun-2010 |
10 Days |
Road Embankment |
LRP001 |
0 |
1.005 |
LRP001 |
5980 |
6.985 |
Pirojpur, (Division Office) |
| Development |
04/e-GP/BZ/ADP/ZH/PIR/2018-2019(TID No.-214370) (W.O-1048) |
2-May-2019 |
780 Days |
Pavement |
LRP001 |
0 |
1.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
116/PRD/1999-2000(Group No-07) |
1-Jul-2002 |
25 Days |
Carpeting |
LRP020 |
-18000 |
2 |
LRP020 |
-17000 |
3 |
Pirojpur, (Division Office) |
| Development |
220/PRD/1998-99(Group No-2) |
1-Jul-2002 |
60 Days |
Pavement |
LRP020 |
-18000 |
2 |
LRP020 |
-17000 |
3 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
41/2009-2010/PRD (Lot-09) |
12-Apr-2010 |
15 Days |
Pavement |
LRP001 |
1500 |
2.505 |
LRP001 |
9150 |
10.155 |
Pirojpur, (Division Office) |
| Development |
81/2010-2011/PRD (Lot No.-03) |
22-Mar-2011 |
60 Days |
Pavement |
LRP001 |
1500 |
2.505 |
LRP001 |
2500 |
3.505 |
Pirojpur, (Division Office) |
| Development |
71/PRD/2009-2010 (Lot No.-03) |
26-May-2010 |
45 Days |
Pavement |
LRP001 |
1500 |
2.505 |
LRP001 |
2500 |
3.505 |
Pirojpur, (Division Office) |
| Development |
108/PRD2010-2011 (04) |
6-Jun-2011 |
20 Days |
Road Embankment |
LRP001 |
1500 |
2.505 |
LRP001 |
1980 |
2.985 |
Pirojpur, (Division Office) |
| Development |
208/2001-2002/PRD(Group No-3) |
1-Jul-2002 |
40 Days |
Pavement |
LRP020 |
-17000 |
3 |
LRP020 |
-15000 |
5 |
Pirojpur, (Division Office) |
| Development |
69/2010-2011 (Lot N0-04) |
16-Mar-2011 |
45 Days |
Pavement |
LRP001 |
2000 |
3.005 |
LRP001 |
2250 |
3.255 |
Pirojpur, (Division Office) |
| Development |
60/PRD/2009-2010(Lot No.-03) |
3-May-2010 |
20 Days |
Road Embankment |
LRP001 |
2500 |
3.505 |
LRP001 |
3500 |
4.505 |
Pirojpur, (Division Office) |
| Development |
299/PRD/1998-99(Group NO-3) |
1-Jul-2002 |
7 Days |
Carpeting |
LRP020 |
-16000 |
4 |
LRP020 |
-15000 |
5 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
36/2007-2008/RFQ(Lot-04) |
25-Nov-2007 |
7 Days |
Road Embankment |
LRP020 |
-16000 |
4 |
LRP020 |
-15000 |
5 |
Pirojpur, (Division Office) |
| Development |
35/2008-09 (Lot -01) |
19-May-2009 |
15 Days |
Road Embankment |
LRP001 |
3000 |
4.005 |
LRP001 |
3900 |
4.905 |
Pirojpur, (Division Office) |
| Development |
80-PRD/2007-08. (Lot No.1) |
10-Jun-2008 |
30 Days |
Carpeting |
LRP001 |
4000 |
5.005 |
LRP001 |
7900 |
8.905 |
Pirojpur, (Division Office) |
| Development |
92/PRD/2010-2011 (Package No.-07 |
19-Apr-2011 |
30 Days |
Pavement |
LRP001 |
4000 |
5.005 |
LRP001 |
5000 |
6.005 |
Pirojpur, (Division Office) |
| Revenue |
138/2007-08 (Lot No.-01) |
24-Jul-2008 |
30 Days |
Carpeting |
LRP001 |
4000 |
5.005 |
LRP001 |
7500 |
8.505 |
Pirojpur, (Division Office) |
| Development |
17/2009-2010 |
24-Dec-2009 |
120 Days |
Pavement |
LRP001 |
4500 |
5.505 |
LRP001 |
5500 |
6.505 |
Pirojpur, (Division Office) |
| Development |
030/PRD/2000-2001(Group No-13) |
1-Jul-2002 |
30 Days |
Pavement |
LRP020 |
-14000 |
6 |
LRP020 |
-13000 |
7 |
Pirojpur, (Division Office) |
| Development |
93/PRD/2010-2011 (Package No.-12) |
19-Apr-2011 |
30 Days |
Pavement |
LRP001 |
5000 |
6.005 |
LRP001 |
5350 |
6.355 |
Pirojpur, (Division Office) |
| Development |
138/PRD/2007-08. (Lot No.1) |
24-Jun-2008 |
30 Days |
Pavement |
LRP001 |
5000 |
6.005 |
LRP001 |
6000 |
7.005 |
Pirojpur, (Division Office) |
| Development |
85/PRD/2010-2011 (Lot No.-14) |
28-Mar-2011 |
25 Days |
Pavement |
LRP001 |
5500 |
6.505 |
LRP001 |
6000 |
7.005 |
Pirojpur, (Division Office) |
| Development |
11/2009-2010 |
23-Dec-2009 |
120 Days |
Pavement |
LRP001 |
5500 |
6.505 |
LRP001 |
8090 |
9.095 |
Pirojpur, (Division Office) |
| Development |
98/2009-2010/PRD (Lot No.-01) |
10-Jun-2010 |
60 Days |
Pavement |
LRP001 |
6000 |
7.005 |
LRP001 |
8500 |
9.505 |
Pirojpur, (Division Office) |
| Revenue |
167/2001-02 (Group No-01) |
1-Jul-2008 |
20 Days |
Carpeting |
LRP001 |
7000 |
8.005 |
LRP001 |
7900 |
8.905 |
Pirojpur, (Division Office) |
| Development |
87/PRD/2010-2011 (Lot No.-10) |
28-Mar-2011 |
10 Days |
Pavement |
LRP001 |
7000 |
8.005 |
LRP001 |
8500 |
9.505 |
Pirojpur, (Division Office) |
| Development |
76/2010-2011/PRD (Lot No.-04) |
1-Mar-2011 |
60 Days |
Carpeting |
LRP001 |
8750 |
9.755 |
LRP001 |
8795 |
9.8 |
Pirojpur, (Division Office) |
| Development |
55/2002-2003(Group-1) |
1-Jul-2002 |
15 Days |
Carpeting |
LRP020 |
-10000 |
10 |
LRP020 |
-9000 |
11 |
Pirojpur, (Division Office) |
| Revenue |
19/PRD/2014-2015 (Package No.02) |
4-May-2015 |
10 Days |
Road Embankment |
LRP001 |
9500 |
10.5 |
LRP001 |
10000 |
11 |
Pirojpur, (Division Office) |
| Development |
285/PRD/2000-2001(Group No-6) |
1-Jul-2002 |
35 Days |
Carpeting |
LRP020 |
-8000 |
12 |
LRP020 |
-7000 |
13 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
47/2009-2010/PRD (Lot No-04) |
25-Apr-2010 |
10 Days |
Road Embankment |
LRP001 |
11200 |
12.205 |
LRP001 |
11780 |
12.785 |
Pirojpur, (Division Office) |
| Revenue |
61/PRD/2012-2013 (06) |
30-Apr-2013 |
20 Days |
Pavement |
LRP001 |
12000 |
13.005 |
LRP001 |
16000 |
17.005 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/01/BZ/PMP/ZR/2016-2017/BRD, ID No. 81902 |
21-Jun-2017 |
107 Days |
Overlay |
LRP014 |
0 |
14 |
LRP020 |
2300 |
22.3 |
Barishal, (Division Office) |
| Development |
300/2000-2001(Group No-3) |
1-Jul-2002 |
20 Days |
Carpeting |
LRP020 |
-6000 |
14 |
LRP020 |
-5000 |
15 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/01/BZ/PMP/ZR/2016-2017/BRD (e-Tender ID No. 81902) |
21-Jun-2017 |
107 Days |
Overlay |
LRP014 |
0 |
14 |
LRP020 |
2300 |
22.3 |
Barishal, (Division Office) |
| Development |
48/2002-2003/PRD(Group-6) |
1-Jul-2002 |
20 Days |
Carpeting |
LRP020 |
-5000 |
15 |
LRP020 |
-4000 |
16 |
Pirojpur, (Division Office) |
| Development |
155/2000-2001/PRD(Group No-15) |
1-Jul-2002 |
15 Days |
Carpeting |
LRP020 |
-5000 |
15 |
LRP020 |
-4000 |
16 |
Pirojpur, (Division Office) |
| Development |
321/1999-2000/PRD(Group-2) |
1-Jul-2002 |
15 Days |
Carpeting |
LRP020 |
-4000 |
16 |
LRP020 |
-3000 |
17 |
Pirojpur, (Division Office) |
| Development |
02/PRD/2010-2011 (01) |
19-Aug-2011 |
60 Days |
Pavement |
LRP001 |
17525 |
18.53 |
LRP001 |
18295 |
19.3 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
32/2007/2008/RFQ(5) (Lot-1) |
6-Nov-2007 |
7 Days |
Road Embankment |
LRP020 |
-1100 |
18.9 |
LRP020 |
-1000 |
19 |
Pirojpur, (Division Office) |
| Development |
320/PRD/2000-01 |
20-Jun-2007 |
30 Days |
Carpeting |
LRP020 |
0 |
20 |
LRP020 |
1000 |
21 |
Pirojpur, (Division Office) |
| Development |
105/2004-2005/PRD- |
1-Jul-2005 |
15 Days |
Road Embankment |
LRP020 |
0 |
20 |
LRP020 |
200 |
20.2 |
Pirojpur, (Division Office) |
| Development |
179/2000-2001(Group No-14) |
1-Jul-2002 |
20 Days |
Carpeting |
LRP020 |
0 |
20 |
LRP020 |
21 |
20.021 |
Pirojpur, (Division Office) |
| Development |
26/PRD/2003-2004(Group No-02)) |
1-Feb-2004 |
5 Days |
Carpeting |
LRP020 |
0 |
20 |
LRP020 |
1000 |
21 |
Pirojpur, (Division Office) |
| Development |
57/2005-2006/RFQ(Lot No-01) |
10-May-2006 |
7 Days |
Carpeting |
LRP020 |
0 |
20 |
LRP020 |
24000 |
44 |
Pirojpur, (Division Office) |
| Development |
48/02-03/PRD |
20-Jun-2007 |
30 Days |
Carpeting |
LRP020 |
0 |
20 |
LRP020 |
1000 |
21 |
Pirojpur, (Division Office) |
| Development |
23/99-2000/PRD |
1-Jul-2002 |
50 Days |
Carpeting |
LRP020 |
1 |
20.001 |
LRP020 |
3 |
20.003 |
Pirojpur, (Division Office) |
| Development |
112/PRD/2001-2002(Group No-1) |
1-Jul-2002 |
20 Days |
Carpeting |
LRP020 |
2 |
20.002 |
LRP020 |
3 |
20.003 |
Pirojpur, (Division Office) |
| Development |
91/2002-2003/PRD(Group-4) |
1-Jul-2005 |
30 Days |
Road Embankment |
LRP020 |
4 |
20.004 |
LRP020 |
5 |
20.005 |
Pirojpur, (Division Office) |
| Development |
91/2002-2003/PRD()Group No-4 |
1-Jul-2002 |
30 Days |
Carpeting |
LRP020 |
4 |
20.004 |
LRP020 |
5 |
20.005 |
Pirojpur, (Division Office) |
| Development |
45/2000-2001/PRD(Group No-12) |
1-Jul-2002 |
20 Days |
Carpeting |
LRP020 |
5 |
20.005 |
LRP020 |
6 |
20.006 |
Pirojpur, (Division Office) |
| Development |
37/2003-2004/PRD(Group No-1) |
26-May-2004 |
30 Days |
Pavement |
LRP020 |
8 |
20.008 |
LRP020 |
9 |
20.009 |
Pirojpur, (Division Office) |
| Development |
36/2003-2004/PRD(Group No-1) |
24-May-2004 |
30 Days |
Carpeting |
LRP020 |
9 |
20.009 |
LRP020 |
10 |
20.01 |
Pirojpur, (Division Office) |
| Development |
79/PRD/2007-08. (Lot No.06) |
19-Jun-2008 |
45 Days |
Carpeting |
LRP020 |
21 |
20.021 |
LRP020 |
1603 |
21.603 |
Pirojpur, (Division Office) |
| Development |
74/PRD/2007-08 (Lot No.4) |
30-Apr-2008 |
45 Days |
Pavement |
LRP020 |
24 |
20.024 |
LRP020 |
550 |
20.55 |
Pirojpur, (Division Office) |
| Development |
75/PRD/2007-08. (Lot No.01) |
30-Apr-2008 |
120 Days |
Carpeting |
LRP020 |
25 |
20.025 |
LRP020 |
2820 |
22.82 |
Pirojpur, (Division Office) |
| Development |
12-PRD/2007-08. |
|
120 Days |
Carpeting |
LRP020 |
25 |
20.025 |
LRP020 |
2790 |
22.79 |
Pirojpur, (Division Office) |
| Revenue |
91/2010-2011/PRD (05) |
19-Apr-2011 |
45 Days |
Road Embankment |
LRP001 |
19500 |
20.505 |
LRP001 |
22500 |
23.505 |
Pirojpur, (Division Office) |
| Development |
30/2005-2006/PRD (Group No.-02) |
13-Jul-2010 |
60 Days |
Pavement |
LRP001 |
19500 |
20.505 |
LRP001 |
28500 |
29.505 |
Pirojpur, (Division Office) |
| Development |
06-2000-2001-PRD(Group No-11) |
1-Jul-2002 |
25 Days |
Road Embankment |
LRP020 |
1000 |
21 |
LRP020 |
2000 |
22 |
Pirojpur, (Division Office) |
| Development |
57/2010-2011/PRD (Lot No.-14) |
6-Feb-2011 |
30 Days |
Road Embankment |
LRP001 |
20000 |
21.005 |
LRP001 |
21000 |
22.005 |
Pirojpur, (Division Office) |
| Revenue |
22/2011-2012/PRD (08) |
21-Nov-2011 |
15 Days |
Pavement |
LRP001 |
20000 |
21.005 |
LRP001 |
30000 |
31.005 |
Pirojpur, (Division Office) |
| Development |
12/2009-2010/PRD |
22-Dec-2009 |
120 Days |
Carpeting |
LRP001 |
20000 |
21.005 |
LRP001 |
22800 |
23.805 |
Pirojpur, (Division Office) |
| Development |
80/2009-2010/PRD (Lot No.-08) |
7-Jun-2010 |
10 Days |
Pavement |
LRP001 |
20000 |
21.005 |
LRP001 |
23000 |
24.005 |
Pirojpur, (Division Office) |
| Revenue |
17/PRD/2012-2013 (04) |
12-Dec-2012 |
30 Days |
Road Embankment |
LRP001 |
20000 |
21.005 |
LRP001 |
20500 |
21.505 |
Pirojpur, (Division Office) |
| Development |
43/2009-2010/PRD (Lot No.-13) |
21-Apr-2010 |
15 Days |
Road Embankment |
LRP001 |
20000 |
21.005 |
LRP001 |
21000 |
22.005 |
Pirojpur, (Division Office) |
| Development |
12/2009-2010 |
22-Dec-2009 |
120 Days |
Pavement |
LRP001 |
20500 |
21.505 |
LRP001 |
22500 |
23.505 |
Pirojpur, (Division Office) |
| Development |
16/2010-2011/PRD (01) |
31-Oct-2010 |
426 Days |
Pavement |
LRP001 |
20500 |
21.505 |
LRP001 |
30000 |
31.005 |
Pirojpur, (Division Office) |
| Development |
13/RFQ/2006-2007 (Lot-01) |
9-Jul-2007 |
7 Days |
Road Embankment |
LRP020 |
2000 |
22 |
LRP020 |
3000 |
23 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
53/2009-2010/PRD(Lot No-01) |
29-Apr-2010 |
15 Days |
Road Embankment |
LRP001 |
21000 |
22.005 |
LRP001 |
27000 |
28.005 |
Pirojpur, (Division Office) |
| Revenue |
43/2004-05/PRD |
9-Jul-2008 |
60 Days |
Carpeting |
LRP001 |
21000 |
22.005 |
LRP001 |
38000 |
39.005 |
Pirojpur, (Division Office) |
| Development |
29/2010-2011/PRD (15) |
26-Dec-2010 |
30 Days |
Carpeting |
LRP001 |
21700 |
22.705 |
LRP001 |
27150 |
28.155 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
33/2007/2008/RFQ(5) (Lot-2) |
6-Nov-2007 |
7 Days |
Road Embankment |
LRP020 |
3000 |
23 |
LRP020 |
7000 |
27 |
Pirojpur, (Division Office) |
| Development |
RFQ/14/PRD/2006-2007(Lot-02) |
9-Jul-2007 |
7 Days |
Road Embankment |
LRP020 |
3000 |
23 |
LRP020 |
4000 |
24 |
Pirojpur, (Division Office) |
| Development |
28/2009-2010/PRD (Lot No.-1) |
16-Mar-2010 |
45 Days |
Pavement |
LRP001 |
22000 |
23.005 |
LRP001 |
22800 |
23.805 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
13/RFQ/2007-2008 (Lot No-5 (five) |
25-Nov-2007 |
7 Days |
Pavement |
LRP020 |
4000 |
24 |
LRP020 |
5000 |
25 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
34/2007-2008/RFQ(Lot-05).. |
25-Nov-2007 |
7 Days |
Pavement |
LRP020 |
4000 |
24 |
LRP020 |
5000 |
25 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
72/2001-02/PRD |
15-Oct-2006 |
30 Days |
Pavement |
LRP020 |
4000 |
24 |
LRP020 |
5000 |
25 |
Pirojpur, (Division Office) |
| Development |
68/RFQ/PRD/2007-08 |
21-Apr-2008 |
7 Days |
Pavement |
LRP001 |
23000 |
24.005 |
LRP001 |
23100 |
24.105 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
34/2007/2008/RFQ(5) (Lot-3) |
6-Nov-2007 |
7 Days |
Road Embankment |
LRP020 |
5000 |
25 |
LRP020 |
9000 |
29 |
Pirojpur, (Division Office) |
| Development |
320/99-2000/PRD(Group N0-2) |
20-Jun-2007 |
30 Days |
Carpeting |
LRP020 |
5000 |
25 |
LRP020 |
6000 |
26 |
Pirojpur, (Division Office) |
| Development |
53/2003-2004/PRD(Group No-02) |
1-Jul-2005 |
30 Days |
Pavement |
LRP020 |
5000 |
25 |
LRP020 |
12000 |
32 |
Pirojpur, (Division Office) |
| Revenue Periodic Roads |
19/RFQ/2007-2008 |
14-Nov-2007 |
7 Days |
Pavement |
LRP020 |
5000 |
25 |
LRP020 |
11000 |
31 |
Pirojpur, (Division Office) |
| Revenue |
10/2012-2013/PRD (05) |
8-Nov-2012 |
60 Days |
Pavement |
LRP001 |
24000 |
25.005 |
LRP001 |
25000 |
26.005 |
Pirojpur, (Division Office) |
| Development |
e-GP/14/ZR/BZ/2015-2016. |
28-Mar-2016 |
458 Days |
Pavement |
LRP001 |
24000 |
25.005 |
LRPE |
0 |
47.86 |
Pirojpur, (Division Office) |
| Development |
121/PRD/2010-11 (08) |
12-May-2011 |
30 Days |
Road Embankment |
LRP001 |
24245 |
25.25 |
LRP001 |
24821 |
25.826 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/22/PRD/2018-19 (W.O-1350) |
20-Jun-2019 |
15 Days |
Pavement |
LRP026 |
0 |
25.85 |
LRP027 |
0 |
26.9 |
Pirojpur, (Division Office) |
| Revenue |
13/BRC/2010-2011(CW-P-4) |
10-May-2011 |
417 Days |
Pavement |
LRP001 |
25300 |
26.305 |
LRP001 |
27400 |
28.405 |
Pirojpur, (Division Office) |
| Development |
79/2010-2011/PRD (04) |
8-Mar-2011 |
45 Days |
Pavement |
LRP001 |
25400 |
26.405 |
LRP001 |
25990 |
26.995 |
Pirojpur, (Division Office) |
| Development |
39/2003-2004/PRD(Group No-2) |
26-May-2004 |
35 Days |
Pavement |
LRP020 |
7000 |
27 |
LRP020 |
8000 |
28 |
Pirojpur, (Division Office) |
| Development |
39-2003-2004/PRD(Group No-2) |
26-May-2004 |
35 Days |
Pavement |
LRP020 |
7000 |
27 |
LRP020 |
8000 |
28 |
Pirojpur, (Division Office) |
| Revenue |
12/PRD/2013-2014 |
11-Feb-2014 |
60 Days |
Pavement |
LRP001 |
26000 |
27.005 |
LRP001 |
26800 |
27.805 |
Pirojpur, (Division Office) |
| Development |
92/2010-2011/PRD (Lot No.-03) |
23-Feb-2011 |
45 Days |
Pavement |
LRP001 |
26000 |
27.005 |
LRP001 |
27700 |
28.705 |
Pirojpur, (Division Office) |
| Development |
86/PRD/2007-08. (Lot No.1) |
7-May-2008 |
30 Days |
Road Embankment |
LRP020 |
7500 |
27.5 |
LRP020 |
8200 |
28.2 |
Pirojpur, (Division Office) |
| Development |
72/2010-2011/PRD (Lot No.-03) |
23-Feb-2011 |
45 Days |
Pavement |
LRP001 |
26500 |
27.505 |
LRP001 |
27500 |
28.505 |
Pirojpur, (Division Office) |
| Revenue |
e-GP 10/PRD/2014-2015. |
26-Apr-2015 |
28 Days |
Pavement |
LRP028 |
0 |
27.7 |
LRP031 |
0 |
30.74 |
Pirojpur, (Division Office) |
| Development |
84/2010-2011/PRD (06) |
24-Mar-2011 |
45 Days |
Pavement |
LRP001 |
26880 |
27.885 |
LRP001 |
27000 |
28.005 |
Pirojpur, (Division Office) |
| Development |
11/PRD/2010-2011 (02) |
7-Oct-2010 |
45 Days |
Carpeting |
LRP001 |
27000 |
28.005 |
LRP001 |
28000 |
29.005 |
Pirojpur, (Division Office) |
| Development |
40/2010-2011/PRD (Lot No.-06 |
3-Jan-2011 |
20 Days |
Pavement |
LRP001 |
27000 |
28.005 |
LRP001 |
28500 |
29.505 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/25/PRD/2018-19 (W.O-1379) |
23-Jun-2019 |
10 Days |
Road Embankment |
LRP029 |
0 |
28.7 |
LRP029 |
300 |
29 |
Pirojpur, (Division Office) |
| Revenue |
40/PRD/2008-2009 (Lot-01) |
24-May-2009 |
30 Days |
Pavement |
LRP001 |
28000 |
29.005 |
LRP001 |
29900 |
30.905 |
Pirojpur, (Division Office) |
| Development |
07/PRD/2010-2011 (Package No.04) |
5-Oct-2010 |
45 Days |
Pavement |
LRP001 |
28000 |
29.005 |
LRP001 |
29000 |
30.005 |
Pirojpur, (Division Office) |
| Revenue |
19/e-GP/PRD/2015-2016 |
6-Jan-2016 |
30 Days |
Road Embankment |
LRP030 |
0 |
29.7 |
LRP030 |
500 |
30.2 |
Pirojpur, (Division Office) |
| Development |
57/1999-2000/PRD(Group-18) |
13-Jul-2005 |
25 Days |
Road Embankment |
LRP020 |
10000 |
30 |
LRP020 |
11000 |
31 |
Pirojpur, (Division Office) |
| Development |
37/PRD/2010-2011( Lot No.-07) |
31-Dec-2010 |
30 Days |
Pavement |
LRP001 |
29500 |
30.505 |
LRP001 |
30100 |
31.105 |
Pirojpur, (Division Office) |
| Development |
89/PRD/2006-2007 |
17-Jun-2007 |
45 Days |
Road Embankment |
LRP020 |
11000 |
31 |
LRP020 |
12000 |
32 |
Pirojpur, (Division Office) |
| Development |
67/PRD/2010-2011 (Lot No.-05) |
13-Feb-2011 |
30 Days |
Pavement |
LRP001 |
30000 |
31.005 |
LRP001 |
31000 |
32.005 |
Pirojpur, (Division Office) |
| Development |
31/2003-2004/PRD(Group No-03) |
13-Jul-2005 |
20 Days |
Carpeting |
LRP020 |
12000 |
32 |
LRP020 |
13000 |
33 |
Pirojpur, (Division Office) |
| Development |
301/PRD2000-2001(Group No-05) |
30-Jul-2005 |
20 Days |
Pavement |
LRP020 |
13000 |
33 |
LRP020 |
14000 |
34 |
Pirojpur, (Division Office) |
| Revenue |
23/PRD/2016-2017 |
5-Jun-2017 |
25 Days |
Road Embankment |
LRP034 |
0 |
33.73 |
LRP034 |
330 |
34.06 |
Pirojpur, (Division Office) |
| Development |
33/2003-2004/PRD(Group-5) |
19-Jul-2005 |
20 Days |
Pavement |
LRP020 |
14000 |
34 |
LRP020 |
15000 |
35 |
Pirojpur, (Division Office) |
| Development |
32/PRD/2003-2004()Group No-4) |
13-Jul-2005 |
20 Days |
Carpeting |
LRP020 |
14000 |
34 |
LRP020 |
15000 |
35 |
Pirojpur, (Division Office) |
| Revenue |
RFQ/03/PRD/2017-2018. |
22-Oct-2017 |
10 Days |
Road Embankment |
LRP039 |
0 |
38.78 |
LRP039 |
300 |
39.08 |
Pirojpur, (Division Office) |
| Revenue |
e-GP 22/PRD/2014-2015. |
9-Jun-2015 |
16 Days |
Pavement |
LRP039 |
0 |
38.78 |
LRP039 |
2000 |
40.78 |
Pirojpur, (Division Office) |
| Development |
142/2001-2002/PRD(Group No-15) |
6-Jul-2005 |
15 Days |
Road Rehablitation |
LRP020 |
20000 |
40 |
LRP020 |
25000 |
45 |
Pirojpur, (Division Office) |
| Development |
53/2004-2005/PRD |
1-Jul-2005 |
45 Days |
Carpeting |
LRP020 |
22000 |
42 |
LRP020 |
23000 |
43 |
Pirojpur, (Division Office) |
| Development |
12/2006-2007/PRD |
5-Oct-2006 |
90 Days |
Pavement |
LRP020 |
22000 |
42 |
LRP020 |
22900 |
42.9 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/17/PRD/2018-19 (1189) |
30-May-2019 |
15 Days |
Pavement |
LRP001 |
41000 |
42.005 |
LRP001 |
41500 |
42.505 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/10/PRD/2020-2021(ID-509750)(W.O-2487) |
23-Dec-2020 |
45 Days |
Pavement |
LRP001 |
42000 |
43.005 |
LRP001 |
42900 |
43.905 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/18/PRD/2018-19 (W.O-1190) |
30-May-2019 |
15 Days |
Pavement |
LRP044 |
0 |
43.22 |
LRP044 |
500 |
43.72 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/11/PRD/2020-2021(ID-509751)(W.O-2431) |
20-Dec-2020 |
45 Days |
Pavement |
LRP001 |
43100 |
44.105 |
LRP001 |
43500 |
44.505 |
Pirojpur, (Division Office) |
| Development |
31/PRD/2006-2007 |
19-Dec-2006 |
30 Days |
Road Embankment |
LRP020 |
28000 |
48 |
LRP020 |
29000 |
49 |
Pirojpur, (Division Office) |
| Revenue |
e-GP/19/PRD/2018-19 (W.O-1191) |
30-May-2019 |
15 Days |
Pavement |
LRP044 |
6000 |
49.22 |
LRP044 |
6500 |
49.72 |
Pirojpur, (Division Office) |